Loading...
HomeMy WebLinkAboutErosion Control OPC_Sam's Club Fuel_Rd4CEI Engineering Associates, Inc. Date: 12/17/2020 7543 N. Ingram Ave., Suite 107 Project: Sam's Club Fuel Fresno, CA 93711 4700 Boardwalk Drive (559) 447-3119 Fort Collins, Colorado Project No: 31493 Engineer's Opinion of Probable Cost Erosion Control Estimate Quantity Unit Unit Cost Total Erosion Control Items: Inlet Protection 2 Each $250.00 $500.00 Big Red 888 LF $1.50 $1,332.00 Construction Exit 1 Each $2,500.00 $2,500.00 Concrete Washout 1 Each $250.00 $250.00 Material Laydown & Removed Dirt Storage Area 3850 SF $1.50 $5,775.00 Construction Fence 930 LF $12.00 $11,160.00 Sub-total $21,517.00 ESC Measures (1.5x)$32,275.50 CEI Confidential Earthwork Costs Page 1