HomeMy WebLinkAboutKING SOOPERS #146, MIDTOWN GARDENS MARKETPLACE - FDP210001 - DOCUMENT MARKUPS - ROUND 2 - DRAINAGE REPORT
PREPARED FOR:
Dillon Companies/King Soopers, Inc.
55 Tejon Street
Denver, Colorado 80223
Phone: (303) 778-3053
PREPARED BY:
Galloway & Company, Inc.
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
DATE:
February 3, 2021
REVISED:
NA
MIDTOWN GARDENS MARKETPLACE
KING SOOPERS STORE #146
Fort Collins, Colorado
FINAL DRAINAGE REPORT
Galloway & Company, Inc. Page 2 of 19
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884 • GallowayUS.com
FINAL DRAINAGE REPORT
Midtown Gardens Marketplace
King Soopers Store #146
Legal Description
Lots 1, 2, and 4 of K-Mart Plaza, and all of Lot 2 of the extension of K-Mart Plaza, situated in the
Southeast 1/4 of Section 23, Township 7 North, Range 69 West, of the 6th Principle Meridian, City
of Fort Collins, County of Larimar, State of Colorado.
Preparation Date
February 3, 2021
Revised Date
NA
Prepared for
Dillon Companies/King Soopers, Inc.
55 Tejon Street
Denver, Colorado 80223
Phone: (303) 778-3053
Prepared by: Reviewed by:
________________________________________ ____________________________
Name Name
Midtown Gardens Marketplace
2/3/2021
Galloway & Company, Inc. Page 3 of 19
ENGINEER’S STATEMENT
I hereby attest that this report and plan for the final drainage design for Midtown Gardens Marketplace
was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins
Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume
liability for drainage facilities designed by others.
Phil Dalrymple, PE # 41171 Date
For and on behalf of Galloway & Company, Inc.
DEVELOPER’S CERTIFICATION
“King Soopers, Inc. hereby certifies that the drainage facilities for Midtown Gardens Marketplace shall be
constructed according to the design presented in this report. I understand that the City of Fort Collins
does not and will not assume liability for the drainage facilities designed and/or certified by my engineer
and that the City of Fort Collins review))s drainage plans pursuant to the Municipal Code; but cannot, on
behalf of Midtown Gardens Marketplace, guarantee that final drainage design review will absolve King
Soopers, Inc. and/or their successors and/or assigns of future liability for improper design.”
Authorized Signature Date
King Soopers, Inc.
Midtown Gardens Marketplace
2/3/2021
Galloway & Company, Inc. Page 4 of 19
I. General Location and Existing Information ................................................................................................ 5
Location ............................................................................................................................................ 5
Description of Property..................................................................................................................... 5
II. Master Drainage Basin Description .......................................................................................................... 5
Major Basin Description ................................................................................................................... 5
Sub- Basin Description..................................................................................................................... 6
III. Floodplain Information .............................................................................................................................. 6
IV. Project Description ................................................................................................................................... 6
V. Drainage Design Criteria .......................................................................................................................... 7
Regulations ...................................................................................................................................... 7
The Four Step Process (Low Impact Development) ........................................................................ 7
Development Criteria Reference and Constraints ........................................................................... 7
Hydrologic Criteria ............................................................................................................................ 8
Hydraulic Criteria .............................................................................................................................. 8
VI. Proposed Drainage Facilities ................................................................................................................... 9
General Concept .............................................................................................................................. 9
Specific Details ............................................................................................................................... 10
VII. Variance Requests ............................................................................................................................... 12
VIII. Erosion Control .................................................................................................................................... 12
Construction Material & Equipment ............................................................................................... 12
Maintenance ................................................................................................................................... 13
IX. Conclusions ........................................................................................................................................... 13
Compliance with Standards ........................................................................................................... 13
Variances ....................................................................................................................................... 13
Drainage Concept .......................................................................................................................... 13
VI. References ............................................................................................................................................ 14
VII. Appendices ........................................................................................................................................... 15
A. Exhibits & Figures ............................................................................................................... 15
B. Hydrologic Computations .................................................................................................... 15
C. Hydraulic Computations ...................................................................................................... 15
D. Drainage Maps .................................................................................................................... 15
TABLE OF CONTENTS
Midtown Gardens Marketplace
2/3/2021
Galloway & Company, Inc. Page 5 of 19
I. General Location and Existing Information
Location
Midtown Gardens Marketplace (hereafter referred to as “the site” or “project site”) will be located at
the northwest corner of South College Avenue and West Drake Road. It is bounded on north by an
existing commercial development; on the south by West Drake Road (including a Jiffy Lube and Loaf
‘N Jug to remain); on the east by College Avenue; and on the west by the MAX-BRT Bus Line.
Spring Creek is located north of the site. More specifically, the site is located in the Southeast Quarter
of Section 23, Township 7 North, Range 69 West in the City of Fort Collins, County of Larimer and
State of Colorado. Refer to Appendix A for a Vicinity Map.
Description of Property
The project site is approximately 11.34 acres, and consists of a currently vacant Kmart store, a small
retail building at the northeast corner of the site and small retail on the southeast corner of the site,
and an existing Loaf N’ Jug fueling station. Existing grades on the site range from one to four
percent, with historic runoff generally draining to the north and east across the site. There are no
major drainage ways passing through the project site.
According to the USDA NRCS Web Soil Survey, ‘Nunn Clay loam, 0 to 1 percent slopes’ covers the
entire project site. This soil is associated with Hydrologic Soil Group (HSG) ‘C’. HSG ‘C’ soils have a
slow infiltration rate when thoroughly wet and consist chiefly of soils having a layer that impedes the
downward movement of water or soils of moderately fine texture or fine texture. These soils have a
slow rate of water transmission. Refer to Appendix A for additional soils information.
The Midtown Gardens Marketplace will be developed in one phase and is approximately 11.34 acres.
The existing vacant Kmart building along with the vacant retail building at the northeast corner of the
site will be removed. A new King Soopers Marketplace will replace the Kmart, while a new King
Soopers fueling station will replace the vacant retail building. The existing parking lot will be
reconstructed to accommodate the new structures. The lot containing the Loaf N’ Jug will remain
vacant for future development but is included in this report in its developed condition.
During the water quality storm event, surface runoff will be collected into an underground storm drain
system through a series of inlets throughout the site through which it will be conveyed to an
underground water quality and detention facility located at the southeast corner of the site. During
the minor (i.e., 2-year) and major (i.e., 100-year) storm events, most of runoff volume generated in
excess of the water quality event will be detained and attenuated in the underground detention
system, and released into an existing storm drain system in College Avenue at a controlled release
rate. The remaining runoff generated will release undetained to College Avenue.
II. Master Drainage Basin Description
Major Basin Description
The project site is located in the Spring Creek drainage basin. According to the City of Fort Collins
website (http://www.fcgov.com/utilities/what-we-do/stormwater/drainage-basins/spring-creek-basin),
this basin “is a major watercourse that flow from Spring Canyon Dam at Horsetooth Reservoir to its
confluence with the Poudre River. The basin is dominated by residential development, but also
includes open space, parks, and isolated areas of commercial and industrial development.”
Midtown Gardens Marketplace
2/3/2021
Galloway & Company, Inc. Page 6 of 19
On-site detention storage is not required for the site because the site is mostly impervious and the
proposed development does not trigger detention requirements. While detention is not required, the
applicant has coordinated with the City to provide 100-year detention for approximately 2/3’s of the
proposed development to alleviate the impact to the downstream system. An Impervious Area Exhibit
is provided in Appendix D, which shows a net decrease in total impervious area form the existing to
proposed condition. Water quality for the site has been provided in accordance with the City of Fort
Collins LID requirements for the redeveloped portions of the site. A Water Quality and detention
structure has been sized for the redeveloped portions of the site in the form of an underground LID
basin, herein referred to as Pond A. Final calculations for the underground basin have been provided
in Appendix C.
Sub- Basin Description
The site historically drains north and east towards the adjacent commercial development and College
Avenue. There are several storm inlets along the northern property line and throughout the site which
collect runoff. These storm sewer mains ultimately drain to Spring Creek. At the request of Fort
Collins Stormwater Master Planning, the historic drainage pattern will be modified to convey flows
from the site to the existing storm drain system at the southeast corner of the site in College Ave and
flowing east along Princeton Road, rather than to the existing storm drain system on the adjacent
property to the north so long as detention is provided for any upstream tributary area which drains to
this new connection point. Minor flows will be conveyed off-site at the site boundaries, which is
consistent with the historic drainage pattern.
At the sub-basin level, no offsite runoff is anticipated to enter the site, with the exception of a small
amount of runoff at the southwest corner or the site coming from the MAX/BRT bus station, which is
currently tributary to the site. A portion of the site along W Drake Rd. and S College Ave. will drain
offsite, which is consistent with the current drainage pattern. The site has been broken into four
basins, each with their own set of sub-basins. A description of each basin and their characteristics
can be found later in the report.
There are no irrigation, reservoir, or other facilities that influence, or are influenced by, the local
drainage.
III. Floodplain Information
The project site is shown on FEMA Map Number 08069C0987G (refer to Appendix A for FEMA
Firmette). This map shows that the project is not impacted by an existing floodplain/floodway. Refer to
Appendix A for a copy of the Firmette.
IV. Project Description
The Midtown Gardens Marketplace will be developed in one phase and is approximately 11.34 acres.
The existing vacant Kmart building along with the vacant retail building at the northeast corner of the
site will be removed. A new King Soopers Marketplace will replace the Kmart, while a new King
Soopers fueling station will replace the vacant retail building. The existing parking lot will be
reconstructed to accommodate the new structures. The lot containing the Loaf N’ Jug will remain
vacant for future development but is included in this report in its developed condition.
Midtown Gardens Marketplace
2/3/2021
Galloway & Company, Inc. Page 7 of 19
V. Drainage Design Criteria
Regulations
This final drainage design presented herein is prepared in accordance with the Fort Collins
Stormwater Criteria Manual, November 2017 (FCSCM), the Mile High Flood District (MHFD) Urban
Storm Drainage Criteria Manual, January 2016 (USDCM), and Chapter 10, Flood Prevention and
Protection, of the Fort Collins City Code. No other drainage reports could be provided for the site by
the City of Fort Collins.
