Loading...
HomeMy WebLinkAboutTIMBERLINE FARMS PUD, DIAMOND SHAMROCK CORNERSTORE - PRELIMINARY - 42-89C - CORRESPONDENCE - DRAINAGE REPORTGalloway, Romero & Associates Design Engineering Planning 14202 East Evans Avenue Aurora, CO 80014 (303) 745-7448 FAX: (303) 745-7480 October 4, 1995 Mr. Basil Hamdan City of Ft. Collins Stormwater Department 235 Mathews Ft. Collins, Co. 80522 Re: Diamond Shamrock Timberline Farms Cornerstore P.U.D. Dear Mr. Hamdan: Enclosed herewith please find three copies of the Drainage and Erosion Control Report for the above referenced project. There are two items not included in the report that were requested by you: 1. Easements for offsite drainage facilities: We have discussed these plans with the adjacent owner and acquiring easements should not be a problem; however, we would prefer to delay preparing these easements until we know the report is acceptable to the city and easement boundaries are more clearly defined. 2. Erosion control cost estimate: Recent Diamond Shamrock projects have cost $500.00 to $1,000.00 for erosion control measures in other areas of the state. One hundred fifty percent is $1,500.00 which exceeds $650.001acre (1.1 acres) . If you have any questions or comments, please feel free to call me at (303) 745-7448. Sincerely, Galloway, Romero & Associates D14IW6��(74- David L. Jones, P.E. cc: Mr. Ted Shepard Mr. Rick Gipson, Diamond Shamrock