Loading...
HomeMy WebLinkAboutTIMBERLINE FARM MASTER PLAN - 42-89 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSt Services 0 Planning Department August 28, 1989 Mr. Eldon Ward Cityscape Urban Design 3030 South College Avenue Suite 200 Fort Collins, CO 80525 Dear Eldon* Staff has reviewed the request for the 'Timberline Farm Master Plan, Rezoning, and Phase One (Parcel A) Preliminary P.U.D. The following comments are offered* MASTER PLAN: 1. The proposed temporary right-in/right-out access to Parcel F is not consistent with the adopted Harmony Road Access Control Plan. Access to this parcel should be obtained from Timberline Road and/or via an internal road across Spring Canyon Ditch. 2. Staff is concerned about the retail designation on Parcel E. During the deliberations on the Harmony Market P.U.D., there was a concern about Har- mony Road becoming another retail strip from College Avenue to I-25. With the amount of retail space approved for Harmony Market P.U.D., further retail activity may lend the appearance of a strip development. Staff suggests that discussions begin about re -designating Parcel E as Business Park/Industrial. This would be more compatible with the industrial nature that has evolved along the Harmony Road corridor. 3. Please be aware that the Harmony Road corridor is being subject to a joint public -private planning effort to promote a quality gateway concept to the City. A key ingredient is an 80 landscaped buffer, as measured from the right-of-way line, along both sides of Harmony Road. This may affect the development potential of Parcel F. This buffer strip should be so noted on the Master Plan. 4. Note number 7 should be revised to indicate the zoning as R-L-P rather than R-P. 5. A note should be added stating that building heights will be 40 maximum unless a variance is granted by a special review by the Planning and Zoning Board. 6. The area of the creek has some mature vegetation that is worth preserv- ing. This vegetation should be so designated on the Master Plan and enhanced as a natural site amenity. 300 LaPorte Avenue • P.O. Box 580 - Fort Collins, CO 80522-0580 - (303) 221-6750 Timberline Farm M Plan Rezoning ` August 29, 1989 - PaW 2 PHASE ONE, PARCEL A, PRELIMINARY P.U.D.: 1. The right-of-way for Caribou and Timberline need to be dedicated with this filing either by plat or separate deed. 2. A Preliminary Soils Report is required. 3. Staff applauds the proposed. streetscape along Caribou Drive, however, it is not clear how Tract A will be maintained. The Parks and Recreation Dept. will not maintain this area. Also, please investigate whether or not Light and Power has a primary underground conduit for the street lights. If so, a mini- mum clearance of 3.5 feet must be maintained between the street trees and the underground conduit. 4. Manholes will be required at the end of all sanitary sewer stubs. Fire hydrants are needed on Sunleaf Court and Gemstone Court. 5. The preliminary plat does not indicate that the utility easement behind the right-of-way line must be 8 feet on local streets. 6. Please include the title "P.U.D." along with the project name. 7. Please add a note stating: "All landscaping must be installed or secured with an irrevocable letter of credit, performance bond, or escrow account for 125% of the valuation of the job prior to issuance of a final Certificate of Occupancy. 8. Staff has met with the applicant regarding the proposed treatment of. the detention pond. The proposed concept is excellent and meets the intention of policy guidelines of several City departments. Please be advised, however, that the Parks and Red. Dept. will not maintain the detention pond. 9. Staff cautions that a note should be added to the drainage documents and the P.U.D. stating that the detention pond is man-made wetland and may be subject to future modifications, if necessary. This note will help document the fact that there is not a wetland in this location at present. 10. Please be sure to account for the rear yard utilities when proposing tree locations in the detention pond. 11. Please investigate the rock filter system designed to alleviate silt and sediment build up which may occur over time. 12. The fencing treatment along Caribou should reflect what was approved in the Sunstone Filings. In Sunstone, fences along Caribou are not allowed to be solid or exceed four feet in height. Shadowbox fences and variations of shadowbox are allowed. Note number 7 should be revised. Also, at the time of final, a schematic of acceptable fence designs should be placed on the P.U.D, site plan. Timberline Farm Mas Plan Rezoning August 29, 1989 - Pagr 3 13. The site plan should indicate that rear and side yard access onto Caribou, or any collector street will not permitted from individual yards. 14. Since the project seems to be an extension of Sunstone Village, Staff recommends that the same street tree requirement apply. In Sunstone, each lot owner is required to plant and maintain one deciduous street tree and one other tree. The minimum tree caliper shall be 1 1 /2 inches. Corner lots shall establish tow deciduous street trees, one tree on each local street. All lot landscaping to be provided and maintained by the individual homeowner. This requirement will help promote a quality streetscape, especially along Stoneridge Drive which is a long, straight street. 15. Please take a look at Lots 7, 8, 18, and 19 as these lots will face a Business Service area. If these lots are turned so that the sideyard faces Stoney Creek, then the problem is alleviated to a degree. It has been our experience that the development of future neighborhood business areas usually run into a buzz saw of opposition from those residents whose lots face directly toward the commercial area. 16. Given the above comment, have you considered making Stoney Creek into a collector street? Since it would serve both a residential and commercial area, a collector function may be the result.. This concludes Staff comments at this time. Engineering and drainage com- ments are being forwarded to Engineering Professionals, Inc. under separate cover. Please note the following deadlines for the September 25, 1989 P & Z hearing. - Plan revisions are due September 8, 1989 Pmrs, colored renderings, and 10 prints are due September 18, 1989 If there are any questions, concerns., or comments, please feel free to call the Planning Department at 221-6750. Sincerely, h Ted Shepard Project Planner TS/kb xc: Joe Frank, Assistant Planning Director Mike Herzig, Development Engineer