Plemorandum
Ln
0
00
0
To: Stuart VIa.c11i I Ian, Everitt Enterprises, Inc.
0
Frank Vaught. Va.ught*Frye, Architects
o
o
Fort Collins Staff
J
10
o
From: Hatt Del ich
0
z
Gate: Flarch 5, 1990
J
W
0
O
Subject: Supertots Learning Center at Oak Ridge West
J
traffic analysis
W
Z)
z
W
Q
It is proposed that a Supertots Learning Center
z
(Day Care) be located at the north end of Oa.k Ridge (.-Jest
}
in Fort Collins, Colorado. The location is shot%in in
z
Figure 1 (Site Plan from Oak Ridge PUG Site Access
m
Study) . Figure 2 shot%is the site plan of the proposed
Super -tots Learning Center.
Table 1
Trip Generation
Gai 1 y A.M. Peak P.Fl Peak
Land Use Trips Trip. Trips Trips Tr- ip=_.
in out in out
Gay Care - 10.5 KSF
(P,ate./KSF) (6.70) (6.02) (5..34) (5.='0) (6.40)
Trip=. 700 63 56 62 67
CD
z
cc
W
z
This area was previously proposed as part of Oak
CD
Ridge kle=.t Office Par -It. A traffic anal > =s i s t,ias prepared
w
J
in October. 1?85 for the Oak Ridge 4Je=.t Off ice Park.
>
Table 1 =.how s the trip generation rates from Trip
Generation. 4th Edition, ITE, 1987, for a day care
=
•
z
center.
V
o
a
Access to this site is proposed from Lemay Avenue,
Wo
o
viith additional future access to the parcel to the south
vlhen it develops.. Figure 3 shot%is the 1 -'88./8? peak hour•
z
<
traffic at the intersections adjacent to Oak Pidge (,,lest.
~
The Lemay/Oakr i dge intersection t-ji 1 1 be impacted the
most by the Supertots Learning Center. The Harmony/
Wc�
U_
Lemay intersection ,,ill] also be impacted, but due to the
cc
small increase in traffic and existing level of service
A operation during the peak hours, the change in
Q
operation due to the Supertots Learning Center will be
minimal. Since this use was not included in the short
range analysis in the Oak Ridge PUD Site Access_. Study, a
revised short range analysis is provided. Figure 4
shows the short range (1990) peak hour assignment using
the assignment from the Site Access. Study and the
Supertots. Learning Center. Consideration was also given
to the proposed Office Park located on the east side of
Lemay Avenue. Table 2 shows the short range operation
at the key intersections related to the Supertots
Learning Center. Peak hour operation at these intersec-
tions is acceptable (level of service D or better).
Calculation forms are provided in Appendix A.
The long range (2010) peak hour assignment is shovin
in Figure 5 (from Figure S of the Oak Ridge PUD Site
Access. Study and the assignment of the Supertots Learn-
ing Center trips). Table 3 shot -is the long range peak
hour operation at key intersections. Calculation forms
are provided in Appendix B. Peak hour operation at the
Lema>,/Oakridge intersection will be acceptable (from the
Oak Ridge PUD Site Access Study). The proposed access
to Lemay will not operate acceptably (left -turn exits
from the site will be at level of service E) . However.
delays vjil1 be confined to only loft -turning vehicles if
a loft -turn lane is provided at this access.. This. left -
turn lane should be at least 45 feet long_ (enough to
store two vehicles). This use wi 1 1 have alternative
access to the Lemay/Rule intersection in the future.
This intersection is likely to be signalized. The
geometric requirements along Lemay Avenue are shown in
Figure 6. These requirements are based upon the
anticipated long range traffic volumes and can be
accommodated in the available space along Lemay Avenue.
It is proposed that the access to the existing
church to the north will be closed and shared viith the
Supertots Learning Center. This will cause the
Supertots access to line up with the one to the Office
Park on the east side of Lemay Avenue. Peak hours of
the Supertots Learning Center and the church are quite
different. Therefore, there should be no conflict of
traffic between these two uses.
Conclusion
It is concluded that the proposed Supertots
Learning Center can be accommodated on the public
streets in this_. area. In the short range future, the
Supertots Learning Center access. to Lemay Avenue will
operate acceptably during the peak hours with full -turn
access. In the long range future (2010), left -turns
from this access will operate unacceptably, but delays
should be confined to the on -site driveway. Separate
exit lanes are recommended at this access. These left.
0
0
turns will have alternative access via the Lemay Pule
intersection.
