Loading...
HomeMy WebLinkAboutKECHTER TOWNHOMES - FDP210002 - - DRAINAGE REPORT FINAL DRAINAGE REPORT AND EROSION CONTROL REPORT February 17, 2021 Kechter Townhomes Fort Collins, Colorado Prepared for: TWG Ryan Kelly, Acquisitions Director 1301 East Washington Street, Suite 100 Indianapolis, IN 46202 317-559-7009 Prepared by: 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 1664-003  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. 301 N. Howes Street, Suite 100, Fort Collins, CO 80521 970.221.4158 www.northernengineering.com February 17, 2021 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage and Erosion Control Report for Kechter Townhomes Dear Staff: Northern Engineering is pleased to submit this Final Drainage and Erosion Control Report for your review. This report accompanies the Final Development Plan submittal for the proposed Kechter Townhomes development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Deborah Spaustat, PE Design Engineer Kechter Townhomes Final Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND EXISTING SITE INFORMATION ................................................................ 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 1 C. Existing Sub-Basin Description .......................................................................................................... 2 II. Master Drainage Basin Information ................................................................................................. 3 III. Floodplain ........................................................................................................................................ 3 IV. Project Description .......................................................................................................................... 3 A. Overall Description............................................................................................................................ 3 B. Sub-Basin Description ....................................................................................................................... 4 V. PROPOSED DRAINAGE FACILITIES .................................................................................................... 5 A. Detention Basin and Outlet Design ................................................................................................... 5 B. Existing Storm Sewer in Kechter Road .............................................................................................. 6 C. WQCV design .................................................................................................................................... 6 D. LID Systems and design ..................................................................................................................... 7 E. Maintenance Access ......................................................................................................................... 8 F. Drainage Easements ......................................................................................................................... 8 VI. DRAINAGE DESIGN CRITERIA ........................................................................................................... 8 A. Regulations........................................................................................................................................ 8 G. Four Step Process .............................................................................................................................. 8 H. Development Criteria Reference and Constraints ............................................................................ 9 I. Hydrological Criteria ......................................................................................................................... 9 J. Hydraulic Criteria ............................................................................................................................ 10 K. Detention Calculation Method ....................................................................................................... 10 L. Floodplain Regulations Compliance ................................................................................................ 10 M. Modifications of Criteria ............................................................................................................. 10 VII. CONCLUSIONS ................................................................................................................................ 11 A. Compliance with Standards ............................................................................................................ 11 N. Drainage Concept ............................................................................................................................ 11 References .................................................................................................................................................. 12 Kechter Townhomes Final Drainage Report APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Detention Ponds B.2 – Water Quality B.3 – Storm Sewers B.4 – Inlets B.5 – Swales APPENDIX C – Erosion Control Report APPENDIX D – LID Exhibit APPENDIX F – References LIST OF FIGURES: Figure 1 – Aerial Photograph ........................................................................................................................ 2 Figure 2 – Existing Floodplains ...................................................................................................................... 3 Figure 3– Proposed Site Plan ........................................................................................................................ 4 MAP POCKET: DR1 - Drainage Exhibit Kechter Townhomes Final Drainage Report 1 I. GENERAL LOCATION AND EXISTING SITE INFORMATION A. Location Vicinity Map A tract located in the southwest quarter of Section 4, Township 6 North, Range 68 West of the 6th Prime Meridian, City of Fort Collins, County of Larimer, State of Colorado. The project site is 4.68-acres located at 3620 Kechter Road approximately one mile west of the Kechter Road/I-25 interchange. The site is situated between the Twin Silo Community Park to the west and Observatory Village to the east with Radiant Park located directly south across Kechter Road. The project is located in the McClellands Creek drainage basin in the Master Drainage Study. The direct outfall for stormwater from the site is the existing stormwater system in Kechter Road, which discharges to the Muskrat Ditch on the south side of Kechter Road in Radiant Park. B. Description of Property 1. The project site is located in the Low Density Mixed-Use Neighborhood District. Currently the lot is mostly undeveloped containing one single family home and several outbuildings. No stormwater infrastructure exists onsite. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey the project site consists of Nunn clay loam and Fort Collins loam, which fall Kechter Townhomes Final Drainage Report 2 into Hydrologic Soil Group C. Figure 1 – Aerial Photograph The existing site is generally comprised of undeveloped land with natural grasses and vegetation. A house, gravel drive, and out-buildings exist on the site. This site will employ water quality features and runoff reduction facilities including rain gardens, minimization of directed connected areas of imperviousness, and an extended detention basin. An irrigation ditch runs outside of the property along the north and east boundary lines to Kechter Road. There is an existing stormwater system in Kechter Road that was designed and installed as part of the Willow Brook development (Observatory Neighborhood). The system comprises storm manholes and 18” RCP pipe. The Final Drainage Report for Willow Brook shows this storm sewer as the point of discharge for detention pond E with a 100-year release rate of 4.55-cfs. The Developed Drainage Plan in the report shows the discharge rate at 4.3-cfs. The analysis of the storm sewer for the current project uses 4.55-cfs to be conservative. C. Existing Sub-Basin Description 1. Historically the property drains in four directions, as shown in the Existing Drainage Exhibit. The southwest quarter of the site (basin A) sheet flows offsite to the pond in Twin Silo Park. The north half of the site (basin B) drains to a low spot in the center of the field and either infiltrates into the ground or evaporates. Basin C at the south east corner of the site sheet flows to Kechter Road and a small basin D sheet flows to the existing irrigation ditch adjacent to the site. Kechter Townhomes Final Drainage Report 3 A full analysis of the existing hydrology was not conducted since the detention requirements are based on the McLellend Basin master plan and not historical release rates. A full-size copy of the Existing Drainage Exhibit and Proposed Drainage Exhibit can be found in the Map Pocket at the end of this report. II. Master Drainage Basin Information 1. Kechter Townhomes is located within the McClellands Basin, which encompasses 3.4 square miles in Southeast Fort Collins. McClellands Creek conveys flow from upper end of the basin northeast of College Avenue and Harmony road to down to its point of discharge to the Fossil Creek Reservoir Inlet Ditch. There are no recommended improvements in the master plan for the Kechter Townhomes site. Onsite detention is being provided per the McClellands Basin master plan’s requirement of 0.2-cfs per acre for the minor storm event and 0.5-cfs per acre for the major storm event. III. Floodplain 1. The subject property is not located in a FEMA or City regulatory floodplain. Figure 2 – Existing Floodplains