The Four Step Process (Low Impact Development)
At final stage of the design process, we developed a commensurate implementation of the ‘The Four-
Step Process’ for stormwater quality management. Ordinance No. 007, 2016 requires that no less
than seventy-five percent (75%) of any newly developed or redeveloped area be treated using one or
a combination of LID techniques. As previously mentioned, the developer proposes to replace the
existing Kmart with a new King Soopers Marketplace. The runoff for the modified areas collected
onsite will be treated using and underground LID water quality system. This LID system will address
100% of the captured volume rather than using a combination of LID and standard methods.
Appropriate spill containment will be provided in the area of the proposed fuel station.
Step 1 - Employ runoff reduction practices
The attached drainage map (see Appendix D) delineates the proposed drainage basins, each of
which drains to a proposed underground water quality system, Pond A. Underground systems are an
accepted LID method when surface BMPs are infeasible, which consist of an underground chamber
that provide stormwater quality treatment via sedimentation, screening, filtration, and other physical
and chemical processes.
Step 2 - Implement BMPs that provide a Water Quality Capture Volume (WQCV)
Due to site constraints, and underground storage system will provide the necessary Water Quality
Capture Volume (WQCV).
Step 3 - Stabilize drainageways
The developed runoff generated by the proposed redevelopment will drain to an existing storm drain
system located along the west side of South College Avenue. This system drains north and outfalls
into Spring Creek. Our work assumes that an appropriate level of stabilization exists at the outfall into
Spring Creek.
Step 4 - Implement site specific and other source control BMPs
Site specific considerations such as material handling/storage and other site operations will be
addressed in the Stormwater Management Plan (SWMP).
Development Criteria Reference and Constraints
This final drainage design presented herein is prepared in accordance with the Fort Collins
Stormwater Criteria Manual, November 2017 (FCSCM) and the Mile High Flood District (MHFD)
Urban Storm Drainage Criteria Manual, January 2016 (USDCM). No other drainage reports could be
provided for the site by the City of Fort Collins.
Existing runoff for the proposed site generally drains to the north and east across the site. The
majority of the existing on-site runoff is captured by an existing storm sewer system which has three
Midtown Gardens Marketplace
2/3/2021
Galloway & Company, Inc. Page 8 of 19
connections to the offsite system downstream to the north. The site drains into an existing 24” storm
pipe just north of the site (2 connections), and an existing 15” storm pipe along College Avenue. Due
to the shallow and undersized nature of the existing storm drain infrastructure, the proposed system
will be re-routed to the southeast corner of the site and connecting into the existing 30” storm pipe in
College Avenue and Princeton Road per coordination with the City. Capacity calculations for the
proposed and existing portions of the storm sewer system have been provided in Appendix C.
Hydrologic Criteria
For urban catchments that are not complex and are generally 160 acres or less in size, it is
acceptable that the design storm runoff be analyzed using the Rational Method. The Rational Method
is often used when only the peak flow rate or total volume of runoff is needed (e.g., storm sewer
sizing or simple detention basin sizing). The Rational Method was used to estimate the peak flow at
each design point. Routing calculations (i.e., time attenuation) that aggregate the basins draining to a
specific design point are include in the Rational Method calculations in Appendix B.
The Rational Method is based on the Rational Formula:
Q = CiA
Where:
Q = the maximum rate of runoff, cfs
C = a runoff coefficient that is the ratio between the runoff volume from an area and the average
rate of rainfall depth over a given duration for that area
i = average intensity of rainfall in inches per hour for a duration equal to the Time of
Concentration (Tc)
A = area, acres
Runoff Coefficients were determined based on Tables 3.2-1, 3.2-2, and 3.2-3 of the the FCSCM. The
one-hour rainfall Intensity-Duration-Frequency tables for use with the Rational Method of runoff
analysis are provided in Table 3.4-1 of the FCSCM.
The 2-year and 100-year storm events serve as the basis for the drainage system design. The 2-year
storm is considered the minor storm event. It has a fifty percent probability of exceedance during any
given year. The 100-year storm is considered the major storm event. It has a one percent probability
of exceedance during any given year.
The 2-year drainage system, at a minimum, must be designed to transport runoff from the 2-year
recurrence interval storm event with minimal disruption to the urban environment. The 100-year
drainage system, as a minimum, must be designed to convey runoff from the 100-year recurrence
interval flood to minimize life hazards and health, damage to structures, and interruption to traffic and
services.
Hydraulic Criteria
There are three on-site basins which drain to the proposed storm sewer system, which are identified
in the proposed drainage map (Appendix D) as Basins A, B, and C. Runoff from each basin will be
collected by storm sewer inlets and pipes and conveyed offsite to the existing storm drain system in
College Ave at the southeast corner of the site. Basin A is collected by a storm sewer system on the
west, south, and east sides of the proposed building. Basins B & C are collected by storm sewers on
the east side of the building. Each of these three systems convey flows to a proposed underground
Midtown Gardens Marketplace
2/3/2021
Galloway & Company, Inc. Page 9 of 19
water quality and detention system at the southeast corner of the site for water quality, detention, and
attenuation, which then releases the detained flows into the existing storm drain system in College
Ave. The detention component of the underground system has been designed to detain flows from
Basin A, with the exception of Basin A-1. Water quality has been provided for the entire site. Runoff
in Basins A-1, B and C greater than the water quality event are released undetained to College
Avenue through a series of concrete chases and the access drive for the development. Additional
areas for the site not collected by the proposed storm drain system are designated as Off-Site Basins
(OS) and will drain offsite to existing storm drain infrastructure, consistent with the existing drainage
pattern. Runoff from these offsite basins will be released undetained toward W Drake Rd, S College
Ave, and existing inlets north of the site.
Inlet Capacity Analysis
CDOT Type ‘D’ , Type R, and Type 13 combination inlets are proposed throughout the project for
removing excess developed runoff from the site. In general, the inlet capacities for the minor and
major storm event were estimated using Figure 7-7 (for area inlets) from Volume 1 of the USDCM,
along with the MHFD spreadsheet UD-Inlet_v4.06 (for curb inlets). Capacity calculations for the
proposed inlets have been provided in this report. For the inlets only required to capture water
quality, capacity calculations only include water quality flows.
All inlets on the site are in a sump condition, with the exception of the inlets located along the access
drive which connect to College Avenue. An orifice plate will be included on inlets in Basins A-1, B
and C to restrict the runoff generated so that only the water quality runoff will enter the storm sewer
system and not additional flows since these basins do not have detention volume included in the
underground system. Orifice plate calculations and details can be found in the Appendices.
Storm Drain Capacity Analysis
The storm drain system is typically sized to convey the sum of the 100-year developed runoff at each
design point draining into the system. The pipes are sized to convey this runoff without surcharging
(full-flow capacity). This method should provide a conservative estimate of total runoff and pipe sizes.
It appears that the 100-year developed runoff for the site will not be able to be conveyed in the
existing storm sewer system at the north end of the site, per the existing drainage pattern. Therefore,
the City has granted that the proposed storm sewer system can be re-routed such that it will be
detained and treated for water quality on site, then released at a controlled 2-year historic rate into
the existing storm drain system in College Ave at the southeast corner of the site. The final design of
the storm sewer system for the site has been sized to handle the 100-year storm event. For the
Final Drainage Study, StormCAD has been utilized to analyze hydraulics of the proposed storm
sewer system. StormCAD output calculations can be found in Appendix C.
VI. Proposed Drainage Facilities
General Concept
This final design presents the detailed design of the proposed system for collecting and conveying
developed runoff from current and proposed development at the Midtown Gardens Marketplace site
to the Stormwater quality and detention features and offsite systems. The existing site runoff drains to
existing storm sewer inlets within the parking lot. The proposed design matches this existing
drainage pattern and includes the implementation of and underground StormTech system to provide
water quality and detention for the site.
Midtown Gardens Marketplace
2/3/2021
Galloway & Company, Inc. Page 10 of 19
Specific Details
The site has been broken into three basins, each with their own set of sub-basins. A description of
each basin and their characteristics can be found below. The intent of the drainage design is to have
the runoff from the majority of the site collected and drain through a water quality and detention
facility prior to entering the existing storm sewer system offsite. Pond A has been sized based on the
City of Fort Collins LID requirements for the necessary portions of the site, which will be located at the
downstream connection point to the existing storm drain system at the southeast corner of the site in
College Ave. The released stormwater from the site will travel in the existing storm sewer system,
and ultimately reach Spring Creek.
Basin A
Basin A consists of the west, south, and southeast portions of the site and is comprised of 13 sub-
basins. The basin includes the proposed building, the south and southeast parking lots, the areas to
the west of the proposed building, and the existing Loaf N’ Jug site (which will remain vacant as part
of this project but is included in the drainage calculations in its future developed condition). Runoff
from Basin A will be collected by the proposed storm sewer system and conveyed to the southeast
corner of the site to the proposed underground water quality and detention facility, and ultimately
discharge into the existing storm sewer system in College Ave. The underground water
quality/detention system has been sized to provide water quality for the entire basin and detention
storage for all basins except for Basin A-1. Runoff greater than the water quality event will be
restricted to enter the system and will release undetained to College Avenue through a proposed
concrete chase.
Basin B
Basin B consists of the northeastern portion of the site between the building and the fuel center and is
comprised of 2 sub-basins. The basin includes the portion of the east parking lot at the building entry
and the access drive to College Ave. Runoff from Basin B will be collected by the proposed storm
sewer system and conveyed south to the southeast corner of the site to the proposed underground
water quality and detention facility, and ultimately discharge into the existing storm sewer system in
College Ave. The underground water quality/detention system has been sized to provide water quality
for the entire basin and no detention storage. Runoff greater than the water quality event will be
restricted in the storm sewer system and will release undetained to College Avenue through a
proposed concrete chase and down the main access drive to College Avenue.
Basin C
Basin C consists of the northeast corner of the site and is comprised of 6 sub-basins. The basin
includes the proposed fuel center and the northeast portion of the main parking lot. Runoff from
Basin C will be collected by the proposed storm sewer system and conveyed south to the southeast
corner of the site to the proposed underground detention facility, and ultimately discharge into the
existing storm sewer system in College Ave. The underground water quality/detention system has
been sized to provide water quality for the entire basin and detention storage for this basin. Runoff
greater than the water quality event will be restricted to enter the system and will release undetained
to College Avenue through a proposed concrete chase.
