HomeMy WebLinkAboutErosion Control OPC_Sam's Club Fuel_Rd4CEI Engineering Associates, Inc. Date: 12/17/2020
7543 N. Ingram Ave., Suite 107 Project: Sam's Club Fuel
Fresno, CA 93711 4700 Boardwalk Drive
(559) 447-3119 Fort Collins, Colorado
Project No: 31493
Engineer's Opinion of Probable Cost
Erosion Control Estimate
Quantity Unit Unit Cost Total
Erosion Control Items:
Inlet Protection 2 Each $250.00 $500.00
Big Red 888 LF $1.50 $1,332.00
Construction Exit 1 Each $2,500.00 $2,500.00
Concrete Washout 1 Each $250.00 $250.00
Material Laydown & Removed Dirt
Storage Area 3850 SF $1.50 $5,775.00
Construction Fence 930 LF $12.00 $11,160.00
Sub-total $21,517.00
ESC Measures (1.5x)$32,275.50
CEI Confidential Earthwork Costs Page 1