Loading...
HomeMy WebLinkAboutPACIFIC COAST SUPPLY WAREHOUSE - FDP200019 - - RESPONSE TO STAFF REVIEW COMMENTSCommunity Development and Neighborhood Services 281 North College AvenuePO Box 580Fort Collins, CO 80522970.221.6689970.224.6134 faxfcgov.com/developmentreviewOctober 09, 2020ZP Response: 1-28-21Jeanne Fielding ZP Architects Engineers2727 Bryant Street,Suite 610Denver, CO 80211RE: Pacific Coast Supply Warehouse, FDP200019, Round Number 1Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Pacific Coast Supply Warehouse. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Todd Sullivan via phone at 9702216695 or via email at tsullivan@fcgov.com. Comment Summary:Department: Development Review CoordinatorContact: Todd Sullivan, 9702216695, tsullivan@fcgov.comTopic: GeneralComment Number: 1 10/09/2020: INFORMATION ONLY:I will be the Development Review Coordinator working with you on this project and will be your primary point of contact throughout the development review and permitting process. If you have any questions, need additional meetings with the project reviewers, or need assistance throughout the process, please let me know and I can assist you and your team. Please include me in all email correspondence with other reviewers and keep me informed of any phone conversations. Thank you!Comment Number: 2 10/09/2020: INFORMATION ONLY:As part of your resubmittal you will respond to the comments provided in this letter. This letter is provided to you in Microsoft Word format. Please use this document to insert responses to each comment for your submittal, using a different font color. When replying to the comment letter please be detailed in your responses, as all comments should be thoroughly addressed. Provide reference to specific project plans or explanations of why comments have not been addressed, when applicable. Please avoid using acknowledged, noted, or other non-descriptive replies.Your resubmittal packet should include all documents related to the project, even ifno changes have occurred.Comment Number: 3 10/09/2020: INFORMATION ONLY:This proposed project is processing as a Type 1 Project Development Plan. The decision maker for Type 1 is an Administrative Hearing Officer. Staff would need to collectively agree the project is ready for hearing before a hearing date willbe determined. The hearing date will be approximately 4 weeks following this decision.Comment Number: 4 10/09/2020: FOR APPROVAL:The “FOR FINAL APPROVAL” and “FOR APPROVAL” labeled comments in this letter will need to be addressedand all documents resubmitted for a second round of review by Staff.When you will be ready to resubmit, please reach out to me with as much advance notice as possible. Submittals are accepted any day of the week, with Wednesday at noon being the cut off for routing the same week.ZP Response: Response to the following comments are included as requested.Department: Engineering Development ReviewContact: Morgan Stroud, 9704164344, mstroud@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 10/06/202010/06/2020: FOR HEARING:After discussion internally and some more research through older approved documents, it has been determined that the "Public Access Right of Way" shown on the plat is indeed a public rightofway and not a private access easement. With this information, additional rightofway needs to be dedicated to meet the classification of this roadway. The southern roadway would be classified as an industrial local street section, and has a minimum rightofway width of 66 feet. For this property to meet its local half street obligation, this project needs to dedicate an additional 18 feet to get to a half rightofway width of 33 feet. The industrial local crosssection is LCUASS figure 77F found at this link: https://www.larimer.org/sites/default/files/fig_701_713_fc_2016.pdfZP Response: As discussed, Phasing this additional 18’ of ROW dedication will be addressed in the Development Agreement to be phased and dedicated when the road improvements to the 66’ Industrial Local Street are required in the future. Until then, the South fence will be located 6’ off the current PL and then moved the addition 18’ in the future.Comment Number: 2 Comment Originated: 10/06/202010/06/2020: FOR HEARING:Ultimate frontage improvements for the I25 frontage road, and the roadway to the south, are not being asked for at this time, and will need to be deferred in a Development Agreement.ZP Response: Understand there are no I-25 Frontage Rd. ROW improvements being requested.Comment Number: 3 Comment Originated: 10/06/202010/06/2020: FOR HEARING:The parking and fencing along the southern property line encroach into the public rightofway currently, and will further encroach with the additional rightofway dedication. These should be moved back into the property and out of the rightofway. The parking may be allowed to stay if a major encroachment permit is obtained for it if ultimate frontage improvements along the southern road are not constructed.ZP Response: A Major Encroachment permit will be processed to allow the existing Parking and Fence to be located with respect to the existing PL and moved in the future if road improvements move forward on the South RoadComment Number: 4 Comment Originated: 10/06/202010/06/2020: FOR HEARING:Please see my redlines for additional comments.ZP Response: Redline comments have been addressed.Addition of a Concrete Curb at the south Drive.Title Change to Utility Plans and Signature Blocks added.Comment Number: 5 Comment Originated: 10/06/202010/06/2020: Development Agreement:A Development Agreement will be needed for this project. We will start the draft after this project is approved at hearing and all contributing departments have had their comments resolved and send me the applicable language. Please fill out the information sheet and send it back to me.ZP Response: It is understood a Development Agreement will be part of this project.Department: Traffic OperationContact: Steve Gilchrist, 9702246175, sgilchrist@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 