HomeMy WebLinkAboutHILL POND RESIDENCES - PDP - PDP140015 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTSeptember 17, 2014 PRELIMINARY DRAINAGE REPORT HILL POND RESIDENCES Fort Collins, Colorado Prepared for: Catamount Properties Ltd. 7302 Rozena Drive Longmont, Colorado 80503 Prepared by: 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 620-004 3This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. September 17, 2014 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage Report for Hill Pond Residences Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage Report for your review. This report accompanies the Preliminary Development submittal for the proposed Hill Pond Residences development. This report has been prepared in accordance with the Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed Hill Pond Residences project. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Nicholas W. Haws, PE Andrew Reese Vice President Project Engineer Hill Pond Residences TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ......................................................... 1 II. DRAINAGE BASINS AND SUB-BASINS ............................................................. 5 III. DRAINAGE DESIGN CRITERIA ......................................................................... 6 IV. DRAINAGE FACILITY DESIGN .......................................................................... 9 V. CONCLUSIONS............................................................................................. 11 References ............................................................................................................. 12 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations (Reserved for Final) B.1 – Hydraulic Computations B.2 – Detention Facilities APPENDIX C – Water Quality Design Computations APPENDIX D – Erosion Control Report (Reserved for Final) APPENDIX E – Standard Operating Procedures (SOP’s) References (Reserved for Final) MAP POCKET: DR1 – Drainage Exhibit DR2 – Existing Drainage Exhibit Hill Pond Residences Page|1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map Figure 1 – Vicinity Map 2. The Hill Pond Residences project site is located in the Northwest quarter of Section 23, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site (refer to Figure 1) is bordered to the north by a single family residence; to the south by Hill Pond Road; to the east by Gilgalad Way; and to the west by existing single family residences. 4. There are no major drainageways within or adjacent to the site. Hill Pond Residences Page|2 B. Description of Property 1. Hill Pond Residences is comprised of ±2.179 acres. 2. The site is currently a single family residence. It was originally developed as a neighborhood amenity with two tennis courts, a pool and large green spaces. Figure 2 – Aerial Photograph 3. The existing groundcover consists of grasses, gravel and concrete. 4. The existing on-site runoff generally drains to both the northeast as well as the southwest due to a ridge that bisects the property. Flows draining to the northeast corner are collected by a series of existing low areas that do not have an outfall to any established drainage facilities. Drainage to the southeast flows to Hill Pond Road and Gilgalad Way. Those flows are collected by an existing inlet on the northeast corner of the intersection which conveys flows to Spring Creek. Project Site Hill Pond Residences Page|3 5. A soils report letter (Project No. FC06692-115 | Date: September 16, 2014) was completed by CTL|Thompson, Inc. The report letter contains the preliminary results of a complete geotechnical subsurface exploration as well as pertinent geotechnical recommendations. According to the summary of findings presented in the aforementioned report, "Strata encountered in our exploratory borings generally consisted of approximately 0-4-1/2 feet of clay and sand fill, underlain by natural sandy clay and clayey sand soils which extended approximately 18 to 21 feet.” 6. There are no major drainageways within or adjacent to the project site. 7. The proposed Hill Pond Residences development will consist of 8 residential buildings that are single family attached units. Other proposed improvements include: a new concrete and permeable Modular Block Paver (MBP) parking area and landscaping. 