HomeMy WebLinkAboutNE PROSPECT & I-25 FRONTAGE ROAD ANNEXATION - ANX210001 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTS  Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6689
970.224.6134 ‑ fax
fcgov.com/developmentreview
February 19, 2021
Jason Messaros
BHA Design Inc
1603 Oakridge Dr
Fort Collins, CO 80525
RE: NE Prospect & I‑25 Frontage Road Annexation, ANX210001, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of NE Prospect & I‑25 Frontage Road Annexation. If you have
questions about any comments, you may contact the individual commenter or direct your
questions through your Development Review Coordinator, Brandy Bethurem Harras via
phone at 970‑416‑2744 or via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970‑416‑2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
02/08/2021: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone conversations. Thank you!
Response: Acknowledged
Comment Number: 2
02/08/2021: INFORMATION:
As part of your resubmittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable.
Response: Acknowledged
Comment Number: 3
02/08/2021: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut‑off for routing the same week. All submittals are electronic. Please give
me advanced notice of when you plan to resubmit.
Response: Acknowledged
Comment Number: 4
02/08/2021: FOR HEARING:
All "For Hearing" comments need to be addressed and resolved prior to moving forward
with scheduling the Hearing. Staff would need to be in agreement the project is ready for Hearing approximately 3‑5 weeks prior to the hearing.
I have attached the 2021 P&Z schedule, which has key dates.
Response: Acknowledged
Department: Planning Services
Contact: Kai Kleer, 970‑416‑4284, kkleer@fcgov.com
Topic: General
Comment Number: 1
02/15/2021: BEFORE HEARING:
The name referenced on the Annexation Petition should match the Annexation
Map. Please revise petition to 'Northeast Frontage Road' Annexation.
Please revise Planning Objectives to address staff redlines.
Response: The Petition and Planning Objectives have been revised.
Department: Engineering Development Review
Contact: Dave Betley, 970‑221‑6573, dbetley@fcgov.com
Topic: General
Comment Number: 1
02/15/2021: FOR APPROVAL:
The legal description researched for the deed does not match the boundary
submitted. If the applicant will please submit the other deed needed to show the
ownership and the vacation of the right of way. The email from the City Surveyor
is attached showing the area of the deed that was located.
Response: Revised the legal description and boundary to match CDOT right of way deed and adjoining “Galatia” Annexation Map. Right of way vacation deed (Rec #20200094326) and CDOT right
of way deed (88059158) are both attached.
Comment Number: 2
02/15/2021: FOR APPROVAL:
Is there any properties that the frontage road serves as access? Does the
applicant need to maintain some form of access to service other properties?
Response: The frontage road is closed and does not serve as access to any properties.
Comment Number: 3
02/15/2021: INFORMATION ONLY:
No improvements are required at the time of ODP. Right of way dedications
and improvements will be required at the time of development.
Response: Acknowledged
Comment Number: 4
02/15/2021: INFORMATION ONLY:
A Development Agreement will be required at the time of development
Response: Acknowledged
Comment Number: 5
02/15/2021: INFORMATION ONLY:
The extension of Carriage Parkway will be required with future development
Response: Acknowledged
Comment Number: 6
02/16/2021: FOR APPROVAL:
There is a reimbursement that is required for the contribution of this
development for the improvements to the overpass at Prospect and I‑25.
Response: Acknowledged
Department: Technical Services
Contact: Jeff County, 970‑221‑6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 1
02/12/2021: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response letter.
Response: Redline markups have been acknowledged and all comments shown on redlines have been revised, including legal description and data table.
Department: Erosion Control
Contact: Basil Hamdan, 970‑222‑1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1
02/10/2021: INFORMATION ONLY:
No ESC requirements for this annexation, comments will be provided at PDP level submittal.
Response: Acknowledged
Department: Stormwater Engineering
Contact: Dan Mogen, 970‑305‑5989, dmogen@fcgov.com
Topic: General
Comment Number: 2
02/11/2021: INFORMATION:
There is no comment regarding the annexation itself; however, please be aware that any
future development following annexation will be required to meet all current City Stormwater Criteria.
Response: Acknowledged
Department: East Larimer County Water District
Contact: Randy Siddens, , 970.493.2044, HYPERLINK "mailto:randys@elcowater.org" randys@elcowater.org
Topic: General
Comment Number: 1
02/16/2021: INFORMATION:
ELCO has no objection to the annexation.
Response: Acknowledged
Department: Light And Power
Contact: Cody Snowdon, 970‑416‑2306, csnowdon@fcgov.com
Topic: General
Comment Number: 1
02/16/2021: INFORMATION:
Light & Power has no comments or concerns with the Annexation of the existing Frontage Road.
Response: Acknowledged
Department: PFA
Contact: Jim Lynxwiler, 970‑416‑2869, jlynxwiler@poudre‑fire.org
Topic: General
Comment Number: 1
02/16/2021: INFORMATION:
Poudre Fire Authority has no comment regarding annexation as this area is already within
our service area. Future development shall comply with applicable sections of the International Fire Code.
Response: Acknowledged
Department: Forestry
Contact: Christine Holtz, , choltz@fcgov.com
Topic: General
Comment Number: 1
02/16/2021: FOR PDP PRE‑SUBMITTAL: Forestry Tree Inventory
Trees provide many environmental and socioeconomic benefits including
reduced cooling expenses, providing natural wind breaks, improving air quality,
and increasing property values. There appear to be existing trees on‑site and
near the limits of development. After the annexation is confirmed, are there
plans to develop or impact existing trees? If so, regardless of impact please
schedule an on‑site meeting with City Forestry (choltz@fcgov.com) to obtain
tree inventory and mitigation information. Existing significant trees should be
retained to the extent reasonably feasible.
Response: Acknowledged