�J
SUPERTOTS
LEARNING
CENTER
AREA B
Business Services
HARMONY
f
I 1
� i� AREA C ' I
I I,
1 ►, 1 I
r, 1 I
i r, 1 1
�. r'j Industrial / 1 I>-
Business i �<
us ness
- Services -`� Park 1 ��
,t4PAREA F
Industrial
Business
Park
AREA G ; AREA H /
1 Single / i 1 Single /Multi i� AREA J
IMulti '� Family ; Single Family
Family
I ,
AREA K
- Single Family
I
AREA A I
i
Business Services �I
1
AREA E
1 g l r
SITE LOCATION FIGURE 1
0 •
I �
Existing Church i
I i
Existing Parking
:..
10,500 s.f.
Parking
Parking
SITE
SUPERTOTS LEARNING CENTER
SITE PLAN
Q
N
FIGURE 2
- 0-
�9 cP d-
�458/944
cA
�—SZ4/9Z9
- 524/4filo
HARMONY
92�/41oZ —�
I 10?2/491
1050/544 —�
53/44 —�
O
Zln/4 —�
Z9/4
0/0
NNW
OAK
RIDGE
0/0
013
o
0/0
—O/tZ
RULE
o/ 1-
o�UN
1�o
�-- ZZ/ 110
1 KEENLAND
a
9
w No AM/PM
J
r-
1988 / 89 PEAK HOUR TRAFFIC FIGURE 3
s
(:SITE:)
0
— I cv4/ 18Z
OAKRIDGE
o
0
0�o
a
w
J
9
OLo
r— I I/4
45/54—�
IJoM.
N
SHORT RANGE
PEAK HOUR TRAFFIC
ACCESS
AM/PM
FIGURE 4
Table 2
Short Range Peak Hour Operation
Intersection AM PM
Lemay/Oaks i dge
WB LT
D C
WB RT
A A
SB LT
A A
Lemay/Access
WB LT
C B
VIB T/RT
A A
EB LT
C C
EB T/*RT
A A
NB LT
A A
SB LT
A A
Table 3
Long Range Peak Hour Operation
Intersection
AH
PM
Lemay/Oakridge (Signal)
A
D
Lemay/Access
WB LT
E
E
WB T,' RT
A
A
EB LT
E
E
EB T/RT
A
A
NB LT
A
B
SB LT
A
A
Lema.y/Ru l e (Signal)
A
A
SITE
Lo
op�
�
Ln
45/ 80
So/ZZO
40/23o
?o/ss
30/ 150
a
w
.J
L 5/10
35/45 —l"e
00M .
ZO/Z5 —1`
OAKRIDGE
ACCESS
Ln
o r0 �— 40/110
E— 2o/2.p
15/I10
I5/-70 RULE
IS/ZO —'►
LD cLo
AM/PM
LONG RANGE
PEAK HOUR TRAFFIC FIGURE 5
• I I •
OAKRIDGE DRIVE
I �t
I II
W I I
D
z
W I I Proposed Oakridge
Office Park
Q`
I I
Existing Church I i
'I I
I Il
SUPERTOTS ( I I
LEARNING I I
CENTER
I I
I I
:I I
Q
W I I
J;
i I
i I
:l I�RULE DRIVE
LONG RANGE
GEOMETRIC / STRIPING PLAN
OF LEMAY AVENUE
FIGURE 6
•
A1=1PE1--jD I X A
„'°.5 Mr tlni_".)('NAL)ZEIl 1NTER=ECT!ONS �'zsc
xtxxxYxxxxixxxxxx�l xxxtxx.k.Cxx:#xxxaxxiXA. k3A;.Kyxxxxtxxxx)R■xx#xXxx». +..K 1:1
I0ENTIFYINR INEOP.MATION
AVERAGE RUNNING. SPEED. MAJOR STREE'..............
35
PEAK HOUR FACTOR .................................
1
AREA POPULATION ...............................
.. 80000
NAME OF THE EAST/WEST STREET .....................
oakridae
NAME OF: THE NORTH/SOUTH STREET ...................
)emay
NAME OF THE ANALYST ............... ..............
mid
DATE OF THE ANALYSIS (mm/dd/yy)..................
2/19/90
TIME PERIOD ANALYZED .............................
am _nsn short
OTHER INFORMATION:--t%Pg
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
EC WB N8 5L.
---- ---- ---- ----
LEFT -- 10 0 155
THRU -- 0 °02 340
RIGHT -- 164 25 0
NUMBER OF LANES
-----------------------------------------------
EB WB NB SF.
