Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of The Quarry by Watermark. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Todd Sullivan via phone at 970 -221-6695 or via email at
tsullivan@fcgov.com.
Ripley
Northern
Watermark
Studio M
Delich
Comment Summary:
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING:
** UPDATED COMMENT**
The “Beat the- -Peak drainage analysis for this project will need to provide more
documentation for the Spring Creek watershed, and not just the Canal
Importation watershed. Please identify and provide a comparison of the
following items:
-MODSWM output showing Spring Creek time to peak and peak flow rate at
this site and several other locations.
-Time of concentration for discharges from this site and peak rational flow.
Page 2 of 33
Depending on the results of this comparison, an actual Spring Creek model run
with this development may be required. Please contact me to discuss in more
detail.
The MODSWM information can be obtained by contacting Dan Evans,
Stormwater Master Planning Manager, at 970-416-2217 or daevans@fcgov.com .
Northern: We are no longer pursuing Beat the Peak for this development.
Comment Number: 6 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Storm separations to buildings and water mains.
Storm pipes should be 10-feet minimum from water mains and buildings. There
are several locations where these separations are not provided. Please see
redlines for more information.
Northern: Updated separation between storm and buildings to 10-feet.
Comment Number: 7 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: The City Stormwater Dept. needs a paved
access path to Canal Importation Ch trail and the Spring Creek trail for stream
maintenance. This access should be 12-ft width and designed to accommodate
an HS-20 loading (dump truck). We will also need an access agreement and a
preferred route to cross your site (preferably with a City standard pavement
section to support HS-20 loading). Please consider options and contact us to
discuss.
Northern: Added access path at southeast corner of site to trails.
Comment Number: 8 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: I have several comments about the stormwater
outfalls:
a. You will need to provide a piped connection for stormwater flows to the
stream channel including appropriate scour protection at the outlet. Stormwater
Dept does not want the drainage chases under the trails. The 100-yr flows will
need to be piped to the creek.
Northern: Updated
b. The outfall locations should be combined as much as possible. Please
remove the western outfall to Spring Creek and try to combine with the
southeastern outlet.
Northern: Updated
c. Please provide more discussion in the drainage report about how major
storm flows will be conveyed through the site and to Spring Creek or Canal
Importation Channel. (such as flow paths, peak flow rates, and hydraulic sizing
of the outlets or pond overflows.)
Northern: Drainage design has been updated and more description added on sub basins
Comment Number: 9 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: There are additional items needed in the
drainage report including:
a. Provide stage-storage tables for WQ ponds.
Northern: Stage storage tables added
b. Provide an impervious areas exhibit and tabulation for WQ/LID. At PDP
you need to provide documentation that the proposed site design will provide
75% minimum LID treatment and water quality treatment for 100% of the site.
The WQ/LID table should be presented in the body of the drainage report. Here
Page 3 of 33
is an example LID table (please modify to apply to your site):
http://tinyurl.com/SampleLIDTable
Since the drainage report did not include all items needed to perform a
complete PDP review, there may be new comments in future rounds as this
information is supplied. Round 2 will require a completeness check to confirm
the drainage report includes these items.
Northern: LID exhibit included
Comment Number: 10 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: The project should provide WQ treatment for
subbasins C1 and C2. Currently these are being released without treatment.
All onsite impervious areas require water quality treatment. Please review and
revise the plans to provide treatment for these subbasin areas.
Northern: Due to existing grading, WQ treatment of subbasins C1 and C2 is not achievable. However, we are proposing
to “swap” treatment area with existing Shields St ROW, which is currently untreated.
Comment Number: 11 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please see the Drainage Report redlines for
more comments including:
a. Text redlines
Northern: Responses added to redlines
b. Rational calculations: Please review the Tc calculation spreadsheet coding
for all proposed subbasins. Please check the C factor for subbasin OS3.
Northern: updated rational calculations
c. Offsite flows west of Shields Street: The report indicates concerns of
existing overtopping of Shields and Stuart Streets. Please identify and quantify
this problem or remove from the drainage report. Please contact me to discuss
if needed.
Northern: This has been determined not to be an issue upon further analysis and discussions with City stormwater staff.
Comment Number: 12 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: There is a proposed drain pan located above the
existing 24-inch sewer trunk main, can a different location be worked out for the
drain pan? We would rather not have a drain pan over the sewer main.
Northern: Relocated drain pan.
Comment Number: 13 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Provide profile drawings for storm sewer mains
showing all crossings. Proposed water main depths may be assumed for PDP.
Northern: Plan and profile provided for storm 1 including water and sanitary crossings
Comment Number: 14 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: The ground water levels need to be documented
at least 24-inches below the bottom of the proposed rain gardens and water
quality ponds. These separations need to be confirmed during the high ground
water season (typically July-September)
Northern: The geotech report borings were completed at the end of July with additional piezometer readings on August 5th. The
highest observed groundwater elevation near the Water Quality pond is estimated at 5006.5’ and the bottom of our WQ pond is
5011’.
Comment Number: 15 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please show the BFEs for Spring Creek and
Canal Importation Channel on the grading plans.
Page 4 of 33
Northern: BFE’s added to grading plans
Comment Number: 16 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL: The rational drainage C-factor assumptions are fine
for PDP but should be directly calculated for the final drainage report.
Northern: Acknowledged
Comment Number: 17 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL - Drain Time Compliance - Please provide evidence
that the detention basin is in compliance with drain times per Colorado Revised
Statute 37-92-602(8). More information on this statute is available at
http://tinyurl.com/RevisedStatuteMemo, and a spre adsheet to show compliance
is available for download at http://tinyurl.com/ComplianceSpreadsheet. Please
contact Matt Simpson at masimpson@fcgov.com with any questions about this
requirement or for assistance with the spreadsheet.
Northern: We will include with final
Comment Number: 18 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL: All hydraulic calculations necessary (such as inlet
capacity, street flow, swale flow, pipe hydraulics, and outlet structures) and
scour protection (revetment) calculations will be required with the FDP round 1
submittal.
Northern: Acknowledged
Comment Number: 19 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL: All necessary standard detail drawings will be
required with the FDP round 1 submittal.
Northern: Acknowledged
Comment Number: 20 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please see the included redlines and set up a
time to go over with me after you have reviewed the comments.
Northern: Meeting held regarding comments and have provided responses to redlines.
Comment Number: 21 Comment Originated: 12/01/2020
12/01/2020: FOR INFORMATION: Tract B includes the Spring Creek channel,
trail and corridor, the Plat indicates that this will be owned and maintained by
the HOA, the Utilities Dept. questions if they will be adequately equipped to
maintain this tract of land. We would like to begin a discussion if the developer
would be willing to convey this tract to the City.
Watermark: Yes, our preference is to convey this tract to the City. We walked that area with the neighbors and would like to
install a new fence along Wallenberger for them and trim some overgrown bushes that are encroaching over their sidewalk . Can
we work out terms that allow us the ability to still clear any clogged drainage areas and remove trash? Would the City mow the
grass between the fence and Wallenberger right of way if they accept the tract?
Comment Number: 22 Comment Originated: 12/02/2020
FOR HEARING:
**NEW COMMENT**
Grading comments:
- The maximum allowable embankment slopes are 4:1. The proposed grading
on the large embankment appears to be too steep. Please review and revise.
- The grading for water quality ponds A and B should articulate to meet the
detention pond landscaping criteria. Please revise or discu ss with us.
Northern: Grading updated to meet landscaping criteria and allowable embankment slopes
Page 5 of 33
Comment Number: 23 Comment Originated: 12/02/2020
12/02/2020: FOR INFORMATION ONLY:
*NEW COMMENT*
Stormwater Fees – to obtain an estimate of stormwater fees you can contact
our Fee and Rate Specialists at UtilityFees@fcgov.com. You will need to
provide or assume the following items to obtain a fee estimate:
- Lot size
- Lot Imperviousness. (rooftops, paving etc).
Watermark - Northern to send email in order for Watermark to confirm budget.
Department: Water-Wastewater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: The drawing scale on the Landscape Detail
drawings is wrong. Please correct.
Ripley – Drawing scale has been updated. See updated sheets in submittal.
Comment Number: 2 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Provide profile drawings for sanitary sewer mains
showing all crossings. Proposed water main depths may be assumed for PDP.
Northern: Sanitary sewer profile drawings included
Comment Number: 3 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Water mains need to be a minimum of 15 -feet
from all buildings. There are 2 garage buildings that are too close to a water
main on the northwest portion of the site. Please see the redlines.
Northern: Updated to 15’ separation
Comment Number: 4 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: There is a location at the NE corner of the site
where 2 buildings share 1 sewer service. This does not meet Utilities
Wastewater criteria and will require a different approach to serve these
buildings. Please come up with ideas and discuss with us.
Northern: Updated so they no longer have shared services
Comment Number: 5 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Can a different location be worked out for the
proposed drain pan located above the existing 24 -inch sewer main? We would
rather not have a drain pan over the sewer main.
Northern: Updated location of drain pan
Comment Number: 6 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: At the southwest corner of the site, there is a long
sewer main extension to serve only 1 building on Lot 2. The City does not want
this much sewer main to serve 1 building. A different way to provide sewer to
this building will need to be figured out. Please review and discuss ideas with us.
Northern: No longer an issue building has been removed.