IV. Project Description A. Overall Description 1. The project is proposing to create an affordable housing neighborhood with 60 townhomes and a Kechter Townhomes Final Drainage Report 4 public loop road on a 4.68-acre parcel of land off of Kechter Road. Vehicular connections to the adjacent Observatory Neighborhood will be made at Eclipse Lane and Quasar Way. 2. Two raingardens will treat 58% of the newly created impervious areas and an extended detention basin will provide additional water quality treatment and detain runoff to allowable release rates as allowed in the McClelland Basin Master Plan. 3. The site will discharge from the extended detention basin (EDB) to the existing stormwater system in Kechter Road. 4. All runoff from the site will be diverted to the extended detention basin. No runoff will be allowed to flow directly to the irrigation ditch or adjacent properties. Figure 3– Proposed Site Plan B. Sub-Basin Description 1. The site is broken into nine sub-basins that drain to one of three locations. Runoff from sub-basins A.1 and A.2 flows to Rain Garden A located in the southwest corner of the site. Runoff in sub-basin A.1 is collected in a grass swale and flows south along the property line to the rain garden. The swale has the capacity to convey 33% more flow than the major storm event. See appendix B.5. Kechter Townhomes Final Drainage Report 5 A gutter pan conveys runoff from sub-basin A.2 south to a double chase drain under the sidewalk at the low point of the road where it enters the rain garden. The outlet of rain garden A discharges flow to the extended detention sub-basin in C.5. Runoff from sub-basin B.1 is collected in a gutter pan and flows south to a chase drain under the sidewalk that discharges to rain garden B. Flow from sub-basin B.2 is collected in a storm system to the east of the buildings that outlets to rain garden B. The outlet of rain garden B discharges flow to the extended detention basin in C.5. Runoff from sub-basins C.1 is collected in a gutter pan and conveyed south to an inlet installed inline on the discharge pipe from rain garden A. Bypass flow is then collected in a double combination inlet at the low point and discharged to the extended detention basin. Flow in sub-basin C.2 is collected in a storm system in the central open space and conveyed south to the extended detention basin. Runoff in sub- basins C.3 and C.4 is collected in gutter pans and inlets that then combines with runoff from basin C.2 before discharging tot the extended detention basin. The outfall of the EDB is the existing 18” RCP stormwater system in Kecther Road. This storm system ultimately discharges to the Muskrat Ditch. Table 1 summarizes the hydrologic characteristics of each subbasin and the total site. Table 1 – Proposed Basin Hydrology Summary Basin ID Basin Area (acres) Composite % Imperv. C2 C100 Tc (min) Q2 (cfs) Q100 (cfs) A.1 0.49 43% 0.54 0.68 5.0 0.75 3.29 A.2 0.85 78% 0.79 0.99 5.0 1.91 8.34 B.1 0.75 81% 0.81 1.00 5.0 1.74 7.47 B.2 0.41 46% 0.56 0.70 5.0 0.66 2.89 C.1 0.62 83% 0.83 1.00 5.0 1.46 6.18 C.2 0.35 64% 0.69 0.86 5.0 0.68 2.97 C.3 0.52 78% 0.79 0.99 5.0 1.16 5.08 C.4 0.07 81% 0.82 1.00 5.0 0.15 0.66 C.5 0.63 2% 0.25 0.31 5.0 0.45 1.95 Total Site 4.68 61% 0.67 0.84 5 8.98 39.17 V. PROPOSED DRAINAGE FACILITIES A. Detention Basin and Outlet Design 1. The Extended Detention Basin was designed to limit release rates to the site to 0.2-cfs/acres for the minor storm event and 0.5cf/acres for the major event. The major storm event release rate was calculated to be 2.34-cfs based on the total onsite area of 4.68- acres. This results in a required detention volume of 35,316 ft3, or 0.811-acre-ft. The total volume provided in the extended detention basin in C.5 is 41,129 ft3, or 0.94-acre-ft. Table 2 summarizes the onsite detention: Kechter Townhomes Final Drainage Report 6 Table 2: Extended Detention Basin Summary Area of Site (acres) Allowable Q2 (cfs) Allowable Q100(cfs) EURV (ft3) Water Quality Capture Volume (ft3) Total Volume Required (ft3) Total Volume Provided (ft3) 4.68 0.94 2.34 11,895 4,866 35,316 36,028 A detail of the EDB outlet structure is included on sheet D6. The major storm attenuation is controlled by a 6” circular orifice plate on the 15” outlet pipe. B. Freeboard and Spillway 1. The FCSWDM requires that the design provide 1’ foot of freeboard above the major storm WSEL. This project is only able to provide 0.70’ of freeboard above the major storm WSEL due to vertical limitations set by the existing storm sewer in Kechter Road and horizontal limitations from the existing trees that are being preserved for habitat. 2. All minimum opening elevations of the proposed buildings are set at least 12” above the major storm WSEL of 4896.65. 3. An emergency spillway for the EDB is not provided. Inlets D.1 and E.1 have grate elevations set at 4896.9 and 4897.0. The highest elevation of the pond is 4897.4 meaning the inlets would surcharge before the pond overtops and water will exit down Kechter Road. 4. Additionally, the development has one alternate vehicular access routes for use if the entrance to Wheelhouse Way is impassible. C. Existing Storm Sewer in Kechter Road 1. The existing storm sewer in Kechter road was modeled in Storm and Sanitary Analysis using as-built data from the existing conditions survey for pipe sizes and inverts and the proposed connection from the extended detention basin in C.5. The 100-year flow from the existing detention pond C was assumed to be 4.55-cfs and the flow from the current project was assumed to be 2.34-cfs. The existing storm sewer has the capacity to convey the increase in flow from the current project. The results of the hydraulic model are included in the appendices. D. Proposed Storm Sewer on-site 1. There are two main, private, storm sewer systems that collect runoff and convey it to the rain gardens and EDB. 2. Storm sewer A consists of 12” HDPE pipe and nyloplast area drains and runs north to south along the east property line before discharging to rain garden B. It has the capacity to convey the minor and major storm event without surcharging. It was evaluated with water surface elevation in the rain garden set to just above the WQCV elevation. 3. Storm sewer B is located in the central open space between buildings and also has the capacity to convey the minor storm event without surcharging when the EDB WSEL is at the 10-year elevation. However, when the EDB is at the 100-year elevation the backwater from the pond causes the HGL and EGL to exceed the inlet grate elevation and the most downstream pipe to surcharge. 4. Storm sewer D conveys water from rain garden A to the EDB as well as collects runoff from basin C.1 in a single curb inlet, E.2. Kechter Townhomes Final Drainage Report 7 5. Storm Sewer E collects bypass runoff from Inlet E.2 in double curb Inlet E.1, which us located at the low point of the road. 6. Both storm sewer D and storm sewer E are heavily influenced by the water surface elevation in the EDB. While both systems have the capacity to convey the minor storm event when the WSEL of the pond is at or below the 10-year elevation, the backwater at the 100-year elevation governs both systems during any runoff event and the inlets will surcharge. 7. Storm sewer, inlet, chase drain and swale capacity calculations are included in Appendix B. E. WQCV design 1. The water quality capture volume for the extended basin was based on a 40-hour drain time. The flow control plate in the outlet structure will consist of three rows of 1-1/16” diameter orifices set at 10” vertical spacing. A detail for the EDB outlet structure including the orifice plate is included on sheet D6. F. LID Systems and design 1. The LID for this project will be provided by two rain gardens, which will treat 58.1% of the newly created impervious area. The rain garden required volumes were based on a 12-hour drain time. Table 3 summarizes the rain gardens: Table 3: Rain Garden Summary Basin Area (acre) % Imperv Volume (ft3) Min Flat Area (ft2) Contributing Basins Rain Garden A 1.33 65 1,185 757 A.1 & A.2 Rain Garden B 1.16 68 1,086 693 B.1 & B.2 The raingardens will have underdrains connected to an ADS inlet. The underdrains will have orifice plates on their outlets that will restrict flow to attain the 12-hour drain time. The grate of the ADS inlet will be set the WSEL for the WQCV to convey flows in excess of the WQCV directly to the EDB. Storm events in excess of the 100-year event, or in the event the EDB outlet is clogged, will result backwater storage in rain garden A. Table 4 Summarizes the LID Project Requirements: Kechter Townhomes Final Drainage Report 8 Table 4: LID Project Requirements Project Summary Total Impervious Area 123,221 sf Target Treatment Percentage 50% Minimum Area to be Treated by LID measures 61,610 sf Rain Garden A Impervious Treatment Area 37,459 sf Rain Garden B Impervious Treatment Area 34,318 sf Total Treatment Area 71,777 sf Offsite Treatment Area 210 sf Onsite Treatment Area 71,567 sf Percent Total Project Area Treated 58.1% Basins A.2 includes 210-ft2 of offsite impervious area from Kechter Road that will be treated in Rain Garden A. While the Rain Garden is designed to include this area, the calculations for required and provided treatment of imperviousness areas omit it. G. Maintenance Access 1. The EDB and both rain gardens can be accessed directly from the Right-of-Way and easements on lots 4 and 5, block 3 for maintenance. H. Drainage Easements 1. Tracts B, C and D are drainage easements for the rain gardens and extended detention basin. 2. There is a 6’ drainage and utility easement adjacent to the west, north and east property lines. 