Loading...
HomeMy WebLinkAboutMULBERRY & GREENFIELDS - PUD MASTER PLAN - ODP210002 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTAugust 31, 2018 2 PUD Development Application Submittal Checklist DRAFT COPY Planned Unit Development (PUD) Complete Submittal Checklist Project Name: _______________________________________________________________________ Applicant Name: _____________________________________________________________________ Office Use Only: Project Type: _______ Project Number (if assigned): ______________ New Submittal  Revision Review Round ___ Submittal Date: ________ Staff Review Meeting Date: _________ Staff Coordinator: _____________________________ All checklist items are required unless city staff indicates an item is (W)aived, (D)eferred, (N)ot Applicable or already (R)eceived. This checklist must be reviewed, completed and accepted by staff prior to project routing. Additional information may be requested from the applicant during the review process if necessary to address specific issues that arise. Please note that all application materials, once submitted, become a matter of public record. Paper Copies: Staff Code Applicant Validation Item Description Submittal Requirement Resources ☐One paper copy of this checklist, completed and signed by applicant Development Review Coordination staff 970- 221-6689 One paper copy is required (with the initial submittal only) for the following: Planning Submittal Package, PUD subdivision plat, Civil Construction Plans. Plan sets shall be provided at full scale (24” x 36”) Development Review Coordination staff 970- 221-6689 ☐One signed paper copy of Development Application Form Application Form.pdf ☐One signed paper copy of Transportation Development Review (TDR) Application and Fee TDR Fees and Application.pdf Contact Engineering at 221-6605 for TDR fee information ☐Check for the above application forms payable to the “City of Fort Collins” (fees may be consolidated into one check) Development Review Coordination staff 970- 221-6689 Mulberry - PUD Master Plan Patrick McMeekin X X X X X No paper copies as confirmed by Staff on 4/7/21. All items under this heading provided digitally. August 31, 2018 3 PUD Development Application Submittal Checklist Electronic Copies: All copies must be provided on a flash drive or CD. Additionally: One paper copy is required (with the initial submittal only) for the following: Planning Submittal Package, PUD subdivision plat, Civil Construction Plans. Plan sets shall be provided at full scale (24” x 36”) 1)General Information: Staff Code Applicant Validation Item Description Submittal Requirement Resources ☐Affected Property Owner (APO) Notification List (following the notification boundary provided by city staff) Development Review Coordination staff 970- 221-6689 DRCoord@fcgov.com☐Conceptual Review (CR) or Preliminary Development Review (PDR) comment response letter; or for resubmittals include a comment response letter from the prior round of review ☐Project Information and Design Narrative (see Submittal Requirements, Section C) 2)Planning Submittal Package: Staff Code Applicant Validation Item Description Submittal Requirement Resources ☐Title Block information on all plan sheets ☐PUD Cover Page, including: ☐a.Title Block ☐b.PUD Land Use Table ☐c.Sheet Index ☐d.Signature Blocks ☐e.PUD Site Plan Notes ☐f.PUD Site Location Map ☐g.PUD Legal Description ☐PUD Overlay Map PUD Master Plan Context Diagram(s), Overall Site Plan and Detailed Site Plan Sheets (as necessary) ☐PUD Design Narrative N/A X x x x x x x x x x x x x August 31, 2018 4 PUD Development Application Submittal Checklist ☐ PUD Master Plan Standards A description of proposed PUD Master Plan design standards, in booklet form or incorporated into plan sheets. See detailed description of requirements included in the notes below). 3)PUD Subdivision Plat: Staff Code Applicant Validation Item Description Submittal Requirement Resources ☐ An overall PUD subdivision plat of the site at an appropriate scale on one or more sheets, with outer dimensions printable at 24" x 36" and appurtenant documents prepared according to the requirements described in the submittal requirements. The plat must conform to the subdivision requirements of the City, except as waived by the approved project development plan for the development. Final Plan review and subdivision plat approval, and complete execution, together with all necessary certifications, shall be required before filing of the subdivision plat or issuance of building permits. LUC Division 3.3 – Engineering Standards 4)Civil Construction Plans: Staff Code Applicant Validation Item Description Submittal Requirement Resources ☐Overall Drainage Plan Utility Plans Checklist.pdf City Contact: Development Review Coordination staff 970- 221-6689 ☐Overall Utility Plan ☐Overall Street Plan, including horizontal alignment and centerline profiles for public streets, with references to any proposed PUD standards 5)Preliminary PUD Overall Drainage Report: Staff Code Applicant Validation Item Description Submittal Requirement Resources ☐Detention Requirements and Calculations Stormwater Criteria Manual Resource Page Stormwater Criteria Manual Appendices: A.Required Submittal Content B.Stormwater Facilities Landscape Standards C.LID Implementation D.Erosion Control Guidance ☐Offsite Flows (if applicable) ☐Floodplain Zone (if applicable) ☐Hydraulic Calculations x n/a x x x x x x x August 31, 2018 5 PUD Development Application Submittal Checklist ☐Detention Basin Calculations E.Erosion Control Construction Measures Fact Sheets F.Erosion Control Construction Measures Standard Notes City Utilities: Development Forms, Guidelines & Regulations City Contact: Development Review Coordination staff 970- 221-6689 ☐Standard Water Quality and LID Calculations ☐Include Drainage Plan or Exhibit in the report 6)Reports and Supporting Documents: Staff Code Applicant Validation Item Description Submittal Requirement Resources Meeting Date: ____ Building Services: (ITEM REQUIRED WITH INITIAL SUBMITTAL ONLY) Confirmation of completed Pre-Submittal Code Review Meeting with Building Services, required for all new construction projects (except individual single family detached residences and tenant finishes). For questions, or to schedule this meeting call 970-416-2748. Please Note: Building Permits will not be reviewed until Development Plan review process is completed Building Codes and Standards Building Permit Fees ☐ Traffic Operations: PUD Overall Transportation Impact Study (TIS) or waiver indicated from Traffic Operations staff (waiver indication to be provided with initial submittal) Traffic Operations Resource Page City Contact: Traffic Operations 970-221-6630 D ☐Development Review Engineering: a)Soils Report – in conformance with the Larimer County Urban Area Street Standards Larimer County Urban Area Street Standards D ☐b)Subsurface Hydrologic Study D ☐ c)Signed letters of intent (required before scheduling PUD hearing) from impacted off-site property owner(s) indicating generating agreement and that all required off-site easement and off-site rights-of-way can be finalized in conjunction with the final development plan submittal City Contact: Engineering Development Review 970-221-6605 W ☐d)Draft legal descriptions for accompanying deeds of dedication by separate document Easement and Right-of- Way Dedication Process W ☐e)Draft legal descriptions for accompanying easement vacation request by separate document Vacation of Easements Process ☐a)Engineering or Utility Variance Requests (City review and approval required prior to scheduling hearing, may Larimer County Urban Area Street Standards x x x x n/a n/a n/a n/a x x