Offsite Basins
The remainder of the site consists of basins that flow offsite, as is current with the existing drainage
pattern. These basins are located along W Drake Rd, S College Ave, and the northern portion of the
site between the building and the adjacent property. These basins include sidewalk, tree lawn, and
Midtown Gardens Marketplace
2/3/2021
Galloway & Company, Inc. Page 11 of 19
landscape areas between the sidewalk and the parking lot, and access drives off of S College Ave
and W Drake Rd, as well as paved areas joining the site with the adjacent property. Flows from these
areas historically sheet flow to either the existing roadways adjacent to the site or to existing inlets on
the adjacent property north of the site, and ultimately drain to an existing inlet located in College
Avenue near the northeast corner of the site and an existing inlet at the northwest corner of College
and Drake. The characteristics of the tributary areas draining to these inlets will remain virtually the
same, so anticipated flow rates generated should be the same and not negatively impact the existing
storm sewer system. Once in the existing storm sewer inlets, the stormwater from this basin is
conveyed through the existing storm sewer system and ultimately reaches Spring Creek.
Water Quality Enhancement
The site has been divided into multiple drainage basins as described above. Runoff from each basin
will be collected and conveyed to Pond A, which provides water quality treatment for the entire site
and detention for all of Basin A (except for Basin A-1) in the form of an underground LID system. The
LID Summary Table below identifies the on-site impervious areas of the proposed improvements.
In the proposed condition, there is approximately 10.06 acres of on-site new or modified impervious
area. Of that area, 0.74 acres of impervious area are infeasible to be captured by the on-site
drainage system due to grading constraints where the proposed improvements match existing
grades. Thus, the system can capture 9.32 acres of the total on-site new and modified impervious
area (93%). In lieu of the uncaptured area, 0.11 acres of off-site impervious area flows into the on-
site detention system. The total impervious area captured onsite is therefore 9.42 acres (94% of the
total new and modified impervious area). Based on coordination with the City, the 94% capture
volume is acceptable for this site. These impervious areas are summarized in the table below.
LID – Impervious Area Summary Table
Proposed Impervious Area (sf) (ac) (ac)
On-Site New and Modified Impervious Area 438,173 10.06 100%
Impervious Area Infeasible to Capture 32,310 0.74 7%
Offsite Impervious Area Captured On-Site 4,586 0.11 1%
On-Site Impervious Area Captured 405,863 9.32 93%
Impervious Area Captured 410,449 9.42 94%
In conformance with the requirement identified under the Four Step Process to treat at least 75% of
impervious areas through LID methods, 100% of the captured on-site proposed impervious areas will
be treated through the proposed underground detention system. A delineation of the on-site area
boundaries for the existing and proposed conditions can be found in the Impervious Area Exhibit in
Appendix D. More information for the calculation and sizing of the water quality system is provide in
Appendix B.
Water Quality treatment will be provided in the isolator rows of the StormTech detention system. The
total volume of water quality has been calculated based on a release rate of 0.35 gpm/sf of storage
area. Structures within the StormTech system will divert flows in excess of the water quality event to
the remainder of the detention system. A summary of the water quality system calculations can be
found in Appendix B.
Midtown Gardens Marketplace
2/3/2021
Galloway & Company, Inc. Page 12 of 19
Storm Water Detention
The proposed underground StormTech system, Pond A, will be designed as an LID basin for the site,
including Water Quality treatment and 100-year detention with a controlled 2-year historic release rate
of 0.50 cfs/acre. Detention storage has been designed for all of Basin A (except for Basin A-1). The
remainder of the site will have just water quality provided in the underground system. Required
volumes were determined using the Modified FAA Method. Below is a summary of the total storage
proposed for each system. A tabulation of the stage storage volume for Pond A can be found in
Appendix C.
StormTech Detention Facility Summary
Facility
I.D.
Tributary
Area
(cf)
%
Imp.
Volume Required Volume Provided
Release
Rate
(cfs)
WQCV
(cf)
100-Yr
Detention
(cf)
Total
(cf)
WQCV
(cf)
100-Yr
Detention
(cf)
Total
(cf)
Pond A 10.46 89% 14,330 58,096 72,426 14,471 58,714 73,022 3.49
VII. Variance Requests
No variances are being requested with the proposed improvements described herein.
VIII. Erosion Control
A General Permit for Stormwater Discharge Associated with Construction Activities issued by the
Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division
(WQCD), will be acquired for the site. A Stormwater Management Plan (SWMP) should be prepared
to identity the Best Management Practices (BMPs) which, when implemented, will meet the
requirements of said General Permit. Below is a summary of SWMP requirements which may be
implemented on-site. A separate SWMP Report has been prepared for the site.
The following temporary BMPs may be installed and maintained to control on-site erosion and
prevent sediment from traveling off-site during construction:
· Silt Fence – a woven synthetic fabric that filters runoff. The silt fence is a temporary barrier that is
placed at the base of a disturbed area.
· Vehicle Tracking Control – a stabilized stone pad located at points of ingress and egress on a
construction site. The stone pad is designed to reduce the amount of mud transported onto public
roads by construction traffic.
· Inlet protection – Inlet protection will be used on all existing and proposed storm inlets to help
prevent debris from entering the storm sewer system. Inlet protection generally consists of straw
wattles or block and gravel filters.
Construction Material & Equipment
The contractor shall store all construction materials and equipment and shall provide maintenance
and fueling of equipment in confined areas on-site from which runoff will be contained and filtered.
Midtown Gardens Marketplace
2/3/2021
Galloway & Company, Inc. Page 13 of 19
Maintenance
The temporary BMPs will be inspected by the contractor at a minimum of once every two weeks and
after each significant storm event. The property owner will be responsible for routine and non-routine
maintenance of the temporary BMPs. Routine maintenance includes:
· Remove sediment from the bottom of the temporary sediment basin when accumulated sediment
occupies about 20% of the design volume or when sediment accumulation results in poor
drainage.
· Debris and litter removal-remove debris and litter to minimize outlet clogging and improve
aesthetics as necessary.
· Inspection of the facility-inspect the facility annually to ensure that it functions as initially intended.
· Cleaning and repair of BMP’s is required when sediment has built up or the BMP is not working
properly.
IX. Conclusions
Compliance with Standards
The design presented in this final drainage report for the Midtown Gardens Marketplace has been
prepared in accordance with the design standards and guidelines presented in the Fort Collins
Stormwater Criteria Manual and the MHFD Urban Storm Drainage Criteria Manual.
Variances
No variances are being requested with the proposed improvements described herein.
Drainage Concept
The proposed Midtown Gardens Marketplace storm drainage improvements should provide adequate
collection and Water Quality protection for the developed site. The proposed drainage design will
sufficiently drain the proposed development and should not negatively impact the existing condition of
the overall storm drainage system.
(i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) (xii)Vault IDTotal Required WQ Volume (cf)Flow, WQ (cfs)Chamber TypeChamber Unit Release Rate (cfs)Chamber Unit Volume (cf)Installed Chamber Unit Volume with Aggregate (cf)Minimum No. of ChambersTotal Release Rate (cfs)Required Storage Volume by FAA Method (cf)Minimum No. of ChambersStorage Provided within the Chambers (cf)Total Installed System Volume (cf)Pond A 14,330 13.30 MC-4500 0.026 106.5 162.6 89 2.314 6,735 64 9,478 14,471(i) Calculated WQCV (Eq. 7-1 & 7-2)(ii) 1/2 of the 2-year developed flow rate for the basin being sized (use half of the 2-year intensity for the time of concentration used in the calc - i.e. for 5 min Tc, use 1.425). See SF-3 Minor Storm(iii) Per ADS, these equate to different chamber sizes they have available.(iv) Flow rate thru the bottom of the Isolator Row chamber which is equal to the area of the bottom of the chamber multiplied by the flow rate per unit area (.35 gpm/sf).(v) Volume within chamber only, not accounting for void spaces in surrounding aggregate.(vi) Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit.(vii) Number of chambers required to provide full WQCV within total installed system, including aggregate. (i) / (vi)(viii) Release rate per chamber times number of chambers. (iv) * (vii)(ix) FAA calc based on Flow, WQ and Total Release Rate.(x) Number of chambers required to provide required FAA storage volume stored within the chamber only (no aggregate storage). (ix) / (v) (xi) Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. Greater of (vii) or (x) * (v)(xii) System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required WQCV. Greater of (vi) or (x) * (vi)(i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) (xii) (xiii) (iv)Vault IDChamber TypeNo. of Water Quality Chambers ProvidedTotal No. Detention Cambers ProvidedNo. of End Caps ProvidedInstalled Chamber Volume with Aggregate (cf)Installed End Cap Volume with Aggregate (cf)Detention Volume Required (cf)Water Quality Volume Required (cf)Total Volume Required (cf)Water Quality Volume Provided (cf)Detention Chamber Volume Provided (cf)Total End Cap Volume Provided (cf)Additional Storage in Perimeter AggregateTotal Installed System Volume (cf)Pond A MC-4500 88 295 46 162.6 115.3 58,096 14,330 72,426 14,308 47,967 5,303 5,444 73,022(i) ADS chamber size provided in system.(ii) Number of WQ chambers provided.(iii) Number of Detention chambers provided (Detention + WQ).(iv) Number of end caps provided.(v) Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit.(vi) Volume includes end cap and void spaces (40%) in surrounding aggregate, per chamber unit.(vii) Total Detention Volume required based on 100-yr. Mod. FAA Volume + WQ. V100 + (xii) above per City Standards(viii) Required WQ storage volume. WQCV (i) from WQ System Calculation Summary(ix) Total System Volume Required. (vii) +(viii)(x) Total Volume provided in WQ chambers (excludes WQ end caps). (ii) * (v)(xi) Total Volume provided in Detention chambers, excluding WQ chambers and end caps. (iii) * (v)(xii) Total Volume provided in end caps. (iv) * (vi)(xiii) Additonal storage provided by void spaces (40%) in Perimeter aggregate.(iv) System volume includes total number of chambers & end caps, and surrounding aggregate.See additional Stage Storage tabulation for total system volume.WQ System Calculation SummaryDetention System SummaryH:\King Soopers - City Market\CO, Fort Collins - KSS000146 -#18 College Drake\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports-Info\Hydrology\KSS 146_Rational_Routing.xlsPage 2 of 3 2/2/2021
Stormwater Facility Name:
Facility Location & Jurisdiction:
User Input: Watershed Characteristics User Defined User Defined User Defined User Defined
Selected BMP Type =No BMP Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs]
Watershed Area =6.98 acres 0.00 6,320 0.00 0.00
Watershed Length =700 ft 0.50 7,640 0.50 0.59
Watershed Length to Centroid =372 ft 1.00 13,930 1.00 1.44
Watershed Slope =0.020 ft/ft 1.50 14,473 1.50 1.91
Watershed Imperviousness =88.0%percent 2.00 13,412 2.00 2.28
Percentage Hydrologic Soil Group A =0.0%percent 2.50 13,771 2.50 2.61
Percentage Hydrologic Soil Group B =0.0%percent 3.00 12,893 3.00 2.89
Percentage Hydrologic Soil Groups C/D =100.0%percent 3.50 12,547 3.50 3.15
Target WQCV Drain Time =N/A hours 4.00 11,850 4.00 3.39
4.50 10,981 4.50 3.62
User Input 5.00 9,595 5.00 3.83
5.50 7,523 5.50 4.03
5.83 7,000 5.83 4.16
6.00 6,837 6.00 4.22
6.50 7,103 6.50 4.40
6.75 6,837 6.75 4.49
After completing and printing this worksheet to a pdf, go to:
https://maperture.digitaldataservices.com/gvh/?viewer=cswdif
Create a new stormwater facility, and attach the PDF of this
worksheet to that record.
