Loading...
HomeMy WebLinkAboutFAIRWAY APARTMENTS - PDP210005 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT Fairway Lane Apartments – Fort Collins, CO Preliminary Drainage Report Project No. 20065 Jensen LaPlante Development 1603 Oakridge Drive, Suite #101 Fort Collins, CO 80525 Submittal Date: 03/17/2021 March 17, 2021 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage and Erosion Control Report for FAIRWAY LANE APARTMENTS Dear Staff: Sanderson Stewart is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies the Project Development Plan submittal for the proposed Fairway Lane Apartments. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM) and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, SANDERSON STEWART Charles Sonnier, PE Senior Engineer/Project Manager Fairway Lane Apartments March 17, 2021 Page 1 Project No. 20065 March 17, 2021 Project No. 20065 PRELIMINARY (PDP) STORMWATER MANAGEMENT REPORT FOR FAIRWAY LANE APARTMENTS FORT COLLINS, COLORADO I. Overview Narrative The proposed project is a multi-family development that will include the construction of eight new apartment buildings, five garages, a clubhouse with amenities and supporting infrastructure improvements. The purpose of this report is to identify the required stormwater management and water quality facilities for the developed site. The design standards governing this project are the Fort Collins Stormwater Criteria Manual (FCSCM), Dec 2018 and the Mile High Flood District’s Urban Storm Drainage Criteria Manual (USDCM), Volume 1-3. II. General Project Location The proposed development is approximately 10.4 acres located at the northwest corner of the South College Avenue and West Fairway Lane intersection. The project site associated with this report encompasses existing Parcel Nos. 9602100006, 9602100012, 9602100015, and 9602109002. More specifically, the project site lies within the northeast corner of Section 3, Township 6 North, Range 69 West, latitude 40.5188, longitude -104.5.0785. The site is generally bounded by the Fort Collins South Transit Center/Fossil Boulevard on the west, the Spradley Barr Ford car dealership on the north, College Avenue on the east and Fairway Lane on the south. Surrounding properties include: the Spradley Barr Ford car dealership adjacent to the property on the north side, Woodley’s Fine Furniture, Worldpac, and Florida Tile on the south side of Fairway Lane Road, and VCA Fort Collins Animal Hospital, and Fossil Ridge Animal Hospital east of South College Avenue. The existing project site is undeveloped and has several mature trees with the ground cover consisting of small shrubs and grasses. Refer to Appendix A for a Vicinity map. III. Existing Site Information Major Basin Description This property is located within the City of Fort Collins Fossil Creek Drainage Basin that outfalls to the Poudre River drainage basin which is a major tributary to the South Platte River. Sub-Basin Description The site is mostly flat to minimally sloped. Generally, runoff from the site sheet flows to the east and south to the existing detention pond, travels through an existing 15” RCP pipe to a water quality facility on the Woodley’s property south of Fairway Lane. The flow is then conveyed through a curb chase onto College Avenue where it is picked up by curb inlets approximately 700 feet south and 1400 feet south of the Woodley’s property, and ultimately discharges into Fossil Creek. Flow then conveys southeast approximately 2.5 miles to the Fossil Creek Reservoir and then another 0.5 miles from the Fossil Creek Reservoir Outlet to the Cache La Poudre River. Fairway Lane Apartments March 17, 2021 Page 2 Project No. 20065 This project site sits within the FEMA Zone X, Area of Minimal flood Hazard, per FEMA FIRM Maps 08069C1000F, dated December 19, 2006. According to the NRCS website, the site consists of primarily Nunn clay loam, 1 to 3 percent slopes, and Fort Collins loam, 0 to 3 percent slopes, both classified as Type C soils. The soils have an erodibility factor of 0.28 to 0.43 which suggests a moderate susceptibility to sheet and rill erosion by runoff. Refer to Appendix A for soil data and floodplain map. IV. Project Description The proposed project will consist of eight new multi-family buildings, five garages, and one clubhouse. Proposed utility improvements will consist of storm sewer, sanitary sewer, and waterline improvements. Surface improvements will include driveway, parking lot, landscaped areas and concrete sidewalk surrounding the buildings. Off-site improvements will mainly consist of a sidewalk, a driveway connection, and an emergency access connection on the north side of the site connecting to the adjacent property. Refer to Appendix A for Site Plan. V. Drainage Design Criteria A. Regulations/Development Criteria The design standards governing this project are the Fort Collins Stormwater Criteria Manual (FCSCM), Dec 2018 and the Mile High Flood District’s Urban Storm Drainage Criteria Manual (USDCM), Volume 1-3. B. Four-Step Process The overall stormwater management strategy to be employed with the proposed project will utilize the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development will incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques will be utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads by implementing multiple Low Impact Development (LID) strategies. Proposed techniques will include providing landscaped islands and buffer areas throughout the site to reduce the overall impervious area, to minimize directly connected impervious areas (MDCIA) and to grade the site such that runoff is routed over a longer distance to increase the time of concentration. