Loading...
HomeMy WebLinkAboutSHORELINE PUD - PRELIMINARY - 32-87 - - VARIANCE REQUEST (2)i • STEWART&ASSOCIATES . Consulting Engineers and Surveyors July 21, 1987 Mr. James Newell City of Fort Collins Office of Development Services/Engineering P.O. Box 580 Fort Collins, Colorado 80522 RE: Shoreline P.U.D. ( Repl at of Tract "L" of the Second Repl at of The Landings P.U.D., Filing 4). ' Dear Jim: I am writing to request a variance to the City Standard for street cross sections as shown on page D-1 of the City of Fort Collins Design Criteria and Standards for Streets dated July, 1986. The variance requested is that the street in Shoreline P.U.D. be 28 feet of pavement in a 46 foot right—of—way instead of the standard 36 feet of pavement in a 54 foot right—of—way. This street is a 450 foot long cul—de—sac serving 12 lots. All lots are to have a double garage and double driveway to provide off—street parking. Also, a foot bridge is to be constructed over the drain ditch at the south end of the cul—de—sac to provide pedestrian access to the parking lot of the Boardwalk Area. This will provide overflow parking for a party. There are some large trees on the site, and the narrowing of the street will allow more of the trees to be retained. In my opinion, this variance from the City Street Width Standards will not cause a hazardous situation to the public. Sincerely, Phillip I. Robinson, P.E. & L.S. Vice President James H. Stewart and Associates, Inc. 214 N. Howes Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331