Routed Hydrograph Results
Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year
One-Hour Rainfall Depth =N/A 0.82 1.09 1.40 1.99 2.83 in
CUHP Runoff Volume =N/A 0.382 0.532 0.713 1.068 1.574 acre-ft
Inflow Hydrograph Volume =N/A 0.382 0.532 0.713 1.068 1.574 acre-ft
Time to Drain 97% of Inflow Volume =N/A 6.5 6.8 7.3 8.1 9.2 hours
Time to Drain 99% of Inflow Volume =N/A 8.2 8.5 8.9 9.8 10.8 hours
Maximum Ponding Depth =N/A 1.05 1.36 1.74 2.71 4.21 ft
Maximum Ponded Area =N/A 0.32 0.33 0.32 0.31 0.26 acres
Maximum Volume Stored =N/A 0.217 0.318 0.445 0.747 1.177 acre-ft
Once CUHP has been run and the Stage-Area-Discharge
information has been provided, click 'Process Data' to
interpolate the Stage-Area-Volume-Discharge data and
generate summary results in the table below. Once this
is complete, click 'Print to PDF'.
Stormwater Detention and Infiltration Design Data Sheet
Pond A
College Ave and Drake Rd, Fort Collins, Colorado
SDI-Design Data v2.00, Released January 2020
Location for 1-hr Rainfall Depths (use dropdown):
After providing required inputs above including 1-hour
rainfall depths, click 'Run CUHP' to generate runoff
hydrographs using the embedded Colorado Urban
Hydrograph Procedure.
SDI_Design_Data_v2.00.xlsm, Design Data 2/2/2021, 10:21 PM
Booleans for Message Booleans for CUHP
Watershed L:W 1 CUHP Inputs Complete
Watershed Lc:L 1 CUHP Results Calculated
Watershed Slope FALSE Time Interval
RunOnce 1
CountA 1
Draintime Coeff 1.0
User Precip 1
Equal SA Inputs 1
Equal SD Inputs 1
Stormwater Detention and Infiltration Design Data Sheet
0
5
10
15
20
25
30
35
0.1 1 10FLOW [cfs]TIME [hr]
100YR IN
100YR OUT
50YR IN
50YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
WQCV IN
WQCV OUT
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
0.1 1 10 100PONDING DEPTH [ft]DRAIN TIME [hr]
100YR
50YR
10YR
5YR
2YR
WQCV
SDI_Design_Data_v2.00.xlsm, Design Data 2/2/2021, 10:21 PM
SHEET
OFDATE:PROJECT #:DRAWN:CHECKED:THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.4640 TRUEMAN BLVDHILLIARD, OH 43026ADVANCED DRAINAGE SYSTEMS, INC.R2 610/11/2020S204757MFSRWDFORT COLLINS, COKING SOOPERSDATEDRWNCHKDDESCRIPTION10/15/20NBRJPR18 CHAMBERS RELOCATED 11/17/20GDLCJDINCREASED VOLUME, EXPANDED SYSTEM EAST01/21/2021GDLJPRREVISED PER ENGINEER01/29/21GDLJPRADDED UNDERDRAIN02/02/21SDMSDMREVISED BOTTOM OF STONE PER EPM0040'80'520 CROMWELL AVENUE | ROCKY HILL | CT | 06067860-529-8188 |888-892-2694 | WWW.STORMTECH.COMDetention Retention Water QualityNOTES
·MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECHNICAL NOTE 6.32 FOR MANIFOLD SIZING GUIDANCE.
·DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD
COMPONENTS IN THE FIELD.
·THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET.
·THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE
SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED.
24" ADS N-12 BOTTOM CONNECTION
INVERT 2.26" ABOVE CHAMBER BASE
(SEE NOTES)
INSPECTION PORT (TYP 5 PLACES)
ISOLATOR ROW
(SEE DETAIL / TYP 5 PLACES)
OUTLET STRUCTURE PER PLAN
MAXIMUM OUTLET FLOW 14.0 CFS
(DESIGN BY ENGINEER / PROVIDED BY OTHERS)
PLACE MINIMUM 17.5' OF ADS GEOSYNTHETICS 315WTM WOVEN
GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET
FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS
24" PARTIAL CUT END CAP, PART# MC4500IEPP24T OR MC4500IEPP24TW
TYP OF ALL MC-4500 24" TOP CONNECTIONS
24" PARTIAL CUT END CAP, PART# MC4500IEPP24B OR MC4500IEPP24BW
TYP OF ALL MC-4500 24" BOTTOM CONNECTIONS AND ISOLATOR ROWS
PROPOSED LAYOUT
383 STORMTECH MC-4500 CHAMBERS
52 STORMTECH MC-4500 END CAPS
12 STONE ABOVE (in)
9 STONE BELOW (in)
40 % STONE VOID
73022 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED)
17523 SYSTEM AREA (ft²)
926 SYSTEM PERIMETER (ft)
PROPOSED ELEVATIONS
5023.21 MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED)
5018.71 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC)
5018.21 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC)
5018.21 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT)
5018.21 MINIMUM ALLOWABLE GRADE (TOP OF RIGID PAVEMENT)
5017.21 TOP OF STONE
5016.21 TOP OF MC-4500 CHAMBER
5013.13 24" TOP MANIFOLD INVERT
5011.46 36" BOTTOM MANIFOLD INVERT
5011.40 36'' X 24" MANIFOLD INVERT
5011.40 24" ISOLATOR ROW PLUS CONNECTION INVERT
5011.40 24" BOTTOM CONNECTION INVERT
5011.21 BOTTOM OF MC-4500 CHAMBER
5010.46 UNDERDRAIN INVERT
5010.46 BOTTOM OF STONE
36" X 24" ADS N-12 INVERT MATCHING MANIFOLD
2.26" ABOVE CHAMBER BASE
(SEE NOTES)
24" X 24" ADS N-12 TOP MANIFOLD
INVERT 23.05" ABOVE CHAMBER BASE
(SEE NOTES)
STRUCTURE PER PLAN W/ELEVATED BYPASS MANIFOLD
MAXIMUM INLET FLOW 9.5 CFS
(DESIGN BY ENGINEER / PROVIDED BY OTHERS)
STRUCTURE PER PLAN W/ELEVATED BYPASS MANIFOLD
MAXIMUM INLET FLOW 28.5 CFS
(DESIGN BY ENGINEER / PROVIDED BY OTHERS)
STRUCTURE PER PLAN
FOR ISOLATOR ROW ACCES
(DESIGN BY ENGINEER / PROVIDED BY OTHERS)
STRUCTURE PER PLAN W/WEIR
MAXIMUM INLET FLOW 33.1 CFS
(DESIGN BY ENGINEER / PROVIDED BY OTHERS)
24" X 24" ADS N-12 BOTTOM MANIFOLD
INVERT 2.26" ABOVE CHAMBER BASE
(SEE NOTES)
PROPOSED STRUCTURE
FOR ISOLATOR ROW ACCES
(DESIGN BY ENGINEER / PROVIDED BY OTHERS)
STRUCTURE PER PLAN W/ WEIR
MAXIMUM INLET FLOW 33.2 CFS
(DESIGN BY ENGINEER / PROVIDED BY OTHERS)
36" BOTTOM MANIFOLD
3.25" ABOVE CHAMBER BASE
(SEE NOTES)
36" BOTTOM MANIFOLD
3.25" ABOVE CHAMBER BASE
(SEE NOTES)
24" X 24" ADS N-12 BOTTOM MANIFOLD
INVERT 2.26" ABOVE CHAMBER BASE
(SEE NOTES)
24" X 24" ADS N-12 TOP MANIFOLD
INVERT 23.05" ABOVE CHAMBER BASE
(SEE NOTES)
INSTALL FLAMP ON 24" ACCESS PIPE
PART# MC450024RAMP (TYPICAL 6 PLACES)
6" ADS N-12 DUAL WALL PERFORATED HDPE UNDERDRAIN
(SIZE TBD BY ENGINEER / SOLID OUTSIDE PERIMETER STONE)
SHEET
OFDATE:PROJECT #:DRAWN:CHECKED:THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.4640 TRUEMAN BLVDHILLIARD, OH 43026ADVANCED DRAINAGE SYSTEMS, INC.R3 610/11/2020S204757MFSRWDFORT COLLINS, COKING SOOPERSDATEDRWNCHKDDESCRIPTION10/15/20NBRJPR18 CHAMBERS RELOCATED 11/17/20GDLCJDINCREASED VOLUME, EXPANDED SYSTEM EAST01/21/2021GDLJPRREVISED PER ENGINEER01/29/21GDLJPRADDED UNDERDRAIN02/02/21SDMSDMREVISED BOTTOM OF STONE PER EPM0020'40'520 CROMWELL AVENUE | ROCKY HILL | CT | 06067860-529-8188 |888-892-2694 | WWW.STORMTECH.COMDetention Retention Water Quality137.75'73.91'71.91'28.75'26.50'45.72'
25.34'25.59'
49.74'73.89'
81.09'16.68'
73.89'53.75'25.76'17.42'41.69'
89.99'18.42'26.00'32.78'
15.19'49.49'77.38'
73.89'18.17'53.26'27.25'9.08'8.05'43.69'
41.69'55.75'0.91'20.25'9.08'82.21'
155.34'
13.27'
16.99'
9.85'
57.28'
49.74'98.31'
53.77'37.93'35.08'
SHEET
OFDATE:PROJECT #:DRAWN:CHECKED:THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.4640 TRUEMAN BLVDHILLIARD, OH 43026ADVANCED DRAINAGE SYSTEMS, INC.R4 610/11/2020S204757MFSRWDFORT COLLINS, COKING SOOPERSDATEDRWNCHKDDESCRIPTION10/15/20NBRJPR18 CHAMBERS RELOCATED 11/17/20GDLCJDINCREASED VOLUME, EXPANDED SYSTEM EAST01/21/2021GDLJPRREVISED PER ENGINEER01/29/21GDLJPRADDED UNDERDRAIN02/02/21SDMSDMREVISED BOTTOM OF STONE PER EPM520 CROMWELL AVENUE | ROCKY HILL | CT | 06067860-529-8188 |888-892-2694 | WWW.STORMTECH.COMDetention Retention Water QualityACCEPTABLE FILL MATERIALS: STORMTECH MC-4500 CHAMBER SYSTEMS
PLEASE NOTE:
1.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".
