Loading...
HomeMy WebLinkAboutTIMBERLINE FARMS PUD, DIAMOND SHAMROCK CORNERSTORE - PRELIMINARY - 42-89C - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTi 1 I Goodson & Associates, Inc. Consulting Engineers GEOTECHNICAL ENGINEERING STUDY DIAMOND SHAMROCK CONVENIENCE STORE AND SERVICE STATION SOUTHEAST CORNER OF TIMBERLINE ROAD AND MILESTONE DRIVE FORT COLLINS, LARIMER COUNTY, COLORADO ' JUNE 31 1994 I (62446.01) GEOTECHNICAL ENGINEERING STUDY DIAMOND SHAMROCK CONVENIENCE STORE AND SERVICE STATION SOUTHEAST CORNER OF TIMBERLINE ROAD AND MILESTONE DRIVE FORT COLLINS, LARIMER COUNTY, COLORADO Prepared for DIAMOND SHAMROCK 520 East 56th Avenue Denver, Colorado 80216 a GOODSON & ASSOCIATES, INC. 11949 West Colfax Avenue Lakewood, Colorado 80215 (62446.01) Prepared byDate O Ir Michelle Richards, I.T. io�Q Reviewed by�4 �om+,`'�0`J0.,0,,A0�1,. naFc0,60�.,p�u�9ai•. ; no ! p 26061 O.-Dale David A. Field, P.E. VA. TABLE OF CONTENTS Page Summary............................................. 1 Scope of Study ......................................... 2 Field Investigation ....................................... 2 Laboratory Testing ...................................... 3 Proposed Construction ................................... 3 Site Conditions ......................................... 4 Foundation Recommendations ............................. 4 Floor Slab Construction ................................... 7 Surface Grading ........................................ 8 Buried Tanks .......................................... 9 Cement.............................................. 9 Pavement Design ....................................... 9 Miscellaneous ......................................... 11 LIST OF TABLES AND FIGURES Figure 1 - Site Plan Figure 2 - Boring Logs Figure 3 - Legend and Notes for Boring Logs Figure 4 - Gradation Analysis Figure 5 - Swell -Consolidation Test Results Figure 6 - Design Nomograph for Rigid Pavement Figure 7 - Design Nomograph for Flexible Pavement Table 1 - Summary of Laboratory Test Results SUMMARY 1) The subsurface conditions at the site are somewhat variable. Our borings encountered 18 to 24 feet of slightly sandy to very sandy clays above a firm to medium hard sandstone/claystone in Boring 1 and a clayey gravelly sand in Boring 2. The maximum depth explored was 31 feet. Groundwater was encountered in both borings at depths ranging from 20 to 24 feet at the time of drilling. 2) In our opinion, the structure should be founded on footings placed below frost depth (30 inches) on the natural soil materials and/or properly compacted structural fill. The footings would be designed using a maximum allowable soil bearing pressure of 2,500 psf. 3) Floor slabs may be supported on -grade as discussed in the text of this report. 4) Concrete and asphalt pavement designs are provided in the text of this report. 5) A representative of our firm should observe the construction operations discussed in this report. 1