10/05/202010/05/2020: We have received and reviewed the Traffic Impact Study and acknowledge and accept the general conclusions. No further traffic evaluation is required. CDOT has also commented on this project and "don't have any large scale concerns," but will be issuing a new access permit.ZP Response: It is understood no traffic improvements will be required along the Frontage Rd and South Road at this time. Department: Outside AgenciesContact: Todd Sullivan, 9702216695, tsullivan@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 10/01/202010/01/2020: CDOT, Tim Bilobran, timothy.bilobran@state.co.us I don't have any large-scale concerns and we will issue a new access permit. Keep in mind though that this site probably needs to stay in its current use. If it ever redevelops substantially, CDOT is going to take the position of "The accesses are too close together and fail spacing on a 45-mph section. Only 1 of the 2 access points should be utilized".ZP Response: ZP has discussed Submittal 1 CDOT comments with Tim B. and there are no specific issues requiring modifications if the exist ROW ditch and discharge are not modified.Department: Planning ServicesContact: Kai Kleer, 9704164284, kkleer@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 09/28/202009/28/2020 FOR HEARING:A significant concern of the overall site plan is the quantity and interrelationship of landscaping to the detention area along the frontage road. This area is not only highly visible but has several overlapping requirements to provide an offset arrangement of trees and shrubs (not grasses which are proposed), varied side slopes, and undulating bottom. Further, the idea of the landscape buffer standard emphasizes the offset arrangement of landscaping to encompass the entire buffer area and not condensed toward the front of the site. Please work with stormwater and planning staff to further refine the detention and landscaping concept.Pages 912 of the City of Fort Collins Stormwater Standards and Guidelines (https://www.fcgov.com/developmentreview/pdf/stormwater_standards_and_guidelines.pdf) contains a list of recommended trees and shrubs that can be located within this area.ZP Response: The ZP Team has worked hard back and forth with Stormwater to come up with the best compromise solution for this difficult site. Meeting the discharge elevation, pond volumes and area required for the detention pond cannot be fully met. As a result, the proposed pond size has limited variables. Meeting typical landscape standards like undulating pond perimeter, plantings throughoutthe 80’ I-25 Landscape Buffer Zone that includes the pond are difficult to fully achieve.The proposed design meets the planting quantities and varied plant types in a natural undulating design, highlighting the I-25 and new building frontage, while incorporating the limits of landscaping within a detention basin. Comment Number: 2 Comment Originated: 09/28/202009/28/2020 FOR HEARING:Fencing remains a significant concern of the proposed expansion. Staff does not support a wholesale modification of standard to allow for a chainlink fence, however, there could be an approach where the posts of the existing chainlink fence are retained, stringers added, columns inserted at minimum intervals of 40 feet, and a corrugated steel fence panel applied. It is required that the fence be as high as the material it hides. In some cases, staff has seen shingles stacked 89 feet high. I’ve added a few redlines of improvements that could save several hundred feet of material cost for the proposal.The southern portion of existing fence is actually located within the 30’ public access rightofway and is not within the boundary of the site. This fence will need to be removed and relocated so that it is located out of the Rightofway. Further, fence must be setback 6 feet (see 3.9.8(B)Location) from the right of way/property line.ZP Response: The fence line has been adjusted to meet the submittal comments and the detail has been changed to an opaquecorrugated metal panel fence with CMU masonry columns at 40’ oc to meet the Outdoor Storage fence requirements. Comment Number: 3 Comment Originated: 09/28/202009/28/2020 FOR HEARING: After speaking to East Larimer County Water District, it was determined that the building located on the southeast corner of the site is in violation of the easement and determined by our building department to be an illegal structure (no building permit was pulled on it). The site plan will need to demonstrate the relocation of this building elsewhere on the site. Please note that a 5foot minimum setback is required from the rear yard.ZP Response: The existing shed will be removed and not require a permit.Comment Number: 4 Comment Originated: 10/05/202010/05/2020 FOR HEARING: Regarding the barb wire, at time of building permit, it is likely that the project will be required to request a revocable use permit that must be renewed every three (3) years for the barbed wire strands. The barbed wire also needs to be (10) feet above the adjoining ground level outside the fence. See 3.8.11(B)(2) for a more detailed description of this standard.Please add a note on the plan stating that calls out the standard and areas where barb wire is expected to remain.ZP Response: Barbwire will not be part of the new fence design.Department: Stormwater EngineeringContact: Dan Mogen, 9703055989, dmogen@fcgov.comTopic: GeneralComment Number: 2 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:It is unclear if the proposed CDOT roadside ditch/culvert is an appropriate outfall for the detention pond. Please contact CDOT to determine the extents of this drainage system and its outfall as well as to get the acceptance of developed runoff into the system. If used, please show the ultimate outfall in the drainage report.ZP Response: The drainage concept has been reviewed with Tim Bilobran/CDOT. There are not changes proposed to the existing ROW ditch and outfall.As a result, CDOT has no concerns.Comment Number: 3 