Page 6 of 33
Comment Number: 7 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: At the northeast corner of the site, at the Hobbit
Street cul-de-sac drive, we have presented a different water and sewer line
configuration in the redlines. Also, at the southwest corner of the site, we have
presented a different waterline configuration. Please review and discuss with us.
Northern: Updated to reflect redlines
Comment Number: 8 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Show the water meter locations on the utility plans.
Ripley – Noted. Irrigation services and meters will be shown at FDP.
Northern: Meter locations added to Utility Plans.
Comment Number: 9 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Irrigation service(s) and meter(s) will need to be
shown on the plans.
Northern: Added to plans
Comment Number: 10 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: All water services need to extend perpendicular
from the main to the water meter. Bends in water services may occur only on
the customer side of the meter. See redlines for more information.
Northern: Water services updated to extend perpendicular to main and deflect after the curb stop – per suggestion by City.
Comment Number: 11 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: There are several locations where we would like
different locations for the fire hydrants. Please see the redlines.
Northern: Updated per redlines
Comment Number: 12 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please see the included redlines of the Utility
Plans. I encourage you to set up a meeting to go over comments with me after
you have reviewed them.
Northern: Met with staff and have updated per redlines
Comment Number: 13 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Add a note to the Utility Plans that there is a
blanket utility easement on this site
Northern: Note added to legend
Comment Number: 14 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please add a call out to the plans that “all new
manhole connections to the existing sewer trunk mains should be done with a
precast manhole. Cast-in-place manholes on the trunk mains will not be allowed.”
Northern: Callouts added to plans at SSMH connecting to existing
Comment Number: 15 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL: Profiles of the water mains may be needed at FDP.
To be discussed later.
Page 7 of 33
Northern: Acknowledged
Comment Number: 16 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL: Show and label the size of the sewer services. Note
that 4-inch to 6-inch services should connect at a tap and 8-inch should connect
at a manhole. Exceptions may be made to avoid taps on the trunk mains.
Northern: To be provided at Final
Comment Number: 17 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL: Please submit service sizing calculations for the
proposed water services.
Northern: To be provided at Final
Comment Number: 18 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL: Show and label the location of the curb stops and
size of water services.
Northern: Curb stops now shown in plans. Sizes to be provided at final.
Comment Number: 19 Comment Originated: 12/01/2020
12/01/2020: FOR INFORMATION ONLY - Sometime in 2021 a code change
will occur that will require irrigation services to be sized and presented with the
FDP submittal. More information to come about this.
Ripley – Noted. Irrigation services and meters will be shown at FDP.
Comment Number: 20 Comment Originated: 12/01/2020
12/01/2020: FOR INFORMATION ONLY: There is a proposed blanket UT and
DR easement across all of Lot 2. Do you want to do this? In comparison, Lot 1
includes easement exclusions for the building footprints.
Northern: Removed blanket easement dedications for Lot 2.
Comment Number: 21 Comment Originated: 12/01/2020
12/01/2020: FOR INFORMATION ONLY: There may be no light poles within
the utility easements around the trunk sewer mains and the 30-inch water
transmission main.
Northern: Light poles added to plans.
Comment Number: 22 Comment Originated: 12/01/2020
12/01/2020: FOR INFORMATION ONLY: Since there are many items in motion
on this site, including utility comments and comments from other departments,
there may be new comments in future rounds of review.
Northern: Acknowledged
Comment Number: 23 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: There is a proposed retaining wall at the NW
corner of the site. This wall is too close to the existing 24 -inch sewer trunk main,
the wall needs to be at least 15-feet from the trunk main.
Northern: Relocated retaining wall away from trunk sewer
Comment Number: 24 Comment Originated: 12/02/2020
Page 8 of 33
12/02/2020: FOR HEARING:
*NEW COMMENT*
Please show the electric and gas on the site plan.
Northern: Electric and gas preliminary layouts shown on plans
Comment Number: 25 Comment Originated: 12/02/2020
12/02/2020: FOR HEARING:
*NEW COMMENT*
Please contact us to set up a utility coordination meeting. (Todd is working on this)
Ripley – Noted, a meeting held on 12/14/2020 and an additional meeting was held on 12/22/2020.
Comment Number: 26 Comment Originated: 12/02/2020
12/02/2020: FOR HEARING: Please see the redlined Landscape Plans for
utility separation comments.
*Please note that trees may not be within the sewer easement for the sewer
trunk mains. This provides 15-feet separation each side of the sewer mains.
These mains have regular maintenance requirements that require large equipment
to access the manholes. Feel free to talk with us if you have any questions.
Ripley – Noted. Tree have been updated to appropriate separations.
Comment Number: 27 Comment Originated: 12/02/2020
12/02/2020: FOR INFORMATION ONLY:
*NEW COMMENT*
Water and Sewer Fees – to obtain an estimate of water and sewer fees you
can contact our Fee and Rate Specialists at UtilityFees@fcgov.com. You will
need to provide or assume the following items to obtain a fee estimate:
-For Multifamily: number of buildings, no. of bedrooms, no. of units, size and
number of water meters, and lot square footage.
-For Commercial: fees are based on water service size only. You will need to
determine or assume the water service size.
Watermark - our development budget has water and sewer fees provided by Jill White with the City.
Department: Stormwater Engineering – Erosion and Sediment Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 11/19/2020
11/19/2020: FOR FINAL:
The disturbed area exceeds 1 acre in size. At FDP please provide the
appropriate Erosion Control Plans, report and security estimate.
A State Dewatering construction permit will need to be obtained prior to
commencing any work on the site.
Starting in January 2021, the City will be collecting fees to pay for temporary
and permanent water quality inspections. These fees were instituted by City
Council and are based on development type and size. An estimate of these
fees will be provided at FDP and will be addressed in the Development
Agreement for this site.
Northern: To be provided at final
Watermark – an estimate is included in our budget.
Page 9 of 33
Department: Stormwater Engineering - Floodplain
Contact: Claudia Quezada, (970)416-2494, cquezada@fcgov.com
Comment Number: 2 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please include the following notes on the site plan
and on utility plans:
1. “Portions of this property are located in the City-regulated, 100-year Canal
Importation floodplain/floodway as well as the FEMA Regulated Spring Creek
100-year floodplain/floodway. Any development within the floodplain must
comply with the safety regulations of Chapter 10 of City Municipal Code. The
Developer shall obtain a Floodplain Use Permit from the City of Fort Collins and
pay all applicable floodplain use permit fees prior to commencing any
construction activity (building of structures, grading, fill, detention ponds, bike
paths, parking lots, utilities, landscaped areas, flood control channels, etc.)
within the City of Fort Collins floodplain limits as delineated on the Final
Subdivision Plat”
2. “Any construction activities, nonstructural development (bridges, sidewalks,
culverts, vegetation, curb-cuts, grading, etc.) in the regulatory floodway must be
preceded by a No-Rise Certification, which must be prepared by a professional
engineer licensed in the State of Colorado.
3. “No storage of materials or equipment shall be allowed in the floodway,
whether temporary (during construction) or permanent.”
4.“Any pedestrian bridges in the floodway that are not able to pass the 100
-year flow are required to be “break-away” and tethered.”
Northern: Notes added.
Comment Number: 3 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please see redlines.
Northern: Redlines have been addressed.
Comment Number: 4 Comment Originated: 12/01/2020
12/01/2020: Will need to discuss pedestrian bridge further. Depending on
location of abutments, some modeling may be required as part of No -Rise
Certification. Please keep in mind that the lowest chord must be 12 -inches
above Base Flood Elevation (BFE).
Northern: Understood.
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/01/2020
12/01/2020: INFORMATION:
Light and Power has existing electric facilities along the north side of Hobbit St
and the east side of Shields St that will need to be extended into the property to
provide power to the site.
There is an existing high voltage duct bank running north and south along the
east side of Shields St adjacent to the project.
Page 10 of 33
Northern: Electric layout has been updated per conversations with Light and Power.
Comment Number: 2 Comment Originated: 12/01/2020
12/01/2020: INFORMATION:
Electric capacity fees, development fees, building site charges and system
modification charges necessary to feed the site will apply to this development.
Please contact me to discuss a preliminary estimate of fees or visit the
following website for information on our charges and fees related to
development projects:
http://www.fcgov.com/utilities/business/builders and developers/plant investment
development fees
Northern: Understood
Comment Number: 3 Comment Originated: 12/01/2020
12/01/2020: INFORMATION:
Transformer locations will need to be coordinated with Light & Power.
Transformers must be placed within 10 ft of a drivable surface for installation
and maintenance purposes. The transformer must also have a fro nt clearance of
10 ft and side/rear clearance of 3 ft minimum. When located close to a building,
please provide required separation from building openings as defined in
Figures ESS4 ESS7 within the Electric Service Standards. Please show all
proposed transformer locations on the Utility Plans.
Northern: Proposed transformer locations shown in plans
Comment Number: 4 Comment Originated: 12/01/2020
12/01/2020: INFORMATION:
During utility infrastructure design, please provide adequate space along the
public roads and private drives to ensure proper utility installation and to meet
minimum utility spacing requirements. 10ft minimum separation is needed
between all water, sewer, storm water, and irrigation main lines. Light and
Power has a 3ft minimum separation requirement from all other utility
lines/infrastructure.