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban development of this intensity will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be treated by the proposed detention pond with an associated outlet structure on the southeast corner of the property. The detention pond will act as a sedimentation basin by allowing for the sediment, fines and pollution suspended in the stormwater to settle out before being released downstream. Fairway Lane Apartments March 17, 2021 Page 3 Project No. 20065 Step 3 – Stabilize Streams There are no major wet drainage conveyances within the subject property. Step 4 – Implement Site Specific and Other Source Control BMPs The proposed project will improve upon site specific source controls compared to historic conditions: The proposed development will provide water quality treatment measures; thus, eliminating sources of potential pollution previously left exposed to weathering and runoff processes. The site-specific measure for this project that will provide a higher level of water quality treatment (LID) will consist of permeable paver systems located throughout the site. C. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure 3.4-1 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table 3.4-1 in the FCSCM has been utilized for Rational Method runoff calculations. Refer to Appendix B for criteria used. 2. The Rational Method will be utilized to compute stormwater runoff utilizing coefficients and calculation methods contained in Chapter 5, Section 3.2 of the FCSCM. 3. Three separate design storms will be utilized to address distinct drainage scenarios. The first design storm event analyzed was the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, was the 10-year event. 4. The project site falls within the Fossil Creek Drainage Basin. According to the City of Fort Collins, the developed release rate from the stie must be a maximum 0.2 cfs/acre. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. 6. Per recent meetings with City Stormwater staff, it was discussed that the preferred outfall would be to utilize the existing Weberg PUD outfall pipe that discharges to the south across the Woodly’s parking lot that ultimately collects in a water quality pond near the southeast corner of the parking lot and discharges to the South College Avenue right-of-way. Most, if not all, of the existing outfall pipe across the Woodly’s parking lot lies within an existing access and drainage easement. Coordination with Woodly’s Furniture store ownership and Water Utilities Development Review will be required regarding discharging to this pipe. Refer to Appendix E for excerpt of Weberg PUD Drainage Report and Plat. D. Hydraulic Criteria 1. All drainage and LID facilities proposed with the project are designed in accordance with criteria outlined in the FCSCM and/or the USDCM. Refer to Appendix B for Rational Method calculation. Fairway Lane Apartments March 17, 2021 Page 4 Project No. 20065 E. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. VI. Proposed Drainage Facilities A. General Concept The intent of the proposed design is to safely and adequately convey the minor and major design storm given the site’s existing constraints that were previously mentioned. 1. Stormwater from the project site will be collected into a proposed pond at the southeast corner of the site. This will serve as detention and provide standard water quality treatment for the contributing basins totaling approximately 11.4-acres. 2. A more detailed description of the projects sub-basins and drainage patterns is provided below. B. Specific Details The proposed storm drainage system will collect runoff via sheet flow, curb and gutter and drainage pans and convey to proposed area and curb inlets. The storm drain piping will then convey the collected stormwater to the proposed detention pond on the southeast corner of the property. Three total outfall pipes are proposed to discharge into the proposed detention pond. The basins contributory to the proposed detention pond and the off-site basins are described below. 1. There are five (5) total sub-basins analyzed for this project. Three (3) basins will be collected in the proposed storm system and detention pond while the two (2) remaining basins consist of areas that cannot be captured and detained but instead will flow to South College Avenue. These basins are further described below. Basin Nos. 1 and 2: These sub-basins total to approximately 9.9 acres and are proposed to be collected in various storm inlets throughout the site via sheet flow, curb and gutter and drainage pans. The flow will then be piped to discharge points into the detention pond at the two design points, 1 and 2, associated with the two basins. These basins generally are comprised of rooftop, driveway and parking lot, sidewalk, and landscaping. The percent composite imperviousness for these basins is approximately 61%. Basin 3: This sub-basin totals to approximately 0.89 acres and consists of the southeast side of the transit center, the east half of Fossil Blvd, and the north side of Fairway