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:It is important to document the site changes in impervious area to determine Stormwater requirements and show they are met. Please provide exhibits showing the changes in impervious area as well as how these areas are treated for Water Quality (WQ) and Low Impact Development (LID). Please note that all newly paved areas are included in the WQ/LID requirements.Detention must be provided for the increased impervious area and runoff to adjacent properties/ROW cannot be increased. The proposed release rate needs to account both releases from the detention pond and any other undetained releases from the site. Please document existing site conditions and runoff including a basin analysis in the hydrology to determine the appropriate pond/site release rate.ZP Response: Understood. Submitted revised design is as discussed in the interim reviews.Comment Number: 4 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:Please provide drainage easement for the proposed rain garden, detention pond, and associated outfalls.ZP Response: A Drainage easement has been shown for the drainage system including the bioretention rain garden, detention pond, pond outfall and site access to the structures.Comment Number: 5 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:Fort Collins encourages a thoughtful approach and design of the stormwater system and its incorporation into the overall site design. Please review Fort Collins’ Landscape Design Standards and Guidelines for Stormwater & Detention Facilities and include concepts and goals from these guidelines into this site’s design.Available along with full Stormwater Criteria here:https://www.fcgov.com/utilities/business/buildersanddevelopers/developmentformsguidelinesregulations/stormwatercriteriaZP Response: The FC Landscape design standards have been incorporated to the best level possible with the site and drainage structure limitations. Submitted revised design is as discussed in the interim reviews.Comment Number: 6 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:Please note that responses to variance requests are pending further additional information about the overall site design and may require submittal of a formal variance request form for official approval.ZP Response: Submitting a formal variance request is anticipated and will be process are required.Comment Number: 7 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:Please address the fourstep process in the drainage report.ZP Response: Submitted revised design is as discussed in the interim reviews.Comment Number: 8 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:Please provide hydraulic calculations showing sizing of the proposed inlets and culverts.ZP Response: Submitted revised design is as discussed in the interim reviews with associated hydraulic calculations for your review.Comment Number: 9 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:Please provide evidence that the detention basin is in compliance with drain times per Colorado Revised Statute 3792602(8). More information on this statute is available at http://tinyurl.com/RevisedStatuteMemo, and a spreadsheet to show compliance is available for download at http://tinyurl.com/ComplianceSpreadsheet. Please contact Dan Mogen at (970)3055989 or dmogen@fcgov.com with any questions about this requirement or for assistance with the spreadsheet.ZP Response: Submitted revised design is as discussed in the interim reviews.Comment Number: 10 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:There is opportunity to greatly clarify the utility plans by limiting the amount of information on each sheet. Please review and show information where it is most appropriate rather than showing most information on most sheets. Please provide an existing conditions/demo plan to clarify the site today and how it will be changing.ZP Response: The Utility Plan has been simplified to limit information to existing and proposed Site Utilities.Comment Number: 11 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:There is an existing utility easement thru the area of the proposed rain garden. Please clarify any existing utilities in this easement and how they will or will not conflict with the proposed rain garden. Similarly, there is an existing underground electric line shown running thru the proposed rain garden. How does this line interact with the rain garden cross section? Please confirm the utility owner accepts alignment thru this stormwater facility or realign to remove the conflict.ZP Response: The interior lot easements will be vacated with the Plat. The rain garden shape has been adjusted to miss the existing underground electrical.Comment Number: 12 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:Please clarify the proposed landscaping in the rain garden.ZP Response: The rain garden plant selections are selected per the sand soil type and arranged to accent the outlet structure and in natural groupings.Comment Number: 13 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:Please show full extents of proposed roadside regrading.ZP Response: The full extent of grading to the north has been shown with a match line plan.Comment Number: 14 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL:Please see redlined drainage report and utility plans. I encourage you to reach out with any questions or to review potential revisions, and I would be happy to set up a meeting or conference call to do so.ZP Response: The redlines have been reviewed and discussed in several intermediate reviews to arrive at the best proposed compromise solution for this site.Comment Number: 15 Comment Originated: 10/05/202010/05/2020: DEVELOPMENT AGREEMENT / INFORMATION:Development agreement will be required to document required private maintenance of onsite drainage facilities.ZP Response: The Property Owner understands a Development Agreement will be required for this site and is prepared to sign one.Comment Number: 16 Comment Originated: 10/05/202010/05/2020: INFORMATION:Please note that additional