3. There is a 14’ drainage easement centered on storm sewer B in the central open space. VI. DRAINAGE DESIGN CRITERIA A. Regulations 1. There are no optional provisions outside of the FCSCM proposed with the Kechter project. The project site has not been a part of any known previous drainage study, however, the Final Drainage Report for Willow Brook, July 27, 2001, was referred to for the capacity analysis of the offsite receiving storm system in Kechter Road. I. Four Step Process The overall stormwater management strategy employed with the Kechter Townhomes project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Kechter Townhomes Final Drainage Report 9 Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through rain gardens to provide additional infiltration. Providing on-site detention to increase time of concentration, promote infiltration and reduce loads on existing storm infrastructure. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, this development will still generate stormwater runoff that will require additional BMPs and water quality. A majority of stormwater runoff from the site will ultimately be intercepted and treated in proposed rain gardens and an extended detention basin. Water quality for areas not routed through the rain gardens will be provided within the extended detention basin volume. Step 3 – Stabilize Drainageways This property discharges detained stormwater to an existing storm sewer system in Kechter Road. The project does not directly impact any drainageways. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: Trash receptacles within home will allow for the disposal of solid waste. Rain Gardens and extended detention basins to provide for water treatment prior to flows being released to existing drainageways and storm infrastructure. Standard Operating Procedures (SOPs) for BMP maintenance of Rain Gardens, Detention ponds, and associated drainage infrastructure to remove sediment accumulation regularly. J. Development Criteria Reference and Constraints 1. The proposed site is a part of the McClelland Drainage Basin, which requires onsite detention with a 0.2-cfs.ac release rate for the 10-year storm and a 0.5-cfs/acre release rate for the 100-year storm. City of Fort Collins standard water quality requirements include treatment of 50% of the site runoff to be treated using the standard water quality treatment as described in the Fort Collins Stormwater Manual, Volume 3-Best Management Practices. This site is subject to the LID requirements per the City of Fort Collins. Please see the LID Exhibit located in the Appendix for calculations concerning LID treatment. For residential neighborhoods with public streets, the City requires 50% of new or modified impervious areas to be treated with LID methods. K. Hydrological Criteria 1. The Rational Method was used to compute stormwater runoff using runoff coefficients from Table 3.2-2 of the FCSCM. 2. Storm intensities based on time of concentration were interpolated from The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves shown in Figure 3.4-1 and Table 3.4-1 of the FCSCM. Required detention storage was calculated using The Modified Federal Aviation Administration (FAA) Procedure. The 2-year storm event and the 100-year storm event were used as the minor and major design storms. Kechter Townhomes Final Drainage Report 10 No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. L. Hydraulic Criteria 1. All drainage facilities proposed with the Kechter Townhomes project are designed in accordance with criteria outlined in the FCSCM. Street capacity – inlets are located so that there is no overtopping of the curb during the minor storm event and with a maximum depth of flow of 12’ in the gutter during the major storm event. Cross-pan – the maximum depth allowed in the cross-pan is 6” for the minor storm event and 18” for the major storm event . Storm sewer – the minimum storm sewer size in the ROW is 15”. Storm sewers should not surcharge during the minor storm event and must comply with street encroachment criteria during the major storm event. M. Detention Calculation Method 1. Onsite detention is required to restrict the 10-year storm release rate to 0.2-cfs/ac and the 100-year storm release rate to 0.5-cfs/acre. The Modified FAA Procedure was used to calculate the required detention volume based on the area of the site as outlined in the FCSCM. The volume of the pond was calculated using FCSCM Equation 6-4 for conical stage storage volume approximation. N. Floodplain Regulations Compliance 1. The subject property is located outside of all FEMA regulated and local floodplains and is not subject to any floodplain regulations. O. Modifications of Criteria 1. Several modifications of drainage criteria are requested: 1.1. Less than 1’ of freeboard above the 100-year water surface elevation in the extended detention basin. 1.2. Surcharging of directly adjacent storm sewer pipes during the 2-year storm event when the WSEL of the EDB is at the 100-year level. Specifically: · Pipes 27, 28 and 29 in storm sewer system B will surcharge and the maximum EGL will be above the grate elevation at inlet B-1. Surcharging occurs during 50-year event but EGL is more than 12” below grate elevations. · Pipes 41 and 44 in storm sewer system D will surcharge and the maximum EGL will be above the grate elevation at inlet D-1. Surcharging occurs during 25-year event but EGL is more than 12” below grate elevation. · Pipe 39 in storm sewer system E will surcharge and the maximum EGL will be above the grate elevation at inlet E-1. Surcharging occurs during 10-year event but EGL is more than 12” below grate elevation. If overflow from the inlets occurs due to the WSEL in the EDB, it will pond in the gutter to an elevation of approximately 4867.3 where it will then enter the cross-pan and gutter system in Kechter Road. The depth of flow at the gutter line will be less than the limit of 12” and the Kechter Townhomes Final Drainage Report 11 depth of flow at the crown will be less than the 6” limit. 1.3. Surcharging of Inlets B.1, D.1 and E.1 during the 100-year storm event due to backwater resulting from the 100-year WSEL in the EDB. Overflow from the inlets will pond in the gutter to an elevation of approximately 4867.3 where it will then enter the cross-pan and gutter system in Kechter Road. The depth of flow at the gutter line will be less than the limit of 12” and the depth of flow at the crown will be less than the 6” limit. 1.4. No emergency spillway for the EDP due to the inlets in Wheelhouse Way surcharging before the WSEL overtops the pond. 2. All of these criteria modifications are related to the vertical and horizontal limitations imposed on the EDB by existing storm sewer in Kechter Road and the preservation area adjacent to the pond. VII. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the Kechter Townhomes project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with the Kechter Townhomes project complies with the City of Fort Collins’ Master Drainage Plan for the McLelland Basin. There are no regulatory floodplains associated with the development. The drainage plan and stormwater management measures proposed with the development are compliant with all applicable State and Federal regulations governing stormwater discharge. The site achieves LID treatment for 58.1% of total impervious areas. This is 8.1% above the requirements set forth by the City of Fort Collins for Low Impact Development (LID). Please see LID Exhibit located in the Appendix. P. Drainage Concept 1. The drainage design for Kechter Townhomes effectively captures runoff from the entire site and safely conveys it via curb & gutter, swales, and storm sewer to two rain gardens and an extended detention basin. 2. Project LID requirements to treat a minimum of 50% of the newly created or modified impervious areas is exceeded by 8.1% 3. Detention to achieve allowable release rates is provided by an extended detention basin, which also provides water quality treatment. 4. 100% of the site is treated for water quality either by rain gardens and/or the extended detention basin. Kechter Townhomes Final Drainage Report 12 References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 3. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 4. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. 5. Final Drainage Report for Willow Brook, TST Inc., Consulting Engineers, July 27, 2001.       APPENDIX A      HYDROLOGIC COMPUTATIONS         Project:Calculations By:Date:A.1 A.1 0.495 5 0.54 0.68 2.85 9.95 0.75 3.29A.2 A.2 0.855 5 0.79 0.99 2.85 9.95 1.91 8.34B.1B.10.755 5 0.81 1.00 2.85 9.95 1.74 7.47B.2B.20.415 5 0.56 0.70 2.85 9.95 0.66 2.89C.1C.10.625 5 0.83 1.00 2.85 9.95 1.46 6.18C.2C.20.355 5 0.69 0.86 2.85 9.95 0.68 2.97C.3C.30.525 5 0.79 0.99 2.85 9.95 1.16 5.08C.4C.40.075 5 0.82 1.00 2.85 9.95 0.15 0.66C.5C.50.635 5 0.25 0.31 2.85 9.95 0.45 1.95Total 4.685 5 0.67 0.84 2.85 9.95 8.98 39.17DPA A.1,A.2 1.335 5 0.70 0.88 2.85 9.95 2.67 11.63DPB B.1,B.2 1.165 5 0.72 0.90 2.85 9.95 2.40 10.48DPCC.1, C.2, C.3, C.4, C.52.185 5 0.63 0.79 2.85 9.95 3.91 17.05DESIGN PONTSFebruary 17, 2021Area, A(acres)Intensity,i2(in/hr)100-yr Tc(min)D. SpaustatKetcher TownhomesPROPOSED RUNOFF COMPUTATIONSC100DesignPointFlow,Q100(cfs)Flow,Q2(cfs)2-yrTc(min)C2Intensity, i100(in/hr)Sub-Basin(s)Rational Method Equation:Rainfall Intensity:Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8()()()AiCCQf= CHARACTER OF SURFACE: RunoffCoefficient1PercentageImpervious1Project:Streets, Parking Lots, Roofs, Alleys, and Drives:Calculations By:Asphalt …………………........................... ..................................................................................0.95100%Date:Concrete ………………............................ ..................................................................................0.95 100%Gravel (packed) ………............................ ..................................................................................0.50 40%Roofs…………………............................. ..................................................................................0.95 90%Pavers…………………............................ ..................................................................................0.50 40%Recycled Asphalt........................... ..................................................................................0.80 80%Lawns and LandscapingPlaygrounds25%Sandy SoilFlat <2% …………............................. ..................................................................................0.10 2%Average 2% to 7%........................... ..................................................................................0.15 2%Steep >7% …………........................... ..................................................................................0.20 2%Clayey SoilFlat <2% …………............................. ..................................................................................0.20 2%Average 2% to 7%........................... ..................................................................................0.25 2%Steep >7% …………........................... ..................................................................................0.352%2-year Cf = 1.00 10-year Cf = 1.00USDA SOIL TYPE: CSub-Basin IDSub-Basin Area(sq. ft.)Sub-Basin Area(ac.)Area of Asphalt & Concrete(ac.)Area of Roofs(ac.)Area of Pavers(ac.)Area ofLandscaping(ac)2-yearComposite RunoffCoefficient10-yearComposite RunoffCoefficient100-yearComposite Runoff CoefficientComposite% Imperv.A.121,1820.49 0.204 0.000 0.000 0.282 0.54 0.54 0.68 43%A.236,9290.85 0.656 0.000 0.000 0.192 0.79 0.79 0.99 78%B.132,7080.75 0.603 0.000 0.000 0.148 0.81 0.81 1.00 81%B.217,9980.41 0.185 0.000 0.000 0.228 0.56 0.56 0.70 46%C.127,0450.62 0.512 0.000 0.000 0.109 0.83 0.83 1.00 83%C.215,0840.35 0.217 0.000 0.000 0.129 0.69 0.69 0.86 64%C.322,5160.52 0.398 0.000 0.000 0.119 0.79 0.79 0.99 78%C.42,8740.07 0.053 0.000 0.000 0.013 0.82 0.82 1.00 81%C.527,3500.63 0.000 0.000 0.000 0.628 0.25 0.25 0.31 2%Total Site203,6864.68 2.829 0.000 0.000 1.847 0.67 0.67 0.84 61%DPA 58,110 1.33 0.860 0.000 0.000 0.474 0.70 0.70 0.88 65%DPB 50,706 1.16 0.788 0.000 0.000 0.376 0.72 0.72 0.90 68%DPC94,8692.181.1810.0000.0000.9970.630.630.7955%Total Treated108,8172.501.6480.00000.850Offsite Treated343.620.010.0080.00000.000Total Onsite Treated108,4732.491.6400.00000.850DESIGN POINTSPROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONSKetcher TownhomesD. SpaustatFebruary 17, 20211) Runoff coefficients are taken from the Fort Collins Stormwater Criteria Manaual, Table 4.1-3and Table 3.2-2.100-year Cf = 1.25Composite Runoff Coefficient with Adjustment APPENDIX B HYDRAULIC COMPUTATIONS B.1 DETENTION POND B.2 WATER QUALITY B.3 STORM SEWER B.4 INLETS B.5 SWALES     APPENDIX B.1      DETENTION POND     Project No.BD-20-051 D.Spaustat Pond No :Extended Detention Basin 1 100-yr 0.84 Area (A)=4.68 acres 35316 ft3 Max Release Rate =2.34 cfs 0.811 ac-ft Time Time 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft 3) (ft 3) 5 300 9.950 39.17 11750 701.4 11048.8 10 600 7.720 30.39 18233 1402.8 16830.7 15 900 6.520 25.67 23099 2104.2 20994.7 20 1200 5.600 22.04 26453 2805.6 23647.1 25 1500 4.980 19.60 29405 3507.0 25898.0 30 1800 4.520 17.79 32027 4208.4 27818.2 35 2100 4.080 16.06 33727 4909.8 28817.4 40 2400 3.740 14.72 35333 5611.2 29722.0 45 2700 3.460 13.62 36774 6312.6 30461.4 50 3000 3.230 12.71 38144 7014.0 31129.8 55 3300 3.030 11.93 39360 7715.4 31644.8 60 3600 2.860 11.26 40529 8416.8 32112.5 65 3900 2.720 10.71 41757 9118.2 32639.3 70 4200 2.590 10.20 42820 9819.6 33000.7 75 4500 2.480 9.76 43930 10521.0 33409.4 80 4800 2.380 9.37 44970 11222.4 33747.2 85 5100 2.290 9.01 45973 11923.8 34049.6 90 5400 2.210 8.70 46977 12625.2 34352.0 95 5700 2.130 8.38 47792 13326.6 34465.4 100 6000 2.060 8.11 48654 14028.0 34626.1 105 6300 2.000 7.87 49599 14729.4 34869.4 110 6600 1.940 7.64 50402 15430.8 34971.0 115 6900 1.890 7.44 51335 16132.2 35202.6 120 7200 1.840 7.24 52150 16833.5 35316.0 125 7500 1.790 7.05 52846 17534.9 35311.4 130 7800 1.740 6.85 53425 18236.3 35188.6 135 8100 1.690 6.65 53886 18937.7 34947.8 140 8400 1.640 6.46 54228 19639.1 34588.8 145 8700 1.590 6.26 54452 20340.5 34111.8 150 9000 1.540 6.06 54559 21041.9 33516.7 155 9300 1.490 5.87 54547 21743.3 32803.5 DETENTION POND CALCULATION; FAA METHOD Project Name :Ketcher Housing Date :February 17, 2021 1.35 Design Point Design Storm Required Detention Volume Developed "C" = Project Location :Fort Collins Input Variables Results Calculations By: Stage (ft)Elevation Incremental Depth (ft) Area (ft2) Volume (ft3) Cumulative Volume (ft3) Cumulative Volume (acre-ft) 0.00 4,891.25 0.0 0.00 0 0 0.00 0.05 4,891.30 0.1 18.14 0 0 0.00 0.15 4,891.40 0.1 263.01 12 12 0.00 0.25 4,891.50 0.1 614.28 43 55 0.00 0.35 4,891.60 0.1 1,295.59 93 148 0.00 0.45 4,891.70 0.1 2,158.00 171 319 0.01 0.55 4,891.80 0.1 3,075.00 260 579 0.01 0.65 4,891.90 0.1 3,852.32 346 925 0.02 0.75 4,892.00 0.1 4,353.62 410 1,335 0.03 0.85 4,892.10 0.1 4,831.17 459 1,794 0.04 0.95 4,892.20 0.1 5,281.79 505 2,299 0.05 1.05 4,892.30 0.1 5,722.03 550 2,849 0.07 1.15 4,892.40 0.1 6,069.11 589 3,439 0.08 1.25 4,892.50 0.1 6,242.36 616 4,054 0.09 1.35 4,892.60 0.1 6,320.53 628 4,683 0.11 1.45 4,892.70 0.1 6,371.67 635 5,317 0.12 WQCV WSEL 1.55 4,892.80 0.1 6,406.37 639 5,956 0.14 1.65 4,892.90 0.1 6,424.72 642 6,598 0.15 1.75 4,893.00 0.1 6,434.90 643 7,241 0.17 1.85 4,893.10 0.1 6,444.96 644 7,885 0.18 1.95 4,893.20 0.1 6,455.07 645 8,530 0.20 2.05 4,893.30 0.1 6,465.24 646 9,176 0.21 2.15 4,893.40 0.1 6,475.45 647 9,823 0.23 2.25 4,893.50 0.1 6,485.67 648 10,471 0.24 2.35 4,893.60 0.1 6,495.87 649 11,120 0.26 2.45 4,893.70 0.1 6,506.05 650 11,770 0.27 2.55 4,893.80 0.1 6,516.21 651 12,421 0.29 EURV WSEL 2.65 4,893.90 0.1 7,769.09 713 13,134 0.30 2.75 4,894.00 0.1 7,777.85 777 13,912 0.32 2.85 4,894.10 0.1 7,786.60 778 14,690 0.34 2.95 4,894.20 0.1 7,795.28 779 15,469 0.36 3.05 4,894.30 0.1 7,803.88 780 16,249 0.37 3.15 4,894.40 0.1 7,812.40 781 17,030 0.39 3.25 4,894.50 0.1 7,820.96 782 17,811 0.41 3.35 4,894.60 0.1 7,829.73 783 18,594 0.43 3.45 4,894.70 0.1 7,838.40 783 19,377 0.44 3.55 4,894.80 0.1 7,846.98 784 20,162 0.46 3.65 4,894.90 0.1 7,855.46 785 20,947 0.48 3.75 4,895.00 0.1 7,863.96 786 21,733 0.50 3.85 4,895.10 0.1 7,872.66 787 22,520 0.52 3.95 4,895.20 0.1 7,881.42 788 23,307 0.54 4.05 4,895.30 0.1 7,890.07 789 24,096 0.55 4.15 4,895.40 0.1 7,898.59 789 24,885 0.57 4.25 4,895.50 0.1 7,907.05 790 25,676 0.59 4.35 4,895.60 0.1 7,915.62 791 26,467 0.61 4.45 4,895.70 0.1 7,924.31 792 27,259 0.63 4.55 4,895.80 0.1 7,933.10 793 28,052 0.64 4.65 4,895.90 0.1 7,941.78 794 28,845 0.66 4.75 4,896.00 0.1 7,950.36 795 29,640 0.68 4.85 4,896.10 0.1 7,958.94 795 30,435 0.70 4.95 4,896.20 0.1 7,967.52 796 31,232 0.72 5.05 4,896.30 0.1 7,976.12 797 32,029 0.74 5.15 4,896.40 0.1 7,984.74 798 32,827 0.75 5.25 4,896.50 0.1 7,993.37 799 33,626 0.77 5.35 4,896.60 0.1 8,002.02 800 34,426 0.79 5.45 4,896.70 0.1 8,010.69 801 35,226 0.81 5.55 4,896.80 0.1 8,019.39 802 36,028 0.83 100-Year WSEL 5.65 4,896.90 0.1 8,028.11 802 36,830 0.85 5.75 4,897.00 0.1 8,241.12 813 37,644 0.86 5.85 4,897.10 0.1 8,469.79 836 38,479 0.88 5.95 4,897.20 0.1 8,707.65 859 39,338 0.90 6.05 4,897.30 0.1 8,954.78 883 40,221 0.92 6.15 4,897.40 0.1 9,211.00 908 41,129 0.94 DETENTION POND CALCULATION; FAA METHOD Project Name : Project No. Date : Project Location : Calculations By: Detention Basin Volume- Conic Volume Approximation Pond No : Ketcher Housing December 22, 2020 BD-20-051 D.Spaustat Fort Collins Pond 1 Project Title Date: Project Number Calcs By: Client Pond Designation Qa = 2.34 cfs C = 0.604 Qa = Allowable Release Rate (cfs)Eh = 4896.70 ft C = Discharge Coefficients (unitless)Ei = 4890.42 ft Aa = Area Allowed of Opening (ft2) g = Gravity (32.2 ft/s2)0.19 ft2 Eh = High Water Surface Elevation (ft)27.74 in2 Ei = Elevation of Outlet Invert (ft) D0 = Diameter of orifice (in.) 0.50 ft 6 in n =0.012 Q =46.79 cfs S0 0.50 ft/ ft Dr=Minimum diameter of pipe (in) n = mannings roughness factor Q = 120% of the undetained 100-year flow (cfs)1.22 ft S0 = longitudinal slope of the pipe (ft/ft)14.69 in Nominal Diameter Material n CMP 0.024 HDPE 0.020 RCP 0.012 Typical Manning's n Values Use 15 in Aa = EDB D0 = Dr = Kechter Townhomes February 17, 2021 1664-003 D. Spaustat EDB Outlet Pipe/Detention Orifice Sizing ()ihEEgCAQ-=2     APPENDIX B.2      WATER QUALITY     WATER QUALITY CAPTURE VOLUME DESIGN CALCULATIONS 40-Hour Detention (Extended Detention Basin) Project: 1664-003 By: DCS Date: 2/17/2021 EDB REQUIRED STORAGE: BASIN AREA =4.68 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT =61 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO =0.6129 <-- CALCULATED WQCV (watershed inches) =0.24 <-- CALCULATED from USDCM Vol.3, Equation 3-1 VWQCV (ft3) =4,899 <-- CALCULATED from USDCM Vol.3, Equation B-1 EURVc/d (watershed inches) =0.71 <-- CALCULATED from MHFD Volume 3, Equation 12-3 VEURV (ft3) =12,003 Project: Basin ID: s Depth Increment = 0.10 ft Watershed Information Top of Micropool -- 0.00 -- -- -- 0 0.000 Selected BMP Type =EDB -- 0.05 -- -- -- 18 0.000 0 0.000 Watershed Area = 4.68 acres -- 0.15 -- -- -- 263 0.006 12 0.000 Watershed Length = 560 ft -- 0.25 -- -- -- 614 0.014 58 0.001 Watershed Length