HomeMy WebLinkAboutHARMONY SCHOOL SHOPS 5TH FILING, BEING A REPLAT OF LOTS FOUR, FIVE, SIX AND SEVEN OF THE 4TH FILING - PDP - 42-89K - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW (3)CornAity Planning and Environmentservices
Current Planning
City of Fort Collins
October 31, 2005
Mr. Dillon Tidwell
Hunt Douglas Real Estate Services
1112 Oakridge Drive
Fort Collins, CO 80525
Dear Mr. Tidwell:
For your information, attached is a copy of the Staff's comments for the Walgreens
Drug Store at Lots 3 and 4 of Harmony School Shops which was presented before
the Conceptual Review Team on October 24, 2005.
The comments are offered by staff to assist you in preparing the detailed components of
the project application. Modifications and additions to these comments may be made at
the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the
review process, please feel free to call me at 970-221-6750.
Sincerely,
Ted Shepard
Chief Planner
CC' Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
ITEM: Walgreens Drug Store & Drive -Through at Harmony School Shops
MEETING DATE: October 24, 20052
APPLICANT: Mr. Dillon Tidwell, Hunt -Douglas Real Estate Services, 1112
Oakridge Drive, Fort Collins, CO 80525.
LAND USE DATA: Request for a 14,500 square foot retail drug store, with
double drive -through lanes, located on an 8,800 square foot pad (Lots 3 and 4) within
the Harmony School Shops shopping center at the northeast corner of Timberline and
Harmony Roads.
COMMENTS:
The site is zoned H-C, Harmony Corridor. Harmony School Shops is classified
as a Community Shopping Center within the Harmony Corridor. Retail stores are
permitted. An 80-foot setback is required along Harmony Road. The parking
ratio will not be calculated on this one project. Rather, parking is governed on an
overall basis for the entire shopping center which cannot exceed five spaces per
1,000 square feet of gross leasable area. Please coordinate with the overall
developer to ensure that the proposed number of spaces for Walgreens does not
put the entire center in jeopardy of exceeding five spaces per 1,000 square feet.
2. There are prairie dogs on the subject site and the abutting parcel to the east.
The prairie dogs must be removed or eradicated in a humane manner. All sites in the
immediate vicinity that have prairie dogs should be treated at the same time otherwise,
the prairie dogs will simply move. If removal and relocation is the option, please note
that the vacuum method is not allowed. There is a possibility that the Black Ferret
Center at Meadow Springs Ranch may be accepting relocated prairie dogs. Please
contact Doug Moore, Natural Resources Planner, at 221-6750 for further information.
3. Please provide bicycle parking near the front entrance. A five foot walk is
preferred along the private drive but Transportation Planning understands the
desire to install shade trees in this area as well. For further information, please
contact David Averill, Transportation Planner, at 416-2643.
4. The site will be served by the Poudre Fire Authority. They will require that a fire
hydrant be within 300 feet of the building capable of delivering a minimum of
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT
1,500 gallons per minute at 20 p.s.i. The address must be visible from Harmony
Road. An automatic fire extinguishing system is required. The most remote
exterior portion of the buildings must not be more than 150 feet from the
designated fire access lane. Designated fire lanes must feature curbs painted
red and "No Parking — Fire Lane" signs. Fire lanes must feature a minimum of 25
feet inside and 50 feet outside turning radii. For further information, please
contact Ron Gonzales, 221-6570.
5. The site will be served by the City's Light and Power Utility. Three-phase power
is available from an existing vault along Harmony Road west of the site. A
Commercial One ("C-1 ") form will be required to be completed by an electrical
contractor to determine entrance capacity. The transformer must be within ten
feet of hard surface. Please note that since the site is located within the
Harmony Corridor, the transformer must be screened from view from Harmony
Road. The screening will likely need to be a solid enclosure meeting the
clearance specifications of Light and Power. The screening materials must
match the predominant building field material and color. If electrical and gas
meters are visible from Harmony Road, they must screened as well. For further
information regarding electrical service, please contact Monica Moore, 221-6700.
6. This site is in the Fox Meadows drainage basin where the new development fee
is $6,468.00/acre which is subject to the runoff coefficient reduction. This fee is
to be paid at the time the building permit is issued. The fee may change as City
Council is considering a new city wide drainage fee instead of the present fee
which is based on a specific drainage basin.
7. A drainage and erosion control report and construction plans are required and
they must be prepared by a Professional Engineer registered in Colorado. The
report could be a letter report verifying compliance with the approved drainage
study. If additional storm sewer is desired to tie in roof drains and facilitate better
parking lot drainage, construction plans for them are required.