comments may be forthcoming upon future submittals as plans are clarified and additional details are discovered about the existing/proposed conditions.ZP Response: Understand there may be additional comments on further reviews.Comment Number: 17 Comment Originated: 10/05/202010/05/2020: INFORMATION:Please note that all City construction detail drawings are to be used in their original, unaltered state. ANY modification(s) must be clearly distinguished and all City logos/identifiers must be removed from the modified detail. Detail drawings can be found in both .pdf and .dwg formats through the links to “Construction Drawings” on www.fcgov.com/utilitydevelopment.ZP Response: FC Detail Sheets will be shown in their original format.Department: Stormwater Engineering – Erosion and Sediment ControlContact: Basil Hamdan, 9702221801, bhamdan@fcgov.comTopic: Erosion ControlComment Number: 1 Comment Originated: 10/02/202010/02/2020: FOR APPROVAL:The Erosion and Sediment Control (ESC) plan is hard to decipher due to multiple layers being turned on, please consider turning off the ones that are not needed for this plan in order to reduce the clutter.The per acre cost of seeding in your reseeding escrow calculation is too high, a more realistic cost for this area would be around $3,000 per acre, that would reduce the amount if escrow needed.Please include a legend for the ESC measures that are shown on the ESC plan on the plan itself not just on the cover for the plan set.Please include all the standard City of Fort Collins notes in the utility plan set, to include the City of Fort Collins standard erosion and sediment control notes. These can be found on our website at:https://www.fcgov.com/utilities/img/site_specific/uploads/fcscmappendixf.pdf?1549566342ZP Response: The Erosion Control Plan has been simplified graphically. The Re-Seeding Cost has been revised.ESC Legend has been added.Standard ESC Notes have been added.Please add a note to the ESC plan stating that all permanent stormwater control measures including the bioretention basin will be built at the end of the construction sequence in order to minimize the potential of the sediment loading of these measures due to site construction activities.Please add a note to the ESC plan stating that all permanent stabilization will be done in accordance with the landscape plan associated with this site development.Please provide a construction detail for all construction control measures that are to be used on this site.Please provide sediment control measures for the work proposed in the frontage road drainage ditch.How will construction traffic from this site be separated from the existing parking lot and roads to prevent construction traffic from causing mud and debris track out? Please use construction fencing to separate the existing developed site form the construction site where appropriate.ZP Response: The following notes have been added to the ESC Plan and Reportper comments:ESC Note: to phase permanent stormwater control structures to be completed at the end of the project.ESC Note: Permanent Stabilization will be done per Landscape Plan.Construction Control Details have been added.Sediment control details have been added at the Ditch ROW.Construction Access has been identified with separation from existing site functions.Department: Light And PowerContact: Austin Kreager, 9702246152, akreager@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 10/06/202010/06/2020: FOR APPROVAL: The existing primary electric line cannot be located underneath the proposed bioretention area. We must retain ability to maintain our line in the future, and the bioretention area would impede our ability to do so.ZP Response: The bioretention pond shape has been adjusted to miss the existing elec. lines.Comment Number: 2 Comment Originated: 10/06/202010/06/2020: INFORMATION:Light and Power would like to remind you that all of our facilities must have a ten foot clearance away from all water, wastewater, and storm sewer facilities. We also require a three-foot clearance away from all other utilities with the exception of communication lines.ZP Response: 10’ SB betw Elec and all stormwater system components has been provided.3’ SB from Elec to all other utilities has been provided.Comment Number: 3 Comment Originated: 10/06/202010/06/2020: FOR APPROVAL:For the new building, please provide a one-line diagram and a C1 form to Light and Power Engineering. The C1 form can be found at: http://zeus.fcgov.com/utilsprocedures/files/EngWiki/WikiPdfs/C/C1Form.pdfZP Response: A One-line diagram and C-1 form will be provided at the time of Bldg Permit application.Comment Number: 4 Comment Originated: 10/06/202010/06/2020: INFORMATION:Electric Capacity Fee, Building Site charges and any system modification charges necessary will apply to this development.ZP Response: It is understood there will be Elec Utility fees.Comment Number: 5 Comment Originated: 10/06/202010/06/2020: INFORMATION:You may contact Austin Kreager, project engineering if you have questions. (970) 2246152. You may reference Light & Power’s Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FINAL_18November2016_Amendment.pdfYou may reference our policies, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/buildersanddevelopers.ZP Response: Standards have been referenced.Department: Environmental PlanningContact: Scott Benton, , sbenton@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL: A Natural Habitat Buffer Zone (NHBZ) is not required along the entire length of the lateral ditch on the eastern side of the property due to its limited length. However, a full 50foot NHBZ, measured from the outer edge of the canopy/dripline as per the Buffer Zone Table found other significant shrub patches. An additional site visit might be required by City Environmental Planning and/or the ecological consultant. The dripline for the shrub patches deemed significant will require the dripline to be portrayed on all applicable plan sets.There is precedent for altering buffer zone width, but the altered