Loading...
HomeMy WebLinkAboutFORT COLLINS MONTESSORI SCHOOL - SPA190003 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYTraffic Impact Study Fort Collins Montessori School Fort Collins, Colorado Prepared for: Fort Collins Montessori School Building Corp. T R A F F I C I M P A C T S T U D Y Fort Collins Montessori School Fort Collins, Colorado Prepared for Fort Collins Montessori School Building Corporation c/o Diversified Consulting Solutions, Inc. Prepared by Kimley-Horn and Associates, Inc. Curtis D. Rowe, P.E., PTOE 4582 South Ulster Street Suite 1500 Denver, Colorado 80237 (303) 228-2300 September 2019 This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley- Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. 9/17/2019 Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page i TABLE OF CONTENTS TABLE OF CONTENTS ................................................................................................... i LIST OF TABLES .............................................................................................................ii LIST OF FIGURES ...........................................................................................................ii 1.0 EXECUTIVE SUMMARY ........................................................................................... 1 2.0 INTRODUCTION ....................................................................................................... 4 3.0 EXISTING AND FUTURE CONDITIONS .................................................................. 7 3.1 Existing Study Area ...........................................................................................................7 3.2 Existing Roadway Network ................................................................................................7 3.3 Existing Traffic Volumes ....................................................................................................9 3.4 Unspecified Development Traffic Growth .........................................................................12 4.0 PROJECT TRAFFIC CHARACTERISTICS ............................................................. 15 4.1 Trip Generation................................................................................................................15 4.2 Trip Distribution ...............................................................................................................16 4.3 Traffic Assignment ...........................................................................................................16 4.4 Total (Background Plus Project) Traffic............................................................................16 5.0 TRAFFIC OPERATIONS ANALYSIS ...................................................................... 21 5.1 Analysis Methodology ......................................................................................................21 5.2 Key Intersection Operational Analysis .............................................................................22 5.3 Vehicle Queuing Analysis ................................................................................................26 5.4 Pedestrian Connection Analysis ......................................................................................28 5.5 Improvements Summary ..................................................................................................28 6.0 CONCLUSIONS AND RECOMMENDATIONS ....................................................... 31 Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page ii APPENDICES Appendix A – Transportation Impact Study Base Assumptions Appendix B – Intersection Count Sheets Appendix C – Traffic Projection Data Appendix D – Trip Generation Worksheets Appendix E – Intersection Analysis Worksheets Appendix F – Queueing Analysis Worksheets Appendix G – Student Drop-Off and Pick-Up Queuing Analysis Worksheets Appendix H – Conceptual Site Plan LIST OF TABLES Table 1 – Fort Collins Montessori School Traffic Generation .....................................................15 Table 2 – Level of Service Definitions .......................................................................................21 Table 3 – Harmony Road and Shields Street LOS Results........................................................23 Table 4 – Westbury Drive and Shields Street LOS Results .......................................................24 Table 5 – Harmony Road Access LOS Results .........................................................................25 Table 6 – Shields Street Access LOS Results ...........................................................................26 Table 7 – Turn Lane Queuing Analysis Results.........................................................................27 LIST OF FIGURES Figure 1 – Vicinity Map ................................................................................................................5 Figure 2 – Surrounding Site Area ................................................................................................8 Figure 3 – Existing Lane Configurations and Control.................................................................10 Figure 4 – Existing Traffic Volumes ...........................................................................................11 Figure 5 – 2024 Background Traffic Volumes............................................................................13 Figure 6 – 2040 Background Traffic Volumes............................................................................14 Figure 7 – Project Trip Distribution ............................................................................................17 Figure 8 – Project Traffic Assignment .......................................................................................18 Figure 9 – 2024 Background Plus Project Traffic Volumes ........................................................19 Figure 10 – 2040 Background Plus Project Traffic Volumes ......................................................20 Figure 11 – 2024 Recommended Lane Configurations and Control ..........................................29 Figure 12 – 2040 Recommended Lane Configurations and Control ..........................................30 Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 1 1.0 EXECUTIVE SUMMARY A new 300-student Pre-K through 6th Grade Montessori Elementary School is proposed to be located on the southwest corner of the Harmony Road and Shields Street intersection in Fort Collins, Colorado. Herein, this project is named Fort Collins Montessori School. It is expected that the project would be completed and open in the fall of 2021 with 160 students. The student population is anticipated to grow each year by around 45 students until the school reaches an enrollment capacity of 300 students, which is expected to occur in 2024. Analysis was therefore completed for the full student capacity in 2024 and the 2040 long term horizons per the City of Fort Collins and State of Colorado Department of Transportation (CDOT) requirements. The purpose of this study is to identify school traffic generation characteristics, to identify potential school traffic related impacts on the local street system, and to develop mitigation measures required for identified impacts. The following intersections were incorporated into this traffic study: • Harmony Road and Shields Street • Westbury Drive and Shields Street In addition, the proposed two accesses for the school along Harmony Road and Shields Street were included for analysis. Fort Collins Montessori School is proposed to be located on the southwest corner of the Harmony Road and Shields Street intersection in Fort Collins, Colorado. Regional access to the school will be provided by Interstate 25 (I-25), and US-287. Primary access will be provided by Harmony Road and Shields Street. Direct access will be provided by two project access driveways. One project access is proposed along the south side of Harmony Road approximately 420 feet west of the Harmony Road/Shields Street intersection (measured center to center) and will be restricted to right-in/right-out movements only. This access will primarily provide access to a parking lot located along the northern edge of the site. Direct access is also proposed along the west side of Shields Street approximately 450 feet south of the Harmony Road/Shields Street intersection (measured center to center). This access is proposed to be restricted to three-quarter turning movements with the westbound left turn exit prohibited. This Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 2 access will primarily serve the proposed student drop-off and pick-up lanes to be located along the east side of the proposed school building. Fort Collins Montessori School is expected to generate approximately 556 weekday daily trips. Of these, 342 trips are expected to occur during the morning peak hour of generator, while 207 trips are expected during the afternoon peak hour of generator. Distribution of school traffic on the street system was based on the area street system characteristics, existing traffic patterns and volumes, demographic information to include potential student population residence location, and the proposed access system for the project. Assignment of project traffic was based upon the trip generation and distributions developed. Based on the analysis presented in this report, Kimley-Horn believes the Fort Collins Montessori School, proposed on the southwest corner of the Harmony Road and Shields Street intersection in Fort Collins, Colorado will be successfully incorporated into the existing and future roadway network. The proposed project development resulted in the following recommendations and conclusions: • With development of the project, a right-in/right-out access is proposed along the south side of Harmony Road approximately 420 feet west of the Harmony Road/Shields Street intersection (measured center to center). This access will primarily serve the parking lot located along the northern edge of the project site. It is recommended that the northbound approach of the proposed T-intersection access include a single right-turn lane and operate with stop control with the installation of an R1-1 “STOP” sign. To further identify this proposed access along Harmony Road as a right-in/right-out driveway, it is recommended that a R3-2 No Left Turn sign be placed underneath the STOP sign and a R6-1(R) ONE WAY sign be installed within the existing center raised median along Harmony Road. • With development of the project, a three-quarter movement access is proposed along the west side of Shields Street approximately 