HomeMy WebLinkAboutCOLOR PRO REMODEL - FDP - 10-05A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET (3)Project: �lz>f_ r�20 T�NI L- -"" t:�:-t7C -"'CO - 0r,--;Av Date: �
Planner: ��T Traffic Operations: Engineer: s �y
ems eques ed
Redline—d ItemsRedline- Being Returned
°_
v
o
0
Other Items Required
a
am
v
c
0
Other Items being
Returned
Engineeringi
Stormwater
i
Water Wastewater/FCLWD
Traffic Operations
_
Transportation Planning
Transfort
Engineering Pvmt.
Light & Power
Technical Services
PFA
TOTALS
Other:
Note: All redlined items should be returned with the resubmittal/revisions.
Please call 221-6750 to schedule a resubmittal
appointment,