buffer zone must still meet the Buffer Zone Performance Standards outlined in 3.4.1(E)(1). Typically, this comes in the form of altering the shape of the buffer to maintain the appropriate the square footage and improving the quantity and quality of native plantings in the buffer. There are numerous native shrub options available for plantings in the buffer that can be viewed at https://www.fcgov.com/naturalareas/pdf/nativeplants2013.pdf?1362179305.ZP Response: The 50’ Natural Habitat Buffer Zone has been shown at the Wild Plum shrub only and set back to a standard fence 6’ SB north of this grove as discussed. Comment Number: 2 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL: Thank you for depicting the NHBZ on all the plan sets. Please add an Environmental Planner signature to all plans that show the buffer zone. ZP Response: The Standard Signature block with Environmental Plannerhas been added to the plans.Also, please add the following note on all sheets of the plans that show the NHBZ: "The Natural Habitat Buffer Zone is intended to be maintained in a native landscape. Please see Section 3.4.1 of the Land Use Code for allowable uses within the Natural Habitat Buffer Zone." This will help preserve the intention behind the buffer zones and the natural features into the future.ZP Response: The NHBZ note has been added to all the sheets showing the Buffer Zone.Please add a table to the site plan that includes the following:amount of buffer area that would be required by a 50' buffer from the ditchamount of buffer area provided on these plansminimum buffer distancemaximum buffer distanceaverage buffer distanceZP Response: A table has been added to the Site Plan identifying the above area and distances.Comment Number: 3 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL: Language regarding the protection and enhancement of the Natural Habitat Buffer Zone will be included in the Development Agreement for this project. A security will need to be provided prior to the issuance of a Development Construction Permit that accounts for the installation and establishment of the Natural Habitat Buffer Zone. Prior to the recording of the Development Agreement, please provide an estimate of the landscaping costs for the Natural Habitat Buffer Zone, including materials, labor, monitoring, weed mitigation, and irrigation. We will then use the approved estimate to collect a security (bond or escrow) at 125% of the total amount prior to the issuance of a Development Construction Permit. A spreadsheet entitled 'Consolidated Escrow Calculator' has been provided to the DRC to assist with estimating the security amount.ZP Response: A Cost Estimate to maintain the Natural Habitathas been discussed and not required for this Wild Plum Natural Habitat which is to be left untouched in a natural state. No regular maintenance and irrigation is proposed per the city requirements.Comment Number: 4 Comment Originated: 10/05/202010/05/2020: FOR APPROVAL: Thank you for providing a photometric plan and luminaire cutsheets. Please indicate that the luminaires selected will have a CCT of 3000K or less.ZP Response: The luminaire output has been changed to 3000K.Comment Number: 5 Comment Originated: 10/05/202010/05/2020: INFORMATION ONLY: The City has a recommended Detention Basin Seed Mix that is preferred for use in detention basins; the recommended seed mix has been provided to the DRC and can share with you.ZP Response: The Detention Pond Seed mix has been changed to recommended.Comment Number: 6 Comment Originated: 10/05/202010/05/2020: Please provide the standard Native Seed Mix Notes on the Landscape Plan:NATIVE SEED MIX NOTES1.THE TIME OF YEAR SEEDING IS TO OCCUR SHOULD BE OCTOBER THROUGH EARLY MAY. 2.PREPARE SOIL AS NECESSARY AND APPROPRIATE FOR NATIVE SEED MIX SPECIES THROUGH LOOSENING AND ADDITION OF AMENDMENTS THAT PROMOTE WATER ABSORPTION AND RELEASE, THEN SEED IN TWO DIRECTIONS TO DISTRIBUTE SEED EVENLY OVER ENTIRE AREA. DRILL SEED ALL INDICATED AREAS AS SOON AS POSSIBLE AFTER COMPLETION OF GRADING OPERATIONS.3.IF CHANGES ARE TO BE MADE TO SEED MIX BASED ON SITE CONDITIONS THEN APPROVAL MUST BE PROVIDED BY CITY ENVIRONMENTAL PLANNER.4.APPROPRIATE NATIVE SEEDING EQUIPMENT WILL BE USED (STANDARD TURF SEEDING EQUIPMENT OR AGRICULTURE EQUIPMENT SHALL NOT BE USED).5.DRILL SEED APPLICATION RECOMMENDED PER SPECIFIED APPLICATION RATE TO NO MORE THAN ½ INCH DEPTH. FOR BROADCAST SEEDING INSTEAD OF DRILL SEEDING METHOD DOUBLE SPECIFIED APPLICATION RATE. REFER TO NATIVE SEED MIX TABLE FOR SPECIES, PERCENTAGES AND APPLICATION RATES.6.PREPARE A WEED MANAGEMENT PLAN TO ENSURE THAT WEEDS ARE PROPERLY MANAGED BEFORE, DURING AND AFTER SEEDING ACTIVITIES.7.AFTER SEEDING THE AREA SHALL BE COVERED WITH CRIMPED STRAW, JUTE MESH, OR OTHER APPROPRIATE METHODS.8.WHERE NEEDED, TEMPORARY IRRIGATION SHOULD BE PROVIDED UNTIL SEED IS GERMINATED THEN WEEN THE SEED FROM IRRIGATION. IF IRRIGATION IS USED, THE IRRIGATION SYSTEM FOR SEEDED AREAS SHALL BE FULLY OPERATIONAL AT THE TIME OF SEEDING AND SHALL ENSURE 100% HEADTOHEAD COVERAGE OVER ALL SEEDED AREAS. ALL METHODS AND REQUIREMENTS IN THE APPROVED IRRIGATION PLAN SHALL BE FOLLOWED.9.CONTRACTOR SHALL MONITOR SEEDED AREA FOR PROPER IRRIGATION, EROSION CONTROL, GERMINATION AND RESEEDING AS NEEDED TO ESTABLISH COVER.10.THE APPROVED NATIVE SEED MIX AREA IS INTENDED TO BE MAINTAINED IN A NATURAL LIKE LANDSCAPE AESTHETIC. DO NOT MOW DURING HOT, DRY PERIODS. DO NOT MOW LOWER THAN 6 TO 8 INCHES IN HEIGHT TO AVOID INHIBITING NATIVE PLANT GROWTH.11.NATIVE SEED AREA WILL BE CONSIDERED ESTABLISHED WHEN SEVENTY PERCENT VEGETATIVE COVER IS REACHED WITH LESS THAN TEN PERCENT OF COVER CONSISTING OF NOXIOUS WEEDS, NO BARE SPOTS LARGER THAN ONE FOOT SQUARE, AND/OR UNTIL DEEMED ESTABLISHED BY CITY PLANNING SERVICES AND EROSION CONTROL.12.THE DEVELOPER AND/OR LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ADEQUATE SEEDLING COVERAGE AND GROWTH AT THE TIME OF FINAL STABILIZATION, AS DEFINED BY STATE AND LOCAL AGENCIES. IF FINAL STABILIZATION IS NOT ACHIEVED TO THE SATISFACTION OF