450 feet south of the Harmony Road/Shields Street intersection (measured center to center). This access will restrict eastbound left turn exiting movements. This driveway will be the primary access for the proposed student drop- off and pick-up lanes. It is recommended that the eastbound approach of the proposed T- intersection access include a single right turn lane and operate with stop control with the Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 3 installation of an R1-1 “STOP” sign. To identify the restriction to eastbound right turns only at the proposed Shields Street three-quarter movement access, it is recommended that a R3-2 No Left Turn sign be installed underneath the proposed “STOP” sign. • At the time of school opening, it is recommended that a 150-foot northbound left turn lane be striped at the Shields Street three-quarter access. There is currently sufficient pavement width within the center striped median area to designate this left turn lane without widening Shields Street. It should be developed as a back-to-back left turn lane with the southbound left turn lane at the Westbury Drive and Shields Street intersection to the south. • Based on the student drop-off/pick-up vehicle queuing analysis with 300 students, 1,275 feet of vehicle stacking should be provided in order to accommodate the anticipated vehicle demands. The site plan shows approximately 1,225 feet of queue length available for the drop-off/pick-up lanes. Since the proposed pick-up and drop-off queue length is slightly less than the identified length, the school is proposing staggered bell times. This will significantly reduce the queue lengths by spreading the traffic out over different drop-off and pick-up times. Likewise, this queue will likely be reduced while some parents will utilize the existing parking lot located along the northern edge of the project site near the Harmony Road access. Therefore, the proposed drop-off/pick-up queue length for the Fort Collins Montessori School is anticipated to provide sufficient length for school operations upon full school occupancy. Of note, the 160 students anticipated in the 2021 opening year had an identified drop-off and pick-up queue length of 680 feet which will be accommodated onsite. • By 2040 if future traffic volumes are realized, the southbound dual left turn lanes at the Harmony Road and Shields Street intersection may need to be extended from 300 feet to 350 feet. • All on-site improvements should be incorporated into the Civil Drawings and conform to standards of the City of Fort Collins and the Manual on Uniform Traffic Control Devices (MUTCD) – 2009 Edition. Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 4 2.0 INTRODUCTION Kimley-Horn and Associates, Inc. has prepared this report to document the results of a Traffic Impact Study of future traffic conditions associated with a new Pre-K through 6th Grade Montessori Elementary School to be located on the southwest corner of the Harmony Road and Shields Street intersection in Fort Collins, Colorado. Herein, this project is named Fort Collins Montessori School. A vicinity map illustrating the school location is shown in Figure 1. The project is proposed to include a 300-student elementary school to be located on the southwest corner of the Harmony Road and Shields Street intersection in Fort Collins, Colorado. A conceptual site plan illustrating the school and access locations is provided in Appendix H. It is expected that the project would be completed by 2021 and will open in the fall of that year with approximately 160 students. The student population is anticipated to grow each year by around 45 students until the school reaches an enrollment capacity of 300 students, which is expected to occur in 2024. Analysis was therefore completed for the full enrollment capacity in 2024 and the 2040 long term horizons per the City of Fort Collins and State of Colorado Department of Transportation (CDOT) requirements. The City of Fort Collins required Transportation Impact Study Base Assumptions form is included in Appendix A. The purpose of this study is to identify school traffic generation characteristics, to identify potential school traffic related impacts on the local street system, and to develop mitigation measures required for identified impacts. The following intersections were incorporated into this traffic study: • Harmony Road and Shields Street • Westbury Drive and Shields Street In addition, the proposed two accesses for the school along Harmony Road and Shields Street were included for analysis. Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 6 Fort Collins Montessori School is proposed to be located on the southwest corner of the Harmony Road and Shields Street intersection in Fort Collins, Colorado. Regional access to the school will be provided by Interstate 25 (I-25), and US-287. Primary access will be provided by Harmony Road and Shields Street. Direct access will be provided by two project access driveways. One project access is proposed along the south side of Harmony Road approximately 420 feet west of the Harmony Road/Shields Street intersection (measured center to center) and will be restricted to right-in/right-out movements only. This access will primarily provide access to a parking lot located along the northern edge of the site. Direct access is also proposed along the west side of Shields Street approximately 450 feet south of the Harmony Road/Shields Street intersection (measured center to center). This access is proposed to be restricted to three-quarter turning movements with the westbound left turn exit prohibited. This access will primarily serve the proposed student drop-off and pick-up lanes to be located along the east side of the proposed school building. Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 7 3.0 EXISTING AND FUTURE CONDITIONS 3.1 Existing Study Area The existing site is private residence consisting of a single-family home, which will be removed with construction of this project. Front Range Community College exists to the east of the project site across Shields Street. Westbury Residential Neighborhood is directly adjacent to the south and west of the proposed school. Outside of this immediate area, single family residential homes and vacant land exists in all directions. The land uses and roadway network surrounding the site are shown in Figure 2. 3.2 Existing Roadway Network Within the project study area, Harmony Road to the north of the proposed school location, provides two through lanes of travel in the eastbound and westbound directions, with designated left and right turn lanes at major intersections. It has a posted speed limit of 40 miles per hour throughout the study area. Shields Street to the east of the proposed school location, provides two through lanes of travel in the northbound and southbound directions, with designated left and right turn lanes at major intersections. It also has a posted speed limit of 40 miles per hour throughout the study area. Westbury Drive is a two-lane roadway that provides direct access to the Westbury Residential Neighborhood located directly west and south of the proposed school site. Westbury Drive provides one lane of travel in each direction with a solid yellow line and a posted speed limit of 25 miles per hour. The existing intersection of Harmony Road and Shields Street is signalized and operates with protected-permitted left turn phasing on the eastbound and westbound approaches and protected-only left turn phasing on the northbound and southbound approaches. The eastbound and westbound approaches consist of separate left-turn lanes, two through lanes, and separate right-turn lanes. The northbound and southbound approaches provide dual left turn lanes, two through lanes, and separate right turn lanes. Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 9 The existing Shields Street and Westbury Drive intersection is signalized that operates with protected-permitted left turn phasing on the southbound approach and permitted-only left turn phasing on the eastbound, westbound, and northbound approaches. The eastbound approach consists of a single lane for shared movements. The westbound approach consists of a shared left turn/through lane and a separate right turn lane. The northbound approach consists of a left turn lane and two through lanes with the outside lane being a shared through/right turn lane. The southbound approach provides a left turn lane, two through lanes, and a right turn lane. The intersection lane configuration and control for the study area intersections are shown in Figure 3. 3.3 Existing Traffic Volumes Existing peak hour turning movement counts were conducted at the key study intersections on Tuesday, August 27, 2019. The counts were conducted during the morning and afternoon peak hours of school generator traffic, or the highest volume hour of site traffic, in 15-minute intervals from 7:30 AM to 8:30 AM and 2:45 PM to 3:45 PM. These peak hours were identified based on drop off times for the Preschool being from 8:15 to 8:30 am and the Elementary School being from 8:00 to 8:15 am. The Preschool pick up is from 3:00 to 3:10 pm and the Elementary School is 3:15 to 3:30 pm. The turning movement counts are shown in Figure 4 with count sheets provided in Appendix B. 121(118) 796(554) 163(152) 37(82) 629(613) 382(320) 127(58) 685(453) 154(85) 233(339) 322(602) 102(194) 5(1) 1064(658) 234(43) 5(13) 611(782) 269(95) 13(13) 1(0) 4(4) 27(166) 0(1) 9(67) Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 12 3.4 Unspecified Development Traffic Growth City of Fort Collins data and information including the published map of average daily traffic volumes and historic traffic counts were used to determine appropriate future traffic volume growth rates near the proposed Fort Collins Montessori School. Daily traffic volumes from year 2009 were compared with 2018 traffic volume counts shown at the intersection of Harmony Road and Shields Street. A comparison of the 2009 and 2018 daily traffic volumes identified an average annual growth rate of approximately 0.9 percent per year along Shields Street south of Harmony Road and a growth rate of approximately 0.5 percent per year along Harmony Road west of Shields Street. The 2009 historic traffic counts from the City of Fort Collins, the 2018 average daily traffic volumes map, as well as the traffic volume calculations are included in Appendix C. Additionally, according to information provided on the CDOT Online Transportation Information System (OTIS) website, the 20-year growth factor along US-287 near the proposed Fort Collins Montessori School site is 1.18. This equates to an annual growth rate of approximately 0.83 percent. US-287 information from the OTIS website is included in Appendix C. Based on this information, an annual growth rate of one (1) percent was used to calculate future traffic volumes within the project study area. This annual growth rate was used to estimate near term 2024 and long term 2040 traffic volume projections at the key intersections. Background traffic volumes for 2024 are shown in Figure 5, while background traffic volumes for 2040 are shown in Figure 6. 