8. The proposed land use is residential, single-family attached. This is a permitted use in the Medium Density Mixed Use Neighborhood District (MMN). Hill Pond Residences Page|4 C. Floodplain 1. The subject property is not located in a FEMA regulatory or City of Fort Collins designated floodplain. In particular, the project site is not located within a FEMA designated 100-year floodplain per Map Number 08069C0987G (Effective date: May 2, 2012). Figure 4 – FEMA Firmette (Map Number 08069C0987G) Project Site Hill Pond Residences Page|5 II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. Hill Pond Residences is located within the City of Fort Collins Spring Creek major drainage basin. Specifically, the project site is situated in the central portion of this major drainage basin. This basin is located in central Fort Collins and has a drainage area of approximately 5,656 acres. The Spring Creek major drainage basin generally drains from west to east. Most of the runoff from the Spring Creek major drainage basin drains into the Poudre River. B. Sub-Basin Description 1. Outfalls: There are two existing outfall locations for the project. The first outfall for the project site is a series of localized low points along the eastern boundary of the project. The second outfall location for the project is the existing curb and gutter along Gilgalad Way, along the southeastern boundary of the project site. 2. The existing subject site can be defined with two (2) sub-basins. Refer to the Existing Drainage Exhibit for additional information. x Sub-basin EX1 delineates the northern portion of the existing project site, which was used to approximate the 2- and 100-year existing runoff. Drainage from the basin generally flows to the northeast, and is collected in localized low-points along the eastern boundary of the site. x Sub-basin EX2 delineates the southern portion of the existing project site and was used to approximate the 2- and 100-year existing runoff. Drainage from the basin generally flows to the southeast and is collected by Gilgalad Way and Hill Pond Road, which then conveys flows to the existing inlet on the northeast corner of the intersection. 3. The project site does not receive notable runoff from contiguous off-site properties. Hill Pond Residences Page|6 III. DRAINAGE DESIGN CRITERIA A. There are no optional provisions outside of the FCSCM proposed with Hill Pond Residences. B. The overall stormwater management strategy employed with Hill Pond Residences utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices. The first consideration taken in trying to reduce the stormwater impacts of this development is the site selection itself. By choosing an already developed site with public storm sewer currently in place, the burden is significantly less than developing a vacant parcel absent of any infrastructure. Hill Pond Residences aims to reduce runoff peaks, volumes and pollutant loads from frequently occurring storm events (i.e., water quality (i.e., 80th percentile) and 2-year storm events) by implementing Low Impact Development (LID) strategies. Wherever practical, runoff will be routed across landscaped areas or Modular Block Pavers (MBPs). This LID practice reduces the overall amount of impervious area, while at the same time Minimizing Directly Connected Impervious Areas (MDCIA). The combined LID/MDCIA techniques will be implemented, where practical, throughout the development, thereby slowing runoff and increasing opportunities for infiltration. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release. The efforts taken in Step 1 will help to minimize excess runoff from frequently occurring storm events; however, urban development of this intensity will still have stormwater runoff leaving the site. The primary water quality treatment will occur in the Modular Block Paver (MBP) section in sub-basin B. Step 3 – Stabilize Drainageways. As stated in Section I.B.5, above, there are no major drainageways in or near the subject site. While this step may not seem applicable to Hill Pond Residences, the proposed project indirectly helps achieve stabilized drainageways nonetheless. Once again, site selection has a positive effect on stream stabilization. By developing an infill site with existing stormwater infrastructure, combined with LID and MDCIA strategies, the likelihood of bed and bank erosion is reduced. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve Citywide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically applies to industrial and commercial developments. C. Development Criteria Reference and Existing Constraints 1. The subject property is not part of any Overall Development Plan (ODP) drainage study or similar “development/project” drainage master plan. 2. The site plan is constrained on two sides by public streets, as well as by existing undeveloped and developed sites along the remaining two sides. As previously mentioned, the drainage outfall for sub-basin EX1 is a series of localized low points along the eastern boundary of the project. Basin EX2 drains to the adjacent streets. Hill Pond Residences Page|7 3. Peak runoff from the project site during the 2-year event will remain unchanged or decrease and will decrease during the 100-year storm event. During the 2-year storm event, runoff to the northeast will decrease from the current ±0.83 cfs to ±0.17 cfs; and during the 100-year storm event runoff will decrease from ±3.75 cfs to ±0.74 cfs. During the 2-year storm event, runoff to the southeast will remain unchanged from the current ±0.83 cfs; and during the 100-year storm event runoff will remain unchanged at ±4.16. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the Hill Pond Residences development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The Rational Formula-based Federal Aviation Administration (FAA) procedure has utilized for detention storage calculations. 4. Two separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. E. Hydraulic Criteria 1. The drainage facilities proposed with the Hill Pond Residences project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 2. As stated in Section I.C.1, above, the subject property is not located in a FEMA regulatory or a City of Fort Collins designated floodplain. F. Floodplain Regulations Compliance 1. As previously mentioned, this project is not subject to any floodplain regulations. G. Modifications of Criteria 1. No modifications are requested at this time. H. Conformance with Low Impact Development (LID) 1. 30,124 sf of paving is proposed with this project, and of the total, 14,321 sf is proposed to be Modular Block Pavers (MBPs). This means that ± 47% of Hill Pond Residences Page|8 the paved areas in the project are pervious, exceeding the minimum requirement of 25%. 2. The total project area is 94,911 sf. Of that area, 90,906 sf will be treated by LID techniques, primarily Modular Block Pavers (MBPs) or releasing flows into landscaped areas. This means that ± 95% of the site will be treated by LID- type technology, exceeding the minimum requirement of 50%. Hill Pond Residences Page|9 IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objective of the Hill Pond Residences drainage design is to maintain existing drainage patterns, while not adversely impacting adjacent properties. 2. No notable off-site runoff passes directly through the project site. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The project site has been divided into three (3) drainage sub-basins, designated as sub-basins A, B & C. The drainage patterns anticipated for each basin are further described below. Sub-Basin A Sub-basin A encompasses ±10 percent of the total site area and runs along the north and east sides of the property. This sub-basin is comprised of landscaping and private concrete patios. This basin will continue to surface drain along the boundary of the project at a decreased 2-year release rate of 0.17 cfs. The basin release rate will also be reduced in the 100-yr event to a rate of 0.74 cfs. Sub-Basin B Sub-basin B encompasses ±60 percent of the total site area. This sub-basin is comprised of roof area, landscaping and the on-site parking area. This parking area will be a mix of concrete and Modular Block Pavers (MBPs). Detention will be provided within in the MBPs (WSEL100-year=5012.07±). The detained flows will then be directed to the existing curb and gutter along Gilgalad Way. This basin will release at an adjusted 2-year rate of 0.86 cfs through an orifice plate. An outlet orifice cap located on the east wall of the proposed drain basin will be used to control the flow rate. The release rate of 0.86 cfs was determined by subtracting the Sub-Basin C release from the historic release rate of Basin EX1. Sub-Basin C Sub-basin C encompasses the western and southern edge of the project site along the Hill Pond and Gilgalad Way frontage. It is comprised of public sidewalks and landscaping, as well as the proposed entry drive. The developed runoff will drain into the streets and flow south and east. The 100-year developed runoff (Q100=3.3 cfs), for sub-basin C, was subtracted from the total 100-year existing release rate (Q100=4.16 cfs) to ensure that total release from the site in the 100-yr event is equal to our less than the existing condition. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. The release rate for the MBP detention area was determined by calculating the existing C-value for the entire existing project site (C2=0.37) and multiplying Hill Pond Residences Page|10 that value by the area of Sub-Basin B (1.34 acres) and by the 2-yr intensity factor (1.75). The result is 0.86 cfs. The other areas of the project are not being significantly affected by development of the site due to the existing of many large trees on the site and a desire to preserve as many as possible. As such, these areas will continue to release at levels similar to their existing condition. In total, the project site will maintain its total release in the 2-year event at 1.77 cfs and will decrease the total release in the 100-yr event from the existing 7.91 cfs to 4.9 cfs in the developed condition. 2. The FAA method was used to size the on-site pond for quantity detention. Calculations for this area, based on the characteristics of sub-basin B and adjusted release rate, indicate a detention volume of 10,495 cu. ft. This includes 2,091 cu. ft. of Water Quality Capture Volume (WQCV). During water quality events the water quality capture volume will release over 12-hours. There is no-infiltration accounted for with this design. 3. The storage volume available within the reservoir area (i.e., No. 57 and No. 2 open-graded aggregate) of the MBP section is ±10,531 cu. ft. at WSEL 5012.07. The MBP section is designed with an increased No.2, open-graded aggregate, material depth in order to provide storage for storm events in excess of the water quality (80th percentile) storm event. 4. A Drain Basin is located at the downstream end of the parking area. This basin will have an orifice cap installed on the east wall that will limit the release from the site to the maximum allowable release rate (0.86 cfs). 5. The majority of roof drain downspouts will discharge into the MBP section. The remaining downspouts will release into landscaped areas. 6. The emergency spill path will be from the parking area onto the lot line, where flows will proceed along the historic path north and east until they spill into undeveloped areas north of the project site. Hill Pond Residences Page|11 V. CONCLUSIONS A. Compliance with Standards 1. The design elements comply without variation, and meet all LID requirements. 2. The drainage design proposed with Hill Pond Residences complies with the City of Fort Collins Master Drainage Plan for the Spring Creek Major Drainage Basin. 3. There are no regulatory floodplains associated with the Hill Pond Residences development. 4. The drainage plan and stormwater management measures proposed with the Hill Pond Residences project are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. Hill Pond Residences will detain for the pervious area converted to impervious areas to release at the 2-year existing rate during the 2- year storm and at a significantly decreased rate during the 100-yr storm. 2. The proposed Hill Pond Residences development will not impact the Master Drainage Plan recommendations for the Spring Creek Major Drainage Basin. Hill Pond Residences Page|12 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Preliminary Geotechnical Investigation – Proposed Hill Pond Project, September 16, 2014, CTL | Thompson, Inc. (Project No. FC006692-115). 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Hill Pond Residences Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0..95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. EX1 53,708 1.23 0.00 0.33 0.02 0.01 0.01 0.85 0.39 0.39 0.48 26.5 EX2 41,204 0.95 0.02 0.15 0.04 0.06 0.00 0.67 0.35 0.35 0.44 23.2 EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 September 17, 2014 Overland Flow, Time of Concentration: Hill Pond Residences Project: Hill Pond Residences 41859.0 Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) EXISTING TIME OF CONCENTRATION COMPUTATIONS A. Reese September 17, 2014 3 1 1 . 87 1 . 1 * S Ti C Cf L  Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Hill Pond Residences Rational Method Equation: Project: Hill Pond Residences Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: EXISTING RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) A. Reese September 17, 2014 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Q C f C i A EX1 EX1 1.23 17.4 17.4 16.2 0.39 0.39 0.48 1.75 2.99 6.30 0.83 1.42 3.75 EX2 EX2 0.95 5.0 5.0 5.0 0.35 0.35 0.44 2.85 4.87 9.95 0.95 1.63 4.16 0.81 0.37 D:\Projects\620-004\Drainage\Hydrology\620-004_Rational Calcs_Existing.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Hill Pond Reside nces Q100 (cfs) EX1 EX1 1.23 0.39 0.39 0.48 17.4 17.4 16.2 0.83 1.42 3.75 EX2 EX2 0.95 0.35 0.35 0.44 5.0 5.0 5.0 0.95 1.63 4.16 EXISTING RUNOFF SUMMARY TABLE D:\Projects\620-004\Drainage\Hydrology\620-004_Rational Calcs_Existing.xlsx\Summary Table CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Hill Pond Residences Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0..95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. A 7,974 0.18 0.00 0.02 0.00 0.00 0.00 0.16 0.33 0.33 0.41 9.9 B 58,195 1.34 0.00 0.24 0.66 0.00 0.33 0.11 0.76 0.76 0.94 65.6 C 28,742 0.66 0.00 0.13 0.07 0.00 0.00 0.47 0.45 0.45 0.57 26.3 TOTAL ONSITE 94,911 2.18 0.00 0.36 0.72 0.00 0.33 0.74 0.62 0.62 0.77 48.2 DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Overland Flow, Time of Concentration: Project: Hill Pond Residences Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ DEVELOPED TIME OF CONCENTRATION COMPUTATIONS A. Reese September 17, 2014 3 1 1 . 87 1 . 1 * S Ti C Cf L  Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Rational Method Equation: Project: Hill Pond Residences Calculations By: Date: From Section 3.2.1 of the CFCSDDC DEVELOPED RUNOFF COMPUTATIONS A. Reese September 17, 2014 Q C f C i A Rainfall Intensity: A A 0.18 5.0 5.0 5.0 0.33 0.33 0.41 2.85 4.87 9.95 0.17 0.29 0.74 B B 1.34 5.8 5.8 5.0 0.76 0.76 0.94 2.76 4.72 9.95 2.79 4.76 12.55 C C 0.66 7.6 7.6 7.2 0.45 0.45 0.57 2.46 4.21 8.80 0.74 1.26 3.30 C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) D:\Projects\620-004\Drainage\Hydrology\620-004_Rational-Calcs_Proposed.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) A A 0.18 0.33 0.33 0.41 5.0 5.0 5.0 0.17 0.29 0.74 B B 1.34 0.76 0.76 0.94 5.8 5.8 5.0 2.79 4.76 12.55 C C 0.66 0.45 0.45 0.57 7.6 7.6 7.2 0.74 1.26 3.30 DEVELOPED RUNOFF SUMMARY TABLE D:\Projects\620-004\Drainage\Hydrology\620-004_Rational-Calcs_Proposed.xlsx\Summary Table APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Storm Sewers B.2 – Detention Facilities APPENDIX B.1 STORM SEWERS APPENDIX B.2 DETENTION FACILITIES Old Town Flats Hill Pond Residences Fort Collins, Colorado Detention Pond Calculation | FAA Method Project: Project Location: Fort Collins, Colorado A. Reese Date: September 17, 2014 Pond No.: Paver Parking Project Location: Calculations By: Pond No.: Paver Parking B Input Variables Results Design Point B 100-yr 0.94 WQCV 2091 ft 3 Design Point Design Storm Required Detention Volume Developed "C" = 0.94 WQCV 2091 ft 3 Area (A)= 1.34 acres Quantity Detention 10495 ft 3 Max Release Rate = 0.86 cfs Total Volume 10495 ft 3 Developed "C" = Max Release Rate = 0.86 cfs Total Volume 10495 ft Total Volume 0.241 ac-ft Time Time Ft.Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Intensity Volume Volume (Release) Volume Volume (mins) (secs) (in/hr) (cfs) (ft 3 ) (ft 3 ) (ft 3 ) 5 300 9.95 12.5 3760 258 3502 10 600 7.72 9.7 5834 516 5318 15 900 6.52 8.2 7391 774 6617 20 1200 5.60 7.1 8465 1032 7433 25 1500 4.98 6.3 9409 1290 8119 30 1800 4.52 5.7 10248 1548 8700 35 2100 4.08 5.1 10792 1806 8986 40 2400 3.74 4.7 11306 2064 9242 45 2700 3.46 4.4 11767 2322 9445 50 3000 3.23 4.1 12206 2580 9626 APPENDIX C WATER QUALITY DESIGN COMPUTATIONS PAVER PARKING AREA Project: Hill Pond Residences By: A. Reese REQUIRED STORAGE & OUTLET WORKS: BASIN AREA = 1.200 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 100.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 1.0000 <-- CALCULATED Drain Time (hrs) 12 <-- INPUT Drain Time Coefficient 0.8 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.400 <-- CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.040 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Adjusted WQCV (ac-ft) = 0.048 <-- CALCULATED (20% Sedimentation Accumulation) WQ Depth (ft) = 0.700 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.183 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 1/2 <-- INPUT from Figure 5 number of rows = 2 t (in) = 0.500 <-- INPUT from Figure 5 number of rows = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE September 17, 204 APPENDIX D EROSION CONTROL REPORT Hill Pond Residences EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing and/or wattles along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet C001 of the Utility Plans. The Final Utility Plans will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project may be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX E STANDARD OPERATING PROCEDURES (SOPs) REFERENCES MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT 55 3300 3.03 3.8 12595 2838 9757 60 3600 2.86 3.6 12969 3096 9873 65 3900 2.72 3.4 13362 3354 10008 70 4200 2.59 3.3 13702 3612 10090 75 4500 2.48 3.1 14057 3870 10187 80 4800 2.38 3.0 14390 4128 10262 85 5100 2.29 2.9 14711 4386 10325 90 5400 2.21 2.8 15032 4644 10388 95 5700 2.13 2.7 15293 4902 10391 100 6000 2.06 2.6 15569 5160 10409 105 6300 2.00 2.5 15871 5418 10453 110 6600 1.94 2.4 16128 5676 10452 115 6900 1.89 2.4 16426 5934 10492 120 7200 1.84 2.3 16687 6192 10495 125 7500 1.79 2.3 16910 6450 10460 130 7800 1.75 2.2 17194 6708 10486 135 8100 1.71 2.2 17447 6966 10481 140 8400 1.67 2.1 17670 7224 10446 145 8700 1.63 2.1 17862 7482 10380 150 9000 1.60 2.0 18138 7740 10398 155 9300 1.57 2.0 18391 7998 10393 160 9600 1.54 1.9 18622 8256 10366 165 9900 1.51 1.9 18830 8514 10316 170 10200 1.48 1.9 19015 8772 10243 175 10500 1.45 1.8 19177 9030 10147 180 10800 1.42 1.8 19317 9288 10029 185 11100 1.40 1.8 19574 9546 10028 190 11400 1.38 1.7 19816 9804 10012 195 11700 1.36 1.7 20043 10062 9981 200 12000 1.34 1.7 20254 10320 9934 205 12300 1.32 1.7 20451 10578 9873 210 12600 1.30 1.6 20632 10836 9796 215 12900 1.28 1.6 20799 11094 9705 220 13200 1.26 1.6 20950 11352 9598 225 13500 1.24 1.6 21086 11610 9476 230 13800 1.22 1.5 21207 11868 9339 235 14100 1.21 1.5 21490 12126 9364 240 14400 1.20 1.5 21766 12384 9382 D:\Projects\620-004\Drainage\Detention\620-004_Detention.xlsm\ Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) A A No 0.25 0.25 0.31 10 15.0 2.0 2.0 1.9 0 0.0 0.00 N/A 248 4.0 3.00 1.4 5.0 5.0 5.0 B B No 0.95 0.95 1.00 113 0.5 3.8 3.8 2.5 174 0.5 1.41 2.1 0 0.0 0.00 N/A 5.8 5.8 5.0 C C No 0.25 0.25 0.31 26 3.8 5.2 5.2 4.8 0 0.0 0.00 N/A 217 1.0 1.50 2.4 7.6 7.6 7.2 Gutter Flow Swale Flow Design Point Basin Overland Flow Time of Concentration (Equation RO-4) D:\Projects\620-004\Drainage\Hydrology\620-004_Rational-Calcs_Proposed.xlsx\Tc-2-yr_&_100-yr 10-year Cf = 1.00 September 17, 2014 D:\Projects\620-004\Drainage\Hydrology\620-004_Rational-Calcs_Proposed.xlsx\C-Values Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) EX1 EX1 No 0.25 0.25 0.31 284 3.6 17.4 17.4 16.2 0 0.0 0.00 N/A 0 0.0 0.00 N/A 17.4 17.4 16.2 EX2 EX2 No 0.25 0.25 0.31 13 5.3 3.3 3.3 3.1 0 0.0 0.00 N/A 0 0.0 0.00 N/A 5.0 5.0 5.0 Gutter Flow Swale Flow Design Point Basin Overland Flow Time of Concentration (Equation RO-4) D:\Projects\620-004\Drainage\Hydrology\620-004_Rational Calcs_Existing.xlsx\Tc-2-yr_&_100-yr D:\Projects\620-004\Drainage\Hydrology\620-004_Rational Calcs_Existing.xlsx\C-Values