June 5, 1996
Steve Olt
City Planner
City of Fort Collins Planning
281 N. College Ave.
Fort Collins, CO. 80522
RE: Symbios ODP/PDP resubmittal
Dear Steve,
Attached are the required copies for resubmittal of the Symbios ODP and PDP.
Engineering documents are being submitted separately by RBD Engineering.
Outlined below I have summarized our response to staff comments. The response
numbers correspond with the numbers on your letter dated May 17, 1996. Of
course we would be happy to get together with you and engineering to discuss any
specific items.
City Item Comment
Number
ODP
1. Will do
2. A note has been added to the ODP indicating that buffering will
be provided if dissimilar land uses are to de developed adjacent to
the north end of the property.
3. RBD has spoken with Ward Stanford with the City, and with Tess
at CDOT. Additionally we have asked our traffic engineer, Matt
Delich to evaluate the proposed access point as currently shown.
Both the City and CDOT have indicated they do not have an issue
with the location as proposed. Matt Delich has indicated the
proposed access point will work better because it is centrally
located between CR 9 and Corbett Dr. The currently approved
access plan would increase congestion at Corbett.
4. The Corbett Dr. entry into English ranch has been realigned to the
originally proposed entry point that is on the approved English
Ranch ODP. Addtionally, we will be contacting the neighbors
that have indicated concerns to try and be sure they are aware of
the modification.
5. No response required
C�CtiI �Il
LANDSCAPE ARCHITECTURE
URBAN DESIGN
PLANNING
BHA DESIGN, INC.
2000 VERMONT
FT. COLLINS, CO 80525
TEL 303 223-7577
FAX 303 226-3855
• 0
design
Symbios ODP/PDP
Revised drawing submittal
Page 2
6.A. Addressed in item I above.
6B. Your staff letter indicates that we are proposing a temporary
access. No temporary accesses are proposed. The only temporary
aspect of circulation has been the proposal that we would use the
County Road 9 access as a full turn movement for this first phase
of development of the ODP. Our proposal is that the CR9 full
turn movement be reduced to a right -in right -out at the time the
first fabrication plant is constructed. Because Corbett Dr. will be
constructed with the second office building we anticipate Corbett
will accommodate the additional traffic load for the second office
building.
6C. No temporary accesses are planned.
PDP
1,2 & 3 Easements will be provided for U S West, PSCo and TCI.
Symbios does not currently wish to have TCI serve this building.
If future service is desired they will work directly with TCI to wire
the building.
4. Parking lots will be illuminated sufficiently for security. In
addition, security cameras will be mounted on buildings for
surveillance of parking areas.
5. Lighting will match the adjacent lighting at Hewlett Packard. The
lighting will be a high cutoff shoebox fixture on a 25' height pole.
The illumination source will be high pressure sodium. We will
also be providing supplemental walkway lighting. A separate
lighting plan is being submitted by Merit Electric.
6. Poudre Fire Authority access will be provided via a 30' drive that
comes within 20' of the building. The access is being provided
through the service drive on the north side of the building. The
service drive will be constructed to accommodate the loading
requirements of the fire department.
7.A Done
7B. Done
0 0
design
Symbios ODP/PDP
Revised drawing submittal
Page 3
7C. The focal point is unknown at this point. It may be deferred to a
future phase. We have indicated an envelope including horizontal
and vertical dimensions. The intent is that this would likely be a
sculpture.
7D. 18 foot stalls are employee spaces. Visitor stalls are 20' in depth
7E. A shadow analysis is being prepared and will be submitted by
RNL by the end of the week.
8. Building Department comments regarding fire resistance ratings
will be addressed at the time of final.
9. Done
10. Will comply at time of Final
11. We would rather not provide trees spaced at 40' O.C. along CR9.
To provide these trees would create a different image for the street
edge than is currently provided by HP. Since HP has an image
already established that is widely recognized as one of the best in
the community it seems appropriate that we complement their
already high standard of landscaping.
12. 1. Addressed in item 6B. And 6C. above
2. Will provide Harmony easement. The 9' easement along
Corbett will be provided at the time Corbett is developed with a
future phase.
3. Addressed in item 3 above
4. Additional bike lanes are being provided and are shown. This
was indicated as a requirement by Kathleen Reavis rather than a
request as stated in engineering staff comments.
5. Site accel and decel lanes have been added.
PLAT
1. Addressed in item 6B and 6C
2. To be addressed at final
design
Symbios ODP/PDP
Revised drawing submittal
Page 4
3. Already being provided
13. Addressed in item 1. Above
14. Done
15. Same as item 14
16. Addressed in item 12 above
17. Addressed in item 7E.
18. Everitt Companies is following up on this item.
19. Accel and decel lanes, as well as bike lanes have been included in
plan. RBD is currently working to determine the ultimate ROW
width for westbound ROW. This final width will be addressed
final.
Please let me know how we can be of further assistance. I look forward to hearing
from you soon.
Sincerely,
bha design inc. by
;uI
ce A. Hen e, ASLA
Principal
cc: Stuart MacMillan, Everitt
Don Rott, Symbios
Dick Anderson, RNL