HomeMy WebLinkAboutSYMBIOS LOGIC PUD - PRELIMINARY - 5-94E - CORRESPONDENCE - SUPPORTING DOCUMENTATIONr�
U
June 10, 1996
Steve Olt
City of Fort Collins -Community Development
281 N. College Ave.
Fort Collins, CO 80524
RE: Symbios Logic P.U.D.
Dear Steve,
design
LANDSCAPE ARCHITECTURE
URBAN DESIGN
PLANNING
BHA DESIGN, INC.
2000 VERMONT
FT. COLLINS, CO 80525
TEL 303 223-7577
Per our earlier conversation, I am sending four copies of the Shadow Analysis and the Point- FAX 303 226-3855
by -Point lighting analysis (prepared by Merit Electric) for the Symbios Logic P.U.D.
This is how we computed the shadows:
1. Based on 40 degrees north latitude, shadows falling on December 21 at 9:00am,
noon, and 3:00pm, the area of the shadow will range from 45 degrees west of north to
• 45 degrees east of north. The length of the shadow is computed at 3.4 time the height
of the building.
2. The hypothetical 25-foot high wall at the north property line will throw a shadow 85
feet to the north (3.4 x 25'-0").
3. The 45-foot-high, three story portions of the building throw shadows 153 feet
northwest, north, and northeast of the building (3.4 x 45'-0").
4. The 30-foot-high, two story portions of the building throw shadows 102 feet
northwest, north, and northeast of the building (3.4 x 30'-0").
If you prefer, I can submit a 24 x 36 shadow analysis on June 17th along with the additional
plans, renderings, and PMT's.
Please give me a call if you need anything else.
Thank You,
r
Roger B. Sherman, ASLA
No Text