2.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.
3.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR
COMPACTION REQUIREMENTS.
4.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
NOTES:
1.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 60x101
2.MC-4500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
3.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION
FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.
4.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.
5.REQUIREMENTS FOR HANDLING AND INSTALLATION:
·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.
·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3”.
·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 500 LBS/IN/IN.
AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS.
MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL
CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT
D
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE
TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE
PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT
PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER
ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS.
CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/A
PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED
INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND
PREPARATION REQUIREMENTS.
C
INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE
TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm)
ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT
SUBBASE MAY BE A PART OF THE 'C' LAYER.
GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR
PROCESSED AGGREGATE.
MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS
LAYER.
AASHTO M145¹
A-1, A-2-4, A-3
OR
AASHTO M43¹
3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10
BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVER
THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN
12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR
WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR
PROCESSED AGGREGATE MATERIALS.
B
EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS
FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER
ABOVE.
CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹
3, 4
A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE
SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER.CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹
3, 4 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3
NO COMPACTION REQUIRED.
24"
(600 mm) MIN*
7.0'
(2.1 m)
MAX
12" (300 mm) MIN100" (2540 mm)
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND
CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS
12" (300 mm) MIN
12" (300 mm) MIN 9"
(230 mm) MIN
D
C
B
A
*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED
INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,
INCREASE COVER TO 30" (750 mm).
DEPTH OF STONE TO BE DETERMINED
BY SITE DESIGN ENGINEER 9" (230 mm) MIN
PERIMETER STONE
(SEE NOTE 4)
EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
MC-4500
END CAP
SUBGRADE SOILS
(SEE NOTE 3)
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
60"
(1524 mm)
**THIS CROSS SECTION DETAIL REPRESENTS
MINIMUM REQUIREMENTS FOR INSTALLATION.
PLEASE SEE THE LAYOUT SHEET(S) FOR
PROJECT SPECIFIC REQUIREMENTS.
SHEET
OFDATE:PROJECT #:DRAWN:CHECKED:THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.4640 TRUEMAN BLVDHILLIARD, OH 43026ADVANCED DRAINAGE SYSTEMS, INC.R5 610/11/2020S204757MFSRWDFORT COLLINS, COKING SOOPERSDATEDRWNCHKDDESCRIPTION10/15/20NBRJPR18 CHAMBERS RELOCATED 11/17/20GDLCJDINCREASED VOLUME, EXPANDED SYSTEM EAST01/21/2021GDLJPRREVISED PER ENGINEER01/29/21GDLJPRADDED UNDERDRAIN02/02/21SDMSDMREVISED BOTTOM OF STONE PER EPM520 CROMWELL AVENUE | ROCKY HILL | CT | 06067860-529-8188 |888-892-2694 | WWW.STORMTECH.COMDetention Retention Water QualityINSPECTION & MAINTENANCE
STEP 1)INSPECT ISOLATOR ROW PLUS FOR SEDIMENT
A.INSPECTION PORTS (IF PRESENT)
A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN
A.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED
A.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG
A.4.LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL)
A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
B.ALL ISOLATOR PLUS ROWS
B.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS
B.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE
i)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY
ii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE
B.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
STEP 2)CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS
A.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED
B.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN
C.VACUUM STRUCTURE SUMP AS REQUIRED
STEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.
STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.
NOTES
1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS
OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.
2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.
SUMP DEPTH TBD BY
SITE DESIGN ENGINEER
(24" [600 mm] MIN RECOMMENDED)
CATCH BASIN
OR MANHOLE
MC-4500 ISOLATOR ROW PLUS DETAIL
NTS
OPTIONAL INSPECTION PORT
MC-4500 END CAP
24" (600 mm) HDPE ACCESS PIPE REQUIRED
USE FACTORY PARTIAL CUT END CAP PART #:
MC4500REPE24BC OR MC4500REPE24BW
STORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM
STRUCTURES WITH OPEN GRATES
COVER PIPE CONNECTION TO END CAP WITH ADS
GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE
ONE LAYER OF ADSPLUS175 WOVEN GEOTEXTILE BETWEEN
FOUNDATION STONE AND CHAMBERS
10.3' (3.1 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
MC-4500 CHAMBER
INSTALL FLAMP ON 24" (600 mm) ACCESS PIPE
PART #: MC450024RAMP
WEIR HEIGHT TBD BY
SITE DESIGN ENGINEER
WEIR
NOTE:
INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION VALLEY.
STORMTECH CHAMBER
CONCRETE COLLAR
PAVEMENT
12" (300 mm) MIN WIDTH
CONCRETE SLAB
6" (150 mm) MIN THICKNESS
4" PVC INSPECTION PORT DETAIL
(MC SERIES CHAMBER)
NTS
8" NYLOPLAST INSPECTION PORT
BODY (PART# 2708AG4IPKIT) OR
TRAFFIC RATED BOX W/SOLID
LOCKING COVER
CONCRETE COLLAR NOT REQUIRED
FOR UNPAVED APPLICATIONS
4" (100 mm)
SDR 35 PIPE
4" (100 mm) INSERTA TEE
TO BE CENTERED ON
CORRUGATION VALLEY
SHEET
OFDATE:PROJECT #:DRAWN:CHECKED:THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.4640 TRUEMAN BLVDHILLIARD, OH 43026ADVANCED DRAINAGE SYSTEMS, INC.R6 610/11/2020S204757MFSRWDFORT COLLINS, COKING SOOPERSDATEDRWNCHKDDESCRIPTION10/15/20NBRJPR18 CHAMBERS RELOCATED 11/17/20GDLCJDINCREASED VOLUME, EXPANDED SYSTEM EAST01/21/2021GDLJPRREVISED PER ENGINEER01/29/21GDLJPRADDED UNDERDRAIN02/02/21SDMSDMREVISED BOTTOM OF STONE PER EPM520 CROMWELL AVENUE | ROCKY HILL | CT | 06067860-529-8188 |888-892-2694 | WWW.STORMTECH.COMDetention Retention Water QualityMC-4500 TECHNICAL SPECIFICATION
NTS
PART #STUB B C
MC4500IEPP06T 6" (150 mm)42.54" (1081 mm)---
MC4500IEPP06B ---0.86" (22 mm)
MC4500IEPP08T 8" (200 mm)40.50" (1029 mm)---
MC4500IEPP08B ---1.01" (26 mm)
MC4500IEPP10T 10" (250 mm)38.37" (975 mm)---
MC4500IEPP10B ---1.33" (34 mm)
MC4500IEPP12T 12" (300 mm)35.69" (907 mm)---
MC4500IEPP12B ---1.55" (39 mm)
MC4500IEPP15T 15" (375 mm)32.72" (831 mm)---
MC4500IEPP15B ---1.70" (43 mm)
MC4500IEPP18T
18" (450 mm)
29.36" (746 mm)---MC4500IEPP18TW
MC4500IEPP18B ---1.97" (50 mm)
MC4500IEPP18BW
MC4500IEPP24T
24" (600 mm)
23.05" (585 mm)---MC4500IEPP24TW
MC4500IEPP24B ---2.26" (57 mm)
MC4500IEPP24BW
MC4500IEPP30BW 30" (750 mm)---2.95" (75 mm)
MC4500IEPP36BW 36" (900 mm)---3.25" (83 mm)
MC4500IEPP42BW 42" (1050 mm)---3.55" (90 mm)
NOTE: ALL DIMENSIONS ARE NOMINAL
NOMINAL CHAMBER SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH)100.0" X 60.0" X 48.3" (2540 mm X 1524 mm X 1227 mm)
CHAMBER STORAGE 106.5 CUBIC FEET (3.01 m³)
MINIMUM INSTALLED STORAGE*162.6 CUBIC FEET (4.60 m³)
WEIGHT (NOMINAL)125.0 lbs.(56.7 kg)
NOMINAL END CAP SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH)90.0" X 61.0" X 32.8" (2286 mm X 1549 mm X 833 mm)
END CAP STORAGE 39.5 CUBIC FEET (1.12 m³)
MINIMUM INSTALLED STORAGE*115.3 CUBIC FEET (3.26 m³)
WEIGHT (NOMINAL)90 lbs.(40.8 kg)
*ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION AND BETWEEN CHAMBERS,
12" (305 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY.