THE AGENCY, THE DEVELOPER AND/OR LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR ADDITIONAL CORRECTIVE MEASURES TO SATISFY FINAL VEGETATIVE REQUIREMENTS FOR CLOSEOUT.ZP Response: The above notes have been added to the Landscape Plan.Department: ForestryContact: Christine Holtz, , choltz@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 10/06/202010/06/2020: RESOLVED 21220: PRESUBMITTAL: Forestry Tree InventoryTrees provide many environmental and socioeconomic benefits including reduced cooling expenses, providing natural wind breaks, improving air quality, and increasing property values. There appear to be existing trees onsite and near the limits of development. What are the anticipated impacts to them associated with this development? Regardless of tree impact, please schedule an onsite meeting with City Forestry (choltz@fcgov.com) to obtain tree inventory and mitigation information. Existing significant trees should be retained to the extent reasonably feasible. This meeting should occur prior to first round PDP.Comment Number: 4 Comment Originated: 10/06/202010/06/2020: RESOLVED21220: INFORMATION ONLY FOR PDPIf applicable, please provide an “Existing Tree Removal Feasibility Letter” for City Forestry staff to review. Proposals to remove significant existing trees must provide a justification letter detailing the reason for tree removal. This is required for all development projects proposing significant tree removal regardless of the scale of the project. The purpose of this letter is to provide a document of record with the project’s approval and for the City to maintain a record of all proposed significant tree removals and justifications. Existing significant trees within the project’s Limits of Disturbance (LOD) and within natural area buffer zones shall be preserved to the extent reasonably feasible. Streets, buildings and lot layouts shall be designed to minimize the disturbance to significant existing trees. (Extent reasonably feasible shall mean that, under the circumstances, reasonable efforts have been undertaken to comply with the regulation, that the costs of compliance clearly outweigh the potential benefits to the public or would unreasonably burden the proposed project, and reasonable steps have been undertaken to minimize any potential harm or adverse impacts resulting from noncompliance with the regulation.) Where it is not feasible to protect and retain significant existing tree(s) or to transplant them to another onsite location, the applicant shall replace such tree(s) according to City mitigation requirements.Comment Number: 6 Comment Originated: 10/06/202010/06/2020: RESOLVED21220: INFORMATION ONLY FOR PDPIf the project is responsible for frontage improvements along NE Frontage Rd., please incorporate new street trees within the right of way.Topic: Landscape PlansComment Number: 2 Comment Originated: 10/06/202010/06/2020: UNRESOLVEDContinued:Thank you for providing the General Landscape Notes on the Landscape plan. Please also include the Tree protection notes, Street Tree Notes, the existing tree inventory. Additionally, please add the boxed permit note to all pages of the landscape plan. I see that you have an (E) on all the existing trees on your landscape plan. Does this mean “existing”? If they are to remain, please label them “existing trees to remain”.ZP Response:Addt Notes have been added: Tree Protection note, Street Tree notes.Existing Tree Inventory has been added.Exist Tree Note: (E) does reference existing trees.Additional note “Existing Trees to remain – Typical has been added in addition.21220: INFORMATION ONLY FOR PDPPlease provide a landscape plan that meets the Land Use Code 3.2.1 requirements such as ‘full tree stocking’. This should include the existing tree inventory, any proposed tree removals with their locations clearly noted and any proposed tree plantings (including species, size, quantity and method of transplant). The plans should also include the following City of Fort Collins notes: ZP Response: The following notes have been added to the Landscape drawings.General Landscape NotesTree Protection Notes Street Tree Permit Note, when applicable. These notes are available from the City Planner or by following the link below and clicking on Standard Plan Set Notes: https://www.fcgov.com/developmentreview/applications.phpRequired tree sizes and method of transplant: Canopy Shade Tree: 2.0” caliper balled and burlapped Evergreen tree: 6.0’ height balled and burlapped Ornamental tree: 1.5” caliper balled and burlapped Required mitigation tree sizes:Canopy Shade Tree: 2.0” caliper balled and burlapped Evergreen tree: 8.0’ height balled and burlapped Ornamental tree: 2.0” caliper balled and burlappedComment Number: 3 Comment Originated: 10/06/202010/06/2020: RESOLVED2/10/2020: INFORMATION ONLY FOR PDPPlease include locations of utilities on the landscape plan including but not limited to water service/mains, sewer service/mains, gas, electric, streetlights, and stop signs. Please adjust tree locations to provide for proper tree/utility separation.10’ between trees and public water, sanitary, and storm sewer main lines6’ between trees and water or sewer service lines4’ between trees and gas lines10’ between trees and electric vaults40’ between canopy shade trees and streetlights15’ between ornamental trees and streetlightsZP Response: The above notes have been added to the Landscape Plans.Comment Number: 5 Comment Originated: 10/06/202010/06/2020: UNRESOLVEDContinued: Thank you for including the planting schedule on the landscape plan. Wasatch maples are considered ornamental trees because of their small size at maturity. Please replace the Wasatch maples with one or a combination of the following shade trees: Kentucky coffetree (Gymnocladus dioicus), Texas red oak (Quercus buckleyi), or chinkapin oak (Quercus muehlenbergii).ZP Response: The Wasatch Maple has been changed to Texas Red Oak. . 21220: INFORMATION ONLY FOR PDPAccording to Land Use Code 3.2.1.