Planning Department
Citv of Fort Collins
January 10, 1995
Mr. David Jones
Galloway, Romero
14202 East Evans
Aurora, CO 80014
Dear David:
& Associates
Avenue
Staff has reviewed the request for Diamond Shamrock Cornerstore at
Timberline Farms Preliminary P.U.D. and offers the following
comments:
Part One
1. U.S. West cautions that telephone facilities sufficient to
serve this project may not be presently available. The owner
is responsible for provision of all conduit, ditch, and street
crossings for telephone facilities within the project, and the
owner provides terminal room space and power for the main
terminal usually within a janitorial area or utility room.
The owner's vendor provides all facilities beyond the main
terminal. Please contact U.S. West for conduit specifications
for the main telephone entrance cable. Also, U.S. West will
require a 10 foot utility easement along both the north and
west property lines of this development.
2. Public Service Company will require a nine foot wide utility
easement for gas lines along the south right-of-way line of
Milestone Drive. Trees must be kept four feet from gas lines.
3. The City Stormwater Utility is concerned that there is no
design of offsite conveyance facilities from the subject site
to the ultimate outfall in the Sunstone/Timberline Farms
development. Supporting documentation is needed to show that
streets and other conveyance facilities downstream can
accommodate storm flows from this site.
4. No undetained runoff will be allowed from Timberline Farms.
All storm flows must be properly detained and detention pond
volumes must be verified. When calculating runoff for this
project, please include Timberline Road out to its planned
future centerline. Doing so will revise the runoff
coefficient and increase your undetained flows. Further
comments from Stormwater Utility are attached.
281 North Colle-e Avenue • P.O. Box '580 Fort Collins, CO S0522-0580 • (303) 221-b7O
FAX ( 03) 221-0378 TDD (303) 224-6002
5. The right -in access off Timberline is not a right -out. More
design work is needed on this access point such as geometrics,
design speed, taper length, and impacts due to the irrigation
ditch. As yet, it is not clear whether the length of the
decel lane and the radius will accommodate the design speed.
6. Dedication for Timberline Road to the full "major arterial"
standard is required at this time. Also, the full width of
Milestone must be dedicated. Such dedications can be made on
the Final Plat.
7. Proposed grades on Milestone are too flat on the south gutter
(0.2%). Grades must be a minimum of 0.4%. Please redesign
accordingly.
8. Final plans for construction of Timberline and Milestone must
be done with the Final P.U.D. and Final Plat.
9. On the north, the full width of Milestone should be built to
the limits of the easterly property line. The City will
assist in writing a "Payback Agreement" so Diamond Shamrock
will be reimbursed by adjacent developers for the full
construction.
10. On the south and east, the two internal private drive aisles
that will serve the balance of the center should be
constructed to their full width to the limits of the property
lines. Since these are private streets, any "Payback
Agreement" must be negotiated between the private parties.
The City is not involved in these discussions.
11. The site should be accessible to persons with disabilities in
accordance with Uniform Building Code Section 3103 and UBC
Appendix Section 3106. Please provide designated and marked
accessible routes between building and the public way, and
between building and accessible parking. Parking signs must
be in accordance with UBC Appendix Section 3107.
12. A fire hydrant must be installed with 400 feet of the
structure. Hydrant must be capable of delivering 1,000
gallons per minute with 20 psi residual pressure. All
portions of the structures must be within 150 feet of an
approved fire access roadway.
Part Two
13. A review of the submitted Auto Related and Roadside Commercial
Point Chart of the L.D.G.S. reveals that points were taken for
the property having at least one -sixth of its property
boundary contiguous to existing urban development (criterion
h). Such is not the case. The L.D.G.S. defines "existing
development" as:
"... any subdivision in the City which has been approved and
recorded once all engineering improvements (water, sewer,
streets, curbs, gutters, streetlights, fire hydrants, and
storm drainage) are installed and completed."
Since there is no approved and recorded subdivision with all
engineering improvements located adjacent to the subject property,
points cannot be earned.
14. The Planning Department is also concerned about how the one
acre parcel fits into the overall center. Criterion b. on the
Auto Related and Roadside Commercial point chart asks:
"b. Is the project contiguous to and functionally a part of
an existing neighborhood or community/regional shopping
center, office, or industrial park?"
The operative concept in this criterion is that the larger
center be "existing." As you are aware, the center is not
existing. Therefore, points cannot be earned for this
criterion.
