Loading...
HomeMy WebLinkAboutNE PROSPECT & I-25 ODP - MA210006 - - PLANNING OBJECTIVESStatement of Planning Objectives Prospect and I-25 ODP Amendment Statement of Planning Objectives Page 1 of 1 Replace the project description with the following: The Prospect / I-25 Overall Development Plan (ODP) is a 115.5 – acre property located at the north east corner of Interstate 25 and Prospect Road. Adjacent developments to the north and northeast include Interchange Business Park, Fox Grove, Waterdale and Clydsdale residential Subdivisions. Kitchell Subdivision and the Poudre High School site are to the east; and existing commercial and Homestead Estates Subdivision are situated south of the site. Boxelder Creek flows under the Interstate Highway just north of the property. The cache La Poudre Reservoir Inlet and the Apparent Lake Canal Company irrigation ditches traverse the site in the northwest to southeast direction. The land is zoned CG –General Commercial District, I- Industrial District and UE -Urban Estate District. Proposed land uses for each parcel of land in the ODP are the same as the permitted land uses in the applicable Zone Districts, which ever applies. The zoning, land uses, and proposed street networks are consistent with the I-25 Sub-Area Plan and the adopted I-25 Regional Plan. Land adjacent the intersection of I-25 and Prospect Road is zoned Commercial. The site is identified on the I-25 Subarea Plan as a mixed-use activity center. The plan calls for a 350000 sq. ft. commercial lifestyle center at the location to serve the city’s objective of providing a mix of employment opportunities. Approximately 1,600,000 sq. ft. of industrial uses are projected on the 79.6 acres north of the proposed activity center. The area zoned Urban Estate will contain approximately 19 lots at a maximum of 2 units per acre. Carriage Parkway (collector) ties to Prospect Road at a future signalized intersection located at the previous intersection point of the devolved frontage road and Prospect. Local street connections are provided at 660 foot intervals. On-street bicycle routes will be provided to encourage alternative modes of travel. Any existing wetland or special wildlife habitats on the property will be identified a the Project Development Plan (PDP) stage The ODP indicates wildlife buffer zones per the LUC for both irrigation ditches and Boxelder Creek. Utility infrastructure adequate to service the proposed land uses is available in close proximity to the site. An existing 20” sewer line serves the northern two-thirds of the property. The entire property is served by an existing ELCO 8” water line. An approved Boxelder Sanitation District 20” sewer line will service the southern one-thirst of the project.