HomeMy WebLinkAboutHTP MEDICAL OFFICE BUILDINGS - PDP200021 - - LANDSCAPE PLAN (2)LARIMER COUNTY
RL
HC
POL
E
UE
E
RL
LMN
MMN
RL
CSU
CC
E
E
LMNLMN
RL
RL
UE
UE
LMN
HC
HC HC HC HC
LMN
LMN
RL
RL
RL RL
HC
RL
HC
SITE
HC
LARIMER COUNTY
HC
HC
RL
HC
FDC
FDC2'' WE
E
E
EET ET
G
G
G
G
GGGGPHASE 2
PHASE 1
BUILDING A (33,830 s.f.)
APPROVED BY THE DIRECTOR OF PLANNING OF THE CITY OF FORT COLLINS,
COLORADO ON THIS DAY OF ,A.D., 20
DIRECTOR OF PLANNING
DIRECTOR OF PLANNING
KNOW ALL MEN BY THESE PRESENT THAT:
By: MAVDevelopment Company
Date:_________________, _______
STATE OF COLORADO )
) ss.
COUNTY OF LARIMER )
WITNESS my hand and official seal.
Notary Public
My commission expires: __________________
Owner: Harmony Technology Park, LLC a Colorado Limited Liability Company
OWNERSHIP CERTIFICATION
Harmony Technology Park, LLC a Colorado Limited Liability Company and/or assigns being all the
lawful recorded owners of the property shown on this development plan, except any existing public
streets, roads, or highways, do hereby certify that I/we accept the conditions and restrictions set forth
on said plan and in the conditions of approval by the City of Fort Collins, dated
_______________________, and that I/we consent to the recordation of any information pertaining
thereto.
The foregoing instrument was acknowledged before me this ________ day of ______________,
__________ by .
LAND USE DATA
Its: Manager
By:
__________________
BICYCLE PARKING PROVIDEDREQUIRED
89BICYCLE PARKING
TOTAL 123 (3.8/1000 S.F.)
ACCESSIBLE PARKING
REGULAR PARKING 123
13
REQUIRED (MIN. / MAX.)PROVIDEDPARKING
OFFICE / MEDICAL OFFICEPROPOSED LAND USE
6 STORIES
200,074 S.F. (4.59 ACRES)
MAX. BUILDING HEIGHT PERMITTED
EXISTING ZONING
GROSS SITE AREA
HC- HARMONY CORRIDOR
.42 FAR
BUILDING A: 33,830 GSFESTIMATED FLOOR AREA
FLOOR AREA RATIO
NET SITE AREA
PUBLIC ROW:0 S.F.
MAX. BUILDING HEIGHT PROPOSED BUILDING A: 2 STORIES
SITE COVERAGE PERCENTAREA
53%
30%
0%
100%
17%
107,011 S.F.
0 S.F.
59,005 S.F.
200,074 S.F.
34,058 S.F.BUILDING COVERAGE
DRIVES AND PARKING
OPEN SPACE
PUBLIC R.O.W.
TOTAL
200,074 S.F. (4.59 ACRES)
OFFICE / MEDICAL OFFICE
BUILDING USES (INTERIOR DIMENSIONS)
84,407 S.F.
CONSTRUCTION TYPE TYPE IIB W/TYPE 13 SPRINKLER SYSTEM
BUILDING OCCUPANCY BUILDING A: TYPE 'B': 197
BUILDING B: TYPE 'B': 295
1.Refer to final utility plans for exact locations and construction information for storm drainage structures, utility
mains and services, proposed topography, street improvements.
2.Refer to the subdivision plat and utility plans for exact locations, areas and dimensions of all easements, lots,
tracts, streets, walks and other survey information.
3.The project shall be constructed in accordance with the final amendments to the plans must be reviewed and
approved by the city prior to the implementation of any changes to the plans.
4.All rooftop and ground mounted mechanical equipment must be screened from view from adjacent property
and public streets. in cases where building parapets do not accomplish sufficient screening, then free-standing
screen walls matching the predominant color of the building shall be constructed. other minor equipment such
as conduit, meters and plumbing vents shall be screened or painted to match surrounding building surfaces.
