October 30, 1989
I4r. Bob Wilkinson
Natural Resources Department
Development Services
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
Dear Bob,
F�
OCT30M
Both you and Glen Schlueter have been very helpful to me
as I've struggled to resolve some of the storm drainage
and development issues I've encountered. I've found that
strictly engineering solutions which may look good on
paper, do not always fit in appearance or appeal with the
neighborhood. This became evident when the Sunstone
detention pond's natural area was bisected by concrete
drainage pans. The attempt to create an appealing, natural
open space and effectively handle necessary storm water
has been a real learning experience for me.
We have briefly discussed with the City staff trying
something new in Timberline Farm (Sunstone Phase 5). The
approved preliminary and the final currently under review,
have presented a new, more natural wetland look in the
detention pond. We think the quiet, natural area can be
an amenity for the neighborhood, can accomodate drainage
efficiently and create a natural wetland that will become
a valuable community resource.
To demonstrate the viability of this design alternative
and to promote increased awareness for similar opportunities
to create or enhance wetlands, I'd like to request
the Natural Resources Department to participate in and help
fund this project. The design is complete and the site
will be graded as part of the development construction.
I am seeking City funding for the wetland's plant and landscape
materials. This project could be an appropriate and excellent
use of a portion of the undesignated wetland mitigation
funds held by the City.
401 West Mulberry Street
Fort Collins, Colorado 80521
Telephone 303/221-0700
1:
the group, inc.
Realtors
Page 2
October 30, 1989
As the developer, we would enjoy cooperating with the City
to improve the traditional approach to storm drainage and
detention ponds. As you review the plans (submitted to
Planning October 30th), please let us know how we can
proceed. Thank you.
Sincerely,
Linda Hopkins
Vice President
LH/ka