(D)(c), canopy shade trees shall constitute at least (50%) of all tree plantings.ZP Response: Canopy Shade Trees are included meeting the 50% of the proposed trees requirement.Comment Number: 7 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVALThere is substantial spacing between the trees planned for the perimeter along NE Frontage rd. as well as the perimeter along the north side of the property. To meet the full tree stocking requirements laid out in the Landuse Code section 3.2.1, please add additional trees from the list mentioned above in comment 5: Kentucky coffetree (Gymnocladus dioicus), Texas red oak (Quercus buckleyi), or chinkapin oak (Quercus muehlenbergii). The spacing requirements for trees are stated below:1520’ between ornamentals or ornamental and shade trees3040’ between shade treesZP Response: Tree spacing has been adjusted to meet the spacing requirements as the site restrictionsallow. The detention pond is located in the only location possible on site to allow discharge to the existing ROW ditch. The pond overlaps with the landscape buffer zone and the required new 9’ Utility Easement along the west property line. No trees can be located within the detention pond and the easement. Trees and Shrubs are proposed around the pond perimeter in natural groupings with balance spacing around the pond perimeter.Department: PFAContact: Jim Lynxwiler, 9704162869, jlynxwiler@poudrefire.orgTopic: GeneralComment Number: 1 Comment Originated: 10/07/202010/07/2020: FIRE SPRINKLER SYSTEMInformation: The "Fire Protection and Water Supply Requirements" letter submitted by Veritas Fire Engineering and dated, July 31, 2020 is currently under review by Assistant Fire Marshal Greg Kimble and Fire Marshal Jerry Howell.ZP Response: PFD comments will be included in the Bldg permit Submittal.Comment Number: 2 Comment Originated: 10/07/202010/07/2020: FIRE DEPARTMENT HOSE CONNECTION Fire Department Connections (FDC) shall be installed in accordance with NFPA standards. Fire department connections shall be located on the street side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access. The location of fire service line and FDC shall be approved by the fire department and the location labeled on Utility Plans.ZP Response: FDC will be located at the SE corner of the new Warehouse Bldg. with direct access from the Fire Emergency Access Easement.Comment Number: 3 Comment Originated: 10/07/202010/07/2020: EMERGENCY ACCESS EASEMENT > Fire access to within a 150-foot perimeter of the proposed storage building has not been achieved. The code allows some latitude in that measure when the building is equipped throughout with an automatic fire sprinkler system but the current condition as shown measures at approximately 200 feet out of access. The fire marshal will approve a plan which extends the fire lane along the east side of the building to a point that reduces the out of access distance to 100 feet. A turnaround is not required when the deadend length does not exceed 150 feet.ZP Response: The Fire Emergency Access Easement/Fire Lane has been extended along the East façade of the Bldg to the NE corner of the Bldg. > The FDC shall be accessible from within 100 feet of the fire lane. It looks like that will be achieved.ZP Response: The FDC has been located at the SE corner of the new Warehouse Bldg. > For clarity, the width of the fire lane shall be expanded to include the full width of both drive entries coming into the site from the south and the west.ZP Response: Fire Lane Width has been increased to match the paved drive width. > All portions of the fire lane shall be constructed to minimum specifications, provided previously.ZP Response: Fire Lane will meet the min. specifications outlined in the Concept Comments. > In recognizing the fire lane is sometimes defined within a larger, hard surfaced area, the code requires the fire lane to be signed and identified, where possible. As a minimum, the main entry drives aisles shall be signed.ZP Response: Fire Lane signs have been noted on the Site Plan and will be either bldg. mounted or pole mounted where they do not interfere with the Outdoor Storage access. > Any gate obstructing a fire lane shall be equipped with an approved design as previously indicated so as to demonstrate compliance with IFC D103.5. A means of fire department access to the facility when locked shall be discussed and approved. You are welcome to reach out to me directly with details of the gate design unless you want to provide that information with the next submittal.ZP Response: There are 2 sliding gates. A Knox Box with access key will be provided at South gate as noted. Spec will be per PFD. > I'm also questioning why the EAE isn't represented on the plat? Platting usually includes details of easements dedicated.ZP Response: The Emergency Access Easement is included on the Plat resubmittal.Comment Number: 4 Comment Originated: 10/07/202010/07/2020: KEY BOXES REQUIRED Poudre Fire Authority requires at least one key box ("Knox Box") to be mounted in an approved, exterior location (or locations) on every new or existing building equipped with a required fire sprinkler or fire alarm system. The box shall be positioned 3 to 7 feet above finished floor and within 10 feet of the front door, or closest door to the fire alarm panel.ZP Response: A PFD approved Key Knox Box has been noted at the South Entrance of the new Bldg 3 Storage Bldg.Department: Internal ServicesContact: Russell Hovland, 9704162341, rhovland@fcgov.comTopic: Building Insp Plan ReviewComment Number: 1 Comment Originated: 09/28/202009/28/2020: Construction shall comply with adopted codes as amended. Current adopted codes are:2018 International Building Code (IBC) with local amendments2018 International Existing Building Code (IEBC) with local amendments2018 International Energy Conservation Code (IECC) with local amendments2018 International Mechanical Code (IMC) with local amendments2018 International Fuel Gas Code (IFGC) with local amendments2018 International Swimming Pool and Spa Code (ISPSC) with local amendments2018 International Plumbing Code (IPC) as amended by the State of Colorado2020 National Electrical Code (NEC) as amended by the State of ColoradoCopies of current City of Fort Collins code amendments can be found at fcgov.com/building.Accessibility: State Law CRS 95 & ICC/ANSI A117.12017.Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.Frost Depth: 30 inches.Wind Loads: Risk Category II (most structures):· 140mph (Ultimate) exposure B or· Front Range Gust Map published by The Structural Engineer's Association of  Seismic Design: Category B.Climate Zone: Zone 5Energy Code: 2018 IECC commercial chapter, required if bldg is conditioned.ZP Response: Applicable Codes will be followed.INFORMATIONAL ITEMS: · Highpile storage above 12ft must comply with the Fire Code.· Commercial occupancies must provide 10ft setback from property line and 20 feet between other buildings or provide fire rated walls and openings per chapter 6 and 7 of the IBC.· City of Fort Collins amendments to the 2018 IBC require a full NFPA13 sprinkler system per IBC chapter 9 or when building exceeds 5000 sq.ft. (or meet fire containment requirements).· Prescriptive energy compliance with increased insulation values is required for buildings using electric heat.· A City licensed commercial general contractor is required to construct any new commercial structure.ZP Response: The above code compliance items will be incorporated in the Bldg design. High Pile Storage: There will be no high pile storage over 12’. IECC: The building will be designed as a Low Heat Use Bldg under IECC Sec C402.3.1.1 and not be conditioned except with supplemental heat in the unisex RR and water Entry Rm that will fall under the 1.0 watt/sf energy use. Lighting and Mech equipment will comply with IECC.Please schedule a presubmittal meeting with Building Services for this project. PreSubmittal meetings assist the designer/builder by assuring, early on in the design, that the new projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to middesign stage for this meeting to be effective. Applicants of new projects should email rhovland@fcgov.com to schedule a presubmittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage, type of construction, and energy compliance method being proposed.ZP Response: A Pre-Submittal review has been done with Russel Hovland and Brad Smith.Comment Number: 2 Comment Originated: 10/05/202010/05/2020: FOR FINAL APPROVAL:A storage polebarn in the SE corner of the property was built without the required building permit and is built on the ELCO water line easement. This building must obtain an approved afterthefact permit or be removed/moved.ZP Response: The unpermitted Shed at the SE Corner will be removed.Department: Technical ServicesContact: Jeff County, 9702216588, jcounty@fcgov.comTopic: Building ElevationsComment Number: 10 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:There are line over text issues. See redlines.ZP Response: Text and line overlaps have been fixed.Topic: Construction DrawingsComment Number: 11 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:Please revise the subtitle as marked. See redlines.ZP Response: The Subdivision name has been added to the Title.Comment Number: 12 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:Please revise the legal description as marked. See redlines.ZP Response: The legal description has been updated to include the subdivision name.Comment Number: 13 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:Please provide the following information for the Benchmark Statement in the EXACT format shown below.PROJECT DATUM: NAVD88BENCHMARK # w/ DESCRIPTIONELEVATION:BENCHMARK # w/ DESCRIPTIONELEVATION:PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS.IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 DATUM X.XX’.ZP Response: The Benchmark Statement has been added to the Civil Cover Sheet and reference in the plan notes on the Civil Grading, Horizontal Control Plan.Comment Number: 14 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:There are text over text issues. See redlines.ZP Response: The text/line overlaps have been fixed.Comment Number: 15 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:There is text that needs to be masked. Mask all text in hatched areas. See redlines.ZP Response: Text and line hatch overlaps have been fixed.Topic: Landscape PlansComment Number: 6 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:There are line over text issues. See redlines.ZP Response: The text overlaps have been fixed.Comment Number: 7 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:There is text that needs to be masked. Mask all text in hatched areas. See redlines.ZP Response: Text and line hatch overlaps have been fixed.Comment Number: 8 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:There are text over text issues. See redlines.ZP Response: Text overlaps have been fixed.Topic: Lighting PlanComment Number: 9 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:There is text that needs to be masked. Mask all text in hatched areas. See redlines.ZP Response: Text and hatch overlaps have been fixed.Topic: PlatComment Number: 1 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter.ZP Response: Plat comments have been addressed or commented on the redline sheet.Topic: Site PlanComment Number: 2 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:Please revise the subtitle as marked. See redlines.ZP Response: Subtitle has been updated to include the Subdivision name.Comment Number: 3 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:Please revise the legal description as marked. See redlines.ZP Response: Legal Description has been updated to include the Subdivision name.Comment Number: 4 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:There are line over text issues. See redlines.ZP Response: Text overlap has been fixed.Comment Number: 5 Comment Originated: 10/06/202010/06/2020: FOR FINAL APPROVAL:There is text that needs to be masked. Mask all text in hatched areas. See redlines.ZP Response: Text and Hatch overlap has been fixed.