Northern: Utility layout re-evaluated to provide required separation
Comment Number: 5 Comment Originated: 12/01/2020
12/01/2020: INFORMATION:
Light and Power infrastructure will need to be located within utility easements.
Once transformer locations are determined, Light and Power's primary electric
route will need to be shown on the utility plans.
Northern: Proposed electric layout shown on plans
Comment Number: 6 Comment Originated: 12/01/2020
12/01/2020: INFORMATION:
Electric meter locations will need to be coordinated with Light and Power
Engineering. Each residential unit will need to be individually metered. Please
gang the electric meters on one side of the building, opposite of the gas meters.
All residential units larger than a duplex and/or 200 amps is considered a
customer owned service, therefore, the owner is responsible to provide and maintain the electrical
service from the transformer to the meters.
Page 11 of 33
Northern: Meter locations will be coordinated with Light and Power.
Comment Number: 7 Comment Originated: 12/01/2020
12/01/2020: INFORMATION:
A customer service information form (C 1 form) and a one line diagram for each
building will need to be completed and submitted to Light & Power Engineering
for review. A link to the C 1 form is below:
http://www.fcgov.com/utilities/business/builders and developers/development
forms guidelines regulations
Northern: Understood
Watermark noted
Comment Number: 8 Comment Originated: 12/01/2020
12/01/2020: SITE SPECIFIC:
The primary electrical routing and transformers internal to the site will need to be
shown on the utility plan to ensure minimum separation from other utility lines is
being met. It is difficult to see how electric will be able to service all buildings
with the current proposed utility layout. A utility coordination meeting is
suggested to address the electric infrastructure needed for the site in relation to
other existing and proposed utilities. I am open to meet directly with Northern
Engineering to go over electric requirements for the project so that electric
infrastructure can be shown accurately on the plans.
Northern: Preliminary routing meeting has been held and layout has been updated per discussions with City staff.
Comment Number: 9 Comment Originated: 12/01/2020
12/01/2020: INFORMATION:
For additional information on our renewal energy programs please visit the
website below or contact John Phelan (jphelan@fcgov.com).
https://www.fcgov.com/utilities/business/go renewable
Northern: Acknowledged
Comment Number: 10 Comment Originated: 12/01/2020
12/01/2020: INFORMATION:
The City of Fort Collins now offers gig speed fiber internet, video and phone
service. Contact Julianna Potts with Fort Collins Connexion at 970 207 7890 or
jpotts@fcgov.com for commercial grade account support, RFPs and bulk agreements.
Northern: Acknowledged
Comment Number: 11 Comment Originated: 12/01/2020
12/01/2020: INFORMATION:
Please contact Tyler Siegmund with Light & Power Engineering if you have any
questions at 970.416.2772. Please reference our policies, construction
practices, development charge processes, electric service standards, and use
our fee estimator at:
http://www.fcgov.com/utilities/business/builders and developers
Northern: Acknowledged
Department: Environmental Planning
Contact: Kelly Smith, , ksmith@fcgov.com
Page 12 of 33
Topic: General
Comment Number: 1 Comment Originated: 11/30/2020
11/30/2020: FOR HEARING
In alignment with previous projects along the Spring Creek corridor, staff asks
that the 100' buffer be adhered to. This is a resource that has specific
protection standards that have historically been adhered to by other developments.
Ripley – Noted. After several meetings with staff, we have adjusted our site plan and removed a multifamily building that was
encroaching on the buffer. We now have detention located along the south of the development. The site plan has gone through
several adjustments in this area. Please see updated plans for reference. No buildings encroach on the 100’ buffer.
Comment Number: 2 Comment Originated: 11/30/2020
11/30/2020: FOR HEARING
Please provide viewshed analysis from different vantage points throughout and
around the site to ensure the project meets compatibility standards for
environmental and historic preservation. See Viewshed Analysis document that
shows different vantage points Historic Preservation and Environmental
Planning staff would like modeled via 3D software. Please also include the
proposed grading as part of the model to demonstrate actual proposed
conditions. Through narrative, please address how this project meets the Visual
Character of Natural Features standard: Projects shall be designed to minimize
the degradation of the visual character of affected natural features within the site
and to minimize the obstruction of scenic views to and from the natural features
within the site.
Based on these renderings staff may have additional comments on building
character and step back requirements.
Ripley – After a conversation with Kelly and City Staff we have adjusted viewshed analysis locations. The locations have been
slightly adjusted to fit with the LPC submittal. Several of these renderings were used in the LPC submittal and Presentation were
the project received approval.
Comment Number: 3 Comment Originated: 11/30/2020
11/30/2020: FOR HEARING
The aesthetic of the NHBZ is concerning since the plan does not preserve or
protect natural characteristics. Instead, the NHBZ is almost exclusively reserved
for stormwater creating a lot of grading and disturbance. It also prevents a trail
from being constructed in the future. Provide more undisturbed area within the
NHBZ along the southern border and work to preserve a natural aesthetic
throughout, even near buildings. Vary grading to create more naturalistic and
undulating landform. Side slopes should vary and range from 4:1 to 20:1 per the
City Stormwater Standards and Guidelines.
Ripley – Noted. We have worked with the City as the plans we have su bmitted and the area in the NHBZ has changed
significantly since the first submittal. We now have a large portion of the sites NHBZ in detention. We have varied the slope and
the edge of the detention area to mimic a more naturalistic look. We have also incorporated natural stone as the retaining wall and
native plantings (shrubs and trees) to soften the edges of the detention areas. We have provided an access easement for parks
allowing space for a future trail.
Comment Number: 4 Comment Originated: 11/30/2020
11/30/2020: FOR HEARING
Please provide the following in a table on the site plan:
Page 13 of 33
A. The total acreage required by the standard 100' buffer zone for Spring Creek
plus the 50' riparian forest.
B. The total acreage proposed within the submitted site plan.
This may be best illustrated through a vignette/detail on the site plan for clarity.
We can discuss this further at the Staff Review meeting and view redlines
together.
Ripley – A table has been provided on the site plan with the information requested in the comment above. It also provides a
reference to the NHBZ Plan which has the same information broken out in more detail. The NHBZ Plan also provides a plan with
the riparian 50’ offset, the 100’ wetland offset and the combined (50 + 100) as well as the proposed NHBZ lines.
Comment Number: 5 Comment Originated: 11/30/2020
11/30/2020: FOR HEARING
Please use the City's Detention Seed mix for detention areas. Thank you for
including the seed mix provided for the other areas within the NHBZ!
Ripley – Noted. With several updates to the site and landscape plan we have included the detention mix in the detention areas.
Comment Number: 6 Comment Originated: 11/30/2020
11/30/2020: FOR HEARING
Please include the top of bank line and buffer around riparian forest to the plans
in a light line type to any plans with the NHBZ.
Ripley – Top of Bank line has been added to all of the site plan, landscape plan, and NHBZ sheets.
Comment Number: 7 Comment Originated: 11/30/2020
11/30/2020: FOR HEARING
Please include the following notes to the landscape plan:
NATIVE SEED MIX NOTES
1. THE TIME OF YEAR SEEDING IS TO OCCUR SHOULD BE OCTOBER
THROUGH EARLY MAY.
2. PREPARE SOIL AS NECESSARY AND APPROPRIATE FOR NATIVE
SEED MIX SPECIES THROUGH LOOSENING AND ADDITION OF
AMENDMENTS THAT PROMOTE WATER ABSORPTION AND RELEASE,
THEN SEED IN TWO DIRECTIONS TO DISTRIBUTE SEED EVENLY OVER
ENTIRE AREA. DRILL SEED ALL INDICATED AREAS AS SOON AS
POSSIBLE AFTER COMPLETION OF GRADING OPERATIONS.
3. IF CHANGES ARE TO BE MADE TO SEED MIX BASED ON SITE
CONDITIONS THEN APPROVAL MUST BE PROVIDED BY CITY
ENVIRONMENTAL PLANNER.
4. APPROPRIATE NATIVE SEEDING EQUIPMENT WILL BE USED
(STANDARD TURF SEEDING EQUIPMENT OR AGRICULTURE EQUIPMENT
SHALL NOT BE USED).
5. DRILL SEED APPLICATION RECOMMENDED PER SPECIFIED
APPLICATION RATE TO NO MORE THAN ½ INCH DEPTH. FOR
BROADCAST SEEDING INSTEAD OF DRILL SEEDING METHOD DOUBLE
SPECIFIED APPLICATION RATE. REFER TO NATIVE SEED MIX TABLE
FOR SPECIES, PERCENTAGES AND APPLICATION RATES.
6. PREPARE A WEED MANAGEMENT PLAN TO ENSURE THAT WEEDS
ARE PROPERLY MANAGED BEFORE, DURING AND AFTER SEEDING
ACTIVITIES.
7. AFTER SEEDING THE AREA SHALL BE COVERED WITH CRIMPED
STRAW, JUTE MESH, OR OTHER APPROPRIATE METHODS.
Page 14 of 33
8. WHERE NEEDED, TEMPORARY IRRIGATION SHOULD BE PROVIDED
UNTIL SEED IS GERMINATED THEN WEEN THE SEED FROM IRRIGATION.
IF IRRIGATION IS USED, THE IRRIGATION SYSTEM FOR SEEDED AREAS
SHALL BE FULLY OPERATIONAL AT THE TIME OF SEEDING AND SHALL
ENSURE 100% HEAD-TO-HEAD COVERAGE OVER ALL SEEDED AREAS.