127(124) 837(582) 171(160) 39(86) 661(644) 401(336) 133(61) 720(476) 162(89) 245(356) 338(633) 107(204) 5(1) 1118(692) 234(43) 5(13) 642(822) 269(95) 13(13) 1(0) 4(4) 27(166) 0(1) 9(67) 149(145) 981(683) 201(187) 46(101) 775(755) 471(394) 157(71) 844(558) 190(105) 287(418) 397(742) 126(239) 5(1) 1311(811) 234(43) 5(13) 753(964) 269(95) 13(13) 1(0) 4(4) 27(166) 0(1) 9(67) Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 15 4.0 PROJECT TRAFFIC CHARACTERISTICS 4.1 Trip Generation Site-generated traffic estimates are determined through a process known as trip generation. Rates and equations are applied to the proposed land use to estimate traffic generated by the development during a specific time interval. The acknowledged source for trip generation rates is the Trip Generation Report1 published by the Institute of Transportation Engineers (ITE). ITE has established trip rates in nationwide studies of similar land uses. For this study, Kimley-Horn used the ITE Trip Generation Report fitted curve equations that applies to Charter Elementary School (ITE Code 537) for traffic associated with the proposed redevelopment. The Fort Collins Montessori School is expected to generate approximately 556 daily weekday trips, with 342 of these trips occurring during the morning peak hour of generator and 207 trips occurring during the afternoon peak hour of generator. The peak hour of the generator is the highest one-hour time period of school traffic both in the morning and afternoon. Calculations were based on an enrollment of 300 students according to the procedure and information provided in the ITE Trip Generation Manual, 10th Edition – Volume 1: User’s Guide and Handbook, 2017. Table 1 summarizes the estimated trip generation for the proposed development. The trip generation worksheets are included in Appendix D. Table 1 – Fort Collins Montessori School Traffic Generation Land Use AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Charter Elementary School (ITE 537) – 300 Students 556 181 161 342 95 112 207 1 Institute of Transportation Engineers, Trip Generation Manual, Tenth Edition, Washington DC, 2017. Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 16 4.2 Trip Distribution Distribution of site traffic was based on the area street system characteristics, existing traffic patterns and volumes, demographic information to include potential student population residence location, and the proposed access system for the project. The directional distribution of traffic is a means to quantify the percentage of school-generated traffic that approaches the site from a given direction and departs the site back to the original source. With the proposed restrictions to the school access driveways, it is anticipated that all eastbound, westbound, and northbound destined project traffic will utilize Westbury Drive through the residential neighborhood in order to gain access to Harmony Road and the intersection of Harmony Road and Shields Street. The project trip distribution is illustrated in Figure 7. 4.3 Traffic Assignment Project traffic assignment was obtained by applying the project trip distribution to the estimated traffic generation of the development shown in Table 1. Project traffic assignment for Fort Collins Montessori School is shown in Figure 8. 4.4 Total (Background Plus Project) Traffic Site traffic volumes were added to the background volumes to represent estimated traffic conditions for the short term 2024 horizon and long term 2040 horizon. These total traffic volumes for the site are illustrated for the 2024 and 2040 horizon years in Figures 9 and 10, respectively. [55%] 35% 35% [35%] [10%] 10% 20% [20%] 70% [80%] 10% [70%] [70%] 63(33) 89(62) 56(39) 63(33) 18(10) 113(78) 16(11) 32(22) 113(78) 36(19) 18(10) 127(67) 129(90) 127(124) 837(582) 171(160) 39(86) 724(677) 401(336) 222(123) 776(515) 162(89) 245(356) 338(633) 170(237) 5(1) 1136(702) 234(43) 118(91) 658(833) 269(95) 13(13) 1(0) 4(4) 27(166) 0(1) 9(67) 32(22) 1128(704) 36(19) 504(843) 18(10) 1160(880) 127(67) 930(935) 129(90) 149(145) 981(683) 201(187) 46(101) 838(788) 471(394) 246(133) 900(597) 190(105) 287(418) 397(742) 189(272) 5(1) 1329(821) 234(43) 118(91) 769(975) 269(95) 13(13) 1(0) 4(4) 27(166) 0(1) 9(67) 32(22) 1303(813) 36(19) 592(988) 18(10) 1361(1032) 127(67) 1091(1097) 129(90) Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 21 5.0 TRAFFIC OPERATIONS ANALYSIS Kimley-Horn’s analysis of traffic operations in the site vicinity was conducted to determine potential capacity deficiencies in the 2024 and 2040 development horizons at the identified key intersections. The acknowledged source for determining overall capacity is the current edition of the Highway Capacity Manual (HCM)2. 5.1 Analysis Methodology Capacity analysis results are listed in terms of Level of Service (LOS). LOS is a qualitative term describing operating conditions a driver will experience while traveling on a particular street or highway during a specific time interval. It ranges from A (very little delay) to F (long delays and congestion). For intersections and roadways in this study area, standard traffic engineering practice and City of Fort Collins requirements identify overall LOS D for signalized intersections and LOS E for movements and approaches of unsignalized intersections as the minimum threshold for acceptable operations. Table 2 shows the definition of level of service for signalized and unsignalized intersections. Table 2 – Level of Service Definitions Level of Service Signalized Intersection Average Total Delay (sec/veh) Unsignalized Intersection Average Total Delay (sec/veh) A ≤ 10 ≤ 10 B > 10 and ≤ 20 > 10 and ≤ 15 C > 20 and ≤ 35 > 15 and ≤ 25 D > 35 and ≤ 55 > 25 and ≤ 35 E > 55 and ≤ 80 > 35 and ≤ 50 F > 80 > 50 Definitions provided from the Highway Capacity Manual, Sixth Edition, Transportation Research Board, 2016. 2 Transportation Research Board, Highway Capacity Manual, Sixth Edition, Washington DC, 2016. Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 22 Study area intersections were analyzed based on average total delay analysis for signalized and unsignalized intersections. Under the unsignalized analysis, the level of service (LOS) for a two-way stop-controlled intersection is determined by the computed or measured control delay and is defined for each minor movement. Level of service for a two-way stop-controlled intersection is not defined for the intersection as a whole. Level of service for a signalized and all-way stop controlled intersection is defined for each approach and for the intersection. 5.2 Key Intersection Operational Analysis Calculations for the level of service at the key intersections for the study area are provided in Appendix E. The existing year analysis is based on the lane geometry and intersection control shown in Figure 3. The existing signalized intersection analyses utilize the observed cycle lengths with existing phasing and timing splits. Estimated peak hour factors are also used in the existing and short-term horizon (2024) analysis. Based on the expected arrival and departure of future school traffic volumes during the peak fifteen-minute time period, it was estimated that all turning movements into or out of the proposed school site will observe a peak hour factor (PHF) of 0.50. Synchro traffic analysis software was used to analyze the study intersections and access driveway for level of service. The Synchro Highway Capacity Manual (HCM) methodology reports were used to analyze intersection delay and level of service. Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 23 Harmony Road and Shields Street The existing intersection of Harmony Road and Shields Street is signalized and operates with protected-permitted left turn phasing on the eastbound and westbound approaches and protected-only left turn phasing on the northbound and southbound approaches. With existing conditions, this intersection operates with a LOS C during the morning and afternoon peak hours of school generator traffic. During the 2024 project build-out horizon with the addition of school traffic, this intersection is anticipated to operate acceptably with LOS D during the peak hours of school generator. By the long-term 2040 horizon, with or without the addition of school traffic, this intersection is anticipated to operate acceptably with a LOS D during peak hours of generator with the existing intersection configuration. Table 3 provides the results of the level of service of this intersection. Table 3 – Harmony Road and Shields Street LOS Results Scenario AM Peak Hour PM Peak Hour Delay (sec) LOS Delay (sec) LOS 2019 Existing 34.6 C 33.9 C 2024 Background 34.6 C 34.7 C 2024 Background Plus Project 40.1 D 37.2 D 2040 Background 46.2 D 39.6 D 2040 Background Plus Project 54.9 D 42.9 D Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 24 Westbury Drive and Shields Street The existing Shields Street and Westbury Drive intersection is signalized that operates with protected-permitted left turn phasing on the southbound approach and permitted-only left turn phasing on the eastbound, westbound, and northbound approaches. With existing conditions, this intersection operates with a LOS B during the morning and afternoon peak hours of the school generator. During the 2024 project build-out horizon as well as throughout the long-term 2040 horizon, with or without the addition of school traffic, this intersection is anticipated to continue operating acceptably with a LOS B during peak hours of generator with the existing intersection configuration. Table 4 provides the results of the level of service at this intersection. Table 4 – Westbury Drive and Shields Street LOS Results Scenario AM Peak Hour PM Peak Hour Delay (sec) LOS Delay (sec) LOS 2019 Existing 10.8 B 12.1 B 2024 Background 11.7 B 12.2 B 2024 Background Plus Project 11.8 B 12.3 B 2040 Background 15.1 B 12.3 B 2040 Background Plus Project 15.2 B 12.5 B Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 25 Harmony Road Access With development of the project, a right-in/right-out access is proposed along the south side of Harmony Road approximately 