5.All construction with this development plan must be completed in one phase unless a phasing plan is shown
with these plans. all exterior lighting provided shall comply with the foot-candle requirements in section 3.2.4
of the land use code and shall use a concealed, fully shielded light source with sharp cut-off capability so as to
minimize up-light, spill light, glare and unnecessary diffusion. signage and addressing are not permitted with
this planning document and must be approved by separate city permit prior to construction. signs must comply
with city sign code unless a specific variance is granted by the city.
6.Fire hydrants must meet or exceed poudre fire authority standards. all buildings must provide an approved fire
extinguishing system.
7.All bike racks provided must be permanently anchored.
8.All sidewalks and ramps must conform to city standards. accessable ramps must be provided at all street and
drive intersections and at all designated accessable parking spaces. accessable parking spaces must slope no
more than 1:48 in any direction. all accessible routes must slope no more than 1:20 in direction of travel and
with no more than 1:48 cross slope.
9.Common open space areas and landscaping within right of ways, street medians, and traffic circles adjacent to
common open space areas are required to be maintained by the property owner of the common area. the
property owner is responsible for snow removal on all adjacent street sidewalks and sidewalks in common open
space areas.
10.Design and installation of all parkway/tree lawn and median areas in the right-of-way shall be in accordance
with city standards. unless otherwise agreed to by the city with the final plans, all ongoing maintenance of such
areas is the responsibility of the owner/developer.
11.Private conditions, covenants, and restrictions (cc&r's), or any other private restrictive covenant imposed on
landowners within the development, may not be created or enforced having the effect of prohibiting or limiting
the installation of xeriscape landscaping, solar/photo-voltaic collectors (if mounted flush upon any established
roof line), clothes lines (if located in back yards), odorcontrolled compost bins, or which have the effect of
requiring that a portion of any individual lot be planted in turf grass.
12.Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and
gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to city
of fort collins standards at the developer's expense prior to the acceptance of completed improvements and/or
prior to the issuance of the first certificate of occupancy.
13.Fire lane marking: a fire lane marking plan must be reviewed and approved by the fire official prior to the
issuance of any certificate of occupancy. where required by the fire code official, approved signs or other
approved notices that include the words no parking fire lane shall be provided for fire apparatus access roads
to identify such roads or prohibit the obstruction thereof. the means by which fire lanes are designated shall be
maintained in a clean and legible condition at all times ad be replaced or repaired when necessary to provide
adequate visibility.
14.Premise identification: an addressing plan is required to be reviewed and approved by the city and poudre fire
authority prior to the issuance of any certificate of occupancy. unless the private drive is named, monument
signage may be required to allow way-finding. all buildings shall have address numbers, building numbers or
approved building identification placed in a position that is plainly legible, visible from the street or road
fronting the property, and posted with a minimum of six-inch numerals on a contrasting background. where
access is by means of a private road and the building cannot be viewed from the public way, a monument, pole
or other sign or means shall be used to identify the structure.
SITE PLAN NOTES
(1/4000 S.F.)
82COVERED BICYCLE PARKING
(2/1000 S.F.) = 68 MIN. (4.5/1000 S.F.) = 153 MAX.
3 / 6
SHEET INDEX
LEGAL DESCRIPTION
A PORTION OF LOT 2, HARMONY TECHNOLOGY PARK SECOND FILING BEING SITUATED IN THE
NORTHWEST ONE-QUARTER OF SETION 4, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE SIXTH PRINCIPAL
MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO.
VICINITY MAP
Sheet Date:
Sheet Number:
Drawing Name:
Drawn by:
Designed by:RevisionsChecked by:
NORTH
Project Number:Project:Client:1603 Oakridge Drive Fort
Collins, CO 80525
(970) 223-7577
www.bhadesign.com
SCALE:
0
Landscape Architecture
Urban Design
Planning
4750 TECHNOLOGY PARKWAYPDPMAVD2723 SOUTH STATE ST, STE. 250ANN ARBOR MI, 481041" - 30"
15'30'60'
AP/JM
AP/JM
JM
COVER SHEET
2020
10/28/2020
L-1
L-1 COVER SHEET
L-2 SITE PLAN
L-3 LANDSCAPE NOTES AND DETAILS
L-4 LANDSCAPE PLAN
L-5 LANDSCAPE PLAN
BUILDING B: 50,577 GSF
BUILDING B: 3 STORIES
BUILDING B (50,577 s.f.)