LANE: -- _
CAPACITY ANc LEVEL -OF -SERVICE Flacie-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIA.L MOVEMENT SHARED RESERVE
RATE CAPACITs CAPA ITY CAPACITY. CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcpn) c (ocph) c = c - v LOS
p M SH R SH
------------------------------------------------ ---
MINOR STREET
We. LEFT 11 231 195 195 1
RIGHT 180 ^28 928 926 7 A
MAJOR STREET
SB LEFT 171 766 766 166 595 A
1985 HCM• UN•_=IGNALIZE1;
Yi i# i X i YYX Z# XX Z Y Y Y# Y#it#flC# Xi # i t XiX Xi i# i X #i i iY >X.X X# XS:X i X X #Y X# #iii #i YXl4
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAG` RUNNING SPEED. MAJOR STREE- ...... ... ..
5
PEAK HOUR FACTOR .............................
AREA POPULATION .................................
8C000
NAME OF THE EAST/WEST STREET .....................
oakridae
NAME OF THE NORTH/SOUTH STREET ............... ...
lemav
NAME OF THE ANALYST ........... ..................
mid
DATE OF THE ANALYSIS (mm/dd/yy'..................
2/19/90
TIME PERIOD ANALYZED.............................c;a
om snort
OTHER INFORMATION: -"i.e
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYP: WESTBOUND: STOP _TGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
ES WE NB S=
__- --- -- ----
LEFT 0
THRU -- 0 715 ?62
RIGHT -- )22 10 0
NUMBER OF LANES
-------------------------------------------------------------
EE WE NB 5E
---------
LANE -
CA.PI.''',' AND LEVEL--OF-SERVICE Page-'
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPAACITY
MOVEMENT V(Pcph) c (pcch) c (pcph) c (pcph) c = c - v LO'-
r. M SH R SH
------------------------------------------------ ---
MINOP STREET
„F. L=IT is 294 "S ?75 257 r
RIGHT 200 92'= 929 929 7296A
^MAJOR STRE T
SF LEFT @t 166 168 768 686 A
•
195' HCM. VN516NALIZE INTErcLECT:ON'' �aa -
### YY#Y XXX X XY# Y Y YXX Y# XY #Y Y Y XX X # Y YYY Y YY # •:XY YYX XY X X X YX
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED, MAJOR STREET... .......
35
PEAK HOUR FACTOR .................................
1
AREA POPULATION ..................................
80000
NAME OF THE EAST/WEST STREET .....................
access
NAME OF THE NORTH/SOUTH STREET ...................
.iema;
NAME OF THE ANALYST ..............................
mjd
DATE OF THE ANALYSIS (mm/dd/yy).................
2/19/90
TIME PERIOD ANALYZED .............................
am ma snort
OTHER INFORMATION: 3..
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB W8 NE_ SE.
---- ---- ---- ----
LEFT 45 1 '3 15
THRU 0 0 250 285
RIGHT 11 2 150
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
F, We. r sp
LANES
..AN, TP
CAPACITY AND LEVEL -OF -SERVICE r"aae-S
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcphl c (pcph) c (pcph) c (pcph) c = c - v LOS
P M SH R 5H
------- ----------------- ------------ ------------ ---
MINOR STREET
WB LEFT 1 303 293 293 29 C
THROUGH 0 346 337 > - > 339 6
RIGHT 2 949 949 > 949 949 > 947 947 >A A
MINOR STREET
EB LEFT 50 317 309 S09 260 C
THROUGH 0 357 348 > 348 > 348 > 8
RIGHT 12 924 924 > 0 924 > 0 912 > A
MAJOR STREET
NO LEFT 14 759 759 759 744 A
SO LEFT i 1 803 80S 803 787 A
n
LJ
195 F:CM: UNS:GNAL1ZEC INTERSECTION`_;
Page-i
iZYiiiYZXiiXZZYYZZXiiXYiYiXiiZZZiZXZYYXZYIZYZZXiX:t XYXYiXiiiXXZXXiiiii
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING' SPEED. MAJOR STREET ..............
35
PEAK HOUR FACTOR ............. ••................
'
AREA POPULATION ..................................
80000
NAME OF THE EAST/WEST STREET .....................
access
NAME OF THE NORTH/SOUTH STREET ...................
lemay
NAME OF THE ANALYST ..............................
mid
DATE OF THE ANALYSIS (mm/dd/yy)..................
