Loading...
HomeMy WebLinkAboutBLOCK 23 MORNINGSTAR - FDP200027 - SUBMITTAL DOCUMENTS - ROUND 4 - EROSION CONTROL LETTER/REPORTProject Number:1204-004 Location:Fort Collins, CO Date:February 10, 2021 Total Acres:3.29 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price L.F.- $1.50 $0.00 Construction Fence w/Rock Sock L.F.1,661 $4.50 $7,474.50 each 10 $75.00 $750.00 Wattle Dike Inlet Protection each - $100.00 $0.00 each - $75.00 $0.00 Wattle Dike Swale Protection each - $100.00 $0.00 each 1 $300.00 $300.00 each - $150.00 $0.00 each 1 $200.00 $200.00 each 6 $75.00 $450.00 L.F.- $1.00 $0.00 per hour 20 $60.00 $1,200.00 Sub-Total:$10,374.50 1.5 x Sub-Total:$15,561.75 Amount of security:$15,561.75 Total Acres x $1325/acre:$4,359.25 Sub-Total:$4,359.25 1.5 x Sub-Total:$6,538.88 Cost to Re-seed:$6,538.88 Minimum escrow amount:$3,000.00 Erosion Control Escrow:$15,561.75 NOTE: 'Total Acres' represents total disturbed area. Vehicle Tracking Control Pads Option 2 | Cost to Re-seed Disturbed acreage Option 3 | Miniumum Escrow Amount Final Escrow Amount Sediment Trap Concrete Washout Area Rock Sock Sawcutting Pollution Prevention Street Sweeping and Cleaning Option 1 | BMP Costs Morningstar / Block 23 Erosion Control Cost Estimate Silt Fencing Inlet Protection Wattle Dike Curb Side Check Dam