Loading...
HomeMy WebLinkAboutTHE QUARRY BY WATERMARK - PDP200019 - SUBMITTAL DOCUMENTS - ROUND 3 - SUPPLEMENTAL INFORMATION (2)S S UDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDMH S HY DSSSS XXXXTOP OF BANK CANAL IMPORTATION CHANNEL EDGE OF WETLAND CITY OF FORT COLLINS 100-YR FLOODWAY EXISTING CONNECTION TO SPRING CREEK TRAIL WALLENBERG DRIVE LOT LINE CITY OF FORT COLLINS 100-YR FLOODPLAIN CONNECTION TO EXISTING WALK 8'-0" EXISTING CONNECTION FROM LANDMARK TO SPRING CREEK TRAIL FEMA 100-YR HIGH RISK FLOOD FRINGE 10'-0" WALLENBERG SPUR TRAIL & MAJOR WALKWAY SPINE 6'-6" EXISTING CONNECTING WALKWAY TO LANDMARK APARTMENTS 6'-0" CONNECTING WALKWAY TO HOBBIT STREET 7'-10" EXISTING CONNECTING WALKWAY TO WALLENBERG DRIVE INTERIM WALKWAY DRAIN PAN EXISTING WALK ALONG WALLENBERG DRIVE EXISTING BRIDGE TO REMAIN UNTIL PARKS BUILDS NEW BRIDGE (SEE NOTE ULTIMATE PLAN BELOW) PROPERTY BOUNDARY PUBLIC ACCESS AND TRAIL EASEMENT ~1.3% SLOPE S S UDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDMH S HY DSSSS XXXXTOP OF BANK CANAL IMPORTATION CHANNEL EDGE OF WETLAND CITY OF FORT COLLINS 100-YR FLOODWAY EXISTING CONNECTION TO SPRING CREEK TRAIL WALLENBERG DRIVE LOT LINE NEW BRIDGE CITY OF FORT COLLINS 100-YR FLOODPLAIN BRIDGE ABUTMENTS LOCATED OUTSIDE OF THE CITY OF FORT COLLINS 100-YR FLOODWAY FEMA 100-YR HIGH RISK FLOOD FRINGE 10'-0" WALLENBERG SPUR TRAIL & MAJOR WALKWAY SPINE 6'-11" EXISTING CONNECTING WALKWAY TO LANDMARK APARTMENTS 6'-0" CONNECTING WALKWAY TO HOBBIT STREET 8'-0" CONNECTING WALKWAY TO WALLENBERG DRIVE FINAL WALKWAY LOCAITON (REGRADED TO MEET LOCATION OF NEW BRIDGE) CONNECT TO EXISTING WALK (REGRADING FOR ADA ACCESSIBLE SLOPE) 6'-6" LANDMARK AND HOBBIT STREET SPUR TRAIL EXISTING WALK ALONG WALLENBERG DRIVE CONNECT TO EXISTING WALK (REGRADING FOR ADA ACCESSIBLE SLOPE) PROPERTY BOUNDARY PUBLIC ACCESS AND TRAIL EASEMENT DRAWING NUMBER: ISSUED PROJECT No.: DRAWN BY: REVIEWED BY: SEAL: PREPARED BY: No.DESCRIPTION DATE REVISIONS No.DESCRIPTION DATE Plotted By: Andrew Papke-Larson Layout: Trail Connection ITERMIN Exhibit Printed On: 5/4/2021 2:02 PM File Name: Trail Connection Exhibit.dwgORIGINAL SIZE 24X36 ENTI T L E M E N T DRA WI N G S NOT F O R CON S T R U C TI O N 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 phone 970.224.5828 | fax 970.225.6657 | www.ripleydesigninc.com RIPLEY DESIGN INC. Russell Lee 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 p. 970.224.5828 f. 970.225.6657 THOMPSON THRIFT Jessica Tuttle 111 Monument Circle, Suite 1500 Indianapolis, IN 46204 p. 317. 853. 5459 ENGINEER PLANNER NORTHERN ENGINEERING Danny Weber 301 N. Howes Street, Suite 100 Fort COllins, CO 80521 p. 970.221.6789 APPLICANT TRAIL CONNECTION EXHIBIT PROJECT DEVELOPMENT PLAN THE QUARRY 05.05.2021PDP SUBMITTAL03 03.03.2021PDP SUBMITTAL02 11.10.2020PDP SUBMITTAL01 FORT COLLINS, CO RL APL R20-040 1 NORTH INTERIM PLAN 0 2.5 05 10 SCALE: 1"=5'-0" ULTIMATE PLAN THIS PLAN IS FOR INFROMATION ONLY. IT IS TO SHOW THE VIABILITY OFT HE NEW BRIDGE. THE NEW BRIDGE WIL BE DESIGNED AND BUILT BY THE FORT COLLINS PARKS DEPARTMENT WHEN FUNDS BECOME AVAILABLE. THE DEVELOPER WILL PROVIDE A CASH IN LIEU PAYMENT FOR THE COST OF REPLACING THE EXISTING BRIDGE.