15. This presents a problem. If points for subtracted for not
meeting these two criteria, then the project earns only 22 raw
points for a score of 41%. This is below the required minimum
of 50%. As such, variance would have to be granted by the
Planning and Zoning Board to allow a Preliminary P.U.D. on a
one acre parcel that precedes the overall shopping center
development.
A variance could possibly be supported if the 18 acre center
is submitted in some form to illustrate how the one acre
parcel fits into its surroundings as part of a planned center.
Such an exercise may give the Planning and Zoning Board the
comfort level needed to grant a variance. Otherwise, the
Board may feel the Cornerstore is premature and represents
"leap frog" development.
16. Staff is concerned about how the Cornerstore will
architecturally blend with the future shopping center. Some
of the work done by the Harmony Corridor Task Force emphasized
the need to establish a commercial character that reflects the
values of the area. With the red brick on the existing,
historic Harmony School, Staff suggests that the Cornerstore
pick up this theme and consider red brick rather than the
synthetic stucco as the primary building exterior material.
From Staff s perspective, the Diamond Shamrock Cornerstore at
Oak Ridge Business Park seems more reflective of the character
of the area than the stucco. The balance of the shopping
center will be set further back from Harmony and Timberline
while the Cornerstore and the Harmony School share an
immediate proximity with both arterials.
17. Canopy columns should be clad in matching brick.
18. Staff recommends that the roof material be carefully
reconsidered to blend in with the red brick theme and also to
complement the nearby residential neighborhoods.
19. A white canopy will not be allowed as this is considered too
bright, mechanistic, and in sharp contrast to red brick. It
is suggested that the "buckskin" color, as specified for Oak
Ridge Business Park, be considered as this would be softer,
more residential, and more compatible with brick.
20. Lighting proved to be a big concern with the surrounding
neighbors. The P.U.D. should include a detail that the
parking lot light fixtures be 16 feet high, use high pressure
sodium lamps, and feature down -directional, sharp -cut off
luminaries.
21. Similarly, the lighting under the canopy should be specified
to be fully recessed into the underside of the canopy deck so
that only one lense surface is exposed.
22. With the orientation of the gas pumps, there will be headlight
glare facing Timberline Road. To mitigate, berms should be
placed along Timberline Road so that headlight glare does not
spill onto a major arterial. Berms should be of sufficient
height to block headlights on a standard car. Evergreens
should be strategically placed for further mitigation.
23. A matching berm should also be placed on Milestone so that the
corner of Timberline and Milestone is "wrapped" by symmetrical
landscape treatment.
24. The landscape strip on the south property line scales only
four feet in width. This should be increased to at least six
feet to provide more depth and separation from the internal
drive aisle serving an 18 acre shopping center.
25. The City Forester will be providing comments in the near
future. We have data on high mortality rates in our local
climate for Newport Plum and Cistena Plum. We may be
suggesting other species that are hardier with future
correspondence.
26. On the site plan, the schematic of the monument sign looks
great. The sign appears attractive and at the right size.
However, signage is regulated by the Sign Code, not the P.U.D.
so the schematic should be removed. Location of signage
should remain. A note should be added that the sign pedestal
will be of a material to match the building.
27. On the site plan, there are references to two number 1130." In
the legend, the reference is for "pad -mounted transformer" but
the site plan also indicates future pump islands. Please
correct. (The location of the transformer looks unusual.
Would it not be better located next to a structure? Wherever
it ends up, please screen from public view.)
s
28. Please indicate bike racks. Racks should be permanently
anchored to concrete and not block pedestrian walks.
29. On the site plan, please provide a title in the lower right
corner of the sheet.
30. Please label the site plan 1 of 4, the landscape plan 2 of 4,
the architectural sheets 3 of 4 and 4 of 4.
This concludes Staff comments at this time. Additional comments
may be forthcoming as other departments re -review the request after
the moratorium period. As these comments become available, they
will be forwarded. Please note the following deadlines for the
February 27, 1995 Planning and Zoning Board meeting:
Plan revisions are due February 8, 1995.
P.M.T.'s, 10 prints, renderings are due Feb. 21, 1995.
As always, please call if there are any questions or concerns
regarding these comments, or to set up a meeting to discuss these
comments in depth.
Sincerely:
T
Ted Shepard
Senior Planner
xc: Kerrie Ashbeck, Civil Engineer