ALL METHODS AND REQUIREMENTS IN THE APPROVED IRRIGATION
PLAN SHALL BE FOLLOWED.
9. CONTRACTOR SHALL MONITOR SEEDED AREA FOR PROPER
IRRIGATION, EROSION CONTROL, GERMINATION AND RESEEDING AS
NEEDED TO ESTABLISH COVER.
10. THE APPROVED NATIVE SEED MIX AREA IS INTENDED TO BE
MAINTAINED IN A NATURAL LIKE LANDSCAPE AESTHETIC. DO NOT
MOW DURING HOT, DRY PERIODS. DO NOT MOW LOWER THAN 6 TO 8
INCHES IN HEIGHT TO AVOID INHIBITING NATIVE PLANT GROWTH.
11. NATIVE SEED AREA WILL BE CONSIDERED ESTABLISHED WHEN
SEVENTY PERCENT VEGETATIVE COVER IS REACHED WITH LESS
THAN TEN PERCENT OF COVER CONSISTING OF NOXIOUS WEEDS, NO
BARE SPOTS LARGER THAN ONE FOOT SQUARE, AND/OR UNTIL
DEEMED ESTABLISHED BY CITY PLANNING SERVICES AND EROSION
CONTROL.
12. THE DEVELOPER AND/OR LANDSCAPE CONTRACTOR IS
RESPONSIBLE FOR ADEQUATE SEEDLING COVERAGE AND GROWTH
AT THE TIME OF FINAL STABILIZATION, AS DEFINED BY STATE AND
LOCAL AGENCIES. IF FINAL STABILIZATION IS NOT ACHIEVED TO THE
SATISFACTION OF THE AGENCY, THE DEVELOPER AND/OR
LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR ADDITIONAL
CORRECTIVE MEASURES TO SATISFY FINAL VEGETATIVE
REQUIREMENTS FOR CLOSEOUT.
Ripley – Notes have been added to the plan (Landscape Notes and Details Sheet)
Comment Number: 8 Comment Originated: 11/30/2020
11/30/2020: FOR HEARING
Please provide cut sheets of lighting fixtures. Also, ensure no light spill into the
NHBZ and that all fixtures (including wall mounted) are included in the
photometric plan.
Watermark - updated lighting plan is submitted that shows amenity space lighting by pool. No light spills into the NHBZ zone.
Comment Number: 9 Comment Originated: 11/30/2020
11/30/2020: FOR HEARING
Please provide a letter from the ditch company agreeing to the pedestrian
crossing.
Ripley – Sorry for the confusion. What is labeled Wallenberg Ditch is the Canal Importation Channel . It is not an irrigation ditch, it’s
a manmade floodplain channel. Coordination will be provided with the City as we move forward regarding the pedestrian crossing.
Comment Number: 10 Comment Originated: 11/30/2020
11/30/2020: FOR HEARING
Will any wetlands be impacted to construct the pedestrian bridge across the
irrigation ditch? These are jurisdictional and will have to be mapped and
represented on the plans.
Ripley – Wetlands have been added to the landscape and site plan and labeled. No wetlands will be impacted. We are removing
the second connection to Wallenberg and bridge crossing.
Page 15 of 33
Department: Forestry
Contact: Christine Holtz, , choltz@fcgov.com
Topic: General
Comment Number: 9 Comment Originated: 12/01/2020
12/01/2020: Please show the existing irrigation tap and backflow for the
streetscape on the site and landscape plans. The City of Fort Collins Parks
Dept. is anticipating that a new tap will be required to tie into the existin g
irrigation infrastructure. Coordinate the potential hand off of the irrigation in the
parkway with the City of Fort Collins Parks Dept. Please contact Jill Wuertz,
970-416-2062, 413 S. Bryan Ave, Fort Collins, CO 80521 regarding the Parks’
Department’s interest.
Ripley – Existing irrigation tap and backflow have been labeled on the landscape and site plans. We are working to use as much
existing infrastructure as possible. We have added a new irrigation tap as the existing location was no longer feasible. Location
has been labeled on site and landscape plans. We will contact Jill Wuertz for the hand off of irrigation in the parkway.
Comment Number: 12 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL APPROVAL
Continued: Thank you for including the utilities on the landscape plan. There are
many proposed planting locations that do not meet the separation requirements
from utilities (see redlines). Please adjust accordingly. Final utility separations
will be reviewed at final plan.
08/17/20: INFORMATION ONLY FOR PDP
Please include locations of utilities on the landscape plan including but not
limited to water service/mains, sewer service/mains, gas, electric, streetlights,
and stop signs. Please adjust tree locations to provide for proper tree/utility
separation.
10’ between trees and public water (including fire hydrants), sanitary, and storm
sewer main lines
6’ between trees and water or sewer service lines
4’ between trees and gas lines
10’ between trees and electric vaults
40’ between canopy shade trees and streetlights
15’ between ornamental trees and streetlights
Ripley – We have reviewed tree locations with utilities. An updated plan has been provided with this submittal.
Comment Number: 18 Comment Originated: 12/01/2020
12/01/2020: INFORMATION ONLY FOR PDP
Again, thank you for your wonderfully diverse planting list. Please consider the
following changes:
-Certain cultivars of Sugar Maple have a fair amoun t of success in Fort Collins
including Green mountain, Legacy, and Fall fiesta. Forestry recommends using
one of these in place of the non-cultivated Sugar maple.
-Thinleaf alders are often killed by harsh winters or early or late freezes. Please
consider replacing them with one or two of the other ornamental native trees.
Lastly, please use Sucker Punch chokecherry (Prunus virginiana ‘sucker punch’)
as this cultivar does not root sucker.
Page 16 of 33
-English oak do not respond well to freeze damage. Please replace these with
a different shade tree.
-Please do not plant lindens in parking lot islands or cutouts, or along arterials
as they don’t respond well to salt
Ripley – Trees have been updated per recommendations above.
Topic: Landscape Plans
Comment Number: 11 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL APPROVAL
Continued:
Thank you for including the General Landscape notes, the Street Tree Notes,
and the Tree Protection notes. Please also include the boxed Street Tree
Permit note on each page of the landscape plan.
Ripley – The boxed Street Tree Permit note has been included on each page of the landscape plan.
Thank you for including a detail on the landscape plan showing which trees are
mitigation trees. Please also include a note in the planting schedule of which
trees are mitigation trees.
Ripley – A note in the planting table has been added to show which trees are mitigation trees.
Please include a detail of the critical root zo nes (CRZs) of all existing trees on
the landscape plan. This is a relatively new requirement and I apologize for
leaving this request out of the conceptual comments. The details of the CRZs
can better help us better anticipate impacts to existing tre es from construction
etc. The critical root zone is defined as 12 inches in radius per one inch in
diameter at 4.5 ft above the ground.
08/17/20: INFORMATION ONLY FOR PDP
Please provide a landscape plan that meets the Land Use Code 3.2.1
requirements. This should include the existing tree inventory, any proposed tree
removals with their locations clearly noted and any proposed tree plantings
(including species, size, quantity, and method of transplant). The plans should
also include the following City of Fort Collins notes:
Ripley – Critical Root Zones have been added to all existing trees recorded in the tree mitigation table as noted above. CRZs have
been added to the landscape plan.
General Landscape Notes
Tree Protection Notes
Street Tree Permit Note, when applicable.
These notes are available from the City Planner or by following the link below
and clicking on Standard Plan Set Notes:
https://www.fcgov.com/developmentreview/applications.php
Required tree sizes and method of transplant:
Canopy Shade Tree: 2.0” caliper balled and burlapped
Evergreen tree: 6.0’ height balled and burlapped
Ornamental tree: 1.5” caliper balled and burlapped
Required mitigation tree sizes:
Canopy Shade Tree: 2.0” caliper balled and burlapped
Evergreen tree: 8.0’ height balled and burlapped
Ornamental tree: 2.0” caliper balled and burlapped
Page 17 of 33
Ripley – Noted. Thank you for the references.
Comment Number: 14 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL APPROVAL
Continued:
Thank you for your exceptional and diverse planting list. Please note that
Japanese tree lilac are ornamental trees, not shade trees which will reduce the
percentage shade trees proposed to 45%. Please adjust the number of shade
trees to accommodate this switch. Final plant counts will be made at Final Plan
Stage.
08/17/20: INFORMATION ONLY FOR PDP
According to Land Use Code 3.2.1.(D)(c), canopy shade trees shall constitute
at least (50%) of all tree plantings.
Ripley – Noted, Japanese tree lilac has been moved to the ornamental tree grouping. Update the landscape plan to reflect that
50% of all trees are shade trees and are now within the LUC 3.2.1(D)(c).
Comment Number: 16 Comment Originated: 12/01/2020
12/01/2020: INFORMATION ONLY FOR FINAL
What type of planting media will be in the shrub beds? Please label it on the
landscape plan legend and use wood mulch if possible. I see many proposed
tree planting locations in these beds, but no shrubs. Please note that if shrubs
will be planted, when installing plant materials in close proximity (within the
dripline) to existing trees, please hand dig planting holes in order to avoid root
damage. In order to protect the existing trees on-site, please pull all plant
material and boulders at least 5 feet away from the tree trunks. Please add a
note to the landscape plan that states the following:
All plant material, boulders, and flagstone shall be spaced at least 5 feet from
the tree trunks. All planting shall be done via hand digging, particularly within the
trees’ dripzones/critical root zones.