Lane. The runoff is proposed to be collected in a storm inlet just to the east of the proposed access off Fossil Blvd. The flow will then be piped directly into the proposed detention pond at design point 3. The percent composite imperviousness of this basin is approximately 53%. Basin OS-1: This basin consists of a 0.27-acre area that cannot be collected and conveyed to the proposed detention pond. OS-1 is located along the east side of the site and will generally sheet flow east to the South College Avenue right-of-way. The percent composite imperviousness of this basin is approximately 67% with an approximate discharge rate of 0.54 cfs (2-year) and 2.3 cfs (100-year). Fairway Lane Apartments March 17, 2021 Page 5 Project No. 20065 Basin OS-2: Basin OS-2 is a small 0.12-acre strip of the north half of Fossil Blvd that currently flows into the existing detention basin for Lot 2 of the Weberg PUD. The on- site grading of the proposed detention pond would prevent this basin from being directed into the proposed detention pond and is therefore proposed to flow east to the South College Avenue right-of-way and then south to the same point that the flow from this basin historically discharges to. The percent composite imperviousness of this basin is approximately 92% with an approximate discharge rate of 0.30 cfs (2-year) and 1.2 cfs (100-year). Refer to Appendix C for the Drainage Basin Map 2. A curb cut currently exists at the southeast edge of the Spradley Barr Ford Dealership property to accommodate a future road to the south from the Spradley Barr property. Stormwater currently flows into the project site at this location and over a riprap rundown. This project proposes to re-establish the curb line at this location as the future roadway will no longer be constructed. As a result, stormwater on the Spradley Barr property will continue to flow east to the South College Avenue right-of-way rather than flow onto the project site. 3. Standard water quality and LID treatment will be served by the detention facility at the southeast portion of the site and permeable paver systems located throughout the site. 4. Final design details, and construction documentation shall be provided to the City of Fort Collins for review prior to Final Development Plan approval. 5. Stormwater facility Standard Operating Procedures (SOP) will be provided by the City of Fort Collins in the Development Agreement, as required. C. Low Impact Development (LID) The LID requirement option for this project will treat at least 50% of the new and/or modified impervious areas. Proposed on-site LID treatment intended to meet this requirement will include permeable paver systems located throughout the site. Refer to Appendix D for permeable paver LID Exhibit with calculations. D. Detention Basin Design The proposed detention basin is located at the southeast corner of the site. The basin is designed to store the required runoff from the proposed site and attenuate the flows to at or below the developed maximum release rate for the Fossil Creek Drainage Basin of 0.2 cfs/acre. The detention basin will also be designed to treat and release the WQCV with a 40-hour drain time. The detention pond’s outlet structure will be designed with an orifice plate to slowly discharge the water quality volume while the structure’s horizontal and vertical openings will attenuate the flows to at or below the maximum 0.2 cfs/acre release rate. An emergency spillway will be designed to pass the developed 100-year event to the Fairway Lane right-of-way. The control structure will utilize the existing 15-inch RCP outfall pipe that will convey runoff south under Fairway lane, through the Weberg property, and outfall to the College Avenue Right-Of-Way. Refer to Table 1 below for proposed detention basin input parameters and storage volume results. Fairway Lane Apartments March 17, 2021 Page 6 Project No. 20065 Table 1. Proposed Detention Basin Summary Table Pond ID Contributing Area (Acres) Allowed Release Rate @ 0.2 cfs/acre Required 100-yr Detention Volume (ac-ft) Provided 100-yr Detention Volume (ac-ft) 100-yr Water Surface Elevation (ft) SE Pond 11.42 2.28 2.47 2.47 4997.65 VII. Variance Requests (if necessary) The proposed development is not requesting any variances at this time. VIII. Erosion Control Erosion and sediment control will be achieved through construction control measure to include various BMPs selected from the FCSCM such as silt fencing, vehicle tracking devices, inlet/outlet protection and curb protection, concrete washout, vehicle tracking control and stabilized staging areas. BMP locations will be shown in the corresponding Utility Plans associated with this report. A separate Erosion Control Report and Erosion Control Plans will be provided at Final Development Plan submittal. IX. Conclusion The proposed drainage system design will provide safe conveyance of the minor and major storm events while providing increased water quality treatment compared to the existing condition. The City of Fort Collins Stormwater Criteria Manual has been used to establish the criteria for the developed condition stormwater management plan within the project area. A. Compliance with Standards 1. The drainage design proposed with the proposed project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with this project complies with requirements for the Fossil Creek Drainage Basin. 3. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. 4. The erosion control materials that will be submitted with the final plans will comply with the requirements set forth by the City of Fort Collins’ Stormwater Criteria Manual and the Urban Storm Drainage Criteria Manual. Fairway Lane Apartments March 17, 2021 Page 7 Project No. 20065 B. Drainage Concept 1. The drainage design proposed with this project will effectively limit any potential flooding and/or damage associated with runoff quantities while effectively treating runoff through water quality mitigation features. 2. Standard water quality and LID treatment will be provided by such measures as grass buffers, grassed swales, proposed detention pond, and permeable pavers. REFERENCES 1. City of Fort Collins, December 2018, Fort Collins Stormwater Criteria Manual. 2. Mile High Flood District, 2001 (November 2010 with some sections updated April 2018), Urban Storm Drainage Criteria Manual, Volume 3, Stormwater Quality. 3. United States Department of Agriculture Natural Resources Conservation Service; Web Soil Survey; accessed on-line September 2019. 4. Federal Emergency Management Agency; FEMA Flood Map Service Center; accessed on-line September 2019. APPENDICES 1. Appendix A - Site Information a. Vicinity Map b. Site Plan c. NRCS Soils Data d. FEMA Maps 2. Appendix B – Hydrologic Calculations a. Storm Criteria b. Detention Basin Volume Calculations 3. Appendix C – Drainage Basin Map a. Drainage Basin Map 4. Appendix D – LID Exhibit a. LID Exhibit with Permeable Paver Calculations 5. Appendix E - Relevant Drainage Reports a. Pages from the Weberg PUD Drainage Report APPENDIX A Fairway Lane Apartments – Fort Collins, CO 20065 ProjectSite BLDG 2 BLDG 9 BLDG 1 BLDG 7 BLDG 6 BLDG 5 BLDG 4 BLDG 3 LOT 1SOUTH TRANSIT CENTER SUBDIVISIONLOT 1 SPRADLEY BARR FORD SUBDIVISION LOT 1 WEBERG, P.U.D.SOUTH COLLEGE AVENUE (SH 287)FOSSIL BLVDLOT 1 GEORGE T. SANDERS CO. P.U.D. REC. NO. 19960013545 WEST FAIRWAY LANE 0 50 SCALE: 1" = 50' 1002550 PRELIMINARY DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONSITE PLANFAIRWAY LANE APARTMENTSCOLLEGE AVE & FAIRWAY LANEFORT COLLINS, COLORADOC3.0 CJS20065_SITE_PROD.DWGERB3/17/211ST PDP SUBMITTAL--------------200065 PLAN NOTES 1 NEW ASPHALT PAVING NEW CONCRETE WALK NEW ACCESSIBILITY RAMP NEW 4" PAINTED WHITE STRIPE AT 3' O.C. (TYP.) NEW PAINTED INTERNATIONAL DISABLED SYMBOL (TYP.) NEW 4" PAINTED WHITE PARKING STRIPE (TYP.) NEW HIGH VOLUME DRIVE TYPE IV CONCRETE DRIVE APPROACH PER LCUASS STANDARDS 12" WHITE STOP BAR STOP SIGN (R1-1) NEW TRASH PAD AND ENCLOSURE (SEE ARCH. FOR DETAILS) 2 3 4 5 6 7 8 9 10 NEW BIKE RACKS11 POOL AND AMENITY AREA12 TRANSFORMER PAD PARK SPACE/PLAYGROUND TRICKLE CHANNEL OUTLET STRUCTURE & RIPRAP PROTECTION 13 14 15 16 SECONDARY EMERGENCY ACCESS WITH EMERGENCY ACCESS GATE AND ROLL-OVER CURB17 LANDSCAPE WALL FOR TREE PROTECTION18 NEW CURB AND GUTTER (TYP.)19 DOG PARK20 NON-ENGINEERED RETAINING WALL (VARYING HEIGHT - 1 FT TO 2.5 FT)21 DOGHOUSES WITH FIRE RISER (TYP.)22 LIGHT POLES23 PERGOLA AND BBQ GRILLS24 PEDESTRIAN HANDICAP RAMPS AND CROSSWALK (TYP.)25 SIDEWALK CHASE AND FLUME (TO MATCH EXISTING WIDTH)26 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE WATER & WASTEWATER UTILITY DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE STANDARD 90 DEGREE PARKING SPACE WITH 2' OVERHANG (TYP.)27 SIDEWALK ANGLED PARKING SPACE WITH 2' OVERHANG (TYP.)28 STANDARD COMPACT PARKING SPACES (TYP.)29 PARALLEL PARKING SPACES (TYP.)30 NOTES: 1.EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. 2.UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. FIRE DEPARTMENT CONNECTION (FDC)31 Detention Basin Area 9 Custom Soil Resource Report Soil Map 448516044852004485240448528044853204485360448540044854404485480448516044852004485240448528044853204485360448540044854404485480493240 493280 493320 493360 493400 493440 493480 493240 493280 493320 493360 493400 493440 493480 40° 31' 12'' N 105° 4' 47'' W40° 31' 12'' N105° 4' 36'' W40° 31' 1'' N 105° 4' 47'' W40° 31' 1'' N 105° 4' 36'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,650 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 15, Jun 9, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 35 Fort Collins loam, 0 to 3 percent slopes 3.4 26.8% 74 Nunn clay loam, 1 to 3 percent slopes 9.4 73.2% Totals for Area of Interest 12.9 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, Custom Soil Resource Report 11 onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 12 Larimer County Area, Colorado 35—Fort Collins loam, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 2tlnc Elevation: 4,020 to 6,730 feet Mean annual precipitation: 14 to 16 inches Mean annual air temperature: 46 to 48 degrees F Frost-free period: 135 to 160 days Farmland classification: Prime farmland if irrigated Map Unit Composition Fort collins and similar soils:85 percent Minor components:15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Fort Collins Setting Landform:Stream terraces, interfluves Landform position (three-dimensional):Interfluve, tread Down-slope shape:Linear Across-slope shape:Linear Parent material:Pleistocene or older alluvium and/or eolian deposits Typical profile Ap - 0 to 4 inches: loam Bt1 - 4 to 9 inches: clay loam Bt2 - 9 to 16 inches: clay loam Bk1 - 16 to 29 inches: loam Bk2 - 29 to 80 inches: loam Properties and qualities Slope:0 to 3 percent Depth