PARTIAL CUT HOLES AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B"
PARTIAL CUT HOLES AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T"
END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W"
B
C
52.0"
(1321 mm)
48.3"
(1227 mm)
INSTALLED
60.0"
(1524 mm)
100.0" (2540 mm)90.0" (2286 mm)
61.0"
(1549 mm)
32.8"
(833 mm)
INSTALLED
38.0"
(965 mm)
CUSTOM PREFABRICATED INVERTS
ARE AVAILABLE UPON REQUEST.
INVENTORIED MANIFOLDS INCLUDE
12-24" (300-600 mm) SIZE ON SIZE
AND 15-48" (375-1200 mm)
ECCENTRIC MANIFOLDS. CUSTOM
INVERT LOCATIONS ON THE MC-4500
END CAP CUT IN THE FIELD ARE NOT
RECOMMENDED FOR PIPE SIZES
GREATER THAN 10" (250 mm). THE
INVERT LOCATION IN COLUMN 'B'
ARE THE HIGHEST POSSIBLE FOR
THE PIPE SIZE.
UPPER JOINT
CORRUGATION
WEB
CREST
CREST
STIFFENING
RIB
VALLEY
STIFFENING RIB
BUILD ROW IN THIS
DIRECTION
LOWER JOINT
CORRUGATION
FOOT
MC-SERIES END CAP INSERTION DETAIL
NTS
NOTE: MANIFOLD STUB MUST BE LAID HORIZONTAL
FOR A PROPER FIT IN END CAP OPENING.
12" (300 mm)
MIN SEPARATION
12" (300 mm) MIN INSERTION
MANIFOLD HEADER
MANIFOLD STUB
STORMTECH END CAP
12" (300 mm)
MIN SEPARATION
12" (300 mm)
MIN INSERTION
MANIFOLD HEADER
MANIFOLD STUB
UNDERDRAIN DETAIL
NTS
A
A
B B
SECTION A-A
SECTION B-B
NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER
4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS
6" (150 mm) TYP FOR SC-740, DC-780, MC-3500 & MC-4500 SYSTEMS
OUTLET MANIFOLD
STORMTECH
END CAP
STORMTECH
CHAMBERS
STORMTECH
CHAMBER
STORMTECH
END CAP
DUAL WALL
PERFORATED
HDPE
UNDERDRAIN
ADS GEOSYNTHETICS 601T
NON-WOVEN GEOTEXTILE
ADS GEOSYNTHETICS 601T
NON-WOVEN GEOTEXTILE
FOUNDATION STONE
BENEATH CHAMBERS
FOUNDATION STONE
BENEATH CHAMBERS
Project:
Chamber Model - MC-4500
Units -Imperial
Number of Chambers -383
Number of End Caps - 52
Voids in the stone (porosity) - 40 %
Base of Stone Elevation - 5010.46 ft
Amount of Stone Above Chambers - 12 in
Amount of Stone Below Chambers - 9 in
9
Area of system - 17523 sf Min. Area -
Height of
System
Incremental Single
Chamber
Incremental
Single End Cap
Incremental
Chambers
Incremental
End Cap
Incremental
Stone
Incremental Ch,
EC and Stone
Cumulative
System Elevation
(inches)(cubic feet)(cubic feet)(cubic feet)(cubic feet)(cubic feet)(cubic feet)(cubic feet)(feet)
81 0.00 0.00 0.00 0.00 584.10 584.10 73021.10 5017.21
80 0.00 0.00 0.00 0.00 584.10 584.10 72437.00 5017.13
79 0.00 0.00 0.00 0.00 584.10 584.10 71852.90 5017.04
78 0.00 0.00 0.00 0.00 584.10 584.10 71268.80 5016.96
77 0.00 0.00 0.00 0.00 584.10 584.10 70684.70 5016.88
76 0.00 0.00 0.00 0.00 584.10 584.10 70100.60 5016.79
75 0.00 0.00 0.00 0.00 584.10 584.10 69516.50 5016.71
74 0.00 0.00 0.00 0.00 584.10 584.10 68932.40 5016.63
73 0.00 0.00 0.00 0.00 584.10 584.10 68348.30 5016.54
72 0.00 0.00 0.00 0.00 584.10 584.10 67764.20 5016.46
71 0.00 0.00 0.00 0.00 584.10 584.10 67180.10 5016.38
70 0.00 0.00 0.00 0.00 584.10 584.10 66596.00 5016.29
69 0.04 0.01 15.69 0.68 577.55 593.92 66011.90 5016.21
68 0.12 0.03 44.47 1.76 565.61 611.84 65417.98 5016.13
67 0.16 0.05 63.09 2.69 557.79 623.57 64806.14 5016.04
66 0.21 0.07 79.94 3.43 550.75 634.12 64182.57 5015.96
65 0.27 0.08 102.78 4.32 541.26 648.36 63548.44 5015.88
64 0.45 0.11 173.42 5.48 512.54 691.44 62900.09 5015.79
63 0.67 0.13 254.79 6.89 479.43 741.11 62208.65 5015.71
62 0.80 0.16 306.02 8.37 458.34 772.74 61467.54 5015.63
61 0.91 0.19 347.81 9.81 441.05 798.67 60694.80 5015.54
60 1.00 0.22 384.11 11.36 425.91 821.39 59896.13 5015.46
59 1.09 0.25 416.45 12.84 412.38 841.67 59074.74 5015.38
58 1.16 0.28 445.61 14.31 400.13 860.06 58233.07 5015.29
57 1.23 0.30 472.63 15.70 388.77 877.09 57373.01 5015.21
56 1.30 0.33 497.78 17.03 378.18 892.98 56495.92 5015.13
55 1.36 0.35 521.27 18.43 368.22 907.92 55602.94 5015.04
54 1.42 0.38 543.37 19.95 358.77 922.09 54695.01 5014.96
53 1.47 0.41 564.28 21.28 349.88 935.44 53772.92 5014.88
52 1.53 0.44 584.13 22.93 341.28 948.34 52837.48 5014.79
51 1.57 0.47 603.03 24.38 333.14 960.54 51889.15 5014.71
50 1.62 0.50 620.99 25.75 325.40 972.15 50928.60 5014.63
49 1.67 0.52 638.17 27.08 318.00 983.24 49956.46 5014.54
48 1.71 0.54 654.59 28.31 310.94 993.84 48973.21 5014.46
47 1.75 0.57 670.28 29.47 304.20 1003.95 47979.37 5014.38
46 1.79 0.59 685.30 30.60 297.74 1013.64 46975.42 5014.29
45 1.83 0.61 699.82 31.72 291.49 1023.02 45961.78 5014.21
44 1.86 0.63 713.70 32.87 285.47 1032.04 44938.75 5014.13
43 1.90 0.64 727.06 33.44 279.90 1040.40 43906.71 5014.04
42 1.93 0.68 739.89 35.22 274.05 1049.17 42866.31 5013.96
41 1.96 0.70 752.24 36.39 268.65 1057.28 41817.15 5013.88
40 2.00 0.72 764.13 37.56 263.42 1065.12 40759.86 5013.79
39 2.03 0.74 775.58 38.67 258.40 1072.65 39694.75 5013.71
38 2.05 0.76 786.60 39.75 253.56 1079.91 38622.10 5013.63
37 2.08 0.79 797.21 40.85 248.88 1086.94 37542.18 5013.54
36 2.11 0.80 807.39 41.74 244.45 1093.58 36455.25 5013.46
35 2.13 0.82 817.26 42.64 240.14 1100.04 35361.67 5013.38
34 2.16 0.84 826.77 43.60 235.95 1106.33 34261.63 5013.29
33 2.18 0.85 835.91 44.27 232.03 1112.21 33155.30 5013.21
32 2.21 0.86 844.72 44.69 228.34 1117.75 32043.10 5013.13
31 2.23 0.89 853.19 46.25 224.32 1123.77 30925.35 5013.04
30 2.25 0.90 861.32 47.02 220.77 1129.10 29801.58 5012.96
29 2.27 0.92 869.16 47.70 217.36 1134.21 28672.48 5012.88
28 2.29 0.92 876.68 47.83 214.30 1138.81 27538.27 5012.79
27 2.31 0.94 883.91 49.06 210.91 1143.88 26399.46 5012.71
26 2.33 0.96 890.84 49.73 207.87 1148.44 25255.58 5012.63
25 2.34 0.97 897.48 50.37 204.96 1152.81 24107.14 5012.54
24 2.36 0.98 903.84 51.03 202.15 1157.03 22954.33 5012.46
23 2.38 0.97 909.93 50.50 199.93 1160.36 21797.30 5012.38
22 2.39 1.00 915.74 52.17 196.93 1164.85 20636.95 5012.29
21 2.41 1.01 921.29 52.58 194.55 1168.42 19472.10 5012.21
20 2.42 1.02 926.58 53.06 192.25 1171.88 18303.67 5012.13
19 2.43 1.03 931.60 53.58 190.03 1175.21 17131.79 5012.04
18 2.44 1.04 936.37 54.01 187.95 1178.33 15956.59 5011.96
17 2.46 1.05 940.89 54.41 185.98 1181.28 14778.25 5011.88
16 2.47 1.05 945.16 54.81 184.11 1184.08 13596.97 5011.79
15 2.48 1.05 949.18 54.62 182.58 1186.38 12412.89 5011.71
14 2.49 1.06 953.00 54.95 180.92 1188.87 11226.51 5011.63
13 2.50 1.08 956.61 55.92 179.08 1191.62 10037.64 5011.54
12 2.51 1.08 959.99 56.30 177.58 1193.88 8846.02 5011.46
11 2.51 1.09 963.14 56.58 176.21 1195.93 7652.14 5011.38
10 2.53 1.11 967.81 57.53 173.96 1199.31 6456.21 5011.29
9 0.00 0.00 0.00 0.00 584.10 584.10 5256.90 5011.21
8 0.00 0.00 0.00 0.00 584.10 584.10 4672.80 5011.13
7 0.00 0.00 0.00 0.00 584.10 584.10 4088.70 5011.04
6 0.00 0.00 0.00 0.00 584.10 584.10 3504.60 5010.96