Ripley – Shrub beds will consist of wood and rock mulch. We will provide shrub plantings at FDP as well as the different mulch
types and locations withing the shrub beds. Note has been added to the landscape plan.
Comment Number: 17 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL APPROVAL
Please ensure that all proposed tree locations meet the following separation
requirements from other trees:
Canopy shade trees 30 – 40’
Ornamental trees 15 – 40’
Coniferous Evergreens 20 – 40’
Ripley – Trees have been reviewed to meet the following separations.
Comment Number: 19 Comment Originated: 12/01/2020
12/01/2020: INFORMATION ONLY FOR PDP
Please change the scale on the landscape plan from 1”= 50’ to the correct scale
(I am assuming 1 = 20’).
Ripley – Scales have been updated to the appropriate dimensions and labels on all landscape plans.
Comment Number: 20 Comment Originated: 12/01/2020
Page 18 of 33
12/01/2020: INFORMATION ONLY FOR PDP
Please use a different symbol for each species of tree being proposed. This
makes it easier to distinguish on the landscape plans for both us, the
developers, and landscapers down the line.
Ripley – A different symbol has been used for each tree species being proposed. See updated landscape plan.
Department: Parks
Contact: Aaron Wagner, , aawagner@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/01/2020
12/01/2020: FOR INFORMATION
The Parks Department and the Park Planning & Development Department
(PP&D) have multiple concerns regarding the existing Spring Creek Trail and
Spring Creek Spur Trail to Wallenburg Drive both of which exist on the site.
Please contact Jill Wuertz (jwuertz@fcgov.com), 970-416-2062, or Parks
Planning Technician, Aaron Wagner (aawagner@fcgov.com) 970 -416-8083,
and Suzanne Bassinger at 970-416-4340, sbassinger@fcgov.com, to schedule
a meeting to discuss these concerns in more detail.
Ripley – Noted. Parks was included in the first utility call on 12/14/2020. We have had a chance to he ar concerns and are
adjusting plans accordingly. Thank you for attending the call and walking through and explaining concerns regarding Spring Creek
Trail. In addition we have had a call in early January.
Comment Number: 2 Comment Originated: 12/01/2020
`12/01/2020: FOR FINAL
Please label and show the flood plain on all plans for reference.
Northern: Flood Plain labeled on sheets
Ripley – Flood plain has been shown and labeled on all plans.
Comment Number: 3 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL
We are requesting a Public Access and Trail Easement for the area highlighted
on the plans that include the existing Spring Creek Trail and Spring Creek Spur
Trail to Wallenburg Drive, as well as the Natural Habitat Buffer Zone of the
above referenced trails. Trail easements may co -exist within a Natural Habitat
Buffer Zone if approval is obtained from Environmental Planning. Including a
Public Access and Trail Easement overlying the entire Natural Habitat Buf fer
Zone may be the most flexible way to allow future trail relocation and construction.
Northern: Easement added to plans
Comment Number: 4 Comment Originated: 12/01/2020
12/01/2020: FOR INFORMATION
This comment is a companion to PP&D’s comments regarding future Spring
Creek Trail improvements, please see their comments for further information.
We do not know future trail alignment and have not begun exploring how these
improvements will be implemented. Grading, floodplain, and meeting existing
infrastructure issues will direct how the trail will be aligned.
Page 19 of 33
Watermark – Noted, Watermark is granting an additional 50’ easement south of the pavement to allow for future trail
improvements.
Comment Number: 5 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL
Parks requires multiple access points to the Spring Creek Trail and the Spring
Creek Spur Trail to Wallenburg Drive for regular maintenance activities. Please
coordinate with Parks, PP&D, and Environmental Planning for potential
locations and mitigation. Of major concern is our inability to get access to the
bridge on the Wallenburg Spur and the Shields St. underpass.
Ripley – We have had several conversations internally, with Environmental, Parks, and planning. We are going to replace the
existing bridge connection to Wallenberg and provide access to Spring Creek Trail (through a maintenance access connection) on
the southeastern edge of the site.
Comment Number: 6 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL
Parks is not going to allow encroachment into our trail easement for
construction activity and/or staging or storage of materials. Please show and
label the trail easement(s) on all plans and add the following note to plan notes:
“There shall be no encroachment of the Spring Creek Trail easement or trail
itself. This includes any related construction activity, staging equipment, or
storage of materials.”
Northern: Note added to Utility Plan sheets.
Ripley – No encroachment is noted. Easements have been labeled on plans. The note above has been added to the site plan
notes.
Comment Number: 7 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL
The Parks Department must approve any proposed connections to the existing
trail system. This includes new bridges over Wallenberg Ditch. Access to the
recreational trail from the internal bike/pedestrian system should be provided at
limited and defined access points. Paved trail connections need to be
approved by PP&D and the Parks Department along with approval from
Environmental Planning. The slope is steep along the embankments to the
trails and all trail connections are required to meet ADA accessibility
requirements. Parks, PP&D, and EP need a full understanding of the floodplain
requirements to make trail connections.
Ripley – Noted. We will be in conversation with the Parks Department as we move forward with the plan. As of this submittal we
have decided to remove the new connection to Wallenberg. This decision was made after the second neighborhood meeting as
the new connection was not received well with the neighborhood. Inste ad, we will be replacing the bridge to Wallenberg Dr. to on
the northeast of the site. Connection to the Spring Creek Trail is made on the southeast of the site along with a maintenance
access.
Comment Number: 8 Comment Originated: 12/01/2020
12/01/2020: FOR INFORMATION
The parks department has plans to replace the bridge to Wallenberg Dr. and
improve the trail at this location. However there currently is no funding. Would
the applicant consider placing the proposed pedestrian crossing at this
location?
Ripley – The applicant is willing to replace the existing bridge connecting to Wallenberg Dr. We are in conversations with the
neighborhood HOA as to not encroach on any neighborhood property.
Page 20 of 33
Department: Park Planning
Contact: Suzanne Bassinger, 970-416-4340, sbassinger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/30/2020
1)The Parks Department and the Park Planning & Development Department
have multiple concerns regarding the existing Spring Creek Trail and Spring
Creek Spur Trail to Wallenburg Drive both of which exist adjacent to or on the
site. A meeting to discuss these concerns would be beneficial.
Ripley – Noted. We have had a chance to meet with Parks to discuss concerns in early January. We have also had opportunities
to explore some of the concerns before this meeting through other discussions with the City.
Comment Number: 2 Comment Originated: 11/30/2020
2) The Spring Creek Trail segment east of Shields Street is one of the most
congested paved trails in the entire city trail system. Trail use can reach up to
20,000 users a month, and consistently has average daily trail counts calculated
at over 500 users/day. Peak day counts are most likely higher but are not
available.
Ripley – Acknowledged.
Comment Number: 3 Comment Originated: 11/30/2020
3)In general, the concerns for the trail segments adjacent to or on the site
include (1) the existing 8’ trail width is undersized and below the current
standard width of 10’, with a 12’ path width suggested for high traffic areas; (2)
there is lack of a permanent construction access easement for trail and bridge
maintenance; and (3) safety concerns at the Wallenburg Drive bridge
connection due to the bridge configuration and bridge access.
Ripley – Noted, we are working with the City to replace the bridge connection to Wallenberg on the northeast of the site
(connection off the spur trail). We are connecting The Quarry to the (North/South) spur trail as well as an additional connection
point to the Spring Creek Trail for maintenance access. We are also dedicating a n additional 50’ easement on the south side of
the site for future Spring Creek Taril maintenance and updates.
Comment Number: 4 Comment Originated: 11/30/2020
4) The City of Fort Collins Land Use Code Section 3.4.8 “Parks and Trails”
addresses compliance with the Parks and Recreation Policy Plan (“Master
Plan”). The Master Plan indicates the general location of all parks and regional
recreational trails. Parcels adjacent to or including facilities indicated in the
Master Plan may be required to provide area for development of these facilities.
Ripley – Noted, The Quarry is providing additional easements (50’ along south edge, next to Spring Creek Trail) for future trail
expansion or adjustments.
Comment Number: 5 Comment Originated: 11/30/2020
5)The 2013 Paved Recreational Trail Master Plan (“Trail Master Plan”) was
adopted by City Council and provides conceptual locations and general trail
design guidelines for regional recreational trails. The Trail Master Plan is
available at https://www.fcgov.com/parkplanning/plans -andpolicies. 6)- The 2013 Paved
Recreational Trail Master Plan identifies an extensive stretch of the
Spring Creek Trail east of Shields Street as a high priority project. This
Page 21 of 33
includes the existing trail on the proposed site. The project would include
widening, repairing and/or replacing this undersized and highly used trail
segment.
Ripley – Noted, we are providing maintenance access to the Spring Creek Trail for the updating as the City notes above. We are
also providing a 50’ easement along the southern edge of the development for the trail adjustment or expansion.
Comment Number: 6 Comment Originated: 11/30/2020
6) The site does contain areas to be protected with Natural Habitat Buffer
Zones. Trail easements may co-exist within a Natural Habitat Buffer Zone if
approval is obtained from Environmental Planning. Including a Public Access
and Trail Easement overlying the entire Natural Habitat Buffer Zone may be the
most flexible way to allow future trail relocation and construction.