BICYCLE PARKING PROVIDEDREQUIRED
1413BICYCLE PARKING
TOTAL 130 (2.6/1000 S.F.)
ACCESSIBLE PARKING
REGULAR PARKING 130
14
REQUIRED (MIN. / MAX.)PROVIDEDPARKING
(1/4000 S.F.)
83COVERED BICYCLE PARKING
(2/1000 S.F.) = 98 MIN. (4.5/1000 S.F.) = 219 MAX.
4 / 7
PHASING PLAN
E
FDC
FDC2'' W2'' W2'' W2'' WE
E
E
E
E
E
E E
E
EEEEEE2'' W2'' WT EEET
G
G
G
G
G
G
G
G
G G
GGGGGGGEG GGGGTIMBERWOOD DRIVE
TIMBER
W
O
O
D
D
R
I
V
E
LADY MOON DRIVEEXISTING STORWATER
DETENTION POND
PA
ENTRY MONUMENT SIGN
(4) COVERED BIKE RACKS
(3) BIKE RACKS
19 20
20 22
11
8
14
20
1024
13
26
9
10
6
13
6 5
PA
PA
PA
PA
PA
PA
PA
PA PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PAPA
PAPA
PA
PA
PA
PA
PA
7'
BIKE REPAIR STATION
BENCH, TYP.
TRASH ENCLOSURE
TRASH ENCLOSURE
BIKE REPAIR STATION
(3) COVERED BIKE RACKS
BENCH, TYP.
PA
SANDSTONE PATIO WITH
FIXED TABLE AND PERMANENT
UMBRELLA
DROP-OFF
DROP-OFF
2
9
BUILDING B
50,577 S.F.
BUILDING A
33,830 S.F.
TRASH RECEPTACLE
SANDSTONE PATIO WITH
FIXED TABLE AND PERMANENT
UMBRELLA
130 STANDARD PARKING SPACES
14 ADA PARKING SPACES
84
123 STANDARD PARKING SPACES
13 ADA PARKING SPACES
9'19'7'7'5'-7"24'5'5'9'9'9'9'
7'
3'3'24'26'16'-3"13'22'27'-71
2"20'-7"5'-91
2"11'-6"9'17'5'
ENHANCED PEDESTRIAN
PAVEMENT
27'-31
2"19'24'19'19'24'17'10'24'17'7'24'17'12'-21
2"
19'
24'
17'
19'
24'
19'
19'
24'
19'
19'
24'
19'
19'
24'
17'
15'-8"26'20'12'-7"20'12'-7"PHASE 1PHASE 2ARCHITECTURAL
SCREEN WALL,
3' HEIGHT MAX
ARCHITECTURAL
SCREEN WALL,
3' HEIGHT MAX
LEGEND
PA
PARKING COUNT
PLANTING AREA
Sheet Date:
Sheet Number:
Drawing Name:
Drawn by:
Designed by:RevisionsChecked by:
NORTH
Project Number:Project:Client:1603 Oakridge Drive Fort
Collins, CO 80525
(970) 223-7577
www.bhadesign.com
SCALE:
0
Landscape Architecture
Urban Design
Planning
4750 TECHNOLOGY PARKWAYPDPMAVD2723 SOUTH STATE ST, STE. 250ANN ARBOR MI, 481041" - 30"
15'30'60'
AP/JM
AP/JM
JM
SITE PLAN
2020
10/28/2020
L-2
UP
UP
UP
UPUPUPE
FDC
FDC2'' W2'' W2'' WE
E
E
E
E E
EEEE2'' WT EET
G
G
G
G
G
G G
GGGGGEGGGTIMBER
W
O
O
D
D
R
I
V
E
LADY MOON DRIVEEXISTING STORWATER DETENTION
POND
REPAIR NATIVE SEED
REPAIR TRAIL
LIMIT OF OFF SITE WORK
LIMIT OF OFF SITE WORK LIMIT OF WORK, TYP.