420 feet west of the Harmony Road/Shields Street intersection (measured center to center) and will be restricted to right-in/right-out movements only. This access will primarily serve the parking lot located along the northern edge of the school site. It is recommended that the northbound approach of the proposed T-intersection access include a single lane and operates with stop control with the installation of an R1-1 “STOP” sign. To further identify this proposed access along Harmony Road as a right-in/right-out driveway, it is recommended that a R3-2 No Left Turn sign be placed underneath the STOP sign and a R6- 1(R) ONE WAY sign be installed within the existing center raised median along Harmony Road. With this configuration in the opening year of 2024 as well as the long-term horizon 2040, the northbound right turn movement at this access intersection is anticipated to operate acceptably with LOS C or better during the morning and afternoon peak hours of generator. Table 5 provides the results of the level of service at this intersection. Table 5 – Harmony Road Access LOS Results Scenario AM Peak Hour PM Peak Hour Delay (sec) LOS Delay (sec) LOS 2024 Background Plus Project Northbound Right 16.2 C 11.8 B 2040 Background Plus Project Northbound Right 18.5 C 12.6 B Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 26 Shields Street Access With development of the project, a three-quarter movement access is proposed along the west side of Shields Street, approximately 450 feet south of the Harmony Road/Shields Street intersection (measured center to center). This access will be restricted to three-quarter movements with the eastbound left turn exit prohibited. This driveway will be the primary access for the proposed student drop-off and pick-up lanes proposed to the east of the school building. The drop-off and pick-up lanes will have a counterclockwise site circulation. It is recommended that the eastbound approach of the proposed T-intersection access include a single right turn lane to operate with stop control with the installation of an R1-1 “STOP” sign. To identify the right turn only restriction, it is recommended that a R3-2 No Left Turn sign be installed underneath the STOP sign for the eastbound approach for motorists exiting the school. With the recommended lane configuration, it is anticipated that all movements will operate acceptably with LOS B or better during the peak hours of school generator throughout the 2040 horizon. Table 6 provides the results of the level of service at this intersection. Table 6 – Shields Street Access LOS Results Scenario AM Peak Hour PM Peak Hour Delay (sec) LOS Delay (sec) LOS 2024 Background Plus Project Northbound Left Eastbound Right 10.1 13.4 B B 8.8 12.1 A B 2040 Background Plus Project Northbound Left Eastbound Right 10.3 14.5 B B 9.4 12.9 A B 5.3 Vehicle Queuing Analysis Queuing analysis was conducted for the study area intersections per City of Fort Collins standards and requirements. Results were obtained from the 95th percentile queue lengths obtained from the Synchro analysis. Queue analysis worksheets at the signalized intersections are provided in Appendix F, while queue length calculations for unsignalized intersections are provided within the level of service operational sheets provided in Appendix E. Results of the queuing analysis and recommendations at the study area intersections are provided in Table 7. Of note, any queue lengths calculated at less than one vehicle were rounded up to 25 feet to account for one vehicle of storage needed. Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 27 Table 7 – Turn Lane Queuing Analysis Results Intersection Turn Lane Existing Turn Lane Length (feet) 2024 Calculated Queue (feet) 2024 Recommended Length (feet) 2040 Calculated Queue (feet) 2040 Recommended Length (feet) Harmony Rd & Shields St Eastbound Left Eastbound Right Westbound Left Westbound Right Northbound Left Northbound Right Southbound Left Southbound Right 325’ 225’ 400’ 275’ 225’ DL 325’ 300’ DL 175’ 168’ 27’ 178’ 67’ 90’ 69’ 257’ 40’ 325’ 225’ 400’ 275’ 225’ DL 325’ 300’ DL 175’ 204’ 46’ 240’ Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 28 proposed vehicle circulation for student drop-off/pick-up is to have vehicles stack along the east side of the school building in dual queue lanes and extend in a counterclockwise fashion. The site plan shows approximately 1,225 feet of queue length for the drop-off/pick-up lane. This length falls slightly below the identified 1,275-foot queue length needed according to the Urban Charter School Queueing Calculator. Although the proposed pick-up and drop-off length is slightly less than the required length, the vehicle queuing calculation does not take into account parameters for reducing the estimated length of 1,275 feet. The school is proposing staggered bell times. Likewise, this queue will likely be reduced while some parents will utilize the existing parking lot located along the northern edge of the project site near the Harmony Road access. Therefore, the proposed drop-off/pick-up queue length for the Fort Collins Montessori School is anticipated to provide sufficient length for school operations upon full school buildout. Of note, with 160 students in the opening year of 2021, the required drop-off and pick-up queue length is 680 feet which will be accommodated onsite. 5.5 Pedestrian Connection Analysis Existing sidewalk exists along the south side of Harmony Road and along the east and west sides of Shields Street adjacent to the proposed school site. These sidewalks connect through the adjacent residential neighborhood surrounding the project area. Likewise, there are designated crosswalks on all four legs of both the Harmony Road/Shields Street and Shields Street/Westbury Drive intersections. Since both of these intersections are signalized, these are signalized pedestrian crossings. These designated crosswalks provide pedestrian access to the residential neighborhoods on all sides of the proposed school site. Designated bicycle lanes are provided along both sides of Harmony Road and Shields Street. Therefore, it is believed that acceptable pedestrian and bicycle connections are available for the proposed school. 5.6 Improvements Summary Based on the results of the intersection operational and queuing analysis, the key intersections recommended configurations and control are shown in Figure 11 for the 2024 horizon and Figure 12 for the 2040 horizon. Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 31 6.0 CONCLUSIONS AND RECOMMENDATIONS Based on the analysis presented in this report, Kimley-Horn believes the Fort Collins Montessori School, proposed on the southwest corner of the Harmony Road and Shields Street intersection in Fort Collins, Colorado will be successfully incorporated into the existing and future roadway network. The proposed project development resulted in the following recommendations and conclusions: • With development of the project, a right-in/right-out access is proposed along the south side of Harmony Road approximately 420 feet west of the Harmony Road/Shields Street intersection (measured center to center). This access will primarily serve the parking lot located along the northern edge of the project site. It is recommended that the northbound approach of the proposed T-intersection access include a single right-turn lane and operate with stop control with the installation of an R1-1 “STOP” sign. To further identify this proposed access along Harmony Road as a right-in/right-out driveway, it is recommended that a R3-2 No Left Turn sign be placed underneath the STOP sign and a R6-1(R) ONE WAY sign be installed within the existing center raised median along Harmony Road. • With development of the project, a three-quarter movement access is proposed along the west side of Shields Street approximately 450 feet south of the Harmony Road/Shields Street intersection (measured center to center). This access will restrict eastbound left turn exiting movements. This driveway will be the primary access for the proposed student drop- off and pick-up lanes. It is recommended that the eastbound approach of the proposed T- intersection access include a single right turn lane and operate with stop control with the installation of an R1-1 “STOP” sign. To identify the restriction to eastbound right turns only at the proposed Shields Street three-quarter movement access, it is recommended that a R3-2 No Left Turn sign be installed underneath the proposed “STOP” sign. • At the time of school opening, it is recommended that a 150-foot northbound left turn lane be striped at the Shields Street three-quarter access. There is currently sufficient pavement width within the center striped median area to designate this left turn lane without widening Shields Street. It should be developed as a back-to-back left turn lane with the southbound left turn lane at the Westbury Drive and Shields Street intersection to the south. Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School Page 32 • Based on the student drop-off/pick-up vehicle queuing analysis with 300 students, 1,275 feet of vehicle stacking should be provided in order to accommodate the anticipated vehicle demands. The site plan shows approximately 1,225 feet of queue length available for the drop-off/pick-up lanes. Since the proposed pick-up and drop-off queue length is slightly less than the identified length, the school is proposing staggered bell times. This will significantly reduce the queue lengths by spreading the traffic out over different drop-off and pick-up times. Likewise, this queue will likely be reduced while some parents will utilize the existing parking lot located along the northern edge of the project site near the Harmony Road access. Therefore, the proposed drop-off/pick-up queue length for the Fort Collins Montessori School is anticipated to provide sufficient length for school operations upon full school occupancy. Of note, the 160 students anticipated in the 2021 opening year had an identified drop-off and pick-up queue length of 680 feet which will be accommodated onsite. • By 2040 if future traffic volumes are realized, the southbound dual left turn lanes at the Harmony Road and Shields Street intersection may need to be extended from 300 feet to 350 feet. • All on-site improvements should be incorporated into the Civil Drawings and conform to standards of the City of Fort Collins and the Manual on Uniform Traffic Control Devices (MUTCD) – 2009 Edition. Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School APPENDICES Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School APPENDIX A Transportation Impact Study Base Assumptions North: Harmony Road South: Westbury Drive East: West: Property Line Short Range: 2020 Long Range: 2040 Sat: N/A Passby: Overall Trip Distribution Mode Split Assumptions Date: Local Entity Engineering: Study Intersections 1. All access drives Time Period for Study Trip Generation Rates SEE ATTACHED ITE CALCULATION SHEET 9/16/2019 Traffic Engineering: Curtis Rowe Project Name Project Location Full: X Committed Roadway Improvements Other Traffic Studies Captive Market: N/A SEE ATTACHED SKETCH 1% Annual Growth Rate TIS Assumptions NA Areas Requiring Special Study 2. Harmony Rd/Shields St 3. Westbury Dr/Shields St 4 5 6 7 8 SEE ATTACHED ITE CALCULATION SHEET AM: 7:00-8:00 PM: 2:30-3:30 Study Years Trip Adjustment Factors Future Traffic Growth Rate Attachement A Transportation Impact Study Base Assumptions Shields Street Fort Collins Montessori School SWC Harmony Road & Shields Street Project Information Type of Study Intermediate: Study Area Bounderies Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School APPENDIX B Intersection Count Sheets File Name : Harmony and Shields AM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 1 Fort Collins, CO Fort Collins Montessori School AM Peak Harmony Rd and Shields Street Groups Printed- Automobiles Harmony Rd Eastbound Harmony Rd Westbound Sheilds Street Northbound Sheilds Street Southbound Start Time Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Int. Total 07:30 AM 28 199 33 1 261 34 94 51 0 179 39 194 39 0 272 96 153 10 0 259 971 07:45 AM 42 192 55 3 292 32 104 76 0 212 42 225 40 0 307 101 191 5 1 298 1109 Total 70 391 88 4 553 66 198 127 0 391 81 419 79 0 579 197 344 15 1 557 2080 08:00 AM 33 161 29 1 224 17 57 50 0 124 22 178 43 0 243 97 135 9 2 243 834 08:15 AM 24 133 37 0 194 19 67 56 1 143 18 199 41 0 258 88 150 13 2 253 848 Grand Total 127 685 154 5 971 102 322 233 1 658 121 796 163 0 1080 382 629 37 5 1053 3762 Apprch % 13.1 70.5 15.9 0.5 15.5 48.9 35.4 0.2 11.2 73.7 15.1 0 36.3 59.7 3.5 0.5 Total % 3.4 18.2 4.1 0.1 25.8 2.7 8.6 6.2 0 17.5 3.2 21.2 4.3 0 28.7 10.2 16.7 1 0.1 28 File Name : Harmony and Shields AM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 2 Fort Collins, CO Fort Collins Montessori School AM Peak Harmony Rd and Shields Street Sheilds Street Harmony Rd Harmony Rd Sheilds Street Right 37 Thru 629 Left 382 U Turns 5 Out In Total 1156 1053 2209 Right 233 Thru 322 Left 102 U Turns 1 Out InTotal 1230 658 1888 Left 121 Thru 796 Right 163 U Turns 0 Out In Total 885 1080 1965 Left 127 Thru 685 Right 154 U Turns 5 OutTotal In 480 971 1451 8/27/2019 07:30 AM 8/27/2019 08:15 AM Automobiles North File Name : Harmony and Shields AM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 3 Fort Collins, CO Fort Collins Montessori School AM Peak Harmony Rd and Shields Street Harmony Rd Eastbound Harmony Rd Westbound Sheilds Street Northbound Sheilds Street Southbound Start Time Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Int. Total Peak Hour Analysis From 07:30 AM to 08:15 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 28 199 33 1 261 34 94 51 0 179 39 194 39 0 272 96 153 10 0 259 971 07:45 AM 42 192 55 3 292 32 104 76 0 212 42 225 40 0 307 101 191 5 1 298 1109 08:00 AM 33 161 29 1 224 17 57 50 0 124 22 178 43 0 243 97 135 9 2 243 834 08:15 AM 24 133 37 0 194 19 67 56 1 143 18 199 41 0 258 88 150 13 2 253 848 Total Volume 127 685 154 5 971 102 322 233 1 658 121 796 163 0 1080 382 629 37 5 1053 3762 % App. Total 13.1 70.5 15.9 0.5 15.5 48.9 35.4 0.2 11.2 73.7 15.1 0 36.3 59.7 3.5 0.5 PHF .756 .861 .700 .417 .831 .750 .774 .766 .250 .776 .720 .884 .948 .000 .879 .946 .823 .712 .625 .883 .848 Sheilds Street Harmony Rd Harmony Rd Sheilds Street Right 37 Thru 629 Left 382 U Turns 5 Out In Total 1156 1053 2209 File Name : Harmony and Shields PM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 1 Fort Collins, CO Fort Collins Montessori School PM Peak Harmony Rd and Shields Street Groups Printed- Automobiles Harmony Rd Eastbound Harmony Rd Westbound Sheilds Street Northbound Sheilds Street Southbound Start Time Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Int. Total 02:45 PM 6 97 20 0 123 42 150 75 0 267 39 132 34 0 205 88 171 13 0 272 867 Total 6 97 20 0 123 42 150 75 0 267 39 132 34 0 205 88 171 13 0 272 867 03:00 PM 23 133 35 0 191 59 162 83 0 304 30 132 41 0 203 85 128 16 2 231 929 03:15 PM 17 109 14 0 140 50 143 88 0 281 25 137 31 0 193 71 149 26 1 247 861 03:30 PM 12 114 16 1 143 43 147 93 0 283 24 153 46 0 223 76 165 27 1 269 918 Grand Total 58 453 85 1 597 194 602 339 0 1135 118 554 152 0 824 320 613 82 4 1019 3575 Apprch % 9.7 75.9 14.2 0.2 17.1 53 29.9 0 14.3 67.2 18.4 0 31.4 60.2 8 0.4 Total % 1.6 12.7 2.4 0 16.7 5.4 16.8 9.5 0 31.7 3.3 15.5 4.3 0 23 9 17.1 2.3 0.1 28.5 File Name : Harmony and Shields PM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 2 Fort Collins, CO Fort Collins Montessori School PM Peak Harmony Rd and Shields Street Sheilds Street Harmony Rd Harmony Rd Sheilds Street Right 82 Thru 613 Left 320 U Turns 4 Out In Total 951 1019 1970 Right 339 Thru 602 Left 194 U Turns 0 Out InTotal 925 1135 2060 Left 118 Thru 554 Right 152 U Turns 0 Out In Total 892 824 1716 Left 58 Thru 453 Right 85 U Turns 1 OutTotal In 802 597 1399 8/27/2019 02:45 PM 8/27/2019 03:30 PM Automobiles North File Name : Harmony and Shields PM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 3 Fort Collins, CO Fort Collins Montessori School PM Peak Harmony Rd and Shields Street Harmony Rd Eastbound Harmony Rd Westbound Sheilds Street Northbound Sheilds Street Southbound Start Time Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Int. Total Peak Hour Analysis From 02:45 PM to 03:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 02:45 PM 02:45 PM 6 97 20 0 123 42 150 75 0 267 39 132 34 0 205 88 171 13 0 272 867 03:00 PM 23 133 35 0 191 59 162 83 0 304 30 132 41 0 203 85 128 16 2 231 929 03:15 PM 17 109 14 0 140 50 143 88 0 281 25 137 31 0 193 71 149 26 1 247 861 03:30 PM 12 114 16 1 143 43 147 93 0 283 24 153 46 0 223 76 165 27 1 269 918 Total Volume 58 453 85 1 597 194 602 339 0 1135 118 554 152 0 824 320 613 82 4 1019 3575 % App. Total 9.7 75.9 14.2 0.2 17.1 53 29.9 0 14.3 67.2 18.4 0 31.4 60.2 8 0.4 PHF .630 .852 .607 .250 .781 .822 .929 .911 .000 .933 .756 .905 .826 .000 .924 .909 .896 .759 .500 .937 .962 Sheilds Street Harmony Rd Harmony Rd Sheilds Street Right 82 Thru 613 Left 320 U Turns File Name : Westbury and Shields AM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 1 Fort Collins, CO Fort Collins Montessori School AM Peak Westbury Dr and Shields Street Groups Printed- Automobiles Westbury Dr Eastbound School Access Westbound Sheilds Street Northbound Sheilds Street Southbound Start Time Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Int. Total 07:30 AM 4 0 3 0 7 2 0 8 0 10 2 266 43 0 311 30 186 2 0 218 546 07:45 AM 5 1 0 0 6 4 0 13 0 17 1 292 51 0 344 93 190 1 0 284 651 Total 9 1 3 0 13 6 0 21 0 27 3 558 94 0 655 123 376 3 0 502 1197 08:00 AM 2 0 0 0 2 0 0 3 0 3 0 238 53 0 291 58 118 1 0 177 473 08:15 AM 2 0 1 0 3 3 0 3 0 6 2 268 87 0 357 88 117 1 0 206 572 Grand Total 13 1 4 0 18 9 0 27 0 36 5 1064 234 0 1303 269 611 5 0 885 2242 Apprch % 72.2 5.6 22.2 0 25 0 75 0 0.4 81.7 18 0 30.4 69 0.6 0 Total % 0.6 0 0.2 0 0.8 0.4 0 1.2 0 1.6 0.2 47.5 10.4 0 58.1 12 27.3 0.2 0 39.5 File Name : Westbury and Shields AM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 2 Fort Collins, CO Fort Collins Montessori School AM Peak Westbury Dr and Shields Street Sheilds Street Westbury Dr School Access Sheilds Street Right 5 Thru 611 Left 269 U Turns 0 Out In Total 1104 885 1989 Right 27 Thru 0 Left 9 U Turns 0 Out InTotal 504 36 540 Left 5 Thru 1064 Right 234 U Turns 0 Out In Total 624 1303 1927 Left 13 Thru 1 Right 4 U Turns 0 OutTotal In 10 18 28 8/27/2019 07:30 AM 8/27/2019 08:15 AM Automobiles North File Name : Westbury and Shields AM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 3 Fort Collins, CO Fort Collins Montessori School AM Peak Westbury Dr and Shields Street Westbury Dr Eastbound School Access Westbound Sheilds Street Northbound Sheilds Street Southbound Start Time Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Int. Total Peak Hour Analysis From 07:30 AM to 08:15 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 4 0 3 0 7 2 0 8 0 10 2 266 43 0 311 30 186 2 0 218 546 07:45 AM 5 1 0 0 6 4 0 13 0 17 1 292 51 0 344 93 190 1 0 284 651 08:00 AM 2 0 0 0 2 0 0 3 0 3 0 238 53 0 291 58 118 1 0 177 473 08:15 AM 2 0 1 0 3 3 0 3 0 6 2 268 87 0 357 88 117 1 0 206 572 Total Volume 13 1 4 0 18 9 0 27 0 36 5 1064 234 0 1303 269 611 5 0 885 2242 % App. Total 72.2 5.6 22.2 0 25 0 75 0 0.4 81.7 18 0 30.4 69 0.6 0 PHF .650 .250 .333 .000 .643 .563 .000 .519 .000 .529 .625 .911 .672 .000 .912 .723 .804 .625 .000 .779 .861 Sheilds Street Westbury Dr School Access Sheilds Street Right 5 Thru 611 Left 269 U Turns 0 File Name : Westbury and Shields PM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 1 Fort Collins, CO Fort Collins Montessori School PM Peak Westbury Dr and Shields Street Groups Printed- Automobiles Westbury Dr Eastbound School Access Westbound Sheilds Street Northbound Sheilds Street Southbound Start Time Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Int. Total 02:45 PM 7 0 1 0 8 23 1 32 0 56 1 180 10 0 191 28 198 2 0 228 483 Total 7 0 1 0 8 23 1 32 0 56 1 180 10 0 191 28 198 2 0 228 483 03:00 PM 3 0 0 0 3 8 0 33 0 41 0 151 13 0 164 25 197 3 0 225 433 03:15 PM 3 0 3 0 6 17 0 49 0 66 0 164 11 0 175 19 184 7 0 210 457 03:30 PM 0 0 0 0 0 19 0 52 0 71 0 163 9 0 172 23 203 1 0 227 470 Grand Total 13 0 4 0 17 67 1 166 0 234 1 658 43 0 702 95 782 13 0 890 1843 Apprch % 76.5 0 23.5 0 28.6 0.4 70.9 0 0.1 93.7 6.1 0 10.7 87.9 1.5 0 Total % 0.7 0 0.2 0 0.9 3.6 0.1 9 0 12.7 0.1 35.7 2.3 0 38.1 5.2 42.4 0.7 0 48.3 File Name : Westbury and Shields PM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 2 Fort Collins, CO Fort Collins Montessori School PM Peak Westbury Dr and Shields Street Sheilds Street Westbury Dr School Access Sheilds Street Right 13 Thru 782 Left 95 U Turns 0 Out In Total 837 890 1727 Right 166 Thru 1 Left 67 U Turns 0 Out InTotal 138 234 372 Left 1 Thru 658 Right 43 U Turns 0 Out In Total 853 702 1555 Left 13 Thru 0 Right 4 U Turns 0 OutTotal In 15 17 32 8/27/2019 02:45 PM 8/27/2019 03:30 PM Automobiles North File Name : Westbury and Shields PM Site Code : IPO 454 Start Date : 8/27/2019 Page No : 3 Fort Collins, CO Fort Collins Montessori School PM Peak Westbury Dr and Shields Street Westbury Dr Eastbound School Access Westbound Sheilds Street Northbound Sheilds Street Southbound Start Time Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Left Thru Right U