to Centroid = 320 ft -- 0.35 -- -- -- 1,296 0.030 154 0.004 Watershed Slope = 0.010 ft/ft -- 0.45 -- -- -- 2,158 0.050 305 0.007 Watershed Imperviousness = 61.00% percent -- 0.55 -- -- -- 3,075 0.071 588 0.014 Percentage Hydrologic Soil Group A = 0.0% percent -- 0.65 -- -- -- 3,852 0.088 896 0.021 Percentage Hydrologic Soil Group B = 0.0% percent -- 0.75 -- -- -- 4,354 0.100 1,345 0.031 Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 0.85 -- -- -- 4,831 0.111 1,804 0.041 Target WQCV Drain Time = 40.0 hours -- 0.95 -- -- -- 5,282 0.121 2,257 0.052 Location for 1-hr Rainfall Depths = User Input -- 1.05 -- -- -- 5,722 0.131 2,860 0.066 -- 1.15 -- -- -- 6,069 0.139 3,389 0.078 -- 1.25 -- -- -- 6,242 0.143 4,065 0.093 Optional User Overrides -- 1.35 -- -- -- 6,321 0.145 4,693 0.108 Water Quality Capture Volume (WQCV) =0.112 acre-feet 0.112 acre-feet -- 1.45 -- -- -- 6,372 0.146 5,264 0.121 Excess Urban Runoff Volume (EURV) =0.276 acre-feet 0.276 acre-feet -- 1.55 -- -- -- 6,406 0.147 5,967 0.137 2-yr Runoff Volume (P1 = 0.88 in.) = 0.190 acre-feet 0.88 inches -- 1.65 -- -- -- 6,425 0.147 6,544 0.150 5-yr Runoff Volume (P1 = 1.16 in.) = 0.280 acre-feet 1.16 inches -- 1.75 -- -- -- 6,435 0.148 7,251 0.166 10-yr Runoff Volume (P1 = 1.47 in.) = 0.393 acre-feet 1.47 inches -- 1.85 -- -- -- 6,445 0.148 7,895 0.181 25-yr Runoff Volume (P1 = 1.99 in.) = 0.606 acre-feet 1.99 inches -- 1.95 -- -- -- 6,455 0.148 8,476 0.195 50-yr Runoff Volume (P1 = 2.49 in.) = 0.805 acre-feet 2.49 inches -- 2.05 -- -- -- 6,465 0.148 9,186 0.211 100-yr Runoff Volume (P1 = 3.05 in.) = 1.040 acre-feet 3.05 inches -- 2.15 -- -- -- 6,475 0.149 9,768 0.224 500-yr Runoff Volume (P1 = 4.68 in.) = 1.709 acre-feet 4.68 inches -- 2.25 -- -- -- 6,486 0.149 10,481 0.241 Approximate 2-yr Detention Volume = 0.181 acre-feet -- 2.35 -- -- -- 6,496 0.149 11,130 0.256 Approximate 5-yr Detention Volume = 0.271 acre-feet -- 2.45 -- -- -- 6,506 0.149 11,715 0.269 Approximate 10-yr Detention Volume = 0.336 acre-feet -- 2.55 -- -- -- 6,516 0.150 12,432 0.285 Approximate 25-yr Detention Volume = 0.426 acre-feet -- 2.65 -- -- -- 7,769 0.178 13,069 0.300 Approximate 50-yr Detention Volume = 0.489 acre-feet -- 2.75 -- -- -- 7,778 0.179 13,923 0.320 Approximate 100-yr Detention Volume = 0.590 acre-feet -- 2.85 -- -- -- 7,787 0.179 14,701 0.337 -- 2.95 -- -- -- 7,795 0.179 15,403 0.354 Define Zones and Basin Geometry -- 3.05 -- -- -- 7,804 0.179 16,260 0.373 Zone 1 Volume (WQCV) = 0.112 acre-feet -- 3.15 -- -- -- 7,812 0.179 16,963 0.389 Zone 2 Volume (EURV - Zone 1) = 0.164 acre-feet -- 3.25 -- -- -- 7,821 0.180 17,823 0.409 Zone 3 Volume (100-year - Zones 1 & 2) = 0.314 acre-feet -- 3.35 -- -- -- 7,830 0.180 18,605 0.427 Total Detention Basin Volume = 0.590 acre-feet -- 3.45 -- -- -- 7,838 0.180 19,310 0.443 Initial Surcharge Volume (ISV) = user ft 3 -- 3.55 -- -- -- 7,847 0.180 20,173 0.463 Initial Surcharge Depth (ISD) = user ft -- 3.65 -- -- -- 7,855 0.180 20,880 0.479 Total Available Detention Depth (Htotal) = user ft -- 3.75 -- -- -- 7,864 0.181 21,744 0.499 Depth of Trickle Channel (HTC) =user ft -- 3.85 -- -- -- 7,873 0.181 22,531 0.517 Slope of Trickle Channel (STC) = user ft/ft -- 3.95 -- -- -- 7,881 0.181 23,240 0.534 Slopes of Main Basin Sides (Smain) = user H:V -- 4.05 -- -- -- 7,890 0.181 24,107 0.553 Basin Length-to-Width Ratio (RL/W) = user -- 4.15 -- -- -- 7,899 0.181 24,818 0.570 -- 4.25 -- -- -- 7,907 0.182 25,687 0.590 Initial Surcharge Area (AISV) =user ft 2 -- 4.35 -- -- -- 7,916 0.182 26,478 0.608 Surcharge Volume Length (LISV) =user ft -- 4.45 -- -- -- 7,924 0.182 27,191 0.624 Surcharge Volume Width (WISV) =user ft -- 4.55 -- -- -- 7,933 0.182 28,063 0.644 Depth of Basin Floor (HFLOOR) =user ft -- 4.65 -- -- -- 7,942 0.182 28,777 0.661 Length of Basin Floor (LFLOOR) =user ft -- 4.75 -- -- -- 7,950 0.183 29,651 0.681 Width of Basin Floor (WFLOOR) =user ft -- 4.85 -- -- -- 7,959 0.183 30,447 0.699 Area of Basin Floor (AFLOOR) =user ft 2 -- 4.95 -- -- -- 7,968 0.183 31,163 0.715 Volume of Basin Floor (VFLOOR) =user ft 3 -- 5.05 -- -- -- 7,976 0.183 32,040 0.736 Depth of Main Basin (HMAIN) =user ft -- 5.15 -- -- -- 7,985 0.183 32,759 0.752 Length of Main Basin (LMAIN) =user ft -- 5.25 -- -- -- 7,993 0.184 33,637 0.772 Width of Main Basin (WMAIN) =user ft -- 5.35 -- -- -- 8,002 0.184 34,437 0.791 Area of Main Basin (AMAIN) =user ft 2 -- 5.45 -- -- -- 8,011 0.184 35,158 0.807 Volume of Main Basin (VMAIN) =user ft 3 -- 5.55 -- -- -- 8,019 0.184 36,039 0.827 Calculated Total Basin Volume (Vtotal) =user acre-feet -- 5.65 -- -- -- 8,028 0.184 36,761 0.844 -- 5.75 -- -- -- 8,241 0.189 37,655 0.864 -- 5.85 -- -- -- 8,470 0.194 38,491 0.884 -- 5.95 -- -- -- 8,708 0.200 39,262 0.901 -- 6.05 -- -- -- 8,955 0.206 40,233 0.924 -- 6.15 -- -- -- 9,211 0.211 41,049 0.942 -- -- -- -- After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Volume (ft 3) Volume (ac-ft) Area (acre) DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Kechter Townhomes EDB C.5 MHFD-Detention, Version 4.03 (May 2020) Example Zone Configuration (Retention Pond) MHFD-Detention-EDB, Basin 2/15/2021, 9:17 AM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete 0.55 H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.38 Zone 1 (WQCV) 1.38 Zone 1 (WQCV) 2.49 Zone 2 (EURV) 2.49 Zone 2 (EURV) 4.26 Zone 3 (100-year)4.26 Zone 3 (100-year) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.03 (May 2020) 0.000 0.240 0.480 0.720 0.960 0.000 0.055 0.110 0.165 0.220 0.00 2.00 4.00 6.00 8.00 Volume (ac-ft)Area (acres)Stage (ft.) Area (acres)Volume (ac-ft) 0 2400 4800 7200 9600 0 5 10 15 20 0.00 2.00 4.00 6.00 8.00 Area (sq.ft.)Length, Width (ft.)Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention-EDB, Basin 2/15/2021, 9:17 AM Project: Basin ID: Estimated Estimated Stage (ft) Volume (ac-ft) Outlet Type Zone 1 (WQCV) 1.38 0.112 Orifice Plate Zone 2 (EURV) 2.49 0.164 Orifice Plate Zone 3 (100-year) 4.26 0.314 Weir&Pipe (Circular) Total (all zones) 0.590 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = ft (distance below the filtration media surface) Underdrain Orifice Area =ft2 Underdrain Orifice Diameter = inches Underdrain Orifice Centroid = feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Invert of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = 6.111E-03 ft2 Depth at top of Zone using Orifice Plate = 2.49 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = 10.00 inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = 0.88 sq. inches (diameter = 1-1/16 inches) Elliptical Slot Area = N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 0.83 1.66 Orifice Area (sq. inches) 0.88 0.88 0.88 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area =N/A N/A ft2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches 1 User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir (and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 2.49 N/A ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =3.12 N/A feet Overflow Weir Front Edge Length = 1.00 N/A feet Overflow Weir Slope Length = 2.58 N/A feet Overflow Weir Grate Slope = 4.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 9.19 N/A Horiz. Length of Weir Sides = 2.50 N/A feet Overflow Grate Open Area w/o Debris = 1.80 N/A ft2 Overflow Grate Open Area % = 70% N/A %, grate open area/total area Overflow Grate Open Area w/ Debris = 1.80 N/A ft2 Debris Clogging % = 0% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Circular Not Selected Zone 3 Circular Not Selected Depth to Invert of Outlet Pipe = 0.83 N/A ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area = 0.20 N/A ft2 Circular Orifice Diameter = 6.00 N/A inches Outlet Orifice Centroid = 0.25 N/A feet Half-Central Angle of Restrictor Plate on Pipe = N/A N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage= 5.40 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.76 feet Spillway Crest Length = 6.00 feet Stage at Top of Freeboard = 7.16 feet Spillway End Slopes = 4.00 H:V Basin Area at Top of Freeboard = 0.21 acres Freeboard above Max Water Surface = 1.00 feet Basin Volume at Top of Freeboard = 0.94 acre-ft Max Ponding Depth of Target Storage Volume =5.37 feet Discharge at Top of Freeboard =18.82 cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) =N/A N/A 0.88 1.16 1.47 1.99 2.49 3.05 4.68 CUHP Runoff Volume (acre-ft) =0.112 0.276 0.190 0.280 0.393 0.606 0.805 1.040 1.709 Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.190 0.280 0.393 0.606 0.805 1.040 1.709 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.1 0.6 1.6 4.0 5.9 8.3 14.5 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A 0.9 2.3 Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.20 0.14 0.35 0.85 1.26 0.50 3.09 Peak Inflow Q (cfs) =N/A N/A 3.0 4.5 6.3 9.9 13.1 17.0 27.5 Peak Outflow Q (cfs) =0.1 0.1 0.1 0.1 0.9 1.9 2.1 2.3 15.7 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.2 0.6 0.5 0.4 1.0 1.1 Structure Controlling Flow =Plate Overflow Weir 1 Plate Plate Overflow Weir 1 Outlet Plate 1 Outlet Plate 1 Outlet Plate 1 Spillway Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A 0.4 1.0 1.1 1.2 1.2 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =39 60 52 61 62 59 57 55 47 Time to Drain 99% of Inflow Volume (hours) =40 64 54 65 67 66 66 65 62 Maximum Ponding Depth (ft) =1.38 2.49 1.83 2.40 2.75 3.43 4.25 5.37 6.07 Area at Maximum Ponding Depth (acres) =0.15 0.15 0.15 0.15 0.18 0.18 0.18 0.18 0.21 Maximum Volume Stored (acre-ft) =0.112 0.276 0.177 0.263 0.320 0.440 0.590 0.792 0.926 DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.03 (May 2020) Kechter Townhomes EDB C.5 The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). Example Zone Configuration (Retention Pond) MHFD-Detention-EDB, Outlet Structure 2/15/2021, 9:15 AM COUNTA for Basin Tab =1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain = 0 0.11(diameter = 3/8 inch)2 1 1 Count_WQPlate = 1 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)2 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch)WQCV 139 Watershed Constraint Check Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 184 Slope 0.010 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch)EURV 250 Shape 1.54 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 241 MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 276 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 344 0.76 WQ Plate Flow at 100yr depth = 0.19 0.97(diameter = 1-1/8 inches)50 Year 426 CLOG #1=70%1.08(diameter = 1-3/16 inches)100 Year 538 1 Z1_Boolean Cdw #1 =0.89 1.20(diameter = 1-1/4 inches)500 Year 608 1 Z2_Boolean Cdo #1 =0.69 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle =0.245 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2=0%1.59(diameter = 1-7/16 inches)Draintime Running Cdw #2 =#VALUE! 