LIMIT OF WORK, TYP.
BUILDING B
BUILDING A
GENERAL LANDSCAPE NOTES
1.Plant quality: all plant material shall be a-grade or no. 1 grade –free of any defects, of normal health, height, leaf density
and spread appropriate to the species as defined by the american association of nurserymen (aan) standards. all trees shall
be ball and burlap or equivalent.
2. Irrigation: all landscape areas within the site including turf, shrub beds and tree areas shall be irrigated with an automatic
irrigation system. the irrigation plan must be reviewed and approved by the city of fort collins water utilities department prior
to the issuance of a building permit. all turf areas shall be irrigated with an automatic pop-up irrigation system. all shrub
beds and trees, including in native seed areas, shall be irrigated with an automatic drip (trickle) irrigation system, or with an
acceptable alternative approved by the city with the irrigation plans. the irrigation system shall be adjusted to meet the water
requirements of the individual plant material. irrigation systems to be turned over to the city parks department for
maintenance must be approved by the parks manager and meet parks irrigation standards. design review shall occur during
utilities department irrigation review prior to the issuance of a building permit and construction observation and inspection
by parks shall be incorporated into the construction process.
3.Topsoil: to the maximum extent feasible, topsoil that is removed during construction activity shall be conserved for later use
on areas requiring revegetation and landscaping.
4.Soil amendments: soil amendments shall be provided and documented in accordance with city code section 12-132. the
soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than
eight(8) inches and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to a depth of at
least six(6) inches by tilling, discing or other suitable method, at a rate of at least three (3) cubic yards of soil amendment
per one thousand (1,000) square feet of landscape area. prior to the issuance of any certificate of occupancy, a written
certification must be submitted to the city that all planted areas, or areas to be planted, have been thoroughly loosened and
the soil amended, consistent with the requirements set forth in section 12-132.
5.Installation and guarantee: all landscaping shall be installed according to sound horticultural practices in a manner
designed to encourage quick establishment and healthy growth. all landscaping for each phase must be either installed or
the installation must be secured with an irrevocable letter of credit, performance bond, or escrow account for 125% of the
valuation of the materials and labor prior to issuance of a certificate of occupancy for any building in such phase.
6.Maintenance: trees and vegetation, irrigation systems, fences, walls and other landscape elements with these final plans
shall be considered as elements of the project in the same manner as parking, building materials and other site details. the
applicant, landowner or successors in interest shall be jointly and severally responsible for the regular maintenance of all
landscaping elements in good condition. all landscaping shall be maintained free from disease, pests, weeds and litter, and
all landscape structures such as fences and walls shall be repaired and replaced periodically to maintain a structurally
sound condition.
7.Replacement: any landscape element that dies, or is otherwise removed, shall be promptly replaced in accordance with the
requirements of these plans.
8.The following separations shall be provided between trees/shrubs and utilities:
40 feet between canopy trees and street lights
15 feet between ornamental trees and streetlights
10 feet between trees and public water, sanitary and storm sewer main lines
6 feet between trees and public water, sanitary and storm sewer service lines.
4 feet between shrubs and public water and sanitary and storm sewer lines
4 feet between trees and gas lines
9.All street trees shall be placed a minimum eight (8) feet away from the edges of driveways and alleys per luc 3.2.1(d)(2)(a).
10.Placement of all landscaping shall be in accordance with the sight distance criteria as specified by the city of fort collins. no
structures or landscape elements greater than 24" shall be allowed within the sight distance triangle or easements with the
exception of deciduous trees provided that the lowest branch is at least 6' from grade. any fences within the sight distance
triangle or easement must be not more than 42" in height and of an open design.
11.The final landscape plan shall be coordinated with all other final plan elements so that the proposed grading, storm
drainage, and other development improvements do not conflict with nor preclude installation and maintenance of
landscape elements on this plan.
12.Minor changes in species and plant locations may be made during construction -- as required by site conditions or plant
availability. overall quantity, quality, and design concept must be consistent with the approved plans. in the event of conflict
with the quantities included in the plant list, species and quantities illustrated shall be provided. all changes of plant species
and location must have written approval by the city prior to installation.
13.All planting beds shall be mulched to a minimum depth of three inches.
