HomeMy WebLinkAboutBANK OF COLORADO DRIVE-THRU AT W ELIZABETH - FDP210007 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORT (3)Project:Disturbed Acres: 0.17
EROSION CONTROL BMPs Units
Estimated
Quantity
Unit
Price
Total
Price
Sediment Control Log (SCL-2)L.F. 130 $8.00 $1,040.00
Block and Rock Sock Inlet Protection (IP-1, IP-3)EA 3 $250.00 $750.00
Rock Sock (RS-1)L.F. 12 $10.00 $120.00
Underground Storage System Protection L.S. 1 $1,500.00 $1,500.00
Stabilized Staging Area (SSA)EA 1 $3,000.00 $3,000.00
Concrete Washout Area (CWA)EA 1 $2,200.00 $2,200.00
EA 1 $2,350.00 $2,350.00
Sub-Total: $10,960.00
1.5 x Sub-Total: $16,440.00
Amount of security: $16,440.00
Total Acres x Price/acre: $1,530.00
$9,000.00 Sub-Total: $1,530.00
1.5 x Sub-Total: $2,295.00
Amount to Re-seed: $2,295.00
Minimum escrow amount: $3,000.00
Erosion Control Escrow:$16,440.00
Fields in yellow should be amended for this project.
“The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to
re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In
no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for
commercial development”
(add all other BMPs for the site in this list)
Final Escrow Amount
Example Erosion and Sediment Control Escrow/Security
Calculation for The City of Fort Collins
BMP Amount
Vehicle Tracking Control (VTC-1)
Reseeding Amount
Miniumum Escrow Amount
Bank of Colorado - Elizabeth
Unit Price of Seeding per acre:
3/23/2021 12:35 PM https://safebuilt.sharepoint.com/sites/IW-Windsor/Shared Documents/Projects/2020/1443-067-00 (BOC Elizabeth)/Design/Erosion Control/3-22-21 Erosion Control Escrow.xls