Loading...
HomeMy WebLinkAbout1990 JUNIOR HIGH SCHOOL - SITE PLAN ADVISORY REVIEW - 20-87A - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (2)CITY OF FORT- COLLINS OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT February 22, 1988 Carr Bicker ZVFK Architects 100 Old Town Square Suite 200 Fort Collins, CO 80524 Dear Carr, The Staff has reviewed the site development plan for the 1990 Junior High School, and offers the following comments: 1. The Seneca Street ROW dedication has not been resolved. Parsons & Associ- ates were supposed to be working on getting the corrected language for the dedication, but as of this time, it has not been completed. This issue is very important and needs to be resolved. The dedication documents will have to be accepted by the City Council at a public hearing. Mike Herzig should be contacted for further details. 2. Provisions should be made to extend an 8" sanitary sewer to the west property line of this site. 3. Certain utility easements have been asked for and agreed upon between the City and the School District. However, I do not believe that the City has received the dedications. What is the status of these utility easements? A fifteen foot utility easement will be needed along Seneca Street for general utility installation, including natural gas; and, an eight foot utility easement is needed along the west property line to allow adjacent property owners to connect to the proposed 8" water main. 4. Several water lines were stubbed off of Seneca Street to serve the develop- ment originally proposed for this site. These stubs must be removed if they are not used. OFFICE OF DEVELOPMENT SERVICES, PLANNING 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6750 5. The building as shown includes a 4" fire sprinkler service line. This fire main may need to be increased to a larger. size to accommodate a sprinkler design. Please contact the Poudre Fire Authority Technician for details. 6. With both the JHS and grade school being located adjacent to one another and extensive athletic facilities, this would be a high level service area for Transfort. Youth ridership continues to grow at Blevins, Boltz, and most likely will at these two school locations. A bus pull-out area along Seneca Street would be highly desirable. Transfort would supply a bus passenger shelter. 7. One of the intents of combining the JHS and elementary Schools sites was to create a "campus" atmosphere. One of the elements of achieving this goal is building architecture. The staff questions how the two building designs will be compatible and meet this intent. 8. The submittal package did not include a final landscape plan. A plan should be submitted which indicates planting sizes, list and quantity. A free permit (no charge) must be obtained from the City Forester before any trees or shrubs are planted, pruned or removed in the public right-of-way. Additional berming, tree and evergreen screening is recommended along the west property line, between the service area and future residential areas. 9. Dimensions of all parking areas and driveways should be indicated on the site plan. The staff would recommend that the southerly entrance to the parking area be widened including utilizing a greater turning radius. All "one-way" aisles and entrances should be marked, if any. All proposed and existing curb cuts on the cast side of Seneca Street should be shown on the site plan. 10. The staff questions how bus traffic will be handled. Turning radius should be shown on the site development plan. 11. During the discussions of the overall Master Plan for the combined elemen- tary/JHS schools, the need for an alternative access to the "campus" was identified: Extension of Seneca Street to Ilorsctooth Road and/or extension of Troutman between Seneca and Shields Street. Staff would like meet to discuss the timing and improvement responsibility of these access routes. 12. A bike path was planned between the elementary school and the Imperial Estates Subdivision. How will this sidewalk be linked to the Junior High School site? 13. Colors of exterior materials on the building should be shown on the building elevations. 14. Ten full size copies and one 8 1/2" x 11" PMT reduction of the site plan and building elevations should be submitted by noon on March 21, 1988. Thank you for the opportunity to comment on the plans. This item is schc- duled to be heard by the Planning and Zoning Board at their March 28, 19S8 meeting. I would recommend that we meet to discuss the above comments as soon as possible. Please let me know when would be convenient to meet. Revisions to the plans should be submitted by March 2, 1988. If you should have any further questions, please feel free to call me. Sincerel , Joe Frank istant Planning Director cc. Mike Herzig, Development Coordinator George Galida,, PR-1 School District