5 0.00 0.00 0.00 0.00 584.10 584.10 2920.50 5010.88
4 0.00 0.00 0.00 0.00 584.10 584.10 2336.40 5010.79
3 0.00 0.00 0.00 0.00 584.10 584.10 1752.30 5010.71
2 0.00 0.00 0.00 0.00 584.10 584.10 1168.20 5010.63
1 0.00 0.00 0.00 0.00 584.10 584.10 584.10 5010.54
StormTech MC-4500 Cumulative Storage Volumes
Rev5 King Soopers (S204757) 2-2-2021
15766 sf min. area
Include Perimeter Stone in Calculations
Click Here for Metric
King Soopers Store #146
2/2/2021
Underground Detention Inlet Structure Restrictor Plates
Formula: Q = CA(2gh)1/2
C = 0.65 Orifice Coefficient
Structure SDMH A8
Calculate Orifice Area using Orifice Equation
Surcharge WSE=5019.11
Pipe Inv =5011.38
Given:Q =1.7 cfs (1/2 of 2-Year Flow Rate)
z2 =7.7 water depth (Design)
Solve:D =4.7 in Orifice Diameter
A =0.12 sf Orifice Area
h =7.54 ft Depth to Centroid of Orifice
Q =1.7 cfs Orifice Flow
Structure SDMH B1
Calculate Orifice Area using Orifice Equation
Surcharge WSE=5019.37
Pipe Inv =5011.38
Given:Q =1.1 cfs (1/2 of 2-Year Flow Rate)
z2 =8.0 water depth (Design)
Solve:D =3.7 in Orifice Diameter
A =0.08 sf Orifice Area
h =7.84 ft Depth to Centroid of Orifice
Q =1.1 cfs Orifice Flow
Structure SDMH B1
Calculate Orifice Area using Orifice Equation
Surcharge WSE=5018.12
Pipe Inv =5011.38
Given:Q =1.6 cfs (1/2 of 2-Year Flow Rate)
z2 =6.7 water depth (Design)
Solve:D =4.7 in Orifice Diameter
A =0.12 sf Orifice Area
h =6.54 ft Depth to Centroid of Orifice
Q =1.6 cfs Orifice Flow
Galloway and Company, Inc.Page 1 of 1
Project:
Basin ID:
Depth Increment = ft
Watershed Information Flood Control Only Media Surface -- 0.00 -- -- -- 6,320 0.145
Selected BMP Type =No BMP -- 0.50 -- -- -- 7,640 0.175 3,490 0.080
Watershed Area = 6.98 acres -- 1.00 -- -- -- 13,930 0.320 8,882 0.204
Watershed Length = 700 ft -- 1.50 -- -- -- 14,473 0.332 15,983 0.367
Watershed Length to Centroid = 372 ft -- 2.00 -- -- -- 13,412 0.308 22,954 0.527
Watershed Slope = 0.020 ft/ft -- 2.50 -- -- -- 13,771 0.316 29,750 0.683
Watershed Imperviousness = 88% percent -- 3.00 -- -- -- 12,893 0.296 36,416 0.836
Percentage Hydrologic Soil Group A = 0.0% percent -- 3.50 -- -- -- 12,547 0.288 42,776 0.982
Percentage Hydrologic Soil Group B = 0.0% percent -- 4.00 -- -- -- 11,850 0.272 48,875 1.122
Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 4.50 -- -- -- 10,981 0.252 54,583 1.253
Target WQCV Drain Time = N/A hours -- 5.00 -- -- -- 9,595 0.220 59,727 1.371
Location for 1-hr Rainfall Depths = User Input -- 5.50 -- -- -- 7,523 0.173 64,006 1.469
-- 5.83 -- -- -- 7,000 0.161 66,402 1.524
-- 6.00 -- -- -- 6,837 0.157 67,579 1.551
Optional User Overrides -- 6.50 -- -- -- 7,103 0.163 71,064 1.631
Water Quality Capture Volume (WQCV) =0.332 acre-feet 0.332 acre-feet -- 6.75 -- -- -- 6,837 0.157 72,806 1.671
Excess Urban Runoff Volume (EURV) = 0.608 acre-feet acre-feet -- -- -- --
2-yr Runoff Volume (P1 = 0.82 in.) = 0.384 acre-feet 0.82 inches -- -- -- --
5-yr Runoff Volume (P1 = 1.09 in.) = 0.532 acre-feet inches -- -- -- --
10-yr Runoff Volume (P1 = 1.4 in.) = 0.713 acre-feet 1.40 inches -- -- -- --
25-yr Runoff Volume (P1 = 1.69 in.) = 0.889 acre-feet inches -- -- -- --
50-yr Runoff Volume (P1 = 1.99 in.) = 1.068 acre-feet inches -- -- -- --
100-yr Runoff Volume (P1 = 2.83 in.) = 1.574 acre-feet 2.83 inches -- -- -- --
500-yr Runoff Volume (P1 = 3.14 in.) = 1.760 acre-feet inches -- -- -- --
Approximate 2-yr Detention Volume = 0.383 acre-feet -- -- -- --
Approximate 5-yr Detention Volume = 0.538 acre-feet -- -- -- --
Approximate 10-yr Detention Volume = 0.686 acre-feet -- -- -- --
Approximate 25-yr Detention Volume = 0.767 acre-feet -- -- -- --
Approximate 50-yr Detention Volume = 0.820 acre-feet -- -- -- --
Approximate 100-yr Detention Volume = 1.083 acre-feet -- -- -- --
-- -- -- --
Define Zones and Basin Geometry -- -- -- --
Zone 1 Volume (User Defined) = 1.663 acre-feet -- -- -- --
Select Zone 2 Storage Volume (Optional) = acre-feet -- -- -- --
Select Zone 3 Storage Volume (Optional) = acre-feet -- -- -- --
Total Detention Basin Volume = 1.663 acre-feet -- -- -- --
Initial Surcharge Volume (ISV) = N/A ft 3 -- -- -- --
Initial Surcharge Depth (ISD) = N/A ft -- -- -- --
Total Available Detention Depth (Htotal) = user ft -- -- -- --
Depth of Trickle Channel (HTC) = user ft -- -- -- --
Slope of Trickle Channel (STC) = user ft/ft -- -- -- --
Slopes of Main Basin Sides (Smain) = user H:V -- -- -- --
Basin Length-to-Width Ratio (RL/W) = user -- -- -- --
-- -- -- --
Initial Surcharge Area (AISV) =user ft 2 -- -- -- --
Surcharge Volume Length (LISV) =user ft -- -- -- --
Surcharge Volume Width (WISV) =user ft -- -- -- --
Depth of Basin Floor (HFLOOR) =user ft -- -- -- --
Length of Basin Floor (LFLOOR) =user ft -- -- -- --
Width of Basin Floor (WFLOOR) =user ft -- -- -- --
Area of Basin Floor (AFLOOR) =user ft 2 -- -- -- --
Volume of Basin Floor (VFLOOR) =user ft 3 -- -- -- --
Depth of Main Basin (HMAIN) =user ft -- -- -- --
Length of Main Basin (LMAIN) =user ft -- -- -- --
Width of Main Basin (WMAIN) =user ft -- -- -- --
Area of Main Basin (AMAIN) =user ft 2 -- -- -- --
Volume of Main Basin (VMAIN) =user ft 3 -- -- -- --
Calculated Total Basin Volume (Vtotal) =user acre-feet -- -- -- --
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
After providing required inputs above including 1-hour rainfall
depths, click 'Run CUHP' to generate runoff hydrographs using
the embedded Colorado Urban Hydrograph Procedure.
Volume
(ft 3)
Volume
(ac-ft)
Area
(acre)
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
Optional
Override
Area (ft 2)
Length
(ft)
Optional
Override
Stage (ft)
Stage
(ft)
Stage - Storage
Description
Area
(ft 2)
Width
(ft)
King Soopers Store #146 - Fort Collins
Underground Detention System
MHFD-Detention, Version 4.03 (May 2020)
ExampleZone Configuration (Retention Pond)
MHFD-Detention_v4 03.xlsm, Basin 2/3/2021, 12:15 AM
1 User Defined Stage-Area Booleans for Message
1 Equal Stage-Area Inputs Watershed L:W
1 CountA Watershed Lc:L
Watershed Slope
0 Calc_S_TC Booleans for CUHP
1 CUHP Inputs Complete
H_FLOOR 1 CUHP Results Calculated
L_FLOOR_OTHER
0.00 ISV 0.00 ISV
0.00 Floor 0.00 Floor
6.70 Zone 1 (User) 6.70 Zone 1 (User)
0.00 Zone 2 0.00 Zone 2
0.00 Zone 3 0.00 Zone 3
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
MHFD-Detention, Version 4.03 (May 2020)
0.000
0.420
0.840
1.260
1.680
0.000
0.085
0.170
0.255
0.340
0.00 2.00 4.00 6.00 8.00 Volume (ac-ft)Area (acres)Stage (ft.)
Area (acres)Volume (ac-ft)
0
3700
7400
11100
14800
0
5
10
15
20
0.00 2.00 4.00 6.00 8.00 Area (sq.ft.)Length, Width (ft.)Stage (ft)
Length (ft)Width (ft)Area (sq.ft.)