Ripley –Noted. A Public Access and Trail Easement has been added and is located within the NHBZ as noted above.
Comment Number: 7 Comment Originated: 11/30/2020
7)Park Planning & Development must approve any proposed connection to
the existing trail system. Internal access to the recreational trail from the internal
bike/pedestrian system should be provided at limited and defined access points.
Ripley – Noted. As of this submittal we have decided to remove the new connectio n to Wallenberg. This decision was made after
the second neighborhood meeting as the new connection was not received well with the neighborhood residents. Instead, we will
be replacing the bridge to Wallenberg Dr. to on the northeast of the site and providing maintenance access to Spring Creek Trail.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING:
The extension of Stuart Street intersection into the development would need at
least a preliminary design to understand how east-west travel would align with
the existing west leg of Stuart Street. The eastern approach of the intersection
had established a curb to curb width that was assuming a public street through
the site (including bike lanes) were to be provided. With the change on those
assumptions, we should understand how the development intends to utilize the
existing width into the site, or is there an opportunity/interest to rebuild or reduce
the width of the approach. There appears to be an unusual transition in the
interior road width to the existing curb return on the westbound movement that
may have some unintended consequences (such as parallel parking along the
mixed-use building that should be looked into. Note that as a private roadway,
this approach leg would typically be built in concrete for the section in right-of-way.
Northern: Preliminary striping concept added to plans
Comment Number: 2 Comment Originated: 12/01/2020
12/01/2020: INFORMATION ONLY:
With the previous comment in mind, at time of final plan, a more finalized
intersection design would be required that would address the signing and
striping lane configuration on both the west and east sides of Stuart Street, and
the signal pole improvements to make the intersection fully functional.
Northern: Intersection detail to be provided at final
Page 22 of 33
Comment Number: 3 Comment Originated: 12/01/2020
12/01/2020: INFORMATION ONLY:
Engineering comment #6 as part of the PDR indicated the need for a repay as
part of the City's construction of the street improvements along the frontage of
the property. At the quoted $233/foot for 2020 with approximately 1,000 feet of
frontage, this is estimated to have been approximately $233,000.00.
Engineering has been re-examining our repay policies for the local portion
obligation and has received confirmation from our Deputy PDT Director that this
repay will not be enforced on the project due to the time period that has elapsed
since the City constructed the infrastructure. With this in mind, (and City code
requiring the maintenance of abutting sidewalk and curb and gutter to be the
responsibility of the abutting property owner) the aspects of the existing frontage
that do not meet City/ADA construction standards today (cross slope, truncated
dome detection, damage infrastructure) are the responsibility of the
development and would need to be identified and demonstrated compliance on
the plans during final plan.
Northern: Existing access ramps (three) on Shields Street adjacent to property will be brought up to current ADA/City standards.
Watermark - thank you, our budget is updated and we plan to bring existing sidewalks up to code along our frontage.
Comment Number: 4 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING:
With the previous comment in mind, the plans before hearing should at least be
still indicating updating the existing access ramps along Shields Street with
truncated dome detection.
Northern: Truncated domes added and note added to bring ramps adjacent to property up to current standards.
Comment Number: 5 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING:
The plat should be dedicating an access easement for the main drive aisle
connection from Hobbit Street tying into Stuart Street.
Northern: Access easement added.
Comment Number: 6 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING:
The plat should be dedicating an access easement for the main drive aisle
connection from Hobbit Street tying into Stuart Street.
Northern: Access easement added.
Comment Number: 7 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING:
Verification should be made on whether named street-like private drives are to
be provided (or required to be provided from an emergency access
perspective.) Should the interior roadways become named, these should be
identified on the plat, and it is presumed two different street names would be
required for the change in direction on the main private drive tying Hobbit to Stuart.
Northern: Any names provided to us will be shown on plans and plat
Watermark - The main drive through the site will be named.
Page 23 of 33
Comment Number: 8 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING:
Similar to the end of the first comment with respect to the construction of a
private drive connecting to public street, the connection to Hobbit Street should
be built in concrete to the property line as part of the construction detail for a
private drive.
Northern: It is intended for the connection to be concrete to the ROW per City standards.
Comment Number: 9 Comment Originated: 12/01/2020
12/01/2020: INFORMATION ONLY:
The utility tie ins into the Hobbit Street -cul-desac- will need to be further
discussed and defined at time of final plan. This excavation would be subject to
triple impact fees for the street cuts due to the pavement being new. It may be
that a mill and overlay should be explored given the extent of the patching and
(resulting street cut penalty) that would occur.
Northern: This to be considered at final.
Watermark – Noted.
Comment Number: 10 Comment Originated: 12/01/2020
12/01/2020: INFORMATION ONLY:
We'll want to coordinate on the timing of the right -of-way vacation for the street
right-of-ways previously dedicated on the property that are no longer necessary
in relationship to a project development plan approval. We would move forward
with an item to City Council after a PDP approval. The providing of a legal
description, an $800 application to vacate a right-of-way, and additional details
should be kept in mind with subsequent submittals leading to a hearing
Northern: Understood
Watermark – Noted.
Comment Number: 11 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING:
The plat creates easement exclusion areas for the buildings, but it leaves some
ambiguity as to whether the Lots surrounding the easement exclusion areas are
then blanket easements, as I do not see any indication of blanket easements.
Absent of the establishment of blanket easements, it seems that interior utility,
drainage, and access easement are missing and needed for the project. Note
that in multi-family projects however, we've had some challenges with the
blanket easement approach for unanticipated structures encroaching into
blanket easements (carports, solar panels, etc.)
Northern: Plat updated to show blanket easements.
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING
The TIS was received, reviewed and conclusions from the study have been
accepted.
Delich - Acknowledged
Page 24 of 33
Comment Number: 2 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING
Prior to hearing we would like a preliminary intersection design for the Stuart
Street intersection into the development. We need an exhibit showing general
intersection geometry and lane alignments in addition to a basic traffic signal
plan, showing mast arm lengths and pole locations with utilities reflected on the
plans
Northern: Preliminary intersection design to be provided with next submittal
Comment Number: 3 Comment Originated: 12/01/2020
12/01/2020: The anticipated delay at the Shields and Stuart intersection
indicates that more storage at the intersection might be beneficial. With the
delays that are anticipated queuing can be expected to extend beyond the
diagonal parking. Moving the parking back could help the operations of the
private drive.
Northern: Diagonal parking shifted east to allow for 35’ minimum calculated queue in long range. 50’ (min) used for 2 vehicles.
Comment Number: 4 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING
The proximity to the Spring Creek Trail and active bike lanes on Stuart indicate
that bike traffic will be present on the site. Please work with FCMoves to
determine the appropriate connections for bike traffic.
Northern: Understood
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING - AUTOMATIC FIRE SPRINKLER SYSTEM
GROUP R SPRINKLER SYSTEMS - LOCAL AMENDMENT
> As previously noted, new multi-family (Group R-2) buildings with a unit count
greater than 12 shall be provided with NFPA 13 (full protection) fire suppression
systems. Group R-2 buildings up to 12 units may qualify to install 13 -R systems
with adequate fire separation between units. Contact the building department for details.
> Approved standpipe systems shall be installed throughout buildings where
the floor level of the highest story is located more than 30 feet above the lowest
level of fire department vehicle access.
> Indicate location of fire line connections on Utility Plans.
> Indicate location of Fire Department Connections on Utility Plans.
INFORMATION - OTHER GROUP OCCUPANCY BUILDINGS
> Any proposed building exceeding 5,000 square feet shall be sprinklered or
fire contained.
> Any Group A-2 assembly occupancy with an occupant load of 100 or more
persons will require a fire sprinkler system.
Watermark – Noted
Page 25 of 33
Comment Number: 2 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING - WATER SUPPLY
> A fire hydrant capable of providing 1500 gpm at 20 psi residual pressure is
required within 300 feet of any commercial/residential building as measured
along an approved path of vehicle travel. An exception to this rule pertains to
buildings (four stories or more) equipped with a standpipe system which
requires a hydrant within 100 feet of any Fire Department Connection (FDC).
> The project is also responsible for hydrant infill along Shields Street. A
hydrant at the Stuart Street intersection is required. The one indicated just east
of this site can be relocated closer to Shields to satisfy this requirement.
> Hydrant placement to be coordinated between PFA and City Water.
Northern: Hydrant placement is being coordinated with PFA and City Water.
Comment Number: 3 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING - FIRE APPARATUS ACCESS
PERIMETER APPARATUS ACCESS: Fire access is required to within 150
feet of all exterior portions of any building ground floor as m easured by an
approved route around the perimeter. This requirement appears to be satisfied
and an EAE is shown on the plat.
AERIAL APPARATUS ACCESS: In addition to the above and so as to
accommodate the access requirements for aerial fire apparatus (ladder trucks),
required fire lanes shall be 26-foot-wide minimum on at least one long side of
the building. At least one of the required access routes meeting this condition
shall be located within a minimum of 15 feet and a maximum of 30 feet from the
building, and shall be positioned parallel to one entire side of the building or as
otherwise approved by the fire code official. At this time, it does not appear all
applicable buildings are compliant. Access to the four-story building remains
problematic.
