Loading...
HomeMy WebLinkAboutMARTIN LUTHER GROUP HOME - 24-87 - - CORRESPONDENCE-CONCEPTUAL REVIEWCITY OF FORT COLLINS OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT March 25, 1987 Martin Luther Group Home c/o Bill Gurski Everitt Homes 2545 Creekwood Drive Fort Collins, CO 80525 Dear Sir, For your information, attached is a copy of the Staff's comments concerning Martin Luther Group Home, which was presented before the Conceptual Review Team on March 23, 1987. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and addi- tions to these comments may be made at the time of formal review of this project. If you should have any ouestions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, Ted Shepard City Planner Attachment ` TS/bh xc: Tom Peterson, Pirecter of Planning Mike Herzig, Development Coordinator Jim Newell, Civil Engineer I Project Planner File Ms. Sharon Jacksi, c/o Martin Luther Homes, 2100 Eastwood Dr., Fort Collins, CO 80525 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6750 SERVICES, PLANNING CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: March 23, 1.987 ITEM: Martin Luther Group Home at 2100 Eastwood Drive APPLICANT: Ms. Sharon Jacksi, Martin Luther Home, c/o Bill Gurski, Ever- itt Homes, 2545 Creekwood Drive, Fort Collins, CO 80525. LAND USE DATA: Four bed facility at 2100 Eastwood for developmentally disabled adolescents and no more than two staff at any one time. The lot is presently vacant. COMMENTS: 1. A water meter will be required. 2. The electrical rate will either be commercial or residential. Mr. Don Botteron of the Light and Power Department will discuss with the appli- cant the slight differences between the rates. It is unknown at this time which rate will apply. 3. A residential fire sprinkler system is strongly encouraged. Mr. Warren Jones of the Poudre Valley Fire Authority is available to answer ques- tions or concerns regarding installation and water service require- ments. 4. The building will be classified as an R-3 occupancy. 5. For the Group Home Review process for the Planning and Zoning Board, the following comments apply: a. A neighborhood meeting will be required. Staff will set up the time and location. The applicant will supply the Staff with the list (on adhesive mailing labels) of the affected propertyowners within the area outlined on the enclosed map. b. There should be no other group home within a radius of one-third of a mile. c. The structure must be compatible with the surrounding area. The plans submitted are residential in character and therefore this criterion is met. Page 2 d. The neighborhood meeting must precede the submittal. The review time after formal submittal is seven weeks culminated by the formal public hearing with the Planning and Zoning Board. 6. The largest sign allowed is two square feet.