to restrictive feature:More than 80 inches Drainage class:Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat):Moderately high to high (0.20 to 2.00 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:12 percent Maximum salinity:Nonsaline to very slightly saline (0.1 to 2.0 mmhos/cm) Available water capacity:High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: R067BY002CO - Loamy Plains Hydric soil rating: No Custom Soil Resource Report 13 Minor Components Nunn Percent of map unit:10 percent Landform:Stream terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY002CO - Loamy Plains Hydric soil rating: No Vona Percent of map unit:5 percent Landform:Interfluves Landform position (three-dimensional):Side slope, interfluve Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY024CO - Sandy Plains Hydric soil rating: No 74—Nunn clay loam, 1 to 3 percent slopes Map Unit Setting National map unit symbol: 2tlpl Elevation: 3,900 to 5,840 feet Mean annual precipitation: 13 to 17 inches Mean annual air temperature: 50 to 54 degrees F Frost-free period: 135 to 160 days Farmland classification: Prime farmland if irrigated Map Unit Composition Nunn and similar soils:85 percent Minor components:15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nunn Setting Landform:Terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Parent material:Pleistocene aged alluvium and/or eolian deposits Typical profile Ap - 0 to 9 inches: clay loam Bt - 9 to 13 inches: clay loam Btk - 13 to 25 inches: clay loam Bk1 - 25 to 38 inches: clay loam Bk2 - 38 to 80 inches: clay loam Custom Soil Resource Report 14 Properties and qualities Slope:1 to 3 percent Depth to restrictive feature:More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat):Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:7 percent Maximum salinity:Nonsaline to very slightly saline (0.1 to 2.0 mmhos/cm) Sodium adsorption ratio, maximum:0.5 Available water capacity:High (about 9.9 inches) Interpretive groups Land capability classification (irrigated): 2e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: R067BY042CO - Clayey Plains Hydric soil rating: No Minor Components Heldt Percent of map unit:10 percent Landform:Terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY042CO - Clayey Plains Hydric soil rating: No Satanta Percent of map unit:5 percent Landform:Terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY002CO - Loamy Plains Hydric soil rating: No Custom Soil Resource Report 15 Soil Information for All Uses Soil Properties and Qualities The Soil Properties and Qualities section includes various soil properties and qualities displayed as thematic maps with a summary table for the soil map units in the selected area of interest. A single value or rating for each map unit is generated by aggregating the interpretive ratings of individual map unit components. This aggregation process is defined for each property or quality. Soil Erosion Factors Soil Erosion Factors are soil properties and interpretations used in evaluating the soil for potential erosion. Example soil erosion factors can include K factor for the whole soil or on a rock free basis, T factor, wind erodibility group and wind erodibility index. K Factor, Whole Soil Erosion factor K indicates the susceptibility of a soil to sheet and rill erosion by water. Factor K is one of six factors used in the Universal Soil Loss Equation (USLE) and the Revised Universal Soil Loss Equation (RUSLE) to predict the average annual rate of soil loss by sheet and rill erosion in tons per acre per year. The estimates are based primarily on percentage of silt, sand, and organic matter and on soil structure and saturated hydraulic conductivity (Ksat). Values of K range from 0.02 to 0.69. Other factors being equal, the higher the value, the more susceptible the soil is to sheet and rill erosion by water. "Erosion factor Kw (whole soil)" indicates the erodibility of the whole soil. The estimates are modified by the presence of rock fragments. 16 Table—Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 35 Fort Collins loam, 0 to 3 percent slopes C 3.4 26.8% 74 Nunn clay loam, 1 to 3 percent slopes C 9.4 73.2% Totals for Area of Interest 12.9 100.0% Rating Options—Hydrologic Soil Group Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Custom Soil Resource Report 23 National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 2/4/2021 at 5:35 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 105°5'1"W 40°31'18"N 105°4'23"W 40°30'51"N Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 Project Site APPENDIX B Fairway Lane Apartments – Fort Collins, CO 20065 FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 2.0 Runoff Methodologies 3.1 Rational Formula Page 3 2.0 Runoff Methodologies There are two runoff analysis methodologies that are approved by the City: the Rational Method and the Stormwater Management Model (SWMM). In general, the chosen methodology should follow the basin size limitations listed in Table 2.0-1 below. SWMM must also be used to assess the performance of multiple detention basins in parallel or in series in a particular watershed. The City is the determining authority with respect to the appropriate methodology to use under uncertain circumstances. Please note that the Colorado Urban Hydrograph Procedure (CUHP) is not allowed to be utilized for hydrology analysis for Fort Collins area projects because this procedure is calibrated using Denver/Boulder rainfall data. Table 2.0-1: Runoff Calculation Method Project Size Runoff Calculation Method < 5 acres Rational Method Required 5-20 acres Rational Method or SWMM Accepted ≥ 20 acres SWMM Required Reference: Drainage Report submittal requirements must be prepared in accordance with the criteria set forth in Chapter 2: Development Submittal Requirements. 