Turns App. Total Int. Total Peak Hour Analysis From 02:45 PM to 03:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 02:45 PM 02:45 PM 7 0 1 0 8 23 1 32 0 56 1 180 10 0 191 28 198 2 0 228 483 03:00 PM 3 0 0 0 3 8 0 33 0 41 0 151 13 0 164 25 197 3 0 225 433 03:15 PM 3 0 3 0 6 17 0 49 0 66 0 164 11 0 175 19 184 7 0 210 457 03:30 PM 0 0 0 0 0 19 0 52 0 71 0 163 9 0 172 23 203 1 0 227 470 Total Volume 13 0 4 0 17 67 1 166 0 234 1 658 43 0 702 95 782 13 0 890 1843 % App. Total 76.5 0 23.5 0 28.6 0.4 70.9 0 0.1 93.7 6.1 0 10.7 87.9 1.5 0 PHF .464 .000 .333 .000 .531 .728 .250 .798 .000 .824 .250 .914 .827 .000 .919 .848 .963 .464 .000 .976 .954 Sheilds Street Westbury Dr School Access Sheilds Street Right 13 Thru 782 Left 95 U Turns 0 Out In Total Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School APPENDIX C Traffic Projection Data Street 2009 2018 Growth (%) Harmony Road West of Shields Street 13,620 14,123 0.404 Shields Street South of Harmony Road 18,980 20,525 0.873 Fort Collins Montessori School Growth Projections *Growth Factors based on City of Fort Collins ADT Count Data US-287 Traffic Projections: ROUTE REFPT ENDREFPT LENGTH UPDATEYR AADT OFFPKTRK YR20FACTOR DHV DD ROUTECAPAC VCRATIO VCRATIO20 DVMT VMT LOCATION 287C 340.181 341.542 1.37 2019 35000 2.4 1.18 8.5 54 4500 0.71 0.84 47950 47950 ON SH 287 COLLEGE AVE N/O TRILBY RD CR 34 FT COLLINS 287C 341.542 342.167 0.618 2019 34000 3 1.08 9.5 52 4000 0.84 0.91 21012 21012 ON SH 287 COLLEGE AVE S/O HARMONY RD FT COLLINS Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School APPENDIX D Trip Generation Worksheets Project Fort Collins Montessori School Subject Trip Generation for Charter Elementary School Designed by ACK Date Job No. Checked by Date Sheet No. of TRIP GENERATION MANUAL TECHNIQUES ITE Trip Generation Manual 10th Edition, Average Rate Equations Land Use Code - Charter Elementary School (ITE Land Use Code 537) Independant Variable - Students (X) Students = X = 300.0 T = Average Vehicle Trip Ends Weekday (Series 500 Page 93) Average Weekday Directional Distribution: 50% entering, 50% exiting (T) = 1.85 (X) T = 556 Average Vehicle Trip Ends (T) = 1.85 * (300.0) 278 entering 278 exiting 278 + 278 = 556 AM Peak Hour of Generator (500 Series Page 96) Directional Distribution: 53% ent. 47% exit. T = 1.14 (X) T = 342 Average Vehicle Trip Ends T = 1.14 * 300 181 entering 161 exiting 181 + 161 = 342 PM Peak Hour of Generator (500 Series Page 97) Directional Distribution: 46% ent. 54% exit. T = 0.69 (X) T = 207 Average Vehicle Trip Ends T = 0.69 * 300 95 entering 112 exiting 95 + 112 = 207 September 11, 2019 096781002 1 1 300 Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School APPENDIX E Intersection Analysis Worksheets HCM 6th Signalized Intersection Summary 2019 Existing AM.syn 1: Shields Street & Harmony Road 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 127 685 154 102 322 233 121 796 163 382 629 37 Future Volume (veh/h) 127 685 154 102 322 233 121 796 163 382 629 37 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 167 797 220 136 418 303 168 905 172 402 767 52 Peak Hour Factor 0.76 0.86 0.70 0.75 0.77 0.77 0.72 0.88 0.95 0.95 0.82 0.71 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 325 938 418 219 890 397 229 1345 600 464 1587 708 Arrive On Green 0.09 0.26 0.26 0.07 0.25 0.25 0.13 0.76 0.76 0.13 0.45 0.45 Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 3456 3554 1585 3456 3554 1585 Grp Volume(v), veh/h 167 797 220 136 418 303 168 905 172 402 767 52 Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1728 1777 1585 1728 1777 1585 Q Serve(g_s), s 8.2 25.5 14.2 6.7 12.0 21.3 5.6 15.1 4.0 13.7 18.3 2.3 Cycle Q Clear(g_c), s 8.2 25.5 14.2 6.7 12.0 21.3 5.6 15.1 4.0 13.7 18.3 2.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 325 938 418 219 890 397 229 1345 600 464 1587 708 V/C Ratio(X) 0.51 0.85 0.53 0.62 0.47 0.76 0.73 0.67 0.29 0.87 0.48 0.07 Avail Cap(c_a), veh/h 415 1081 482 318 1051 469 562 1345 600 533 1587 708 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.9 41.9 37.7 32.8 38.2 41.7 51.0 10.9 9.5 50.9 23.4 19.0 Incr Delay (d2), s/veh 1.3 5.9 1.0 2.9 0.4 6.2 4.5 2.7 1.2 12.7 1.1 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.6 11.9 5.6 3.1 5.3 9.0 2.5 4.0 1.4 6.7 7.8 0.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 31.1 47.8 38.8 35.7 38.6 47.8 55.5 13.6 10.7 63.6 24.5 19.2 LnGrp LOS C D D D D D E B B E C B Approach Vol, veh/h 1184 857 1245 1221 Approach Delay, s/veh 43.8 41.4 18.9 37.2 Approach LOS D D B D Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 20.6 49.9 13.3 36.2 12.5 58.1 14.9 34.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 18.5 31.5 15.5 36.5 19.5 30.5 16.5 35.5 Max Q Clear Time (g_c+I1), s 15.7 17.1 8.7 27.5 7.6 20.3 10.2 23.3 Green Ext Time (p_c), s 0.4 6.1 0.2 4.1 0.4 3.9 0.2 3.1 Intersection Summary HCM 6th Ctrl Delay 34.6 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2019 Existing PM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 58 453 85 194 602 339 118 554 152 320 613 82 Future Volume (veh/h) 58 453 85 194 602 339 118 554 152 320 613 82 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 92 533 139 237 654 373 155 609 183 352 681 108 Peak Hour Factor 0.63 0.85 0.61 0.82 0.92 0.91 0.76 0.91 0.83 0.91 0.90 0.76 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 227 791 353 340 1024 457 215 1382 616 409 1581 705 Arrive On Green 0.05 0.22 0.22 0.12 0.29 0.29 0.12 0.78 0.78 0.12 0.44 0.44 Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 3456 3554 1585 3456 3554 1585 Grp Volume(v), veh/h 92 533 139 237 654 373 155 609 183 352 681 108 Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1728 1777 1585 1728 1777 1585 Q Serve(g_s), s 4.7 16.5 9.0 11.8 19.3 26.3 5.2 7.0 4.0 12.0 15.8 4.9 Cycle Q Clear(g_c), s 4.7 16.5 9.0 11.8 19.3 26.3 5.2 7.0 4.0 12.0 15.8 4.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 227 791 353 340 1024 457 215 1382 616 409 1581 705 V/C Ratio(X) 0.40 0.67 0.39 0.70 0.64 0.82 0.72 0.44 0.30 0.86 0.43 0.15 Avail Cap(c_a), veh/h 390 1081 482 623 1555 693 533 1382 616 446 1581 705 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.7 42.7 39.8 30.5 37.3 39.7 51.5 8.9 8.6 51.9 22.9 19.8 Incr Delay (d2), s/veh 1.2 1.0 0.7 2.6 0.7 4.6 4.5 1.0 1.2 14.7 0.9 0.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 7.3 3.6 5.3 8.5 10.7 2.3 2.3 1.4 6.0 6.8 1.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 34.9 43.7 40.5 33.1 37.9 44.3 56.0 9.9 9.8 66.6 23.7 20.3 LnGrp LOS C D D C D D E A A E C C Approach Vol, veh/h 764 1264 947 1141 Approach Delay, s/veh 42.0 38.9 17.5 36.6 Approach LOS D D B D Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 18.7 51.2 18.9 31.2 12.0 57.9 11.0 39.1 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 15.5 16.5 33.5 36.5 18.5 13.5 17.5 52.5 Max Q Clear Time (g_c+I1), s 14.0 9.0 13.8 18.5 7.2 17.8 6.7 28.3 Green Ext Time (p_c), s 0.2 2.8 0.6 3.9 0.3 0.0 0.1 6.3 Intersection Summary HCM 6th Ctrl Delay 33.9 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2024 BG AM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 133 720 162 107 338 245 127 837 171 401 661 39 Future Volume (veh/h) 133 720 162 107 338 245 127 837 171 401 661 39 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 175 837 231 143 439 318 176 951 180 422 806 55 Peak Hour Factor 0.76 0.86 0.70 0.75 0.77 0.77 0.72 0.88 0.95 0.95 0.82 0.71 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 339 1034 461 229 987 440 239 1223 545 489 1479 660 Arrive On Green 0.09 0.29 0.29 0.07 0.28 0.28 0.14 0.69 0.69 0.14 0.42 0.42 Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 3456 3554 1585 3456 3554 1585 Grp Volume(v), veh/h 175 837 231 143 439 318 176 951 180 422 806 55 Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1728 1777 1585 1728 1777 1585 Q Serve(g_s), s 8.3 26.2 14.5 6.8 12.2 21.8 5.9 21.6 5.5 14.3 20.6 2.5 Cycle Q Clear(g_c), s 8.3 26.2 14.5 6.8 12.2 21.8 5.9 21.6 5.5 14.3 20.6 2.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 339 1034 461 229 987 440 239 1223 545 489 1479 660 V/C Ratio(X) 0.52 0.81 0.50 0.62 0.44 0.72 0.73 0.78 0.33 0.86 0.54 0.08 Avail Cap(c_a), veh/h 385 1407 627 284 1377 614 677 1223 545 590 1479 660 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.7 39.5 35.3 30.9 35.7 39.2 50.6 15.6 13.1 50.4 26.5 21.2 Incr Delay (d2), s/veh 1.2 2.6 0.8 2.8 0.3 2.5 4.3 4.9 1.6 10.9 1.4 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.7 11.7 5.7 3.1 5.3 8.7 2.5 5.8 2.0 6.9 8.9 1.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 28.9 42.1 36.2 33.7 36.0 41.7 55.0 20.6 14.8 61.3 27.9 21.4 LnGrp LOS C D D C D D D C B E C C Approach Vol, veh/h 1243 900 1307 1283 Approach Delay, s/veh 39.1 37.7 24.4 38.6 Approach LOS D D C D Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 21.5 45.8 13.3 39.4 12.8 54.4 14.9 37.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 20.5 21.5 12.5 47.5 23.5 18.5 13.5 46.5 Max Q Clear Time (g_c+I1), s 16.3 23.6 8.8 28.2 7.9 22.6 10.3 23.8 Green Ext Time (p_c), s 0.6 0.0 0.1 6.7 0.5 0.0 0.1 4.2 Intersection Summary HCM 6th Ctrl Delay 34.6 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2024 BG PM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 61 476 89 204 633 356 124 582 160 336 644 86 Future Volume (veh/h) 61 476 89 204 633 356 124 582 160 336 644 86 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 97 560 146 249 688 391 163 640 193 369 716 113 Peak Hour Factor 0.63 0.85 0.61 0.82 0.92 0.91 0.76 0.91 0.83 0.91 0.90 0.76 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 225 787 351 340 1029 459 225 1339 597 436 1556 694 Arrive On Green 0.06 0.22 0.22 0.13 0.29 0.29 0.13 0.75 0.75 0.13 0.44 0.44 Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 3456 3554 1585 3456 3554 1585 Grp Volume(v), veh/h 97 560 146 249 688 391 163 640 193 369 716 113 Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1728 1777 1585 1728 1777 1585 Q Serve(g_s), s 5.0 17.5 9.5 12.4 20.5 27.9 5.4 8.3 4.8 12.5 17.0 5.2 Cycle Q Clear(g_c), s 5.0 17.5 9.5 12.4 20.5 27.9 5.4 8.3 4.8 12.5 17.0 5.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 225 787 351 340 1029 459 225 1339 597 436 1556 694 V/C Ratio(X) 0.43 0.71 0.42 0.73 0.67 0.85 0.73 0.48 0.32 0.85 0.46 0.16 Avail Cap(c_a), veh/h 530 1081 482 599 1229 548 590 1339 597 562 1556 694 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.8 43.2 40.1 30.6 37.6 40.2 51.2 10.2 9.8 51.3 23.7 20.4 Incr Delay (d2), s/veh 1.3 1.4 0.8 3.1 1.1 10.7 4.4 1.2 1.4 9.2 1.0 0.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.2 7.8 3.8 5.6 9.0 12.2 2.4 2.7 1.7 6.0 7.3 2.