8. There are certain portions of the overall fourth filing that would need to be
constructed as part of developing this portion of the site. One of them would be
the storm sewer proposed from the borrow ditch along Harmony to the detention
pond. A developer to the east is considering draining through this site to the
north, so there could be a possible cost sharing of the storm sewer.
9. Onsite detention is required with a 2-year historic release rate for water quantity
and extended detention is required for water quality treatment. The detention
pond was re -sized using present rainfall criteria; however it is not built yet so as
this site develops the pond would need to be expanded to meet the new design.
The other option is to size an interim pond and build it. The outlet for the pond
has been modified but only includes the water quality capture volume sizing for
the third filing. Therefore the outlet structure as shown for the fourth filing should
be built with this project or again, an interim outlet structure could be designed to
CJ
•
add the water quality capture volume for just this site. For further information,
please contact Glen Schlueter, 221-6700.
10. There is an existing 16-inch water main along the north edge of Harmony, an 8-
inch water main, and an 8-inch sewer main in the private drive area shown on the
previous development plan. Also, there is an 8-inch water in the north -south
drive west of the site.
11. The existing water main and sanitary sewer in the east -west drive will have to be
relocated due to the conflict with the proposed building and site improvements.
12. The water conservation standards for landscape and irrigation will apply to the
project. Development fees and water rights will be due at time of building permit.
For further information regarding water and sewer services, please contact Roger
Buffington, 221-6700.
13. The new building will be assessed both the Larimer County Road Impact Fee
and the City's Street Oversizing Fee. The exact fee will depend on the land use
and trip generation rate. These fees are payable at the time of building permit
issuance. Keep in mind fees are adjusted annually. For further information,
please contact Matt Baker, 221-6605.
14. The Transportation Impact Study will have to be updated and amended
accordingly. The Study should address the circulation and stacking pattern for
the double drive -through lanes. Please check with Eric Bracke, 221-6630, to
determine the scope of the T.I.S.
15. A replat of the existing plat would be required.
16. You are encouraged to research the existing Development Agreement for
Harmony School Shops. The extent and timing of the required public
improvements are detailed. If there is to be any changes to construction
sequence of public improvements as required by the D.A., then it must be
amended accordingly by all the affected parties, including the overall developer,
if necessary.
17. One of the key public improvements is the "channelized tee" median and turn
lanes to be built in Timberline Road at Milestone Drive. The T.I.S. should
address whether this improvement is required with Walgreens as a stand-alone
project that precedes the balance of the center.
18. Bicycle and pedestrian connectivity to the east is very important in order to link
the shopping center with the Harmony Mobile Home Park. The property to the
east is expected to develop in the near future. Both projects should coordinate
how best to locate and construct a bicycle and pedestrian path that links the
residential neighborhood with the two commercial sites. Please contact Mr. Gino
Campana at Bellisimo Inc., 229-5900, developer of the abutting parcel to the east
for further information.
19. Please note that access from Harmony School Shops must be provided to the
signalized intersection of Harmony and Snow Mesa Drive. This improvement will
be required of the development that is first to proceed. Again, please contact
Bellisimo Inc. regarding this access.
20. The Utility Phasing Plan for Harmony School Shops will have to be amended.
This may require a utility coordination meeting so the installation sequence for
Walgreens does not negatively impact the utility installation for the balance of the
center.
21. The private drive that connects the center to Milestone Drive will have to be
constructed with the Walgreens phase.
22. If there are existing overhead utility lines, then these lines must either be placed
underground or provisions for placing underground must be secured.
23. The center is required to demonstrate a unified architectural theme. This may
require modification of the standard national Walgreens prototype as stated in
Section 3.5.3(D) of the Land Use Code. As mentioned previously, close
coordination with the overall developer will be required to logically meet this
standard.
24. The proposed double drive -through lanes appear superfluous. Casual
observation of similar stores indicates that these drive -through lanes are used
infrequently and there is rarely any stacking like that associated with restaurants.
Unlike restaurants which experience heavy usage at certain times, there is no
similar pattern associated with a retail drugstore. Unless documentation can be
provided as to the need for two drive -through lanes, Staff recommends that one
lane be eliminated, thus minimizing the auto -related character of the project.
Such documentation may be part of the Transportation Impact Study.
25. Be sure that the trash enclosure is of sufficient size to hold containers for
recyclable materials as well as the trash dumpster.