A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR
SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC
RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS
AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND
SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY
OF FORT COLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT
IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY.
1.A permit must be obtained from the city forester before any trees or shrubs as noted on this plan are planted, pruned or
removed in the public right-of-way. this includes zones between the sidewalk and curb, medians and other city property. this
permit shall approve the location and species to be planted. failure to obtain this permit is a violation of the city of fort
collins code subject to citation (section 27-31) and may also result in replacing or relocating trees and a hold on certificate
of occupancy.
2.Contact the city forester to inspect all street tree plantings at the completion of each phase of the development. all must be
installed as shown on the landscape plan. approval of street tree planting is required before final approval of each phase.
3.Street landscaping, including street trees, shall be selected in accordance with all city codes and policies. all tree pruning
and removal works shall be performed by a city of fort collins licensed arbors where required by code. street trees shall be
supplied and planted by the developer using a qualified landscape contractor.
4.The developer shall replace dead or dying street trees after planting until final maintenance inspection and acceptance by
the city of fort collins forestry division. all street trees in the project must be established, with an approved species and of
acceptable condition prior to acceptance.
5.Subject to approval by the city forester -- street tree locations may be adjusted to accommodate driveway locations, utility
separations between trees, street signs and street lights. street trees to be centered in the middle of the lot to the extent
feasible. quantities shown on plan must be installed unless a reduction is approved by the city to meet separation standards.
STREET TREE NOTES
Sheet Date:
Sheet Number:
Drawing Name:
Drawn by:
Designed by:RevisionsChecked by:
NORTH
Project Number:Project:Client:1603 Oakridge Drive Fort
Collins, CO 80525
(970) 223-7577
www.bhadesign.com
SCALE:
0
Landscape Architecture
Urban Design
Planning
4750 TECHNOLOGY PARKWAYPDPMAVD2723 SOUTH STATE ST, STE. 250ANN ARBOR MI, 481041" - 30"
15'30'60'
AP/JM
AP/JM
JM
OVERALL LANDSCAPE
PLAN
2020
11/25/2020
L-3
DECIDUOUS CANOPY TREE
EVERGREEN TREE
ORNAMENTAL TREE
DECIDUOUS SHRUBS
EVERGREEN SHRUBS
E
FDC2'' W2'' W2'' W2'' WE
E
E
E
2'' WT EEET
G
G
G
G
G
G
EG GGGG3 PI PU
5 SP SN
4 CO ST
5 IL GL
3 CO ST
3 PI PU
1 CO ST
3 BA AS
3 BA AS
3 IL GL
2 TI AM
4 BA AS
2 CE OC
3 CO ST
3 BA AS
2 IL GL
3 IL GL
1 UL SP
3 BA AS
3 RH AR
3 LA AN
3 LA AN
