HomeMy WebLinkAboutSUPERTOTS AT OAKRIDGE WEST, 2ND FILING - PRELIMINARY & FINAL - 23-87D - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTEngineering Consultants
2900 South College Avenue
Fort Collins, Colorado 80525
(303) 226-4955
March 5, 1990
Ms. Susan D. Hayes
Stormwater Utility Department
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
RE: OAKRIDGE WEST - SECOND FILING - SUPERTOTS LEARNING CENTER
FINAL DRAINAGE REPORT
Dear Susan,
RBD Inc. is pleased to submit this letter and accompaning cal-
culations and Drainage and Grading Plan as the final drainage
report for the Oakridge West Second Filing, a planned unit
development, proposed by the Everitt Companies.
This 1.14 acre site is located within the McClellands Major Basin
of South Fort Collins, Colorado, as shown in the vicinty map
(Figure 1). It is bounded on the east by Lemay Avenue, on the
north by the Evangelical Covenant Church, and on the west and
south by undeveloped property. The site presently is covered
with field stubble and natural grasses, and slopes in a southeas-
tern direction where it drains into an existing storm drain inlet
at the northwest corner of Lemay Avenue and Rule Drive. A ditch
running along Lemay Avenue also crosses the site which convey
present stormwaters north of the site (refer to Figure 2).
The project site has been divided into two sub -basins (Basins A &
B) as shown on the Drainage and Grading Plan. A composite runoff
coefficient "C" was calculated for each sub -basin and used in
computing the runoff and the storage detention.. The Mass Diagram
Method was used to compute the storage volumes for each basin.
Two detention ponds provide for the required storage volume. The
ponding area west of the building and the parking lot area will
provide the storage volume for Basins A and B, respectively. The
Pond Information Table on the Drainage and Grading Plan sum-
marizes the storage volume analyses. The outflow release rates
were based on 0.5 cfs/ac which produce outflow rates of 0.21 cfs
for Pond A and 0.37 cfs for Pond B. These release outflows are
then discharged into a 30" storm drain pipe.
Offsite flows include the runoff from the basin areas north and
west of the site (again, refer to Figure 2). Runoff flows from
Other Offices: Vail, Colorado (303) 476-6340 • Colorado Springs, Colorado (719) 598-4107 • Longmont, Colorado (303) 678-9584
the north have been previously calculated in the Harmonv Market
P.U.D. Filing One Final report (revised 4/89 by RBD, Inc.) to be
15.8 cfs. The runoff from the church site was calculated to be
1.7 cfs. Thus, the offsite flow north of the site is 17.5 cfs.
A 30" storm drain pipe will replace the existing ditch that
traverses north to south along Lemay Avenue and convey these of-
fsite flows through the site. Offsite runoff west of the site
will collect in Pond A up to an elevation 4981.8. Once at this
elevation, the runoff will continue to flow in a southeasterlv
direction until discharging into the storm drain inlet at the
northwest corner of Lemay Avenue and Rule Drive.
Should the ponding water surface elevation in either pond rise
greater than the elevations shown in the table:
Pond A will continue to drain through the area inlet up to eleva-
tion 4981.8. At this point, overflows would follow the same
flow pattern as the offsite flows coming from the west.
Pond B, however, would overflow into the church parking lot to
the north at elevation 4980.65 and then drain through the
church's release outflow system. If the ponding water surface
elevation continued to rise up to 4980.85, overflows would then
surcharge onto Lemay Avenue and flow south until reaching the
storm drain inlet at the northwest corner of Lemay Avenue and
Rule Drive.
When the recommendations from this report are implemented, along
with the City of Fort Collins drainage criteria, this site will
drain stormwater in a safe and controlled manner.
Please call if you may have any questions or concerns.
Sincerely,
RB Inc.
\1\\1t1111111161IPPPI//!/
QA >Q, Ilk-EGI
Thomas M. Ochwat
®�,�.;;Q,� �' �yF,p•;�
Project En i eer
;�05
_ 18060T
O •
=�• eC-
Stan Myers,,/'.�,
•
Project Manager
`.'•oY®...�••;,\\`
cc:035-110a
FIGURE
\� Harmony/Market P.U.D. 1 15.8 cis
OAKRI�GE DRIVE II jl
1- TO, -
Existing Swale
f f
{9
9°=�� i II
/ I ( Evangelical
/ I l Covenant
—mot I
9&
8�
�J
l Church/
Offsite Runoff
/ I �
/Z' I ' 1.7 cis
Existing Swale (Pond B
I
See Harmony/Market P.U.D. 1
Moil
Grading and/Drainage Plan--
(o
CO
v
/Pond A
l ry
/Temporary Gravel / CO
/ Cul—de—sac
c
Storm Drain
Inlet
----------------
/ RULE DRIVE
w
Z
w
Q
a
w
J
qw, Oakridge West P.U.D.
Engineering Cansullanls OFFSITE RUNOFF — Fioure 2
CLIENT pp " JOB NO.R
INC PROJECT CALCULATIONS FOR
Engineering Consultants MADE BY ! DATE Z b CHECKED BY DATE SHEET Z OF/76
3
Q Iasi <J �
a scams/q � x a. -714 AY-, a
U SE �� 1 .ADD 7`hG 6G <.,GE 'ea s'.
A316 , egG __ 4m ti i i 2 ~A 7.c1&,rS
p.Q,FiA�1l.ftt'
D3Iz- a.155cis
�a
u
CLIENT ,Tr JOB NO.09S
INC PROJECT SNp�Q7brS CALCULATIONSFOR��La9
Engineering Consultants MADE BY77cs DATE 2 CHECKED BY -DATE SHEET OF
A�/ ��'� )
RINC
Engineering Consultants
CLIENT JOB NO. e)
PROJECT Cf �P 71�7T CALCULATIONS FOR �e_ �. l- !;f y
MADE BY f7GU.- DATE2'IYyiCHECKED BY DATE SHEET 2- OF
� •
SN,P.vi o
_ X Go -
S 7 dab
�f 2-
7 760 - 517
i J _..!
1 % -Ma
17
7
i
T II
,ads . J �La pF — / • 5 `� t' � 1 ' -r-
a,—
DATE: 3-3-90
PROJECT: OAKRIDGE WEST SECOND FILING
JOB NUMBER: 035-110
DESIGN ENGINEER: TMO
BASIN DESIGNATION = BASIN A
DETERMINE EXISTING Q FOR 2 YEAR STORM
=====================================================================
HISTORIC RUNOFF COEFFICIENT .2
BASIN SLOPE: 1.5 PERCENT
BASIN LENGTH 220 FEET
AREA: .408 ACRES
HIST TC = 1.87*(1.1-( 1 * .2
))*SQRROOT 220 >)/ 1.5
21.81007 MINUTES
HISTORIC OUTFLOW IS SUPERCEDED BY: .2 CUBIC FEET PER SECOND
DETERMINATION OF DETENTION POND VOLUME FOR DEVELOPED CONDITIONS
==================================================================
DEVELOPED
STORM:
100
YEAR STORM
DEVELOPED
RUNOFF COEFFICIENT
.44
CCFAC =
.44
*
1.25
*
.408
=
.2244
DURATION
GROSS VOL.
OUTFLOW VOL.
DETENTION VOL.
MIN
CU. FT.
CU. FT.
CU. FT
5
613.9584
60
553.9584
10
945.1729
120
825.1729
15
1203.682
180
1023.682
30
1664.15
360
1304.15
45
1999.404
540
1459.404
60
2108.463
720
1388.462
90
2278.109
1080
1198.109
120
2326,579
1440
886.5794
180
2520.461
2160
360.4605
360
2811.283
4320
-1508.717
REQUIRED DETENTION
VOLUME IS
1459.404
CU. FT. OR
3.350331E-02
ACRE FEET
DATE: 3-3-90
PROJECT: OAKRIDGE WEST SECOND FILING
JOB NUMBER: 035-110
DESIGN ENGINEER: TMO
BASIN DESIGNATION = BASIN B
DETERMINE EXISTING Q FOR 2 YEAR STORM
=====================================================================
HISTORIC RUNOFF COEFFICIENT .2
BASIN SLOPE: 1.5 PERCENT
BASIN LENGTH 190 FEET
AREA: .739 ACRES
HIST TC = 1.87*(1.1-( 1 * .2
))*SQRROOT 190 ))/ 1.5
20.26855 MINUTES
HISTORIC OUTFLOW IS SUPERCEDED BY: .37 CUBIC FEET PER SECOND
DETERMINATION OF DETENTION POND VOLUME FOR DEVELOPED CONDITIONS
==================================================================
DEVELOPED STORM: 100
DEVELOPED RUNOFF COEFFICIENT
CCFAC =
.739
72
DURATION
MIN
5
10
15
30
45
60
90
120
180
360
*
.6651001
GROSS VOL.
CU. FT.
1819.714
2801.401
3567.597
4932.382
5926.041
6249.28
6752.095
6895.758
7470.404
8332.372
YEAR STORM
.72
1.25
OUTFLOW VOL.
CU. FT,
111
222
333
666
999
1332
1998
2664
3996
7992
*
DETENTION VOL.
CU. FT
1708.714
2579.401
3234.597
4266.382
4927.041
4917.28
4754.095
4231.758
3474.403
340.3721
REQUIRED DETENTION VOLUME IS 4927.041 CU. FT. OR
.1131093 ACRE FEET
RINC
Engineering Consultants
CLIENT G!/C�TT JOB NO.
PROJECT CALCULATIONS FOR
MADE BY fl-MODATE rLCHECKED BY DATE SHEET OF
CLIENT i/ J(��7ff JOB NO. 03 IT- // (3
MOINC PROJECT SGQj0if _`��►U��,1 CALCULATIONS FOR �1G F/C 6M41 �1G
Engineering Consultants MADEBV-M-. �[ DATE /_ CHECKED BY DATE SHEET OF 3
m x Y Q-,le-aSr, - assc��,� d.S cys/ate
uSi 1) G -rkf- 02 1h z_6 COS or,.>n F;c.. 1
IL
El Sb.S
z
A - 0, 03y5
CLIENT 'G 094e -ry baft p&t t rAl r- a P JOB NO. n IT -B O
INC PROJECT CALCULATIONS FOR
Engineering Consultants MADE BY- '
DATE CHECKED BY DATE SHEET I OF