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 35.1 44.5 40.8 33.7 38.7 50.9 55.6 11.5 11.2 60.5 24.7 20.9 LnGrp LOS D D D C D D E B B E C C Approach Vol, veh/h 803 1328 996 1198 Approach Delay, s/veh 42.7 41.3 18.6 35.4 Approach LOS D D B D Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 19.7 49.7 19.6 31.1 12.3 57.1 11.4 39.2 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 19.5 13.5 32.5 36.5 20.5 12.5 27.5 41.5 Max Q Clear Time (g_c+I1), s 14.5 10.3 14.4 19.5 7.4 19.0 7.0 29.9 Green Ext Time (p_c), s 0.6 1.5 0.7 4.0 0.4 0.0 0.2 4.8 Intersection Summary HCM 6th Ctrl Delay 34.7 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2024 Total AM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 222 776 162 170 338 245 127 837 171 401 724 39 Future Volume (veh/h) 222 776 162 170 338 245 127 837 171 401 724 39 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 292 902 231 227 439 318 176 951 180 422 883 55 Peak Hour Factor 0.76 0.86 0.70 0.75 0.77 0.77 0.72 0.88 0.95 0.95 0.82 0.71 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 411 1015 453 277 926 413 237 1129 504 473 1372 612 Arrive On Green 0.13 0.29 0.29 0.11 0.26 0.26 0.14 0.64 0.64 0.14 0.39 0.39 Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 3456 3554 1585 3456 3554 1585 Grp Volume(v), veh/h 292 902 231 227 439 318 176 951 180 422 883 55 Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1728 1777 1585 1728 1777 1585 Q Serve(g_s), s 14.1 29.2 14.6 11.0 12.5 22.3 5.9 25.2 6.4 14.4 24.4 2.6 Cycle Q Clear(g_c), s 14.1 29.2 14.6 11.0 12.5 22.3 5.9 25.2 6.4 14.4 24.4 2.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 411 1015 453 277 926 413 237 1129 504 473 1372 612 V/C Ratio(X) 0.71 0.89 0.51 0.82 0.47 0.77 0.74 0.84 0.36 0.89 0.64 0.09 Avail Cap(c_a), veh/h 416 1081 482 311 1051 469 533 1129 504 475 1372 612 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.1 41.0 35.9 31.1 37.4 41.0 50.7 19.5 16.1 50.9 30.1 23.4 Incr Delay (d2), s/veh 5.5 8.9 0.9 14.5 0.4 6.8 4.5 7.7 2.0 18.7 2.3 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.6 13.9 5.8 5.8 5.5 9.4 2.6 7.7 2.3 7.4 10.8 1.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 32.6 50.0 36.7 45.6 37.8 47.8 55.3 27.2 18.1 69.6 32.4 23.7 LnGrp LOS C D D D D D E C B E C C Approach Vol, veh/h 1425 984 1307 1360 Approach Delay, s/veh 44.3 42.8 29.7 43.6 Approach LOS D D C D Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 20.9 42.6 17.7 38.8 12.7 50.8 20.7 35.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 16.5 33.5 15.5 36.5 18.5 31.5 16.5 35.5 Max Q Clear Time (g_c+I1), s 16.4 27.2 13.0 31.2 7.9 26.4 16.1 24.3 Green Ext Time (p_c), s 0.0 3.6 0.2 3.1 0.4 2.7 0.0 3.2 Intersection Summary HCM 6th Ctrl Delay 40.1 HCM 6th LOS D Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2024 Total PM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 123 515 89 237 633 356 124 582 160 336 677 86 Future Volume (veh/h) 123 515 89 237 633 356 124 582 160 336 677 86 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 195 606 146 289 688 391 163 640 193 369 752 113 Peak Hour Factor 0.63 0.85 0.61 0.82 0.92 0.91 0.76 0.91 0.83 0.91 0.90 0.76 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 294 833 372 366 970 433 225 1238 552 436 1455 649 Arrive On Green 0.10 0.23 0.23 0.14 0.27 0.27 0.13 0.70 0.70 0.13 0.41 0.41 Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 3456 3554 1585 3456 3554 1585 Grp Volume(v), veh/h 195 606 146 289 688 391 163 640 193 369 752 113 Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1728 1777 1585 1728 1777 1585 Q Serve(g_s), s 9.8 18.9 9.3 14.1 20.9 28.6 5.4 10.2 5.9 12.5 19.0 5.4 Cycle Q Clear(g_c), s 9.8 18.9 9.3 14.1 20.9 28.6 5.4 10.2 5.9 12.5 19.0 5.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 294 833 372 366 970 433 225 1238 552 436 1455 649 V/C Ratio(X) 0.66 0.73 0.39 0.79 0.71 0.90 0.72 0.52 0.35 0.85 0.52 0.17 Avail Cap(c_a), veh/h 624 1081 482 597 1022 456 619 1238 552 562 1455 649 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.4 42.4 38.7 29.4 39.3 42.1 51.2 13.4 12.7 51.3 26.5 22.5 Incr Delay (d2), s/veh 2.6 1.8 0.7 3.9 2.2 20.6 4.4 1.5 1.7 9.2 1.3 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.4 8.5 3.7 6.4 9.4 13.5 2.4 3.3 2.1 6.0 8.3 2.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 34.0 44.2 39.4 33.2 41.5 62.7 55.5 14.9 14.5 60.5 27.8 23.1 LnGrp LOS C D D C D E E B B E C C Approach Vol, veh/h 947 1368 996 1234 Approach Delay, s/veh 41.3 45.8 21.5 37.2 Approach LOS D D C D Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 19.7 46.3 21.4 32.6 12.3 53.6 16.8 37.2 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 19.5 13.5 32.5 36.5 21.5 11.5 34.5 34.5 Max Q Clear Time (g_c+I1), s 14.5 12.2 16.1 20.9 7.4 21.0 11.8 30.6 Green Ext Time (p_c), s 0.6 0.7 0.8 4.2 0.4 0.0 0.5 2.2 Intersection Summary HCM 6th Ctrl Delay 37.2 HCM 6th LOS D Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2040 BG AM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 157 844 190 126 397 287 149 981 201 471 775 46 Future Volume (veh/h) 157 844 190 126 397 287 149 981 201 471 775 46 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 207 981 271 168 516 373 207 1115 212 496 945 65 Peak Hour Factor 0.76 0.86 0.70 0.75 0.77 0.77 0.72 0.88 0.95 0.95 0.82 0.71 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 329 994 444 217 940 419 271 1149 512 554 1439 642 Arrive On Green 0.10 0.28 0.28 0.09 0.26 0.26 0.16 0.65 0.65 0.16 0.41 0.41 Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 3456 3554 1585 3456 3554 1585 Grp Volume(v), veh/h 207 981 271 168 516 373 207 1115 212 496 945 65 Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1728 1777 1585 1728 1777 1585 Q Serve(g_s), s 10.0 33.0 17.8 8.1 15.0 27.2 6.9 35.7 7.7 16.9 25.9 3.1 Cycle Q Clear(g_c), s 10.0 33.0 17.8 8.1 15.0 27.2 6.9 35.7 7.7 16.9 25.9 3.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 329 994 444 217 940 419 271 1149 512 554 1439 642 V/C Ratio(X) 0.63 0.99 0.61 0.78 0.55 0.89 0.76 0.97 0.41 0.90 0.66 0.10 Avail Cap(c_a), veh/h 392 994 444 381 1051 469 648 1149 512 590 1439 642 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.7 43.0 37.5 32.1 38.0 42.4 49.5 20.7 15.7 49.4 28.9 22.1 Incr Delay (d2), s/veh 2.4 25.2 2.5 5.9 0.5 17.4 4.4 20.4 2.5 15.6 2.4 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.5 17.8 7.2 3.8 6.6 12.6 3.0 12.2 2.7 8.5 11.4 1.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 31.0 68.2 40.0 37.9 38.5 59.8 53.9 41.0 18.2 65.0 31.3 22.5 LnGrp LOS C E D D D E D D B E C C Approach Vol, veh/h 1459 1057 1534 1506 Approach Delay, s/veh 57.7 45.9 39.6 42.0 Approach LOS E D D D Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 23.7 43.3 14.9 38.1 13.9 53.1 16.7 36.3 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 20.5 29.5 21.5 30.5 22.5 27.5 16.5 35.5 Max Q Clear Time (g_c+I1), s 18.9 37.7 10.1 35.0 8.9 27.9 12.0 29.2 Green Ext Time (p_c), s 0.4 0.0 0.3 0.0 0.5 0.0 0.2 2.6 Intersection Summary HCM 6th Ctrl Delay 46.2 HCM 6th LOS D Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2040 BG PM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 71 558 105 239 742 418 145 683 187 394 755 101 Future Volume (veh/h) 71 558 105 239 742 418 145 683 187 394 755 101 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 113 656 172 291 807 459 191 751 225 433 839 133 Peak Hour Factor 0.63 0.85 0.61 0.82 0.92 0.91 0.76 0.91 0.83 0.91 0.90 0.76 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 220 824 367 345 1086 485 254 1195 533 495 1443 644 Arrive On Green 0.06 0.23 0.23 0.14 0.31 0.31 0.15 0.67 0.67 0.14 0.41 0.41 Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 3456 3554 1585 3456 3554 1585 Grp Volume(v), veh/h 113 656 172 291 807 459 191 751 225 433 839 133 Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1728 1777 1585 1728 1777 1585 Q Serve(g_s), s 5.7 20.9 11.2 14.4 24.5 34.0 6.4 14.4 7.8 14.7 22.0 6.5 Cycle Q Clear(g_c), s 5.7 20.9 11.2 14.4 24.5 34.0 6.4 14.4 7.8 14.7 22.0 6.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 220 824 367 345 1086 485 254 1195 533 495 1443 644 V/C Ratio(X) 0.51 0.80 0.47 0.84 0.74 0.95 0.75 0.63 0.42 0.87 0.58 0.21 Avail Cap(c_a), veh/h 483 1229 548 388 1086 485 590 1195 533 562 1443 644 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.1 43.4 39.7 30.2 37.4 40.7 50.1 15.4 14.3 50.3 27.7 23.1 Incr Delay (d2), s/veh 1.9 2.2 0.9 14.2 2.8 28.1 4.5 2.5 2.4 13.1 1.7 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 9.4 4.5 7.4 11.0 16.9 2.8 4.4 0.4 7.3 9.6 2.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 34.9 45.7 40.6 44.3 40.2 68.8 54.6 17.9 16.8 63.5 29.4 23.8 LnGrp LOS C D D D D E D B B E C C Approach Vol, veh/h 941 1557 1167 1405 Approach Delay, s/veh 43.5 49.4 23.7 39.4 Approach LOS D D C D Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 21.7 44.8 21.1 32.3 13.3 53.2 12.3 41.2 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 19.5 21.5 19.5 41.5 20.5 20.5 25.5 35.5 Max Q Clear Time (g_c+I1), s 16.7 16.4 16.4 22.9 8.4 24.0 7.7 36.0 Green Ext Time (p_c), s 0.5 2.6 0.3 5.0 0.5 0.0 0.2 0.0 Intersection Summary HCM 6th Ctrl Delay 39.6 HCM 6th LOS D Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2040 Total AM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 246 900 190 189 397 287 149 981 201 471 838 46 Future Volume (veh/h) 246 900 190 189 397 287 149 981 201 471 838 46 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 324 1047 271 252 516 373 207 1115 212 496 1022 65 Peak Hour Factor 0.76 0.86 0.70 0.75 0.77 0.77 0.72 0.88 0.95 0.95 0.82 0.71 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 356 1081 482 236 1051 469 271 1140 509 446 1321 589 Arrive On Green 0.10 0.30 0.30 0.10 0.30 0.30 0.16 0.64 0.64 0.13 0.37 0.37 Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 3456 3554 1585 3456 3554 1585 Grp Volume(v), veh/h 324 1047 271 252 516 373 207 1115 212 496 1022 65 Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1728 1777 1585 1728 1777 1585 Q Serve(g_s), s 12.5 34.9 17.2 11.5 14.4 26.0 6.9 36.2 7.9 15.5 30.4 3.2 Cycle Q Clear(g_c), s 12.5 34.9 17.2 11.5 14.4 26.0 6.9 36.2 7.9 15.5 30.4 3.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 356 1081 482 236 1051 469 271 1140 509 446 1321 589 V/C Ratio(X) 0.91 0.97 0.56 1.07 0.49 0.80 0.76 0.98 0.42 1.11 0.77 0.11 Avail Cap(c_a), veh/h 356 1081 482 236 1051 469 619 1140 509 446 1321 589 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.5 41.2 35.0 32.4 34.8 38.9 49.5 21.1 16.0 52.3 33.3 24.7 Incr Delay (d2), s/veh 26.7 20.1 1.5 77.2 0.4 9.2 4.5 21.9 2.5 76.4 4.5 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.3 18.1 6.8 9.8 6.3 11.2 3.0 12.7 2.7 11.4 13.8 1.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 59.2 61.3 36.5 109.5 35.2 48.1 54.0 43.0 18.5 128.7 37.7 25.1 LnGrp LOS E E D F D D D D B F D C Approach Vol, veh/h 1642 1141 1534 1583 Approach Delay, s/veh 56.8 55.8 41.1 65.7 Approach LOS E E D E Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 20.0 43.0 16.0 41.0 13.9 49.1 17.0 40.