HomeMy WebLinkAboutTHE QUARRY BY WATERMARK - PDP200019 - SUBMITTAL DOCUMENTS - ROUND 3 - SUPPLEMENTAL INFORMATION (2)S
S
UDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDMH
S
HY DSSSS
XXXXTOP OF BANK CANAL
IMPORTATION
CHANNEL
EDGE OF
WETLAND
CITY OF FORT COLLINS
100-YR FLOODWAY
EXISTING CONNECTION TO
SPRING CREEK TRAIL
WALLENBERG
DRIVE
LOT LINE
CITY OF FORT COLLINS
100-YR FLOODPLAIN
CONNECTION TO
EXISTING WALK
8'-0"
EXISTING CONNECTION
FROM LANDMARK TO
SPRING CREEK TRAIL
FEMA 100-YR HIGH
RISK FLOOD FRINGE
10'-0" WALLENBERG
SPUR TRAIL & MAJOR
WALKWAY SPINE
6'-6" EXISTING CONNECTING
WALKWAY TO LANDMARK
APARTMENTS
6'-0" CONNECTING
WALKWAY TO HOBBIT
STREET
7'-10" EXISTING
CONNECTING WALKWAY TO
WALLENBERG DRIVE
INTERIM WALKWAY
DRAIN PAN
EXISTING WALK ALONG
WALLENBERG DRIVE
EXISTING BRIDGE TO REMAIN UNTIL PARKS BUILDS
NEW BRIDGE (SEE NOTE ULTIMATE PLAN BELOW)
PROPERTY BOUNDARY
PUBLIC ACCESS AND
TRAIL EASEMENT
~1.3%
SLOPE
S
S
UDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDMH
S
HY DSSSS
XXXXTOP OF BANK
CANAL
IMPORTATION
CHANNEL
EDGE OF
WETLAND
CITY OF FORT COLLINS
100-YR FLOODWAY
EXISTING CONNECTION TO
SPRING CREEK TRAIL
WALLENBERG
DRIVE
LOT LINE
NEW BRIDGE
CITY OF FORT COLLINS
100-YR FLOODPLAIN
BRIDGE ABUTMENTS LOCATED OUTSIDE
OF THE CITY OF FORT COLLINS
100-YR FLOODWAY
FEMA 100-YR HIGH
RISK FLOOD FRINGE
10'-0" WALLENBERG
SPUR TRAIL & MAJOR
WALKWAY SPINE
6'-11" EXISTING
CONNECTING WALKWAY TO
LANDMARK APARTMENTS
6'-0"
CONNECTING
WALKWAY TO
HOBBIT STREET
8'-0" CONNECTING WALKWAY
TO WALLENBERG DRIVE
FINAL WALKWAY LOCAITON
(REGRADED TO MEET
LOCATION OF NEW BRIDGE)
CONNECT TO EXISTING WALK
(REGRADING FOR ADA ACCESSIBLE SLOPE)
6'-6" LANDMARK AND HOBBIT
STREET SPUR TRAIL
EXISTING WALK ALONG
WALLENBERG DRIVE
CONNECT TO EXISTING WALK
(REGRADING FOR ADA ACCESSIBLE SLOPE)
PROPERTY BOUNDARY
PUBLIC ACCESS AND
TRAIL EASEMENT
DRAWING NUMBER:
ISSUED
PROJECT No.:
DRAWN BY:
REVIEWED BY:
SEAL:
PREPARED BY:
No.DESCRIPTION DATE
REVISIONS
No.DESCRIPTION DATE
Plotted By: Andrew Papke-Larson Layout: Trail Connection ITERMIN Exhibit Printed On: 5/4/2021 2:02 PM File Name: Trail Connection Exhibit.dwgORIGINAL SIZE 24X36
ENTI
T
L
E
M
E
N
T
DRA
WI
N
G
S
NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
419 Canyon Ave. Suite 200 Fort Collins, CO 80521
phone 970.224.5828 | fax 970.225.6657 | www.ripleydesigninc.com
RIPLEY DESIGN INC.
Russell Lee
419 Canyon Ave. Suite 200
Fort Collins, CO 80521
p. 970.224.5828
f. 970.225.6657
THOMPSON THRIFT
Jessica Tuttle
111 Monument Circle, Suite 1500
Indianapolis, IN 46204
p. 317. 853. 5459
ENGINEER
PLANNER
NORTHERN ENGINEERING
Danny Weber
301 N. Howes Street, Suite 100
Fort COllins, CO 80521
p. 970.221.6789
APPLICANT
TRAIL CONNECTION
EXHIBIT
PROJECT
DEVELOPMENT PLAN
THE QUARRY
05.05.2021PDP SUBMITTAL03
03.03.2021PDP SUBMITTAL02
11.10.2020PDP SUBMITTAL01
FORT COLLINS, CO
RL
APL
R20-040
1
NORTH
INTERIM PLAN
0 2.5 05 10
SCALE: 1"=5'-0"
ULTIMATE PLAN
THIS PLAN IS FOR INFROMATION ONLY. IT IS TO SHOW THE VIABILITY OFT HE NEW BRIDGE.
THE NEW BRIDGE WIL BE DESIGNED AND BUILT BY THE FORT COLLINS PARKS
DEPARTMENT WHEN FUNDS BECOME AVAILABLE. THE DEVELOPER WILL PROVIDE A CASH
IN LIEU PAYMENT FOR THE COST OF REPLACING THE EXISTING BRIDGE.