February 14, 1990
Frank Vaught/Tony Hughes
Vaught-Fryt Architects
2900 S. College Avenue
Fort Collins, CO 80525
Dear Frank & Tony:
For your information, attached is a copy of the Staff's comments concerning
Supertots Learning Center which was presented before the Conceptual Review
Team on February 12, 1990.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Ted Shepard
Project Planner
TS/gjt
Attachment
xc: Tom Peterson, Director of Planning
Mike Herzig, Development Coordinator
Rick Richter, Civil Engineer I
Project Planner
File
300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: February 12, 1990
ITEM: Supertots Learning Center
APPLICANT: Frank Vaught and Tony Hughes, Vaught - Frye Architects, 2900
South College Avenue, Fort Collins, CO. 80525.
LAND USE DATA:
Request for a 10,000 sq. ft. daycare and classroom facility on 1.15 acres located
on the west side of South Lemay Avenue, between Rule Drive and the
Evangelical Covenant Church (4825 S. Lemay Ave.).
COMMENTS:
It is strongly encouraged that the existing curb cut off Lemay Avenue
align with the proposed curb cut for the office park located directly
across the street. An off -set intersection with two uses that would have
the same peak hours of traffic would not be acceptable for an arterial
street such as Lemay Avenue. Please consider revising either the
Supertots Learning Center curb cut or the Office Park curb cut so these
two access points align. By aligning the two curb cuts, the likelihood of
allowing full access at the Office Park access is enhanced.
2. In general, a direct access off an arterial
problems that should be mitigated. The curb
of 33 feet wide for three 11 foot wide lanes.
lane would minimize stacking back on to the
right turns or through movements. Please be
spaces to the access drive are of sufficient
maneuvers do not interfere with the operation
drop-off and pick-up areas should be safe and
stacking on the access point.
street creates operational
cut should be a minimum
A separate left turn exit
site and allow uninhibited
sure the nearest parking
distance so that parking
of the curb cut. Internal
uncongested and not cause
3. Arterial street improvements should be
continued down from the church
site. Please
use the new detail
for
detached sidewalks along arterial
streets.
4. Street trees
should be planted
along
Lemay at an average of 40 foot
intervals. If
there is a conflict
with a streetlight, please keep the tree a
minimum of
20 feet from the
pole.
Trees should be setback from the
underground
electrical line by 4
feet.
5. The site is located in Special Improvement District #78, Phase Two. Please
be advised that assessments are due to this S.I.D.
6. A daycare facility is classified as a Category "D" for purposes of the
street oversizing fee. This fee is calculated at $14,055 per acre.
7. The 20 inch water main in Lemay Avenue is too large to tap for service.
The existing water main in Rule Drive should be extended to serve the
site. There is no sewer main in Lemay. The nearest sewer main is in
Oak Ridge and Rule Drives. Since the sewer will flow towards Rule, it
would be easier to extend the sewer from Rule to serve the site. All
main extensions must be placed in utility easements.
The Water
and Wastewater
Department cautions that any
main extensions
into this area should account for future long term
growth. Since
buildings cannot
be placed
over mains, the location of
future develop-
ment will
be determined
by the location and proximity
to both the
water and
sewer mains.
It may be advisable to do
utility master
planning so
potential conflicts can be avoided.
8. Three phase electrical power is available from Lemay from either north or
south of the site. A Commercial One (C-1) form must be filled out by
the electrical contractor to determine entrance capacity. The transformer
location should be coordinated with Light and Power so that it is
accessible from one side by a line truck, but screened from the arterial
street.
9. The site is located in the McClleland drainage basin which calls for a
controlled release rate of storm flows of .2 cfs. The Health Care
International site was approved based on the assumption that upstream
flows would be detained and released at this approved rate. Any
exceptions must be approved by the Stormwater Utility.
10. The Poudre Fire Authority has no concerns if the building is equipped
with an approved fire sprinkler system.
11. The concept of shared parking with the existing church is applauded as
efficient use of land. At the time of final approval, evidence of the
shared parking agreement should be presented to the Planning and Zoning
Board.
12. A neighborhood meeting will not be required by the Planning Department.
13. The Oak Ridge West Master Plan designates the area as Parcel B with
anticipated uses of Retail/Office. This Master Plan would have to be
amended to allow the proposed child care center with classrooms.