Ripley – The 4-story building and site layout has been adjusted to allow for access within 30 feet from the building. The north and
south sides are now within 30 feet from the edg e of the emergency access easement to building face.
Comment Number: 4 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL APPROVAL - FIRE LANE SPECIFICATIONS
> Fire lane sign locations or red curbing should be labeled and detailed on fi nal
plans. Refer to LCUASS detail #1418 & #1419 for sign type, placement, and
spacing. Appropriate directional arrows required on all signs.
> Add LCUASS detail #1418 to Utility Plan set.
Northern: Sign location and detail to be provided at final.
Comment Number: 5 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL APPROVAL - ADDRESS POSTING & WAYFINDING
> New buildings shall have approved address numbers, building numbers or
approved building identification placed in a position that is plainly legible,
visible from the street or road fronting the property, and posted with a minimum
of eight-inch numerals on a contrasting background.
> Where access is by means of a private road and the building cannot be
viewed from the public way, a monument, pole or other sign or means shall be
used to identify the structure and best route.
> A plan for address posting and wayfinding shall be submitted prior to final approval.
Page 26 of 33
Watermark –Noted.
Comment Number: 6 Comment Originated: 12/01/2020
12/01/2020: INFORMATION - FIRE PITS & GRILLS
> Fire pits & grills fueled by natural gas may be allowed in association with
multi-family buildings with prior approval of the fire marshal. Wood burning or
smoke producing fire pits & grills are strictly prohibited.
> Fire pits & grills shall be located in a permanent/fixed location, such as a
built-in kitchen or fireplace with UL fixtures as appropriate; or as otherwise
limited by manufacturer's installation guidelines. Connections shall have hard
pipe, not flex pipe and be equipped with an emergency shut off.
> Fire pits and grills fueled by natural gas shall have a 10 -foot separation to
combustible construction and/or vegetation. This distance is measured both
horizontally and vertically from the fire source.
Ripley – Noted, any fire pits will follow the prescribed details above. Thanks
Comment Number: 7 Comment Originated: 12/01/2020
12/01/2020: INFORMATION - VALET TRASH SERVICE
Several Multi-Family developments have proposed valet trash and recycling
services where residents set their trash and recycling outside their unit for
building maintenance or janitorial staff to collect and deposit in a centralized
location. Please be aware that while not specifically prohibited, valet collection
service requires careful planning and approval from the City and Poudre Fire
Authority. In general, no valet collection service will be approved that allows
residents to place combustible materials within an emergency exit corridor. Any
proposal to provide valet collection services must be approved by the fire
marshal and thoroughly documented on the Planning Set.
Watermark – Noted.
Department: Planning Services
Contact: Meaghan Overton, 970-416-2283, moverton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/01/2020
12/01/2020: FOR INFORMATION: Staff appreciates the responsiveness to
early discussions about the design of the street-like private drive connecting
Stuart and Hobbit Streets. The wide sidewalks, trees, and angled parking
create a logical, aesthetically pleasing travel route through the site. Thank you.
Ripley – Acknowledged. Thanks
Comment Number: 2 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: The ground-level entrances onto Hobbit Street,
Stuart Street, and along the private street satisfy the code intent to orient
buildings to streets, rather than parking lots. Thank you for creatively
redesigning the ground-level access points of the buildings. There are still
buildings that do not orient to streets, which are addressed in comments about
the requested modification below. In addition, there is not a pedestrian crossing
between buildings 7 (multifamily) and 10 (two-family). Please consider
modifying the design in this area to ensure safe pedestrian passage and
Page 27 of 33
minimal impact to proposed landscaping.
Ripley – An enhanced pedestrian crossing (raised) has been added between buildings 7 (multifamily) and 10 (two -family). We
have also updated the sidewalk in this area to a 9’ walk with tree grates and additional landscaping . A modification has been
added to our submittal concerning this update and the connecting walkway from two-family buildings #8, #9, #10. Please see the
modification for a detailed response.
Comment Number: 3 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please update the modification request to include
building 5 as well; the entrances facing the parking lot appear to measure more
than 200 feet to a street sidewalk. The code standard is clear that any primary
entrance must be no more than 200 feet from a street sidewalk.
Ripley –Noted. Modification has been updated to include building 5 as well. The walkway and entrances along the west have been
updated to the standards along the south in the modification. Please see the Site Plan and updated modification for reference .
Comment Number: 4 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please see comments from Environmental
Planning, Stormwater, and Parks Planning regarding the Natural Habitat Buffer
Zone (NHBZ), Spring Creek Trail access, and overall coordination of the
southern portion of the site. Staff has previously recommended moving building
#8 out of the NHBZ, and understands that there will be further discussion about
how best to resolve these issues given site constraints.
Ripley – Noted. We have been working with Environmental, Stormwater, and Parks in the NHBZ and Spring Creek Trial on the
south of the property. We have removed building #8 (3-story multifamily). After additional review, we have to use the southern
portion of the site for detention. For this reason, the commercial building has also been removed from the plans. The area will now
act as detention as well as a natural buffer and open space. A paved access to the Spring Creek Trail has been added for
maintenance vehicles per city’s request.
Comment Number: 5 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: The proposed development meets requirements
for the number of building types in 3.8.30 with three distinct building designs
(multifamily, mixed use, twofamily). However, the requirements in this section
(specifically 3.8.30(F)(2)) for variation among buildings have not been fully
addressed. Building designs should be distinguished from one another by
including unique architectural elevations and unique entrance features within a
coordinated overall theme of roof forms, massing proportions and other
characteristics. Such variation among buildings shall not consist solely of
different combinations of the same building features. Staff suggests looking
closely at buildings 1 and 2 as well as buildings 6 and 7 to incorporate more
variation in entrance features and elevations. One possible suggestion is to
incorporate some of the varied roof forms and massing from the mixeduse
building into building A to provide more variety throughout the development.
Watermark – Our submittal now includes a revised building A elevation to add variety to the architecture throughout the site. See
enclosed.
Comment Number: 6 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: With the exception of building type C, all of the
multifamily (3story) buildings appear to have no windows on the sides. Is there
any way to add more visual interest to the sides of the buildings? Windows
could be a solution, and there may be other options that would help add more
Page 28 of 33
variety and interest to the sides of the buildings.
Watermark – The revised building A has added windows on the short ends of the buildings. Closets and bathrooms in our
floorplans limit adding windows in the other building types. The short end that faces Shields Street is a Type A building that will
have windows.
Comment Number: 7 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: The proposed building architecture does not meet
the requirements in section 3.8.30 for color variation. Two color schemes are
proposed, and three are required. Please add one color scheme to your next
submittal. Also be prepared to identify which color scheme is proposed for each
building to ensure that no similar-colored buildings are next to each other.
Watermark – Three color schemes are now included. A colored site plan shows the variation throughout the site.
Comment Number: 8 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: The commercial building elevations look
significantly less complete than the rest of the architectural set, and the building
is identified as “future commercial.” However, earlier comments in conceptual
review indicated that the project will be completed in one phase. Please clarify.
In addition, the elevation for the commercial building appears to have a very
different architectural style than the rest of the development, particularly with the
thicker column/pilaster elements and the curved roof. This building should be
coordinated with the rest of the development.
Watermark – The stormwater department has required onsite detention which needs to fit on the south side of the si te due to
topography. The required “street like drive” connection location on Shields meant the stormwater detention area removed the
commercial outlot. We have expanded the commercial square footage in the mixed use building and have planned for viable
commercial uses on-site.
Comment Number: 9 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: The mixed-use building appears to have more
variation in massing than is demonstrated on the site plan based on staff’s
review of the elevations and rendering in the architectural set. Is this cor rect?
Please note that Section 3.5.3 has specific standards for mixed -use buildings,
including that building bays shall be a maximum of thirty (30) feet in width,
visually established by architectural features such as columns, ribs or pilasters,
piers and fenestration pattern. It might be helpful to see a footprint for the
building to better review the building articulation at the ground level.
Watermark – The revised plans show the correct footprint that match our architect’s design.
Comment Number: 10 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: A shadow analysis will be required for all buildings
over 40 feet in height – this will include all of the multifamily buildings and the
mixed use building. The code requirements in this Section 3.5(G) are primarily
concerned with impacts on adjacent properties and preservation of privacy for
neighbors and residents of the development.
Studio M - Provided with this submittal.
Comment Number: 11 Comment Originated: 12/01/2020
Page 29 of 33
12/01/2020: FOR HEARING: The Neighborhood Commercial District is
intended to be a mixed-use commercial core area anchored by a supermarket
or grocery store and a transit stop. The main purpose of this District is to meet
consumer demands for frequently needed goods and services, with an
emphasis on serving the surrounding residential neighborhoods. It would be
very helpful to have an idea of what uses are being proposed in the mixed-use
and commercial buildings. The zone district standards strongly encourage a
supermarket or grocery store use.
Watermark – Noted, Watermark also sees a grocery store as a nice amenity for our residents. We are open to leasing the space
to a market or small grocery in the mixed-use retail space. We are designing the retail space to allow for a variety of commercial
uses to be able to lease to interested tennants. The building’s foundation is being designed to allow for flexibility with utilities.
Comment Number: 12 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please add the new zone district boundaries onto
the site plan for your next submittal to show where the NC and MMN zones are
in relation to the buildings proposed. This will help staff more accurately review
the NC parcel for compliance with Section 4.23 (secondary uses, block
frontage, etc.).