3 CO ST
7 IL GL
4 PI PU
5 PI PU
3 BA AS
3 CO ST
2 IL GL
3 HE SE
1 RH TR
3 AC HW
8 CA CL
2 CO ST
7 SP SN
3 RH AR
3 RH TR
4 CA CL
3 IL GL
6 CA CL
3 CO ST
3 PI PU
3 CO ST
1 UL CC
1 SP SN
8 CA KF
5 HE RC
3 CE OC
2 IL GL
7 BA AS
1 PI NI
1 SP SN
3 IL GL
1 TI AM
6 LA AN
8 HE RC
4 HE RC
6 BA AS
2 CE OC
3 CO ST
2 IL GL
7 CA CL
2 RH AR
1 BA AS
5 IL GL
1 UL SP
17 HE SE
3 PI PU
7 CO ST
3 LA AN
3 CO ST
3 PI PU
3 CO ST
35 CA KF
7 MI VA
5 CO ST
4 CA KF
1 UL CC
6 HE RC
10 HE RC
TIMBER
W
O
O
D
D
R
I
V
E
EXISTING STORWATER DETENTION POND
4 IL GL
2 QU RO
7 SP SN
6 MI VA
5 HE RC
2 CA KF
3 PI PU
5 CA CL
5 MI VA
1 IL GL
1 AC SA
1 AC SA
3 IL GL
3 LA AN
6 LA AN
5 HE RC
1 TI AM
3 IL GL
3 IL GL
1 AC SA
4 LA AN
5 SP SN
1 TI AM
9 MI VA
4 BA AS
3 IL GL
2 SP SN
1 TI AM
6 CA KF
5 HE RC
4 BA AS
1 AC GR
2 AC PL
3 PI PU
5 HE RC
1TI AM
3 PI PU
3 BA AS
7 LA AN
5 MA SS
7 MI VA
3 HE RC
7 AS NO
3 SP SN
1 PI PU
3 HE RC
2 JU KE
5 CA CL
3 CO ST
3 LA AN
6 JU HO
8 SP SN
5 JU SQ
2 RH AR
3 CO ST
5 JU HO
1 PI PO
5 IL GL
3 CO ST
7 BA AS
3 PI PU
3 PR NE
3 CO ST
2 SP SN
6 DE CE
7 AS NO
9 DE CE
7 AS NO
9 DE CE
7 AS NO 6 HE RC
3 SP SN
1 UL CC
7 CA KF
1 PI PU
3 IL GL
7 AS NO
9 DE CE
7 AS NO
9 DE CE
5 DE CE
3 CO ST
2 AC SA
5 IL GL
7 BA AS
1 TI AM
5 IL GL
10 BA AS
3 CO ST
2 CE OC
2 CO ST
6 IL GL
4 BA AS
7 MI VA
5 BA AS
5 IL GL 5 HE RC
3 CA KF
5 HE RC
2 TI AM
1 PI PU
3 PI PU
5 MA SS
5 IL GL
8 LA AN
2 CO ST
3 MI VA
3 IL GL
3 CO ST
3 CA CL
1 UL CC
2 CA KF
5 HE RC
1 AC SA
9 BA AS
1 QU RO
2 BA AS
BUILDING B
5 BA AS
3 CO ST
5 CA KF
5 CA CL
5 LA AN
7 MI VA
6 IL GL
1 AC SA
6 PI PU
5 HE RC
6 CA KF
3 CO ST
5 BA AS
2 IL GL
7 MI VA
3 CA CL
6 CO ST
1 AC SA
5 HE RC
1 TI AM
3 CA KF
3 CO ST
3 SP SN
2 QU BI
ORNAMENTAL GRASSES
PERENNIALS
BOULDERS
BLUEGRASS SOD
NATIVE SEED
COBBLE MULCH
LEGEND
A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR
SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC
RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS
AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND
SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY
OF FORT COLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT
IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY.Sheet Date:
Sheet Number:
Drawing Name:
Drawn by:
Designed by:RevisionsChecked by:
NORTH
Project Number:Project:Client:1603 Oakridge Drive Fort
Collins, CO 80525
(970) 223-7577
www.bhadesign.com
SCALE:
0
Landscape Architecture
Urban Design
Planning
4750 TECHNOLOGY PARKWAYPDPMAVD2723 SOUTH STATE ST, STE. 250ANN ARBOR MI, 481041" - 20"
10'20'40'
AP/JM
AP/JM
JM
LANDSCAPE PLAN
2020
11/25/2020
L-4MATCHLINE SEE SHEET L-5NATIVE SEED MIX Seed shall be a mixture that matches the following:
Sheeps Fescue, Application rate - 13 pounds per acre, 30% pure live seed
Buffalo Grass, Application rate - 13 pounds per acre, 40% pure live seed
Blue Grama, Application rate - 14 pounds per acre, 30% pure live seed
Overall non-irrigated seed mix application rate shall be 40 pounds per acre.