3.0 Rational Method 3.1 Rational Formula The methodology and theory behind the Rational Method is not covered in this Manual as this subject is well described in many hydrology reference books. However, the Rational Method procedure is generally provided in the following sections. Runoff coefficient calculations, rainfall data, and the time of concentration formula are specific to the City and are included below. The Rational Formula is represented by the following equation: 𝐐𝐐=𝐂𝐂𝐂𝐂𝐂𝐂 Equation 5-1 Where: Q = Peak Rate of Runoff, cfs C = Runoff Coefficient, dimensionless I = Rainfall Intensity, in/hr A = Area of the Basin or Sub-basin, acres FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.2 Runoff Coefficients Page 4 3.2 Runoff Coefficients Runoff coefficients used for the Rational Method are determined based on either overall land use or surface type across the drainage area. For Overall Drainage Plan (ODP) submittals, when surface types may not yet be known, land use shall be used to estimate flow rates and volumes. Table 3.2-1 lists the runoff coefficients for common types of land uses in the City. Table 3.2-1. Zoning Classification - Runoff Coefficients Land Use Runoff Coefficient (C) Residential Urban Estate 0.30 Low Density 0.55 Medium Density 0.65 High Density 0.85 Commercial Commercial 0.85 Industrial 0.95 Undeveloped Open Lands, Transition 0.20 Greenbelts, Agriculture 0.20 Reference: For further guidance regarding zoning classifications, refer to the Land Use Code, Article 4. For a Project Development Plan (PDP) or Final Plan (FP) submittals, runoff coefficients must be based on the proposed land surface types. Since the actual runoff coefficients may be different from those specified in Table 3.2-1, Table 3.2-2 lists coefficients for the specific types of land surfaces. FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.2 Runoff Coefficients Page 5 Table 3.2-2. Surface Type - Runoff Coefficients Surface Type Runoff Coefficients Hardscape or Hard Surface Asphalt, Concrete 0.95 Rooftop 0.95 Recycled Asphalt 0.80 Gravel 0.50 Pavers 0.50 Landscape or Pervious Surface Lawns, Sandy Soil, Flat Slope < 2% 0.10 Lawns, Sandy Soil, Avg Slope 2-7% 0.15 Lawns, Sandy Soil, Steep Slope >7% 0.20 Lawns, Clayey Soil, Flat Slope < 2% 0.20 Lawns, Clayey Soil, Avg Slope 2-7% 0.25 Lawns, Clayey Soil, Steep Slope >7% 0.35 3.2.1 Composite Runoff Coefficients Drainage sub-basins are frequently composed of land that has multiple surface types or zoning classifications. In such cases a composite runoff coefficient must be calculated for any given drainage sub-basin. The composite runoff coefficient is obtained using the following formula: ( ) t n i ii A xAC C ∑ ==1 Equation 5-2 Where: C = Composite Runoff Coefficient Ci = Runoff Coefficient for Specific Area (Ai), dimensionless Ai = Area of Surface with Runoff Coefficient of Ci, acres or square feet n = Number of different surfaces to be considered At = Total Area over which C is applicable, acres or square feet 3.2.2 Runoff Coefficient Frequency Adjustment Factor The runoff coefficients provided in Table 3.2-1 and Table 3.2-2 are appropriate for use with the 2-year storm event. For any analysis of storms with higher intensities, an adjustment of the runoff coefficient is required due to the lessening amount of infiltration, depression retention, evapotranspiration and other losses that have a proportionally smaller effect on high-intensity storm runoff. This adjustment is FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.3 Time of Concentration Page 6 applied to the composite runoff coefficient. These frequency adjustment factors, Cf, are found in Table 3.2-3. Table 3.2-3. Frequency Adjustment Factors Storm Return Period (years) Frequency Adjustment Factor (Cf) 2, 5, 10 1.00 25 1.10 50 1.20 100 1.25 3.3 Time of Concentration 3.3.1 Overall Equation The next step to approximate runoff using the Rational Method is to estimate the Time of Concentration, Tc, or the time for water to flow from the most remote part of the drainage sub-basin to the design point under consideration. The Time of Concentration is represented by the following equation: 𝐓𝐓𝐜𝐜=𝐓𝐓𝐢𝐢+𝐓𝐓𝐭𝐭 Equation 5-3 Where: Tc = Total Time of Concentration, minutes Ti = Initial or Overland Flow Time of Concentration, minutes Tt = Channelized Flow in Swale, Gutter or Pipe, minutes 3.3.2 Overland Flow Time Overland flow, Ti, can be determined by the following equation: 𝐓𝐓𝐢𝐢=𝟏𝟏.𝟖𝟖𝟖𝟖(𝟏𝟏.𝟏𝟏−𝐂𝐂𝐂𝐂𝐂𝐂𝐟𝐟)√𝐋𝐋√𝐒𝐒𝟑𝟑 Equation 3.3-2 Where: C = Runoff Coefficient, dimensionless Cf = Frequency Adjustment Factor, dimensionless L = Length of Overland Flow, feet S = Slope, percent CXCF PRODUCT OF CXCF CANNOT EXCEED THE VALUE OF 1 OVERLAND FLOW LENGTH L=200’ MAX IN DEVELOPED AREAS L=500’ MAX IN UNDEVELOPED AREAS FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.4 Intensity-Duration-Frequency Curves for Rational Method Page 7 3.3.3 Channelized Flow Time Travel time in a swale, gutter or storm pipe is considered “channelized” or “concentrated” flow and can be estimated using the Manning’s Equation: 𝐕𝐕= 𝟏𝟏.