2/19/90
T'.ME PERIOD ANALYZED .............................
se pm short
OTHER INFORMATION: wg
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTEP.SECTION TYPE: 4-LEG
M:.JOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WF, NB SB
---- ---- ---- ----
LEFT 54 4 12 2
TaR,U a 0 260 i46
RIGHT 13 11 1 50
NUMBER OF LANE!i AND LANE USAGE
---------------------------------------------------------------------
EF. WP. NF.
LANF U°,A6- Tr- TP
CAPACITY AND LEVEL -OF -SERVICE page
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHAPED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT .vcph) c (ocoh) c (pcph) c (ocoh) c = - - v LOS
- M SH R H
MINOR STP.EE'
WE. LEFT
4
::40
33'.
THROUGH
0
389
385
RIGHT
12
963
963
MINOR STREET
EB LEFT
59
'57
350
THROUGH
0
405
400
RIGHT
14
045
945
MAJOR STREET
NB LEFT
13
794
794
SB LEFT
2
829
829
"' 3 B
> 385 38 B
963 963 > 951 951 >A A.
350 291 C
> 400 > 400 > A
0 945 > 0 930 > A
794 781 A
829 827 A
I
ArPFEIAD I x t
0135 HCM: (w SIPNALIZED INTERSECTIONS Pao(--,
#YiiYYYYYXiiYXXtX�tiYXYYYYYYYICYYXiiXXYXYYYYYYYYYYXYIkYYYX7:X MtXYXIkYYYYYXi
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED, MAJOR STREET ..............
35
PEAK HOUR FACTOR .................................
1
AREA POPULATION ..................................
80000
NAME OF THE EAST/WEST STREET .....................
access
NAME OF THE NORTH/SOUTH STREET ...................
lemay
NAME OF THE ANALYST ..............................
mid
DATE OF THE ANALYSIS (mm/dd/yy)..................
2/19/90
TIME PERIOD ANALYZED .............................
am
OTHER INFORMATION: long
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB N8 SB
---- ---- ---- ----
LEFT 35 _ 20 10
THRU 0 0 765 550
RIGHT 20 5 15 40
NUMBER OF LANE=; AND LANE USAGE
---------------------------------------------------------------------
EP• WE' NB SE
----- ----- --- -
1 kNES _
LAW 1•:Af .- TP Tr,
CAPACITY AND LEVEL -OF -SERVICE Paae
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------------------------------------ ------------ ---
MINOR STREET
WB LEFT
6
79
74
THROUGH
0
106
102
RIGHT
6
709
709
MINOR STREET
EB LEFT
39
83
79
THROUGH
0
109
104
RIGHT
22
795
795
MAJOR STREET
NB LEFT
22
562
562
SB LEFT
11
438
438
74 c
102 > le 0
> 709 709 > 704 704 >A A
79 41 E
104 > 104 > 0
0 795 > 0 773 > A
562 540 A.
438 427 A
•
1985 HCM-. (INSIGNALIZED INTERSECTIONS
#YYYX#X#Y###]KY#YYYx#Y#YXYYYX:KY#YYYYXYXYYYYY##YM(Y YYX7lY#YYXXYYYY#YYXYXY
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED. MAJOR STREET ..............
35
PEAK HOUR FACTOR .................................
I
AREA POPULATION ..................................
80000
NAME OF THE EAST/WEST STREET .....................
access
NAME OF THE NORTH/SOUTH STREET ...................
lemay
NAME OF THE ANALYST ..............................
mid
DATE OF THE ANALYSIS (mm/dd/yy)..................
2/19/90
TIME PERIOD ANALYZED ............................
OTHER INFORMATION long
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 45 5 20 5
THRU 0 0 '65 3S0
RIGHT 25 10 5 40
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
Ek WB NF, SE
! ANES _
L.ANt. L i TR _ - TR
CAPACITY AND LEVEL -OF -SERVICE Pa4e-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(ocph) c (pcph) c (pcph) c (pcph) c - c - v LOS
p M SH R SH
------------------------------------------------ ---
MINOR STREET
WB LEFT
6
60
56
THROUGH
0
75
72
RIGHT
11
714
714
MINOR STREET
ES LEFT
50
60
57
THROUGH
0
75
72
RIGHT
28
657
657
MAJOR STREET
NE. LEFT
22
368
368
SB LEFT
6
445
445
56 7* E
72 7
> '14 714 > 703 703 >A A
57 7 E
72 > 72 > E
> 0 657 > 0 629 > A
368 346 E.
445 439 A
0