Loading...
HomeMy WebLinkAboutSHORELINE PUD - PRELIMINARY - 32-87 - - VARIANCE REQUESTCITY OF FORT COLLINS DEVELOPMENT SERVICES — ENGINEERING MEMORANDUM DATE: July 24, 1987 TO: Ted Shepard, Project Planner FROM: Jim Newell, Civil Engineer I �y,�0�����"� RE: Street Design for Shoreline P.U.D. Upon further review of the Shoreline P.U.D., the City Engineering Divi- sion has decided to recommend denial of the request for variance to allow a non-standard street width. The current standard is 36 foot wide resi- dential streets and the Developer is proposing a 28 foot wide street. The narrow street will have single family housing on both sides with only the standard 2 off-street parking areas per house. The Engineering Divi- sion recognizes a strong potential of parking on both sides of the street, leaving only one lane open for traffic to move though the devel- opment. After re-evaluating the request for the variance to be granted for the sub -standard street, the Engineering Division has decided this is not acceptable, and the request for the variance does not justify the sub- standard street design. Therefore the Engineering Division is recommend- ing denial of the 28' wide street request. ENGINEERING