𝟒𝟒𝟒𝟒𝐧𝐧 𝐑𝐑𝟐𝟐/𝟑𝟑𝐒𝐒𝟏𝟏/𝟐𝟐 Equation 5-4 Where: V = Velocity, feet/second n = Roughness Coefficient, dimensionless R = Hydraulic Radius, feet (Hydraulic Radius = area / wetted perimeter, feet) S = Longitudinal Slope, feet/feet And: 𝐓𝐓𝐭𝐭=𝐋𝐋𝐕𝐕𝐂𝐂𝐕𝐕𝐕𝐕 Equation 5-5 3.3.4 Total Time of Concentration A minimum Tc of 5 minutes is required. The maximum Tc allowed for the most upstream design point shall be calculated using the following equation: 𝐓𝐓𝐜𝐜=𝐋𝐋𝟏𝟏𝟖𝟖𝐕𝐕+𝟏𝟏𝐕𝐕 Equation 3.3-5 The Total Time of Concentration, Tc, is the lesser of the values of Tc calculated using Tc = Ti + Tt or the equation listed above. 3.4 Intensity-Duration-Frequency Curves for Rational Method The two-hour rainfall Intensity-Duration-Frequency curves for use with the Rational Method is provided in Table 3.4-1 and Figure 3.4-1. TC • A MINIMUM TC OF 5 MINUTES IS REQUIRED IN ALL CASES. • A MAXIMUM TC OF 5 MINUTES IS TYPICAL FOR SMALLER, URBAN PROJECTS. FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.4 Intensity-Duration-Frequency Curves for Rational Method Page 8 Table 3.4-1. IDF Table for Rational Method Duration (min) Intensity 2-year (in/hr) Intensity 10-year (in/hr) Intensity 100-year (in/hr) Duration (min) Intensity 2-year (in/hr) Intensity 10-year (in/hr) Intensity 100-year (in/hr) 5 2.85 4.87 9.95 39 1.09 1.86 3.8 6 2.67 4.56 9.31 40 1.07 1.83 3.74 7 2.52 4.31 8.80 41 1.05 1.80 3.68 8 2.40 4.10 8.38 42 1.04 1.77 3.62 9 2.30 3.93 8.03 43 1.02 1.74 3.56 10 2.21 3.78 7.72 44 1.01 1.72 3.51 11 2.13 3.63 7.42 45 0.99 1.69 3.46 12 2.05 3.50 7.16 46 0.98 1.67 3.41 13 1.98 3.39 6.92 47 0.96 1.64 3.36 14 1.92 3.29 6.71 48 0.95 1.62 3.31 15 1.87 3.19 6.52 49 0.94 1.6 3.27 16 1.81 3.08 6.30 50 0.92 1.58 3.23 17 1.75 2.99 6.10 51 0.91 1.56 3.18 18 1.70 2.90 5.92 52 0.9 1.54 3.14 19 1.65 2.82 5.75 53 0.89 1.52 3.10 20 1.61 2.74 5.60 54 0.88 1.50 3.07 21 1.56 2.67 5.46 55 0.87 1.48 3.03 22 1.53 2.61 5.32 56 0.86 1.47 2.99 23 1.49 2.55 5.20 57 0.85 1.45 2.96 24 1.46 2.49 5.09 58 0.84 1.43 2.92 25 1.43 2.44 4.98 59 0.83 1.42 2.89 26 1.4 2.39 4.87 60 0.82 1.4 2.86 27 1.37 2.34 4.78 65 0.78 1.32 2.71 28 1.34 2.29 4.69 70 0.73 1.25 2.59 29 1.32 2.25 4.60 75 0.70 1.19 2.48 30 1.30 2.21 4.52 80 0.66 1.14 2.38 31 1.27 2.16 4.42 85 0.64 1.09 2.29 32 1.24 2.12 4.33 90 0.61 1.05 2.21 33 1.22 2.08 4.24 95 0.58 1.01 2.13 34 1.19 2.04 4.16 100 0.56 0.97 2.06 35 1.17 2.00 4.08 105 0.54 0.94 2.00 36 1.15 1.96 4.01 110 0.52 0.91 1.94 37 1.16 1.93 3.93 115 0.51 0.88 1.88 38 1.11 1.89 3.87 120 0.49 0.86 1.84 FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.4 Intensity-Duration-Frequency Curves for Rational Method Page 9 Figure 3.4-1. Rainfall IDF Curve – Fort Collins FORT COLLINS STORMWATER CRITERIA MANUAL Detention (Ch. 6) 2.0 Water Quantity Detention 2.2 SWMM Page 6 Table 2.1-1: Detention Calculation Method Project Size * Detention Calculation Method < 5 acres Modified FAA Required 5-20 acres Modified FAA or SWMM Accepted ≥20 acres SWMM Required *Project Size must include any offsite runoff that is tributary to the subject site Note about the UDFCD Manual: Because of the Master Drainage Plans detention requirements, the City does not allow for detention basins to be designed with the “full- spectrum detention” method that is described in the UDFCD Manual. 2.2 SWMM For project sites equal to or greater than 20 acres, the use of a Stormwater Management Model (SWMM) is required. If there are upstream detention facilities within the watershed that contribute and route runoff into the site being designed, hydrograph routing methods must be employed to allow for the upstream facilities to be included in the overall SWMM model. Reference: The theory and methodology for reservoir routing is not covered in this Manual as this subject is well described in many hydrology reference books. 2.3 Modified FAA Procedure The Modified FAA Procedure (1966) detention sizing method as modified by Guo (1999a), provides a reasonable estimate of volume requirements for detention facilities. This method provides sizing for one level of peak control only and not for multi-stage control facilities. The input required for this Modified FAA volume calculation procedure includes: A = area of the catchment tributary to the detention facility (acres) C = runoff coefficient Qout = allowable maximum release rate from the detention facility (cfs) Tc = time of concentration for the tributary catchment (minutes) I = rainfall intensity (inches/hour) at the site taken from Chapter 4: Hydrology Standards, for the relevant return frequency storms The calculations are best set up in a tabular (spreadsheet) form with each 5-minute increment in duration being entered in rows and the following variables being entered, or calculated, in each column: 1) Storm Duration Time, T (minutes), up to 120 minutes FORT COLLINS STORMWATER CRITERIA MANUAL Detention (Ch. 6) 2.0 Water Quantity Detention 2.4 Detention Basin Volume Page 7 2) Rainfall Intensity, I (inches per hour) 3) Inflow volume, Vi (cubic feet), calculated as the cumulative volume at the given storm duration using the equation: Vi = CIA (60T) Equation 6-1 4) Calculated outflow volume, Vo, (cubic feet), given the maximum allowable release rate, Qout (cfs), over the duration T: Vo= Qout (60 T) Equation 6-2 5) Required detention volume, Vs (cubic feet), calculated using the equation: Vs = Vi – Vo Equation 6-3 The value of Vs increases with time, reaches a maximum value, and then starts to decrease. The maximum value of Vs is the required detention volume for the detention facility. Note about UDFCD Manual: Please note that the UDFCD excel-based spreadsheets are not allowed to be used to calculate required detention volumes because they utilize Denver region rainfall data. The Design Engineer will be required to establish their own spreadsheet for calculating basin volume requirements based on the Modified FAA Procedure documented above using Fort Collins IDF curves. 