SEED AND SOD MIXES
SOD MIX Sod shall be a Texas Bluegrass Hybrid
Botanical Name Common Name % of Mix
Andropogon gerardii Big Bluestem 10%
Calamovilfa longifolia Prairie Sandreed (plains, sandy areas)20%
Distichlis stricta Inland saltgrass 15%
Panicum virgatum Switchgrass 10%
Poa palustris Marsh bluegrass (plains-montane, wet)20%
Sorghastrum nutans Yellow Indiangrass 10%
Spartina pectinata Prairie Cordgrass 15%
100%
(~70 seeds/sq ft and/or 11.4 Lbs/PLS/acre)
SEED MIX B - WETLAND TRANSITION SEED
UP
UP
UP
E
FDC
E
E
E E
E
EEEEEE2'' W2'' WT
G
G
G
G G
GGGGGGG2 CE OC
6 BA AS
3 CO ST
1 IL GL
5 SP SN
1 TI AM
4 CA KF
6 HE RC
7 MI VA
3 CO ST
1 UL SP
6 CA CL
5 JU SQ
3 IL GL
1 CO ST
1 UL SP
1 IL GL
7 CA CL
3 IL GL
1 UL SP
1 CO ST
7 CA CL7 SP SN
3 IL GL
5 HE RC
3 CA KF
1 QU RO
3 BA AS
4 CA KF
11 HE RC
5 HE RC
5 CA CL
3 IL GL
5 SP SN
5 MI VA
4 MI VA
3 JU SQ
3 PI PU
3 PI PU
5 SP SN
2 PI PO
3 CA KF
3 CA CL
3 JU SQ5 CO ST
1 JU KE 5 SP SN
4 LA AN
3 BA AS
2 JU SQ
5 CA KF
3 BA AS
5 LA AN
3 SP SN3 IL GL
1 TI AM
6 LA AN
8 HE RC
6 HE RC
1 TI AM
3 IL GL
7 LA AN
4 HE RC
6 BA AS
2 CE OC
3 CO ST
2 IL GL
7 CA CL
2 RH AR 3 JU SQ
1 BA AS
5 IL GL
TIMBERWOOD DRIVE
6 HE RC
1 MA SS
2 UL SP
3 CO ST
4 HE RC
3 JU SQ
5 CA CL
5 MI VA
14 CA KF
5 MI VA
LADY MOON DRIVE3 BA AS
3 PI PU
6 BA AS
3 IL GL
3 IL GL
7 CA KF
5 BA AS
3 RH AR 3 RH AR
7 JU SQ
4 BA AS
2 AC SA
3 IL GL
4 IL GL
2 AC SA
3 CO ST
2 QU BI
3 QU BI
6 HE RC
3 BA AS
3 MI VA
3 HE RC
5 CA KF
4 IL GL
3 BA AS
5 CA KF
5 HE RC
3 MI VA
3 BA AS
2 CE OC
3 IL GL
2 LA AN
5 LA AN
9 MI VA
12 IL GL
3 AC HW
6 SP SN
3 PI PU
3 UL CC
1 TI AM
9 MI VA
4 BA AS
3 IL GL
2 SP SN
1 TI AM
6 CA KF
5 HE RC
4 LA AN
5 BA AS
1 PI PU
3 PI PU
3 AC HW
5 HE RC
3 CA CL
9 MI VA
12 IL GL
2 BA AS
1 QU RO
2 IL GL
3 HE RC4 HE RC
1 SP SN
3 CA KF
5 MA SS
5 IL GL
8 LA AN
2 CO ST
4 JU SQ
3 QU RO
2 CO ST
4 SP SN
6 MI VA
1 CO ST
3 PI PU
3 IL GL
BUILDING A
5 HE RC
3 CO ST
3 CA CL
5 HE RC
DECIDUOUS CANOPY TREE
EVERGREEN TREE
ORNAMENTAL TREE
DECIDUOUS SHRUBS
EVERGREEN SHRUBS
ORNAMENTAL GRASSES
PERENNIALS
BOULDERS
BLUEGRASS SOD
NATIVE SEED
COBBLE MULCH
MATCHLINE SEE SHEET L-4 L-4LEGEND
Sheet Date:
Sheet Number:
Drawing Name:
Drawn by:
Designed by:RevisionsChecked by:
NORTH
Project Number:Project:Client:1603 Oakridge Drive Fort
Collins, CO 80525
(970) 223-7577
www.bhadesign.com
SCALE:
0
Landscape Architecture
Urban Design
Planning
4750 TECHNOLOGY PARKWAYPDPMAVD2723 SOUTH STATE ST, STE. 250ANN ARBOR MI, 481041" - 30"
10 20'40'
AP/JM
AP/JM
JM
LANDSCAPE PLAN
2020
11/25/2020
L-5