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) Cdo #2 =#VALUE! 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle =#VALUE!2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 1 1 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) =1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) = 1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 8.00 50,000 20 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.00 (December 2019) 0 5 10 15 20 25 30 0.1 1 10FLOW [cfs]TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 7 0.1 1 10 100PONDING DEPTH [ft]DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 2 4 6 8 10 12 14 16 18 20 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 OUTFLOW [cfs]AREA [ft^2], VOLUME [ft^3]PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] MHFD-Detention-EDB, Outlet Structure 2/15/2021, 9:15 AM WATER QUALITY CAPTURE VOLUME DESIGN CALCULATIONS12-Hour Detention (Rain Garden)Project: 1664-003By: DCSDate: 2/17/2021BASIN AREA =1.33<-- INPUT from impervious calcsBASIN AREA =1.16<-- INPUT from impervious calcsBASIN IMPERVIOUSNESS PERCENT =65<-- INPUT from impervious calcsBASIN IMPERVIOUSNESS PERCENT =68<-- INPUT from impervious calcsBASIN IMPERVIOUSNESS RATIO =0.6517<-- CALCULATEDBASIN IMPERVIOUSNESS RATIO =0.6833<-- CALCULATEDWQCV (watershed inches) =0.20<-- CALCULATED from USDCM Vol.3, Equation 3-1WQCV (watershed inches) =0.21<-- CALCULATED from USDCM Vol.3, Equation 3-1V (ft3) =1,185<-- CALCULATED from USDCM Vol.3, Equation B-1V (ft3) =1,086<-- CALCULATED from USDCM Vol.3, Equation B-1Af, Minimum Flat Filter Area (ft2) = 757<-- CALCULATED from USCDM Vol.3, Equation B-2Af, Minimum Flat Filter Area (ft2)693<-- CALCULATED from USCDM Vol.3, Equation B-2Pond Bottom Elev (ft) = 4,894.00Pond Bottom Elev (ft)4,896.30Underdrain invert at outlet (ft) =4,892.50Underdrain invert at outlet (ft)4,893.04Distance to center of orifice (ft) =1.54Distance to center of orifice (ft)3.29Orifice Diameter (in) =0.84 (7/8")Orifice Diameter (in)0.69 (3/4")Q100 (cfs) =11.6Q100 (cfs) =10D (in)18D (in)18Ao (ft2)1.77Ao (ft2)1.77Co0.67Co0.67d100 (ft)1.50d100 (ft)1.18REQUIRED STORAGE & SAND FILTER SIZE:REQUIRED STORAGE & SAND FILTER SIZE:RAIN GARDEN ARAIN GARDEN B Project No.BD-20-051 D.Spaustat Pond No :RGA Detention Basin Volume- Conic Volume Approximation Elevation Increment al Depth (ft) Area (ft2) Volume (ft3) Cumulative Volume (ft3) Cumulative Volume (acre- ft) 4,894.00 0.0 848.7 0 0 0.00 4,894.10 0.1 892.66 87 87 0.00 4,894.20 0.1 937.45 91 179 0.00 4,894.30 0.1 983.07 96 275 0.01 4,894.40 0.1 1029.52 101 375 0.01 4,894.50 0.1 1076.81 105 481 0.01 4,894.60 0.1 1124.92 110 591 0.01 4,894.70 0.1 1173.86 115 706 0.02 4,894.80 0.1 1223.63 120 825 0.02 4,894.90 0.1 1274.23 125 950 0.02 4,895.00 0.1 1325.66 130 1,080 0.02 4,895.10 0.1 1395.92 136 1,216 0.03 WQCV WSEL 4,895.20 0.1 1460.48 143 1,359 0.03 4,895.30 0.1 1528.43 149 1,509 0.03 4,895.40 0.1 1602.55 157 1,665 0.04 4,895.50 0.1 1684.94 164 1,829 0.04 Calculations By: RAIN GARDEN POND VOLUME Project Name :Ketcher Housing Date :February 17, 2021 Project Location :Fort Collins Project No.BD-20-051 D.Spaustat Pond No :RGB Detention Basin Volume- Conic Volume Approximation Elevation Increment al Depth (ft) Area (ft2) Volume (ft3) Cumulativ e Volume (ft3) Cumulativ e Volume (acre-ft) 4,896.30 0.0 868.62 0 0 0.00 4,896.40 0.1 917.6 89 89 0.00 4,896.50 0.1 967.55 94 184 0.00 4,896.60 0.1 1018.47 99 283 0.01 4,896.70 0.1 1070.38 104 387 0.01 4,896.80 0.1 1123.26 110 497 0.01 4,896.90 0.1 1177.11 115 612 0.01 4,897.00 0.1 1231.94 120 732 0.02 4,897.10 0.1 1287.75 126 858 0.02 4,897.20 0.1 1344.54 132 990 0.02 4,897.30 0.1 1404.65 137 1,127 0.03 WQCV WSEL 4,897.40 0.1 1468.44 144 1,271 0.03 4,897.50 0.1 1533.66 150 1,421 0.03 4,897.60 0.1 1600.32 157 1,578 0.04 4,897.70 0.1 1668.41 163 1,741 0.04 4,897.80 0.1 1737.93 170 1,912 0.04 4,897.90 0.1 1808.89 177 2,089 0.05 4,898.00 0.1 1881.28 184 2,273 0.05 4,898.10 0.1 1955.11 192 2,465 0.06 4,898.20 0.1 2030.37 199 2,664 0.06 4,898.30 0.1 2107.06 207 2,871 0.07 4,898.40 0.1 2185.19 215 3,086 0.07 4,898.50 0.1 2264.75 222 3,308 0.08 4,898.60 0.1 2345.75 231 3,539 0.08 4,898.70 0.1 2428.18 239 3,778 0.09 4,898.80 0.1 2512.05 247 4,025 0.09 4,898.90 0.1 2597.34 255 4,280 0.10 4,899.00 0.1 2684.08 264 4,544 0.10 4,899.10 0.1 2772.24 273 4,817 0.11 4,899.20 0.1 2861.84 282 5,099 0.12 4,899.30 0.1 2952.88 291 5,389 0.12 4,899.40 0.1 3045.35 300 5,689 0.13 4,899.50 0.1 3139.25 309 5,998 0.14 4,899.60 0.1 3234.59 319 6,317 0.15 RAIN GARDEN POND VOLUME Project Name :Ketcher Housing Date :February 17, 2021 Project Location :Fort Collins Calculations By:     APPENDIX B.3      STORM SEWERS          APPENDIX B.4 INLETS Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =0.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK = Height of Curb at Gutter Flow Line HCURB =4.75 inches Distance from Curb Face to Street Crown TCROWN =15.0 ft Gutter Width W =2.58 ft Street Transverse Slope SX =0.030 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.098 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =15.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =4.8 12.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Kechter Townhomes Inlet E.1 1664-003 UD-Inlet_v4.05, Inlet E.1 2/15/2021, 10:51 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No = 2 2 Water Depth at Flowline (outside of local depression)Ponding Depth = 4.8 7.5 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Warning 1 Height of Vertical Curb Opening in Inches Hvert =3.88 3.88 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5)Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.58 2.58 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.422 0.651 ft Depth for Curb Opening Weir Equation dCurb =0.14 0.37 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.56 0.88 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.56 0.88 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =2.3 8.6 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =0.7 5.6 cfs Warning 1: Dimension entered is not a typical dimension for inlet type specified. CDOT/Denver 13 Combination INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT/Denver 13 Combination Override 1664-003 UD-Inlet_v4.05, Inlet E.1 2/15/2021, 10:51 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =0.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK = Height of Curb at Gutter Flow Line HCURB =4.75 inches Distance from Curb Face to Street Crown TCROWN =15.0 ft Gutter Width W =2.58 ft Street Transverse Slope SX =0.030 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.098 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.013 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =15.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =4.8 12.0 inches Allow Flow Depth at Street Crown (leave blank for no)check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =5.2 96.0 cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Kechter Townhomes Inlet E.2 Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' 1664-003 UD-Inlet_v4.05, Inlet E.2 2/15/2021, 10:51 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf-G =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf-C =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q = 1.2 3.4 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.7 5.6 cfs Capture Percentage = Qa/Qo =C% = 64 38 % INLET ON A CONTINUOUS GRADE Version 4.05 Released March 2017 CDOT/Denver 13 CombinationCDOT/Denver 13 Combination 1664-003 UD-Inlet_v4.05, Inlet E.2 2/15/2021, 10:51 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =0.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK = Height of Curb at Gutter Flow Line HCURB =4.75 inches Distance from Curb Face to Street Crown TCROWN =15.0 ft Gutter Width W =2.58 ft Street Transverse Slope SX =0.030 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.098 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.007 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =15.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =4.8 12.0 inches Allow Flow Depth at Street Crown (leave blank for no)check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =3.9 71.9 cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Kechter Townhomes Inlet B.1 Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' 1664-003 UD-Inlet_v4.05, Inlet B.1 2/15/2021, 10:51 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf-G =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf-C =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q = 0.1 0.6 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 0.1 cfs Capture Percentage = Qa/Qo =C% = 79 84 % INLET ON A CONTINUOUS GRADE Version 4.05 Released March 2017 CDOT/Denver 13 CombinationCDOT/Denver 13 Combination 1664-003 UD-Inlet_v4.05, Inlet B.1 2/15/2021, 10:51 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =0.