2.4 Detention Basin Volume 2.4.1 Stage-Storage A relationship between the water surface elevation and detention basin volume, commonly referred to as a “stage-storage” curve, needs to be developed. This relationship, in conjunction with the “stage- discharge” relationship will provide the required detention volume. An initial detention basin design must be created and a “stage-storage” curve developed that corresponds to the design. The available detention volume shall be based on the following formula: 𝐕𝐕=𝐃𝐃𝟑𝟑�𝐀𝐀+𝐁𝐁+√𝐀𝐀𝐁𝐁� Equation 6-4 Where V = Volume between two contours, ft3 D = Depth between contours, feet A = Area of bottom contour, ft2 B = Area of top contour, ft2 Fairway Lane ApartmentsFort Collins, ColoradoLAND USE AND IMPERVIOUSNESS3/16/202120065Surface TypeRunoff Coefficients% ImperviousAsphalt0.95100%2-Year Cf1.00Concrete 0.95 90%10-Year Cf1.00Rooftop0.9590%100-Year Cf1.25Gravel0.5040%Clayey Soil Landscape < 2%0.202%Clayey soil Landscape 2-7%0.252%BASIN IMPERVIOUS CALCSBasins Conveying to On-Site Detention Basin to SoutheastTotal Area, A Total Area, A2-Year 10-Year 100-Year %Basin Description sf Acres Asphalt Rooftop Concrete Landscape Composite Composite Composite Composite IA Soil TypeDesign PointArea (sf) Area (sf) Area (sf) Area (sf) Runoff Coefficient Runoff Coefficient Runoff Coefficient Impervious, I (A,B,C,D)1 B-1 424,2749.74165,780 95,353 0 163,141 0 0.66 0.66 0.8360% 5.85C2 B-2 8,2760.197,400 0 0 876 0 0.87 0.87 1.0090% 0.17C3 B-3 38,7680.8920,170 0 0 18,598 0 0.59 0.59 0.7453% 0.47CO1 OS-1 11,7610.277,800 0 0 3,961 0 0.70 0.70 0.8767% 0.18CO2OS-25,2270.124,8000042700.890.891.0092%0.11CGravel Area (sf)Fort Collins Rational Calculations_2-10-100-Yr_.xlsxComposite 100-Yr RunoffCoefficient = 0.82(contributory to detention) 0.82 2.28 11.42 Time (min)Intensity (In/hr)Qin (cfs)Vin (ft3)Qout (cfs)Vout (ft3) Volume Detained (ft3) Volume Detained (acre-ft) 5 9.95 93.18 27953 2.28 685 27268 0.63 10 7.72 72.29 43376 2.28 1370 42006 0.96 15 6.52 61.06 54950 2.28 2056 52895 1.21 20 5.6 52.44 62929 2.28 2741 60188 1.38 25 4.98 46.63 69952 2.28 3426 66526 1.53 30 4.52 42.33 76189 2.28 4111 72078 1.65 35 4.08 38.21 80234 2.28 4796 75438 1.73 40 3.74 35.02 84055 2.28 5482 78573 1.80 45 3.46 32.40 87482 2.28 6167 81315 1.87 50 3.23 30.25 90741 2.28 6852 83889 1.93 55 3.03 28.37 93635 2.28 7537 86097 1.98 60 2.86 26.78 96416 2.28 8222 88193 2.02 65 2.71 25.38 98972 2.28 8908 90065 2.07 70 2.59 24.25 101866 2.28 9593 92273 2.12 75 2.48 23.22 104507 2.28 10278 94229 2.16 80 2.38 22.29 106979 2.28 10963 96016 2.20 85 2.29 21.44 109367 2.28 11648 97718 2.24 90 2.21 20.70 111755 2.28 12334 99421 2.28 95 2.13 19.95 113693 2.28 13019 100674 2.31 100 2.06 19.29 115744 2.28 13704 102040 2.34 105 2.00 18.73 117991 2.28 14389 103602 2.38 110 1.94 18.17 119902 2.28 15074 104827 2.41 115 1.88 17.61 121475 2.28 15760 105715 2.43 120 1.84 17.23 124060 2.28 16445 107615 2.47 2.47 Detention requirements for Detention Pond for Major Storm (100-Yr) Modified FAA Method Total Detention @ 120 mins (Acre-ft) = Runoff Coefficient Allowed Release Rate (cfs) Area (Acres) APPENDIX C Fairway Lane Apartments – Fort Collins, CO 20065 9.74 B-1 0.66 0.83 0.89 B-3 0.59 0.74 0.19 B-2 0.87 1.00 0.12 OS-2 0.89 1.00 0.27 OS-1 0.70 0.87 0 50 SCALE: 1" = 50' 1002550 PRELIMINARY DEVELOPMENT PLANNORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION----DRAINAGE PLANFAIRWAY LANE APARTMENTSCOLLEGE AVE & FAIRWAY LANEFORT COLLINS, COLORADOC6.0 CJS20065_DRAIN_PROD.DWGERB3/17/211ST PDP SUBMITTAL--------------200065C2 C100 BASIN # AREA C2 = 2 YR RUNOFF COEFFICIENT C100 = 100 YR RUNOFF COEFFICIENT Detention Basin Storage = 2.47 Ac-Ft APPENDIX D Fairway Lane Apartments – Fort Collins, CO 20065 BLDG 2 BLDG 9 BLDG 1 BLDG 7 BLDG 6 BLDG 5 BLDG 4 BLDG 3 LID TREATMENT EXHIBIT NORTH 50 25 0 SCALE:1" = 50' 50 100 PROPOSED PERMEABLE PAVERS IMPERVIOUS SURFACES CALCULATED WITHIN THESE AREAS AND CONTRIBUTORY TO PAVER SECTIONS Paver Area Description Paver Area (sf)Contributing Impervious Area (sf) Run-On Ratio (.33 Min Allowed) P1 1,551 3,448 0.45 P2 1,577 3,399 0.46 P3 3,177 7,355 0.43 P4 3,341 7,335 0.46 P5 2,471 4,927 0.50 P6 2,512 6,327 0.40 P7 1874 5676 0.33 P8 1408 4330 0.33 P9 14082 38461 0.37 P10 3649 7437 0.49 P11 2256 6940 0.33 Totals 37,898 95,635 0.40 NEW OR MODIFIED IMPERVIOUS AREAS 265,152 SF TARGET TREATMENT PERCENTAGE 50% MINIMUM AREA TO BE TREATED BY LID MEASURES 132,576 SF TOTAL NEW PAVED DRIVEABLE SURFACE 104,707 TARGET PERMEABLE DRIVEABLE SURFACE 25% PERMEABLE DRIVEABLE SURFACE 37,898 PERCENT OF TOTAL DRIVEABLE SURFACE BEING PERMEABLE PAVERS 36.2% ONSITE AREA CONTRIBUTORY TO PAVERS 133,533 SF PERCENT TOTAL PROJECT AREA TREATED 50.4% PROJECT SUMMARY PERMEABLE PAVER SYSTEM = 26,177 sf (including paver sections) APPENDIX E Fairway Lane Apartments – Fort Collins, CO 20065