Ripley – Zoning district boundaries have been added to the site plan. NC and MMN zones are now shown and labeled.
Comment Number: 13 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Staff would like to see more landscaping along
the proposed major walkway spine to fully comply with the definition of "major
walkway spine", particularly along eastern edge and at curve leading to
Wallenberg. Please add detail to the site plan demonstrating that the major
walkway spine meets the definition in the LUC. The walkway itself must be a
minimum of 5 feet wide, and the walkway spine must measure 35 feet in total
width (including landscaping on either side of the 5 ft walk). In addition, the
walkway spine must be visible from a publ ic street – in this case, that would
likely be Wallenberg Drive.
Ripley – Landscaping has been added to the Major Walkway Spine. Details regarding the width of the walk (6’ wide), and width of
the total walkway spine (min 92’) have been added to the site plan. You are correct in assuming the walkway would be visible from
Wallenberg Drive.
Comment Number: 14 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Can the walkway meander or curve more naturally
along the south edge of the development where it currently zig-zags with the
outline of the streetlike private drive? This would provide a more logical - pedestrian path.
Ripley – Walkway has been updated to meander along southern edge of development where street -like private drives zig-zags.
Comment Number: 15 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please add a calculation to the landscape plan
showing that the requirement for 10% interior parking lot landscaping has been
met as required in Section 3.2.2(M).
Ripley – Calculation has been added to the landscape details sheet.
Comment Number: 16 Comment Originated: 12/01/2020
12/01/2020: FOR INFORMATION: The shrub beds around the building are
noted, and meet requirements for foundation plantings. Staff understands that
plant selection will occur at final plan.
Ripley – Understood, planting of shrubs will occur at final plan around foundations.
Page 30 of 33
Comment Number: 17 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Staff understands that a trash valet service is
proposed. Where will the trash and recycling be staged for pickup?
Watermark – Our design team is working with the Fire Marshal to ensure our valet trash design will work and if not, we plan to
add trash rooms to the buildings. One compactor will be on-site regardless of if we do valet trash or not because a company will
still come empty the trash rooms.
Comment Number: 18 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Is the lighting design finalized? The photometric
plan indicates that some areas of the site will be unlit – examples include the
building surrounds facing Hobbit Street, the area around the two-family
buildings, and much of the walkway along the west side of the street -like private
drive. Please clarify – currently, the site appears to be under-lit.
Watermark – a revised photometric plan is included.
Comment Number: 19 Comment Originated: 12/01/2020
12/01/2020: FOR HEARING: Please confirm that the accessible parking stalls
will have ramp access to the sidewalk network wherever they are shown on the site plan.
Ripley – Noted, access with be show before hearing.
Northern: Ramp locations now shown.
Comment Number: 20 Comment Originated: 12/01/2020
12/01/2020: FOR INFORMATION: Note that all mechanical equipment (ground
and roof-mounted) will need to be screened from view.
Ripley – Understood. Mechanical equipment has been added to the site and landscape plan. Shrub plantings will be added at
FDP. We plan to screen all mechanical equipment as noted in comment above.
Watermark –Noted.
Department: Historic Preservation
Contact: Maren Bzdek, 970-221-6206, mbzdek@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/01/2020
12/01/2020: We are anticipating that you will bring this item to the Landmark
Preservation Commission for the January 20 meeting. Submittal materials for
that meeting are due by midnight on December 28. The LPC will provide a
recommendation to the decision maker (P&Z) regarding the project's
compliance with Section 3.4.7 of the land use code.
Watermark – This project was unanimously approved by LPC with the closing quote from Charman Dunn “Very fine project that
will fit well with the historic district.”
Comment Number: 2 Comment Originated: 12/01/2020
12/01/2020: As we have discussed in meetings and via email, the presentation
to the LPC should include views of the development from the Sheely Drive
Historic District at any relevant points, but to include at least from the property
that is closely abutting the development site and from a useful point further to the
north within the district. Please include the recent Landmark development in
those views.
Page 31 of 33
Watermark – See enclosed for 3D views discussed with the City after we received this comment letter.
Comment Number: 3 Comment Originated: 12/01/2020
12/01/2020: For the LPC meeting, please summarize how the buildings within
the historic influence area, as shown on your map, are specifically compliant
with each design compatibility requirement in Table 1 of section 3.4.7 (E),
relative to the Sheely Drive District. Staff recommends responding to all six
design compatibility requirements to avoid any confusion regarding the site's
status as directly abutting a historic district.
Watermark – See enclosed elevation for descriptions showing how the building is compatible to all items in Table 1.
Department: Transportation Planning
Contact: Seth Lorson, 970-416-4320, slorson@fcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 12/03/2020
12/03/2020: FOR HEARING: A strong bike/ped connection should be made
from the terminus of Hobbit directly to the east and connect with the Spring
Creek Trail at the bridge to Wallenberg Drive.
Ripley – Access is provided through the northeaster edge of the site. An existing bridge will be replaced creating a safe and
accessible ped and bike connection to Spring Creek Trail and Wallenberg Drive. It is important to note that there is also a
connection from Landmark (development to the north) in the same location. In addition, bike lanes have been added on the street
like private drive when it terminates with Schields street. A connection to on the southeast of the site connects to Spring Creek
Trail.
Comment Number: 2 Comment Originated: 12/03/2020
12/03/2020: FOR HEARING: Regarding the proposed private drives through
the site, they need to accommodate bicycle traffic both from tenants within the
site and other cyclists moving through the site. Perhaps a parallel bike/ped path
would serve this purpose without creating the conflict between parking vehicles
and bikes -from the corner of Shields and Stuart along the edge of the NHBZ
up to the northeast corner.
Ripley – Cyclists will have to access at the connection of W Stuart St with bike lanes. Bike lanes will merge within the drive lane of
the street like private drive. We also have a connecting sidewalk along the south of site that connects to a Major Walkway spine
connecting to Spring Creek Trail.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 12/01/2020
12/01/2020: INFORMATION ONLY:
Unless required during PDP, a complete review of all plans will be done at FDP.
Ripley –Noted. Plans will be reviewed at FDP
Topic: Plat
Comment Number: 1 Comment Originated: 12/01/2020
12/01/2020: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
Page 32 of 33
made. Please provide any responses on redlined sheets and/or in response letter.
Northern: Redlines addressed.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 11/30/2020
11/30/2020: Construction shall comply with adopted codes as amended.
Current adopted codes are:
2018 International Building Code (IBC) with local amendments
2018 International Residential Code (IRC) with local amendments
2018 International Existing Building Code (IEBC) with local amendments
2018 International Energy Conservation Code (IECC) with local amendments
2018 International Mechanical Code (IMC) with local amendments
2018 International Fuel Gas Code (IFGC) with local amendments
2018 International Swimming Pool and Spa Code (ISPSC) with local
amendments
2018 International Plumbing Code (IPC) as amended by the State of Colorado
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins c ode amendments can be found at
fcgov.com/building.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
· 140mph (Ultimate) exposure B or Front Range Gust Map published by SEAC.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code:
· Single family: IRC chapter 11.
· Multi-family and Condominiums 3 stories max: 2018 IECC residential chapter.
· Commercial and Multi-family 4 stories and taller: 2018 IECC commercial
chapter.
INFORMATIONAL ITEMS:
· 10% of all parking spaces must be EV ready (conduit in place)
· Multi-family Residential located within 1000ft of rail tracks, 500 of highway, or
250ft of a 4-lane road must provide exterior wall composite sound transmission of 39
STC min.
· R-2 occupancies apartment/condo must provide 10ft setback from property
line and 20 feet between other buildings or provide fire rated walls and
openings per chapter 6 and 7 of the IBC.
· City of Fort Collins amendments to the 2018 IBC require a full NFPA -13
sprinkler system in multifamily units with an exception to allow NFPA 13R
systems in buildings with no more than 6 dwelling units (or no more than 12
dwelling units where the building is divided by a 2-hour fire barrier with no more
than 6 dwelling units on each side).
· Prescriptive energy compliance with increased insulation values is required for
buildings using electric heat.
Page 33 of 33
· A City licensed commercial general contractor is required to construct any new
multi-family structure.
· Attached single-family provide 3ft setback to property line or provide fire rated
walls & openings per chap 3 of the IRC.
· Bedroom egress windows (emergency escape openings) required in all
bedrooms.
· Attached single-family townhomes and duplexes are required to be fire
sprinkled per local amendment and must provide a P2904 system min and
provide fire rated wall per R302. Determine what water line size will be provided
to dwellings so the fire-sprinkler system can be designed.
· New homes must provide EV/PV ready conduit, see local amendment.
· Provide site-wide accessibility plan in accordance with CRS 9-5. This requires
accessible units per that state standard. This requirement includes single family
attached homes and accessible path must be provided into the dwelling
entrance (no step).
Stock Plans:
When residential buildings will be built at least three times with limited
variations, a stock plan design or master plan can be submitted for a single
review and then permit issued from that master.
Building Permit Pre-Submittal Meeting:
Please schedule a pre-submittal meeting for any new commercial or multi-family
building with Building Services for this project. Pre-Submittal meetings assist
the designer/builder by assuring, early on in the design, that the new projects
are on track to complying with all of the adopted City codes and Standards.
Watermark – Noted.