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK = Height of Curb at Gutter Flow Line HCURB =4.75 inches Distance from Curb Face to Street Crown TCROWN =15.0 ft Gutter Width W =2.58 ft Street Transverse Slope SX =0.030 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.098 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.007 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =15.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =4.8 12.0 inches Allow Flow Depth at Street Crown (leave blank for no)check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =4.0 73.9 cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Kechter Townhomes Inlet B.2 Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' 1664-003 UD-Inlet_v4.05, Inlet B.2 2/15/2021, 10:50 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf-G =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf-C =N/A N/A Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q = 0.8 2.3 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.3 2.8 cfs Capture Percentage = Qa/Qo =C% = 70 45 % INLET ON A CONTINUOUS GRADE Version 4.05 Released March 2017 CDOT/Denver 13 Valley GrateCDOT/Denver 13 Valley Grate 1664-003 UD-Inlet_v4.05, Inlet B.2 2/15/2021, 10:50 AM HY-8 Culvert Analysis Report - Chase A.2 Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 0.5 cfs Design Flow: 1.91 cfs Maximum Flow: 8.34 cfs Table 1 - Summary of Culvert Flows at Crossing: Chase A.2 Headwater Elevation (ft) Total Discharge (cfs) Culvert 1 Discharge (cfs) Roadway Discharge (cfs) Iterations 4897.15 0.50 0.50 0.00 1 4897.27 1.28 1.28 0.00 1 4897.34 1.91 1.91 0.00 1 4897.43 2.85 2.71 0.12 12 4897.47 3.64 3.00 0.61 7 4897.50 4.42 3.13 1.26 5 4897.52 5.20 3.10 2.07 4 4897.54 5.99 2.87 3.10 4 4897.56 6.77 2.62 4.14 4 4897.58 7.56 2.35 5.17 3 4897.60 8.34 2.03 6.29 3 4897.39 2.32 2.32 0.00 Overtopping Table 2 - Culvert Summary Table: Culvert 1 ******************************************************************************** Straight Culvert Inlet Elevation (invert): 4897.01 ft, Outlet Elevation (invert): 4896.99 ft Culvert Length: 4.50 ft, Culvert Slope: 0.0044 ******************************************************************************* Total Discha rge (cfs) Culvert Discha rge (cfs) Headw ater Elevati on (ft) Inlet Contro l Depth (ft) Outlet Contro l Depth (ft) Flow Typ e Norma l Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwat er Depth (ft) Outlet Velocit y (ft/s) Tailwat er Velocit y (ft/s) 0.50 0.50 4897.1 5 0.134 0.144 2-M 2c 0.129 0.079 0.079 0.107 1.589 2.335 1.28 1.28 4897.2 7 0.249 0.261 2-M 2c 0.235 0.147 0.147 0.194 2.177 3.303 1.91 1.91 4897.3 4 0.325 0.338 7-M 2c 0.305 0.192 0.192 0.251 2.487 3.800 2.85 2.71 4897.4 3 0.424 0.424 7-M 2c 0.333 0.243 0.243 0.327 2.797 4.356 3.64 3.00 4897.4 7 0.462 0.462 7-M 2c 0.333 0.259 0.259 0.385 2.891 4.719 4.42 3.13 4897.5 0 0.481 0.489 7-M 2t 0.333 0.267 0.273 0.440 2.866 5.024 5.20 3.10 4897.5 2 0.476 0.512 7-M 2t 0.333 0.265 0.325 0.492 2.379 5.288 5.99 2.87 4897.5 4 0.444 0.536 4-FF f 0.333 0.252 0.333 0.543 2.150 5.518 6.77 2.62 4897.5 6 0.412 0.556 4-FF f 0.333 0.237 0.333 0.591 1.968 5.726 7.56 2.35 4897.5 8 0.377 0.573 4-FF f 0.333 0.220 0.333 0.639 1.760 5.912 8.34 2.03 4897.6 0 0.339 0.589 4-FF f 0.317 0.200 0.333 0.686 1.520 6.080 Water Surface Profile Plot for Culvert: Culvert 1 Site Data - Culvert 1 Site Data Option: Culvert Invert Data Inlet Station: 21.88 ft Inlet Elevation: 4896.84 ft Outlet Station: 26.38 ft Outlet Elevation: 4896.82 ft Number of Barrels: 2 Culvert Data Summary - Culvert 1 Barrel Shape: Concrete Box Barrel Span: 2.00 ft Barrel Rise: 0.50 ft Barrel Material: Concrete Embedment: 2.00 in Barrel Manning's n: 0.0240 (top and sides) Manning's n: 0.0240 (bottom) Culvert Type: Straight Inlet Configuration: Square Edge (90º) Headwall Inlet Depression: None Roadway Data for Crossing: Chase A.2 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross-Section: Coord No. Station (ft) Elevation (ft) 0 0.57 4897.49 1 19.46 4897.39 2 55.16 4897.64 Roadway Surface: Paved Roadway Top Width: 4.50 ft HY-8 Culvert Analysis Report – Chase B.1 Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 0.5 cfs Design Flow: 1.74 cfs Maximum Flow: 7.47 cfs Table 1 - Summary of Culvert Flows at Crossing: Chase B.1 Headwater Elevation (ft) Total Discharge (cfs) Culvert 1 Discharge (cfs) Roadway Discharge (cfs) Iterations 4899.43 0.50 0.50 0.00 1 4899.60 1.20 1.20 0.00 1 4899.70 1.74 1.67 0.05 17 4899.76 2.59 1.99 0.59 8 4899.79 3.29 2.14 1.13 5 4899.81 3.98 2.25 1.71 4 4899.83 4.68 2.31 2.36 4 4899.85 5.38 2.36 2.99 3 4899.86 6.08 2.41 3.65 3 4899.88 6.77 2.44 4.31 3 4899.89 7.47 2.48 4.97 3 4899.66 1.48 1.48 0.00 Overtopping Table 2 - Culvert Summary Table: Culvert 1 ******************************************************************************** Straight Culvert Inlet Elevation (invert): 4899.19 ft, Outlet Elevation (invert): 4899.16 ft Culvert Length: 12.04 ft, Culvert Slope: 0.0022 ******************************************************************************** Total Discha rge (cfs) Culvert Discha rge (cfs) Headw ater Elevati on (ft) Inlet Contro l Depth (ft) Outlet Contro l Depth (ft) Flow Typ e Norma l Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwat er Depth (ft) Outlet Velocit y (ft/s) Tailwat er Velocit y (ft/s) 0.50 0.50 4899.4 3 0.214 0.242 2-M 2c 0.249 0.125 0.125 0.026 2.004 9.584 1.20 1.20 4899.6 0 0.378 0.415 2-M 2c 0.446 0.223 0.223 0.044 2.681 13.466 1.74 1.67 4899.7 0 0.472 0.512 7-M 2c 0.500 0.279 0.279 0.056 2.998 15.593 2.59 1.99 4899.7 6 0.534 0.571 7-M 2c 0.500 0.313 0.313 0.071 3.176 18.170 3.29 2.14 4899.7 9 0.563 0.599 7-M 2c 0.500 0.329 0.329 0.083 3.254 19.926 3.98 2.25 4899.8 1 0.585 0.621 7-M 2c 0.500 0.340 0.340 0.093 3.309 21.425 4.68 2.31 4899.8 3 0.598 0.641 7-M 2c 0.500 0.346 0.346 0.103 3.339 22.778 5.38 2.36 4899.8 5 0.609 0.658 7-M 2c 0.500 0.351 0.351 0.112 3.363 23.997 6.08 2.41 4899.8 6 0.618 0.674 7-M 2c 0.500 0.356 0.356 0.121 3.384 25.103 6.77 2.44 4899.8 8 0.626 0.689 7-M 2c 0.500 0.359 0.359 0.129 3.401 26.154 7.47 2.48 4899.8 9 0.634 0.703 7-M 2c 0.500 0.363 0.363 0.138 3.420 27.098 Water Surface Profile Plot for Culvert: Culvert 1 Site Data - Culvert 1 Site Data Option: Culvert Invert Data Inlet Station: 14.33 ft Inlet Elevation: 4899.19 ft Outlet Station: 26.37 ft Outlet Elevation: 4899.16 ft Number of Barrels: 1 Culvert Data Summary - Culvert 1 Barrel Shape: Concrete Box Barrel Span: 2.00 ft Barrel Rise: 0.50 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0240 Culvert Type: Straight Inlet Configuration: Square Edge (90º) Headwall Inlet Depression: None Roadway Data for Crossing: Chase B.1 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross-Section: Coord No. Station (ft) Elevation (ft) 0 0.15 4899.84 1 14.23 4899.75 2 30.39 4899.66 Roadway Surface: Paved Roadway Top Width: 4.50 ft APPENDIX B.5 SWALES Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Friday, Feb 12 2021 Swale A Triangular Side Slopes (z:1) = 5.50, 3.25 Total Depth (ft) = 0.64 Invert Elev (ft) = 4895.00 Slope (%) = 1.35 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 4.38 Highlighted Depth (ft) = 0.63 Q (cfs) = 4.380 Area (sqft) = 1.74 Velocity (ft/s) = 2.52 Wetted Perim (ft) = 5.66 Crit Depth, Yc (ft) = 0.58 Top Width (ft) = 5.51 EGL (ft) = 0.73 0 1 2 3 4 5 6 7 8 Elev (ft)Depth (ft)Section 4894.75 -0.25 4895.00 0.00 4895.25 0.25 4895.50 0.50 4895.75 0.75 4896.00 1.00 Reach (ft)     APPENDIX C      EROSION CONTROL REPORT      Mountain’s Edge     Preliminary Erosion Control Report      A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with  the final construction drawings.  It should be noted, however, that any such Erosion and Sediment  Control Plan serves only as a general guide to the Contractor.  Staging and/or phasing of the BMPs  depicted, and additional or different BMPs from those included may be necessary during construction,  or as required by the authorities having jurisdiction.    It shall be the responsibility of the Contractor to ensure erosion control measures are properly  maintained and followed.  The Erosion and Sediment Control Plan is intended to be a living document,  constantly adapting to site conditions and needs.  The Contractor shall update the location of BMPs as  they are installed, removed or modified in conjunction with construction activities.  It is imperative to  appropriately reflect the current site conditions at all times.    The Erosion and Sediment Control Plan shall address both temporary measures to be implemented  during construction, as well as permanent erosion control protection.  Best Management Practices from  the Volume 3, Chapter 7 – Construction BMPs will be utilized.  Measures may include, but are not limited  to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet  protection at existing and proposed storm inlets.  Vehicle tracking control pads, spill containment and  clean‐up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also  be provided by the Contractor.    Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans.  The Utility Plans at  final design will also contain a full‐size Erosion Control Plan as well as a separate sheet dedicated to  Erosion Control Details.  In addition to this report and the referenced plan sheets, the Contractor shall  be aware of, and adhere to, the applicable requirements outlined in any existing Development  Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the  Development Construction Permit.  