Loading...
HomeMy WebLinkAboutVERIZON FTC PARKWOOD TELECOMMUNICATIONS FACILITY - FDP180012 - PLANS - APPLICANT COMMUNICATIONTransmittal 301 N. Howes, Suite 100, Fort Collins, CO 80521 Page 1 of 2 PROJECT:2025 Sharp Point Drive - Lots 13 & 14 Prospect Industrial Park 1179-003 DATE:4/15/2021 SUBJECT:Sharp Point Drive Subdivision final quick check TRANSMITTAL ID:00007 PURPOSE:For your approval VIA:Info Exchange FROM NAME COMPANY EMAIL PHONE Adam Boese 301 N. Howes, Suite 100 Fort Collins, CO 80521 Northern Engineering adam@northernengineering.c om 970-568-5402 TO NAME COMPANY EMAIL PHONE Dan Mogen City of Fort Collins Utilities dmogen@fcgov.com (970) 224-6192 REMARKS:Dan, Please follow the link to download the Utility, Landscape and Drainage Report for Sharp Point Drive final quick check. Note that the imperviousness was slightly higher than previous drainage reports stated and we are proposing a way to attenuate the peak 100-yr flow released from the site down to the allowable rate. Please let me know if you have any questions. Thanks, Adam Boese, PE Project Engineer 301 N. Howes Street, Suite 100 | Fort Collins, CO 80521 D: 970.568.5402 O: 970.221.4158 northernengineering.com Improving quality of life in our communities. Transmittal DATE:4/15/2021 TRANSMITTAL ID:00007 Page 2 of 2 DESCRIPTION OF CONTENTS QTY DATED TITLE NOTES 1 3/26/2021 2025 Sharp Point 03-25-21.pdf 1 3/26/2021 2025 SHARP POINT DRIVE - DLC - ROUND FOUR COMMENTS- WGA RESPONSE.docx 1 3/26/2021 2025 Sharp Point Tree Removal Feasibility.doc 1 4/14/2021 Sharp Point Drive Minor Amendment Drainage Report 04-14-2021.pdf 1 4/14/2021 Sharp Point Drive Minor Amendment Utility Plans.pdf COPIES: Todd Sullivan Adam Boese (Northern Engineering)