HomeMy WebLinkAboutVERIZON FTC PARKWOOD TELECOMMUNICATIONS FACILITY - FDP180012 - PLANS - APPLICANT COMMUNICATIONTransmittal
301 N. Howes, Suite 100, Fort Collins, CO 80521
Page 1 of 2
PROJECT:2025 Sharp Point Drive - Lots 13
& 14 Prospect Industrial Park
1179-003
DATE:4/15/2021
SUBJECT:Sharp Point Drive Subdivision
final quick check
TRANSMITTAL ID:00007
PURPOSE:For your approval VIA:Info Exchange
FROM
NAME COMPANY EMAIL PHONE
Adam Boese
301 N. Howes, Suite 100
Fort Collins, CO 80521 Northern Engineering adam@northernengineering.c
om 970-568-5402
TO
NAME COMPANY EMAIL PHONE
Dan Mogen City of Fort Collins
Utilities dmogen@fcgov.com (970) 224-6192
REMARKS:Dan,
Please follow the link to download the Utility, Landscape and Drainage
Report for Sharp Point Drive final quick check.
Note that the imperviousness was slightly higher than previous drainage
reports stated and we are proposing a way to attenuate the peak 100-yr
flow released from the site down to the allowable rate.
Please let me know if you have any questions.
Thanks,
Adam Boese, PE
Project Engineer
301 N. Howes Street, Suite 100 | Fort Collins, CO 80521
D: 970.568.5402
O: 970.221.4158
northernengineering.com
Improving quality of life in our communities.
Transmittal
DATE:4/15/2021
TRANSMITTAL ID:00007
Page 2 of 2
DESCRIPTION OF CONTENTS
QTY DATED TITLE NOTES
1 3/26/2021 2025 Sharp Point 03-25-21.pdf
1 3/26/2021 2025 SHARP POINT DRIVE - DLC - ROUND FOUR
COMMENTS- WGA RESPONSE.docx
1 3/26/2021 2025 Sharp Point Tree Removal Feasibility.doc
1 4/14/2021 Sharp Point Drive Minor Amendment Drainage Report
04-14-2021.pdf
1 4/14/2021 Sharp Point Drive Minor Amendment Utility Plans.pdf
COPIES:
Todd Sullivan
Adam Boese (Northern Engineering)