Also, the Site Contractor for this project will be required to secure a  Stormwater Construction General Permit from the Colorado Department of Public Health and  Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any  earth disturbing activities.  Prior to securing said permit, the Site Contractor shall develop a  comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and  guidelines.  The SWMP will further describe and document the ongoing activities, inspections, and  maintenance of construction BMPs.      APPENDIX D      LID EXHIBIT     GAS CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR S VAULT ELEC W FE S D S SS HY DCONTROL IRR CONTROL IRR CONTROL IRR D E VAULT ELEC T VAULT ELECCXGTTE EWW W W W W WT T T E E E E E XXXXXXXXXXXXXXE E EX G G G G G GWST ST ST ST ST ST ST ST ST ST ST ST STSTSS SS SS SS SS SS SS SS SSSSSS SS SSXX X X X X X X X X XXXXXXXXXELEC WWTTTTEEEEEEEETE TEEEEEEEEE E ETT T EEEEEEEEEEEEEEEEEEEEEEEE E EEEE EEEEEEEEEEEEEEETE EEE EEE EE EC ECLIPSE LANE CACTUSCURVE)CACTUS CURVEWHEELHOUSEWAYQUASAR WAYLOGGERS LANE PARCEL X WILLOW BROOK PARCEL W WILLOW BROOK PARCEL NO. 8604000904 PARCEL NO. 8604000904 B A ECLIPSE LANE CACTUSCURVE)QUASAR WAYA.2 0.85 AC C.1 0.62 AC C.2 0.35 AC C.3 0.52 AC C.5 0.63 AC C.4 0.07 AC A.1 0.49 AC B.2 0.41 AC B.1 0.75 AC EXTENDED DETENTION BASIN REQUIRED VOL=35,316 CF PROVIDED VOL=41,129 CF CHASE DRAIN A.2 STORM SEWER D POND OUTLET STORM SYSTEM W/ INLINE DRAINS PROPOSED SWALE PROPOSED SWALE PROPOSED SWALE STORM SEWER A RAIN GARDEN OUTLET PROPOSED CULVERT (IRRIGATION DITCH) CURB & GUTTER (TYP.) CURB INLET E.1 STORM SEWER A STORM SEWER B RAIN GARDEN B 6' DRAINAGE & UTILITY EASEMENT 6' DRAINAGE & UTILITY EASEMENT 6' DRAINAGE & UTILITY EASEMENT TRACT D DRAINAGE EASMENT RAIN GARDEN A TRACT C DRAINAGE EASEMENT TRACT B DRAINAGE EASMENT CURB INLET B.1 CURB INLET B.2 CHASE DRAIN B.1 CURB INLET D.1 12" RCP 12" RCP 14' DRAINAGE EASEMENT FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH LID PROJECT SUMMARY A 1.62 AC LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY NOTES: 1.REFER TO THE FINAL DRAINAGE REPORT FOR WILLOW BROOK, JULY 27, 2001 BY TST, INC. CONSULTING ENGINEERS FOR ADDITIONAL INFORMATION. UDPROPOSED UNDERDRAIN BENCHMARK PROJECT DATUM: NAVD88 BENCHMARK #1: City of Fort Collins Benchmark 2-03 Location: South side Kechter Road approximately 0.6 miles west of Strauss Cabin Road on the east end of the south parapet wall of the bridge over the Dixon Canyon Lateral. Elevation= 4898.14 (NAVD88) BENCHMARK #2: City of Fort Collins Benchmark 13-13 Location: On the west side of Strauss Cabin Road, approximately 90-ft south of Kechter Road, on the northwest corner of a storm inlet. Elevation= 4887.05 (NAVD88) Please note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted Datum (prior City of Fort Collins Datum) for their vertical datums. If NGVD29 Unadjusted Datum (prior City of Fort Collins Datum) is required for any purpose, the following equation should be used: NGVD29 Unadjusted Datum (prior City of Fort Collins Datum) = NAVD88 - 3.18' Basis of Bearings South line of the Southeast Quarter of Section 4-6-68 as bearing South 88°11'39" East. SheetKECHTER TOWNHOMESThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealedby a ProfessionalEngineer in the employ ofNorthern EngineeringServices, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 1 LID (LID) EXHIBITLOW IMPACT DEVELOPMENT 1 LID BASIN/TREATMENT SUMMARY LID A 1.33 LID B 1.16 LID BASIN LABEL DRAINAGE BASIN BOUNDARY LID B 0.97     APPENDIX F      REFERENCES    Hydrologic Soil Group—Larimer County Area, Colorado (Ketcher Townhomes) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/25/2020 Page 1 of 444836004483800448400044842004484400448460044848004483600448380044840004484200448440044846004484800498300498500498700498900499100499300499500499700499900500100 498300 498500 498700 498900 499100 499300 499500 499700 499900 500100 40° 30' 51'' N 105° 1' 18'' W40° 30' 51'' N104° 59' 52'' W40° 30' 8'' N 105° 1' 18'' W40° 30' 8'' N 104° 59' 52'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 450 900 1800 2700 Feet 0 100 200 400 600 Meters Map Scale: 1:9,340 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 35 Fort Collins loam, 0 to 3 percent slopes C 83.8 29.7% 36 Fort Collins loam, 3 to 5 percent slopes C 28.4 10.1% 73 Nunn clay loam, 0 to 1 percent slopes C 6.0 2.1% 74 Nunn clay loam, 1 to 3 percent slopes C 143.8 51.0% 76 Nunn clay loam, wet, 1 to 3 percent slopes C 17.0 6.0% 103 Stoneham loam, 5 to 9 percent slopes B 3.1 1.1% Totals for Area of Interest 282.0 100.0% Hydrologic Soil Group—Larimer County Area, Colorado Ketcher Townhomes Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/25/2020 Page 3 of 4   FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.4 Intensity-Duration-Frequency Curves for Rational Method Page 8 Table 3.4-1. IDF Table for Rational Method Duration (min) Intensity 2-year (in/hr) Intensity 10-year (in/hr) Intensity 100-year (in/hr) Duration (min) Intensity 2-year (in/hr) Intensity 10-year (in/hr) Intensity 100-year (in/hr) 5 2.85 4.87 9.95 39 1.09 1.86 3.8 6 2.67 4.56 9.31 40 1.07 1.83 3.74 7 2.52 4.31 8.80 41 1.05 1.80 3.68 8 2.40 4.10 8.38 42 1.04 1.77 3.62 9 2.30 3.93 8.03 43 1.02 1.74 3.56 10 2.21 3.78 7.72 44 1.01 1.72 3.51 11 2.13 3.63 7.42 45 0.99 1.69 3.46 12 2.05 3.50 7.16 46 0.98 1.67 3.41 13 1.98 3.39 6.92 47 0.96 1.64 3.36 14 1.92 3.29 6.71 48 0.95 1.62 3.31 15 1.87 3.19 6.52 49 0.94 1.6 3.27 16 1.81 3.08 6.30 50 0.92 1.58 3.23 17 1.75 2.99 6.10 51 0.91 1.56 3.18 18 1.70 2.90 5.92 52 0.9 1.54 3.14 19 1.65 2.82 5.75 53 0.89 1.52 3.10 20 1.61 2.74 5.60 54 0.88 1.50 3.07 21 1.56 2.67 5.46 55 0.87 1.48 3.03 22 1.53 2.61 5.32 56 0.86 1.47 2.99 23 1.49 2.55 5.20 57 0.85 1.45 2.96 24 1.46 2.49 5.09 58 0.84 1.43 2.92 25 1.43 2.44 4.98 59 0.83 1.42 2.89 26 1.4 2.39 4.87 60 0.82 1.4 2.86 27 1.37 2.34 4.78 65 0.78 1.32 2.71 28 1.34 2.29 4.69 70 0.73 1.25 2.59 29 1.32 2.25 4.60 75 0.70 1.19 2.48 30 1.30 2.21 4.52 80 0.66 1.14 2.38 31 1.27 2.16 4.42 85 0.64 1.09 2.29 32 1.24 2.12 4.33 90 0.61 1.05 2.21 33 1.22 2.08 4.24 95 0.58 1.01 2.13 34 1.19 2.04 4.16 100 0.56 0.97 2.06 35 1.17 2.00 4.08 105 0.54 0.94 2.00 36 1.15 1.96 4.01 110 0.52 0.91 1.94 37 1.16 1.93 3.93 115 0.51 0.88 1.88 38 1.11 1.89 3.87 120 0.49 0.86 1.84 FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.4 Intensity-Duration-Frequency Curves for Rational Method Page 9 Figure 3.4-1. Rainfall IDF Curve – Fort Collins        MAP POCKET      DR1 – OVERALL DRAINAGE EXHIBIT      GAS CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR S VAULT ELEC W FE S D S SS HY DCONTROL IRR CONTROL IRR CONTROL IRR D E VAULT ELEC T VAULT ELECCXGTTE EWW W W W W WT T T E E E E E XXXXXXXXXXXXXXE E EX G G G G G GWST ST ST ST ST ST ST ST ST ST ST ST STSTSS SS SS SS SS SS SS SS SSSSSS SS SSXX X X X X X X X X XXXXXXXXXELEC WWEXTENDED DETENTION BASIN REQUIRED VOL=35,316 CF PROVIDED VOL=36,028 CF CHASE DRAIN A.2 STORM SEWER D POND OUTLET STORM SYSTEM W/ INLINE DRAINS PROPOSED SWALE PROPOSED SWALE PROPOSED SWALE STORM SEWER A RAIN GARDEN OUTLET ECLIPSE LANE CACTUSCURVE)QUASAR WAYPROPOSED CULVERT (IRRIGATION DITCH) PARCEL X WILLOW BROOK PARCEL W WILLOW BROOK PARCEL R WILLOW BROOK POUDRE R-1 SCHOOL DISTRICT PARCEL NO. 8604000904 CURB & GUTTER (TYP.)EX DRIPLINE CANOPY (AREA UNDEERNEATH TO REMAIN UNDISTURBED) TAPER TOP WALL TAPER TOP WALL EX DRIPLINE CANOPY (AREA UNDEERNEATH TO REMAIN UNDISTURBED) CURB INLET E.1 STORM SEWER A STORM SEWER B A.2 0.85 AC C.1 0.62 AC C.2 0.35 AC C.3 0.52 AC C.5 0.63 AC C.4 0.07 AC A.1 0.49 AC RAIN GARDEN B 6' DRAINAGE & UTILITY EASEMENT 6' DRAINAGE & UTILITY EASEMENT 6' DRAINAGE & UTILITY EASEMENT TRACT D DRAINAGE EASMENT RAIN GARDEN A TRACT C DRAINAGE EASEMENT TRACT B DRAINAGE EASMENT A B C B.2 0.41 AC B.1 0.75 AC CURB INLET B.1 CURB INLET B.2 CHASE DRAIN B.1 CURB INLET D.1 12" RCP 12" RCP 14' DRAINAGE EASEMENT FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION HYDROLOGY SUMMARY CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH LID SUMMARY EXTENDED DETENTION BASIN SUMMARY A 1.62 AC LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET ADESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 11 NOTES: 1.REFER TO THE FINAL DRAINAGE REPORT FOR WILLOW BROOK, JULY 27, 2001 BY TST, INC. CONSULTING ENGINEERS FOR ADDITIONAL INFORMATION. UDPROPOSED UNDERDRAIN BENCHMARK PROJECT DATUM: NAVD88 BENCHMARK #1: City of Fort Collins Benchmark 2-03 Location: South side Kechter Road approximately 0.6 miles west of Strauss Cabin Road on the east end of the south parapet wall of the bridge over the Dixon Canyon Lateral. Elevation= 4898.14 (NAVD88) BENCHMARK #2: City of Fort Collins Benchmark 13-13 Location: On the west side of Strauss Cabin Road, approximately 90-ft south of Kechter Road, on the northwest corner of a storm inlet. Elevation= 4887.05 (NAVD88) Please note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted Datum (prior City of Fort Collins Datum) for their vertical datums. If NGVD29 Unadjusted Datum (prior City of Fort Collins Datum) is required for any purpose, the following equation should be used: NGVD29 Unadjusted Datum (prior City of Fort Collins Datum) = NAVD88 - 3.18' Basis of Bearings South line of the Southeast Quarter of Section 4-6-68 as bearing South 88°11'39" East. EXISTING NATURAL HABITAT BUFFER ZONE PROPOSED NATURAL HABITAT BUFFER ZONE EXISTING WETLAND SheetKECHTER TOWNHOMESThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealedby a ProfessionalEngineer in the employ ofNorthern EngineeringServices, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 36 DR1 DRAINAGE EXHIBIT36 DESIGN POINT SUMMARY