Loading...
HomeMy WebLinkAboutFRONT RANGE VILLAGE, SECOND REPLAT (COMPASS BANK) - FDP110007 - - CITY STAFFCity®� Planning, Development and Transportation Services Planning281 F6rt CollinsCurrent N. College Avenue PO Box 580 Fort Collins, CO 80522-0580 970.221.6750 970.224.6134 - fax fcgov.com/Currentp/annrng MEMORANDUM TO: Engineering Stormwater M.I.S./G.I.S Mapping Technical Services Light and Power Transportation Planning Poudre Fire Authority Water/Wastewater Zoning Building Inspection FROM: Ted Shepard, Chief Planner 1 �(S DATE: May 16, 2011 RE: Front Range Village, Second Replat, Final, Compass Bank, #12-09 Attached please find the latest revision for Front Range Village, Second Replat, Final, Compass Bank. This is a replat of Lot Two, a pad site west of Corbett Drive. This Replat was approved by the Hearing Officer on April 24, 2009. The changes are as follows: The lot increases in width by 12 feet from 160 to 172 feet. An 82-foot wide "view corridor" (for the benefit of Lowe's) divided between Lots Two and Three is now indicated. The drainage easement on the north has been adjusted accordingly. A Minor Amendment, MA-08-000-52, recently completed three rounds of review and was approved. This approved Minor Amendment, however, shows a lot width of 160 feet. A new Minor Amendment is being circulated by Zoning that now indicates a lot width of 172 feet. This revised Plat and new Minor Amendment represents the first time since March 12, 2009 that Front Range Village, Lowe's, Compass Bank, Stantec (representing Bayer Properties) and Ziegler -Cooper (representing Compass Bank) are all on the same page. Fart Collins FINAL PLAN l� COMMENT SHEET Current Planning PO Box 580 Fort Collins, Co 805?2-0580 Fax: 970-224-61 >4 DATE: May 19, 2011 TO: Ted Shepard PROJECT PLANNER: Ted Shepard FDP110007 Front Range Village Second Replat Please enter your comments in Accela V360 Please return all comments to the project planner no later than the staff review meeting: May 25, 2011 Note --Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below, attached, or Accela) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape