HomeMy WebLinkAboutTIMBERLINE FARM PUD, PARCEL A - PRELIMINARY - 42-89A - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETINGServices
Planning Department
u
NEIGHBORHOOD MEETING MINUTES
PROJECT: Timberline Farm Master Plan and Phase One, Preliminary P.U.D.
LOCATION: Platte River Power Authority
DATE: May 24, 1989
REPRESENTATIVE: Linda Hopkins, The Group, Inc.
Eldon Ward, Cityscape Urban Design
PROJECT PLANNER: Ted Shepard
QUESTIONS, CONCERNS, COMMENTS
1. Who is the builder and what will be the value of the homes?
RESPONSE: The builder will be Geneva Homes, and the homes will be of similar
value as the homes being constructed in Sunstone Village P.U.D. The prices
would range between $80,000 and $100,000.
2. What will the lot sizes be?
RESPONSE: The lots will probably be no smaller than 6,500 square feet. It is
anticipated that the lot sizes will approximate the lots in Sunstone Village,
Filings Two and Three.
3. The parkland fee, collected at the time of building permit, is supposed to
stay within the square mile section for a neighborhood park. Where are these
fees going?
RESPONSE: The Parks and Rec Dept. is negotiating with Mr. Johnson for a parcel
of land located adjacent to the Linton Elementary School on the east. It is not
certain how these negotiations are proceeding. The Parks and Rec Dept. would
prefer this site because it is central to the section, could be served by a
collector street, and would benefit by being adjacent to school.
4. What is the depth of the commercial tract on the northwest corner?
RESPONSE: Approximately 300 feet.
5. Will there be any direct access off Timberline Road for lots?
300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
RESPONSE: No.
6. What kinds of commercial uses are anticipated?
RESPONSE: At this time, a mix of industrial, commercial and retail uses are
anticipated. No specific land uses have been identified as of yet.
7. What are the anticipated uses at the northeast corner of Caribou and Tim-
berline on the Sunstone commercial tract?
RESPONSE: It is anticipated that this parcel will develop as an area for
Business Service Uses as defined by the L.D.G.S. It is not anticipated that
this tract will develop as a Neighborhood Convenience Center.
8. Won't this proposal cause overcrowding at the new elementary school?
RESPONSE: Linton School is under the jurisdiction of the Poudre R-1 School
District. The enrollment boundary is determined by the District, not the City
or the developer. By being located central to a section that is only about half
developed, it is hoped the District accounted for future residential growth.
9. What's going on across Timberline Road on the west?
RESPONSE: The area is owned by Mr. Tiley and is being developed as an indus-
trial park. The construction is for a firm called C.B.W. manufacturing which
makes equipment for handling plastic containers for restaurants.
10. Who will maintain the open drainage tract?
RESPONSE: It is likely that the City's Stormwater Utility would accept mainte-
nance of this facility if it is designed in accordance with the Fox Meadows
Drainage Basin Master Plan. It should be stated, however, that "maintenance"
actually means about 5 to 7 mowings per growing season. It will not be a highly
maintained area.
11. Will storm flows from Phase One reach the detention pond that is built just
north of the Linton School?
RESPONSE: Eventually, storm flows will be released at a controlled rate and
flow into the pond by the school. All detention ponds are designed to collect
and store runoff for a temporary period of time and release at a rate that
won't overwhelm the system.
12. Will the detention pond in Phase One accept flows from the west side of
Timberline Road?
RESPONSE: Yes. The west side of Timberline is all part of the same drainage
basin. All detention ponds in the Fox Meadows Basin are designed to calculate
upstream flows that are built in a developed condition.
0
13. Why is the City encouraging growth in what is regarded as a soft residen-
tial market. It seems that Fort Collins is overbuilt and we don't need anymore
new homes.
RESPONSE: First, the City is not the developer and, as a result, is not making
a decision to develop or not. Second, the City does not encourage or discourage
growth of residential or commercial development. Rather, development proposals
are evaluated based on established policies and criteria. Third, the developer
has analyzed the market and foresees a market demand for homes of this size and
price in this location. Since the developer is in the best position to to assess the
potential risks, the City's role is to then evaluate the development impacts and not
second guess the marketing decision.
14. What is the time frame for development?
RESPONSE: It is anticipated that the developer will submit for approval by the
Planning and Zoning Board in August.
15. Can a Master Plan ever be amended?
RESPONSE: Yes, a Master Plan can be amended. Minor changes can be amended
administratively, and major changes must be approved by the Planning and Zoning
Board.
16. Is the school on Harmony a designated historic landmark?
RESPONSE: At this time, the building is not designated as a historic landmark.