MHFD-Detention_v4 03.xlsm, Basin 2/3/2021, 12:15 AM
Project:
Basin ID:
Estimated Estimated
Stage (ft) Volume (ac-ft) Outlet Type
Zone 1 (User) 6.70 1.663 Circular Orifice
Zone 2
Zone 3
Total (all zones) 1.663
User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain
Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2
Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet
User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate
Invert of Lowest Orifice = N/A ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = N/A ft2
Depth at top of Zone using Orifice Plate = N/A ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet
Orifice Plate: Orifice Vertical Spacing = N/A inches Elliptical Slot Centroid = N/A feet
Orifice Plate: Orifice Area per Row = N/A inches Elliptical Slot Area = N/A ft2
User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest)
Row 1 (optional) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional)
Stage of Orifice Centroid (ft) N/A N/A N/A N/A N/A N/A N/A N/A
Orifice Area (sq. inches) N/A N/A N/A N/A N/A N/A N/A N/A
Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional)
Stage of Orifice Centroid (ft) N/A N/A N/A N/A N/A N/A N/A N/A
Orifice Area (sq. inches) N/A N/A N/A N/A N/A N/A N/A N/A
User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice
Zone 1 Circular Not Selected Zone 1 Circular Not Selected
Invert of Vertical Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = 0.37 ft2
Depth at top of Zone using Vertical Orifice = 6.70 ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = 0.34 feet
Vertical Orifice Diameter = 8.22 inches
User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir (and No Outlet Pipe) Calculated Parameters for Overflow Weir
grate Not Selected Not Selected Not Selected Not Selected
Overflow Weir Front Edge Height, Ho =ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =feet
Overflow Weir Front Edge Length =feet Overflow Weir Slope Length =feet
Overflow Weir Grate Slope =H:V Grate Open Area / 100-yr Orifice Area =
Horiz. Length of Weir Sides =feet Overflow Grate Open Area w/o Debris =ft2
Overflow Grate Open Area % =%, grate open area/total area Overflow Grate Open Area w/ Debris =ft2
Debris Clogging % =%
User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate
Not Selected Not Selected Not Selected Not Selected
Depth to Invert of Outlet Pipe =ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area =ft2
Circular Orifice Diameter =inches Outlet Orifice Centroid =feet
Half-Central Angle of Restrictor Plate on Pipe = N/A N/A radians
User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway
Spillway Invert Stage= ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= feet
Spillway Crest Length = feet Stage at Top of Freeboard = feet
Spillway End Slopes = H:V Basin Area at Top of Freeboard = acres
Freeboard above Max Water Surface = feet Basin Volume at Top of Freeboard = acre-ft
Max Ponding Depth of Target Storage Volume =#REF! feet Discharge at Top of Freeboard = cfs
Routed Hydrograph Results
Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year
One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.09 1.40 1.69 1.99 2.83 3.14
CUHP Runoff Volume (acre-ft) =0.332 0.608 0.384 0.532 0.713 0.889 1.068 1.574 1.760
Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.384 0.532 0.713 0.889 1.068 1.574 1.760
CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.1 0.7 2.4 5.0 6.9 12.5 14.4
OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A
Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.10 0.34 0.71 0.98 1.78 2.07
Peak Inflow Q (cfs) =N/A N/A 7.5 10.0 13.1 16.9 20.4 29.8 33.3
Peak Outflow Q (cfs) =1.8 2.4 1.5 1.8 2.1 2.5 2.7 3.49 3.7
Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 2.6 0.9 0.5 0.4 0.3 0.3
Structure Controlling Flow =Vertical Orifice 1 Vertical Orifice 1 Vertical Orifice 1 Vertical Orifice 1 Vertical Orifice 1 Vertical Orifice 1 Vertical Orifice 1 Vertical Orifice 1Vertical Orifice 1
Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A
Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A
Time to Drain 97% of Inflow Volume (hours) =11 8 10 9 9 9 9 9 10
Time to Drain 99% of Inflow Volume (hours) =24 17 22 18 16 15 14 13 13
Maximum Ponding Depth (ft) =1.40 2.27 1.05 1.35 1.74 2.27 2.71 4.21 4.81
Area at Maximum Ponding Depth (acres) =0.33 0.31 0.32 0.33 0.32 0.31 0.31 0.26 0.23
Maximum Volume Stored (acre-ft) =0.334 0.611 0.217 0.317 0.445 0.608 0.745 1.176 1.326
DETENTION BASIN OUTLET STRUCTURE DESIGN
MHFD-Detention, Version 4.03 (May 2020)
King Soopers Store #146 - Fort Collins
Underground Detention System
The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF).
Example Zone Configuration (Retention Pond)
MHFD-Detention_v4 03.xlsm, Outlet Structure 2/3/2021, 12:17 AM
COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2
Count_Underdrain = 0 0.11(diameter = 3/8 inch)1 2 1
Count_WQPlate = 0 0.14(diameter = 7/16 inch)
Count_VertOrifice1 = 1 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean
Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)1 1 5yr, <72hr 0
Count_Weir1 = 0 0.29(diameter = 5/8 inch)>5yr, <120hr 0
Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row
Count_OutletPipe1 = 0 0.42(diameter = 3/4 inch)WQCV 141 Watershed Constraint Check
Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 106 Slope 0.020
COUNTA_2 (Standard FSD Setup)= 0 0.58(diameter = 7/8 inch)EURV 228 Shape 1.61
Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 136
MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 175 Spillway Depth
Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 228
WQ Plate Flow at 100yr depth = 0.00 0.97(diameter = 1-1/8 inches)50 Year 272
CLOG #1=0%1.08(diameter = 1-3/16 inches)100 Year 422 1 Z1_Boolean
Cdw #1 = 1.20(diameter = 1-1/4 inches)500 Year 482 1 Z2_Boolean
Cdo #1 = 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean
Overflow Weir #1 Angle = 1.45(diameter = 1-3/8 inches)1 Opening Message
CLOG #2=0%1.59(diameter = 1-7/16 inches)Draintime Running
Cdw #2 = 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4)
Cdo #2 = 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 1 1 1
Overflow Weir #2 Angle = 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean
Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 0 0 0 Max Depth
VertOrifice1 Q at 100yr depth = 3.49 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth
VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 0 0 0 Freeboard
2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 0 Spillway
Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length
CountA_3 (EURV & 100yr) =0 3.09(diameter = 2 inches)FALSE Time Interval
CountA_4 (100yr Only) = 0 3.29(use rectangular openings)Button Visibility Boolean
COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain
COUNTA_6 (EURV Weir Only)= 0 0 WQCV Plate
0 EURV-WQCV Plate
Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice
Outlet2_Pulldown_Boolean 0 Outlet 90% Qpeak
Outlet3_Pulldown_Boolean 0 Outlet Undetained
0 Weir Only 90% Qpeak
0 Five Year Ratio Plate
0 Five Year Ratio VertOrifice
EURV_draintime_user
Spillway Options
Offset
Overlapping
Vertical Orifice 1
S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis
minimum bound 0.00 0 0
maximum bound 6.00 60,000 10
S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis
minimum bound
maximum bound
DETENTION BASIN OUTLET STRUCTURE DESIGN
MHFD-Detention, Version 4.00 (December 2019)
0
5
10
15
20
25
30
35
40
0.1 1 10FLOW [cfs]TIME [hr]
500YR IN
500YR OUT
100YR IN
100YR OUT
50YR IN
50YR OUT
25YR IN
25YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
EURV IN
EURV OUT
WQCV IN
WQCV OUT
0
1
2
3
4
5
6
0.1 1 10 100PONDING DEPTH [ft]DRAIN TIME [hr]
500YR
100YR
50YR
25YR
10YR
5YR
2YR
EURV
WQCV
0
1
2
3
4
5
6
7
8
9
10
0
10,000
20,000
30,000
40,000
50,000
60,000
0.00 1.00 2.00 3.00 4.00 5.00 6.00 OUTFLOW [cfs]AREA [ft^2], VOLUME [ft^3]PONDING DEPTH [ft]
User Area [ft^2]
Interpolated Area [ft^2]
Summary Area [ft^2]
Volume [ft^3]
Summary Volume [ft^3]
Outflow [cfs]
Summary Outflow [cfs]
MHFD-Detention_v4 03.xlsm, Outlet Structure 2/3/2021, 12:17 AM
COCOEEVTECBGMEEEETLTLETLGMIRTLWMCOEKM
PJD
2/3/2021
PROPOSED DRAINAGE MAP
2
SCALE: 1"=40'
0 20 40
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\King Soopers - City Market\CO, Fort Collins - KSS000146 -#18 College & Drake\CADD\Exhibits\KSS146_Drainage_Proposed.dwg - Erland Mowinckel - 2/3/2021Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
Planning. Architecture. Engineering.
O
www.gallowayUS.com
C 2016. Galloway & Company, Inc. All Rights Reserved
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
KSS000146
OF 2PROPOSED DRAINAGE MAPMIDTOWN GARDENS MARKETPLACEKING SOOPERS MARKETPLACE #146S. COLLEGE AVE. & DRAKE RD.FORT COLLINS, COLORADOBASIN SUMMARY TABLE - PROPOSED
Tributary Area
C2 C100
tc | 2-Year tc | 100-Year Q2 Q100
Sub-basin (acres)(min)(min)(cfs)(cfs)
A-1 1.33 0.89 1.00 5.0 5.0 3.4 13.3
A-2 0.91 0.82 1.00 5.7 5.0 2.1 9.1
A-3 0.23 0.87 1.00 5.0 5.0 0.6 2.3
A-4 1.65 0.87 1.00 5.1 5.0 4.1 16.5
A-5 0.64 0.85 1.00 5.0 5.0 1.6 6.4
A-6 0.15 0.95 1.00 5.0 5.0 0.4 1.5
A-7 0.15 0.88 1.00 5.0 5.0 0.4 1.5
A-8 0.25 0.81 1.00 5.0 5.0 0.6 2.5
A-9 0.13 0.67 0.84 5.5 5.0 0.2 1.1
A-10 0.11 0.95 1.00 5.0 5.0 0.3 1.1
A-11 1.21 0.95 1.00 5.0 5.0 3.3 12.1
A-12 0.67 0.95 1.00 5.0 5.0 1.8 6.7
A-13 0.88 0.95 1.00 5.0 5.0 2.4 8.8
B-1 0.79 0.90 1.00 5.3 5.0 2.0 7.9
B-2 0.09 0.72 0.91 5.0 5.0 0.2 0.8
C-1 0.11 0.95 1.00 5.0 5.0 0.3 1.1
C-2 0.12 0.95 1.00 5.0 5.0 0.3 1.2
C-3 1.01 0.87 1.00 6.4 5.0 2.3 10.1
C-4 0.01 0.95 1.00 5.0 5.0 0.0 0.1
C-5 0.02 0.95 1.00 5.0 5.0 0.1 0.2
OS-1 0.51 0.54 0.68 13.6 13.6 0.5 2.4
OS-2 0.32 0.73 0.91 7.7 6.0 0.6 2.8
OS-3 0.10 0.91 1.00 5.0 5.0 0.3 1.0
OS-4 0.36 0.91 1.00 5.0 5.0 0.9 3.6
OS-5 0.71 0.87 1.00 5.0 5.0 1.8 7.1
OS-6 0.15 0.95 1.00 5.0 5.0 0.4 1.5