Loading...
HomeMy WebLinkAboutHARMONY SCHOOL SHOPS PUD, SECOND FILING - FINAL - 42-89G - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSMay 1, 1997 Ted Shepard Senior Planner City of Fort Collins Planning Department P.O. Box 580 Fort Collins, CO 80522 Dear Ted; Cho urban design, inc. 3555 stanford road, suite 105 fort collins, colorado 80525 (970) 226-4074 FAX (970) 226-4196 Attached are five prints of the Harmony School Shops Second Filing PUD Plans, revised in response to the April 16th, Staff Comments. Specific responses include: The Sear Brown Group is completing the requested plat revisions. 2. The utility and landscape plans have been coordinated as requested. 3. The necessary PSCo easements are included on the plat. 7. The bike lane has been revised as requested, although we remain somewhat concerned about the change in design from the Harmony Road Bicycle Project: Concept Plan. 8, 9. A pedestrian circulation plan was included with the approved Preliminary PUD for Harmony SchoolShops; and the proposed final is consistent with that plan. The proposed plan includes walkways that are located and aligned to connect areas of pedestrian origin and destination, while the additional walk suggested by the Staff Comments is more the result of the outline of the parking lot configuration, does not provide direct pedestrian access to planned destinations, and is redundant to the two - more functional - planned parallel east -west walkways. The 11' landscaped median separating the angled parking area in front of the proposed anchor from the main circulation drive is important in our attempt to keep more of a "street" scale in these areas. To sacrifice half this landscaped area to a walkway directing pedestrians to the middle of a large parking area is not desirable. We have added another minor pedestrian crossing to provide a third connection between the building proposed in the second filing, and the future pad sites. 14, 15. Manufacturer's information regarding the proposed light fixtures is attached; light pole locations have been added to the site and landscape plans; and restrictions to the lighting level in the north parking area have been noted. It is estimated that the level of lighting in this area will be about .5 foot candle. urban design, inc. 16. Additional details regarding the combination berm and screen wall have been added to the plans. 17. The 80' buffer along Harmony Road is planned to be installed with the adjacent co-anchor (Anchor 'A' on the Preliminary), or phased with the individual pad sites; which ever comes first. 18-22. The requested landscape revisions have been made. 23. The requested cross-section, and an enlarged detail of the berm/screen wall have been added. 24-25. As we discussed on Monday, Vaught#rye has addressed the "big box" architectural criteria. The quantity of additional articulation requested by staff has been added, although not precisely in the locations that would be dictated by a strict interpretation of the standards. Because of the pattern of the architectural design theme - and because of the higher visibility to the public - some of the additional architectural features have been placed on the south elevation rather than on the east. The "tulip" block detail used on the Harmony School and on Diamond Shamrock, and some of the distinctive brick patterns from the school, have been included in the architectural design for the second filing. Any pallet storage and/or cardboard bundle storage is to be handled within the building. As was indicated on the Preliminary PUD, the "Central Features and Community Spaces" planned at Harmony School Shops comprise two vendor plazas. One will be constructed with the Second Filing, and the other with the future co- anchor. An enlarged detail of the plaza has been added to our plans. 26. We have added the proposed service/truck circulation routes to the pedestrian circulation plan for the center. We understand that City Engineering and Sear Brown have agreed on a cross section for Harmony Road that is nearly the same as was established with the first filing. We will make any needed minor adjustments to Harmony Road as illustrated on the site plan prior to filing. Ten sets of prints, reductions, and color renderings will be submitted by May 12th as required. o urban design, inc. We appreciate your assistance in the planning of this project. Please call if you need further information regarding Harmony School Shops. Sincerely, Eldon Ward, President Cityscape Urban Design, Inc. cc: Verniece Thomas, P. B. Roche Development Joe Frye, Vaught#rye Architects Stan Whitaker, L.G.T. Real Estate Advisors Stan Myers, The Sear -Brown Group