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 15.5 38.5 11.5 36.5 21.5 32.5 12.5 35.5 Max Q Clear Time (g_c+I1), s 17.5 38.2 13.5 36.9 8.9 32.4 14.5 28.0 Green Ext Time (p_c), s 0.0 0.2 0.0 0.0 0.5 0.0 0.0 2.9 Intersection Summary HCM 6th Ctrl Delay 54.9 HCM 6th LOS D Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2040 Total PM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 133 597 105 272 742 418 145 683 187 394 788 101 Future Volume (veh/h) 133 597 105 272 742 418 145 683 187 394 788 101 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 211 702 172 332 807 459 191 751 225 433 876 133 Peak Hour Factor 0.63 0.85 0.61 0.82 0.92 0.91 0.76 0.91 0.83 0.91 0.90 0.76 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 289 852 380 375 1027 458 254 1098 490 495 1346 600 Arrive On Green 0.11 0.24 0.24 0.16 0.29 0.29 0.15 0.62 0.62 0.14 0.38 0.38 Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 3456 3554 1585 3456 3554 1585 Grp Volume(v), veh/h 211 702 172 332 807 459 191 751 225 433 876 133 Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1728 1777 1585 1728 1777 1585 Q Serve(g_s), s 10.5 22.5 11.1 16.1 25.1 34.7 6.4 16.8 9.1 14.7 24.4 6.8 Cycle Q Clear(g_c), s 10.5 22.5 11.1 16.1 25.1 34.7 6.4 16.8 9.1 14.7 24.4 6.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 289 852 380 375 1027 458 254 1098 490 495 1346 600 V/C Ratio(X) 0.73 0.82 0.45 0.89 0.79 1.00 0.75 0.68 0.46 0.87 0.65 0.22 Avail Cap(c_a), veh/h 607 1081 482 576 1027 458 619 1098 490 562 1346 600 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.5 43.2 38.9 28.9 39.3 42.7 50.1 19.1 17.6 50.3 30.7 25.3 Incr Delay (d2), s/veh 3.5 4.2 0.8 10.4 4.1 42.7 4.4 3.5 3.1 13.1 2.5 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.8 10.3 4.4 7.9 11.5 18.8 2.8 5.3 3.1 7.3 10.8 2.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 35.1 47.5 39.8 39.3 43.4 85.3 54.6 22.5 20.7 63.5 33.2 26.1 LnGrp LOS D D D D D F D C C E C C Approach Vol, veh/h 1085 1598 1167 1442 Approach Delay, s/veh 43.8 54.6 27.4 41.6 Approach LOS D D C D Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 21.7 41.6 23.5 33.3 13.3 49.9 17.6 39.2 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 19.5 13.5 32.5 36.5 21.5 11.5 34.5 34.5 Max Q Clear Time (g_c+I1), s 16.7 18.8 18.1 24.5 8.4 26.4 12.5 36.7 Green Ext Time (p_c), s 0.5 0.0 0.9 4.3 0.5 0.0 0.6 0.0 Intersection Summary HCM 6th Ctrl Delay 42.9 HCM 6th LOS D Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2019 Existing AM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 1 4 9 0 27 5 1064 234 269 611 5 Future Volume (veh/h) 13 1 4 9 0 27 5 1064 234 269 611 5 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 20 4 12 16 0 52 8 1169 349 374 764 8 Peak Hour Factor 0.65 0.25 0.33 0.56 0.92 0.52 0.62 0.91 0.67 0.72 0.80 0.62 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 80 17 25 137 0 78 588 2048 602 401 3112 1388 Arrive On Green 0.05 0.05 0.05 0.05 0.00 0.05 0.76 0.76 0.76 0.16 1.00 1.00 Sat Flow, veh/h 673 340 507 1570 0 1585 698 2708 796 1781 3554 1585 Grp Volume(v), veh/h 36 0 0 16 0 52 8 761 757 374 764 8 Grp Sat Flow(s),veh/h/ln 1520 0 0 1570 0 1585 698 1777 1727 1781 1777 1585 Q Serve(g_s), s 1.6 0.0 0.0 0.0 0.0 3.9 0.3 21.9 22.8 6.7 0.0 0.0 Cycle Q Clear(g_c), s 2.7 0.0 0.0 1.0 0.0 3.9 0.3 21.9 22.8 6.7 0.0 0.0 Prop In Lane 0.56 0.33 1.00 1.00 1.00 0.46 1.00 1.00 Lane Grp Cap(c), veh/h 121 0 0 137 0 78 588 1344 1306 401 3112 1388 V/C Ratio(X) 0.30 0.00 0.00 0.12 0.00 0.67 0.01 0.57 0.58 0.93 0.25 0.01 Avail Cap(c_a), veh/h 545 0 0 540 0 535 588 1344 1306 678 3112 1388 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 55.5 0.0 0.0 54.7 0.0 56.1 3.6 6.2 6.3 17.0 0.0 0.0 Incr Delay (d2), s/veh 1.3 0.0 0.0 0.4 0.0 9.4 0.0 1.7 1.9 13.0 0.2 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 0.0 0.0 0.5 0.0 1.8 0.0 7.6 7.8 9.2 0.1 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 56.8 0.0 0.0 55.1 0.0 65.5 3.6 8.0 8.2 30.1 0.2 0.0 LnGrp LOS E A A E A E A A A C A A Approach Vol, veh/h 36 68 1526 1146 Approach Delay, s/veh 56.8 63.0 8.1 9.9 Approach LOS E E A A Timer - Assigned Phs 1 2 4 6 8 Phs Duration (G+Y+Rc), s 14.3 95.3 10.4 109.6 10.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 28.5 37.5 40.5 70.5 40.5 Max Q Clear Time (g_c+I1), s 8.7 24.8 4.7 2.0 5.9 Green Ext Time (p_c), s 1.1 8.4 0.2 6.6 0.2 Intersection Summary HCM 6th Ctrl Delay 10.8 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2019 Existing PM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 0 4 67 1 166 1 658 43 95 782 13 Future Volume (veh/h) 13 0 4 67 1 166 1 658 43 95 782 13 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 28 0 12 92 4 208 4 723 52 112 815 28 Peak Hour Factor 0.46 0.92 0.33 0.73 0.25 0.80 0.25 0.91 0.83 0.85 0.96 0.46 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 133 9 39 265 10 246 512 2325 167 555 2736 1220 Arrive On Green 0.16 0.00 0.16 0.16 0.16 0.16 0.69 0.69 0.69 0.08 1.00 1.00 Sat Flow, veh/h 527 57 251 1331 67 1585 653 3362 242 1781 3554 1585 Grp Volume(v), veh/h 40 0 0 96 0 208 4 382 393 112 815 28 Grp Sat Flow(s),veh/h/ln 835 0 0 1398 0 1585 653 1777 1827 1781 1777 1585 Q Serve(g_s), s 2.3 0.0 0.0 0.0 0.0 15.3 0.2 10.1 10.1 2.1 0.0 0.0 Cycle Q Clear(g_c), s 9.9 0.0 0.0 7.6 0.0 15.3 0.2 10.1 10.1 2.1 0.0 0.0 Prop In Lane 0.70 0.30 0.96 1.00 1.00 0.13 1.00 1.00 Lane Grp Cap(c), veh/h 181 0 0 276 0 246 512 1229 1264 555 2736 1220 V/C Ratio(X) 0.22 0.00 0.00 0.35 0.00 0.85 0.01 0.31 0.31 0.20 0.30 0.02 Avail Cap(c_a), veh/h 655 0 0 806 0 839 512 1229 1264 727 2736 1220 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 47.9 0.0 0.0 46.0 0.0 49.3 5.7 7.3 7.3 4.6 0.0 0.0 Incr Delay (d2), s/veh 0.6 0.0 0.0 0.8 0.0 7.8 0.0 0.7 0.6 0.2 0.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 0.0 0.0 2.7 0.0 6.6 0.0 3.8 3.9 0.6 0.1 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 48.5 0.0 0.0 46.8 0.0 57.1 5.8 7.9 7.9 4.7 0.3 0.0 LnGrp LOS D A A D A E A A A A A A Approach Vol, veh/h 40 304 779 955 Approach Delay, s/veh 48.5 53.8 7.9 0.8 Approach LOS D D A A Timer - Assigned Phs 1 2 4 6 8 Phs Duration (G+Y+Rc), s 9.4 87.5 23.1 96.9 23.1 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 16.5 26.5 63.5 47.5 63.5 Max Q Clear Time (g_c+I1), s 4.1 12.1 11.9 2.0 17.3 Green Ext Time (p_c), s 0.2 4.3 0.2 7.1 1.3 Intersection Summary HCM 6th Ctrl Delay 12.1 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2024 BG AM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 1 4 9 0 27 5 1118 234 269 642 5 Future Volume (veh/h) 13 1 4 9 0 27 5 1118 234 269 642 5 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 20 4 12 16 0 52 8 1229 349 374 802 8 Peak Hour Factor 0.65 0.25 0.33 0.56 0.92 0.52 0.62 0.91 0.67 0.72 0.80 0.62 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 80 17 25 137 0 78 561 2040 569 401 3112 1388 Arrive On Green 0.05 0.05 0.05 0.05 0.00 0.05 0.74 0.74 0.74 0.19 1.00 1.00 Sat Flow, veh/h 673 340 507 1570 0 1585 673 2745 765 1781 3554 1585 Grp Volume(v), veh/h 36 0 0 16 0 52 8 788 790 374 802 8 Grp Sat Flow(s),veh/h/ln 1520 0 0 1570 0 1585 673 1777 1733 1781 1777 1585 Q Serve(g_s), s 1.6 0.0 0.0 0.0 0.0 3.9 0.4 24.5 25.8 8.3 0.0 0.0 Cycle Q Clear(g_c), s 2.7 0.0 0.0 1.0 0.0 3.9 0.4 24.5 25.8 8.3 0.0 0.0 Prop In Lane 0.56 0.33 1.00 1.00 1.00 0.44 1.00 1.00 Lane Grp Cap(c), veh/h 121 0 0 137 0 78 561 1321 1288 401 3112 1388 V/C Ratio(X) 0.30 0.00 0.00 0.12 0.00 0.67 0.01 0.60 0.61 0.93 0.26 0.01 Avail Cap(c_a), veh/h 545 0 0 540 0 535 561 1321 1288 654 3112 1388 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 55.5 0.0 0.0 54.7 0.0 56.1 4.0 7.1 7.3 19.5 0.0 0.0 Incr Delay (d2), s/veh 1.3 0.0 0.0 0.4 0.0 9.4 0.0 2.0 2.2 14.1 0.2 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 0.0 0.0 0.5 0.0 1.8 0.1 8.7 9.0 9.1 0.1 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 56.8 0.0 0.0 55.1 0.0 65.5 4.0 9.1 9.5 33.6 0.2 0.0 LnGrp LOS E A A E A E A A A C A A Approach Vol, veh/h 36 68 1586 1184 Approach Delay, s/veh 56.8 63.0 9.2 10.7 Approach LOS E E A B Timer - Assigned Phs 1 2 4 6 8 Phs Duration (G+Y+Rc), s 15.9 93.7 10.4 109.6 10.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 28.5 37.5 40.5 70.5 40.5 Max Q Clear Time (g_c+I1), s 10.3 27.8 4.7 2.0 5.9 Green Ext Time (p_c), s 1.1 7.0 0.2 7.0 0.2 Intersection Summary HCM 6th Ctrl Delay 11.7 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2024 BG PM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 0 4 67 1 166 1 692 43 95 822 13 Future Volume (veh/h) 13 0 4 67 1 166 1 692 43 95 822 13 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 28 0 12 92 4 208 4 760 52 112 856 28 Peak Hour Factor 0.46 0.92 0.33 0.73 0.25 0.80 0.25 0.91 0.83 0.85 0.96 0.46 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 130 9 38 262 10 242 496 2343 160 539 2745 1224 Arrive On Green 0.15 0.00 0.15 0.15 0.15 0.15 0.69 0.69 0.69 0.08 1.00 1.00 Sat Flow, veh/h 520 58 248 1330 67 1585 628 3375 231 1781 3554 1585 Grp Volume(v), veh/h 40 0 0 96 0 208 4 400 412 112 856 28 Grp Sat Flow(s),veh/h/ln 826 0 0 1397 0 1585 628 1777 1829 1781 1777 1585 Q Serve(g_s), s 2.3 0.0 0.0 0.0 0.0 15.4 0.2 10.7 10.7 2.1 0.0 0.0 Cycle Q Clear(g_c), s 9.9 0.0 0.0 7.6 0.0 15.4 0.2 10.7 10.7 2.1 0.0 0.0 Prop In Lane 0.70 0.30 0.96 1.00 1.00 0.13 1.00 1.00 Lane Grp Cap(c), veh/h 177 0 0 272 0 242 496 1234 1270 539 2745 1224 V/C Ratio(X) 0.23 0.00 0.00 0.35 0.00 0.86 0.01 0.32 0.32 0.21 0.31 0.02 Avail Cap(c_a), veh/h 295 0 0 404 0 390 496 1234 1270 756 2745 1224 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 48.2 0.0 0.0 46.3 0.0 49.6 5.6 7.2 7.2 4.6 0.0 0.0 Incr Delay (d2), s/veh 0.6 0.0 0.0 0.8 0.0 10.5 0.0 0.7 0.7 0.2 0.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.0 0.0 2.7 0.0 6.8 0.0 4.0 4.1 0.6 0.1 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 48.8 0.0 0.0 47.1 0.0 60.1 5.7 7.9 7.9 4.7 0.3 0.0 LnGrp LOS D A A D A E A A A A A A Approach Vol, veh/h 40 304 816 996 Approach Delay, s/veh 48.8 56.0 7.9 0.8 Approach LOS D E A A Timer - Assigned Phs 1 2 4 6 8 Phs Duration (G+Y+Rc), s 9.4 87.8 22.8 97.2 22.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 19.5 57.5 29.5 81.5 29.5 Max Q Clear Time (g_c+I1), s 4.1 12.7 11.9 2.0 17.4 Green Ext Time (p_c), s 0.2 6.2 0.1 7.8 1.0 Intersection Summary HCM 6th Ctrl Delay 12.2 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2024 Total AM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 1 4 9 0 27 5 1136 234 269 658 118 Future Volume (veh/h) 13 1 4 9 0 27 5 1136 234 269 658 118 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 20 4 12 16 0 52 8 1248 349 374 822 190 Peak Hour Factor 0.65 0.25 0.33 0.56 0.92 0.52 0.62 0.91 0.67 0.72 0.80 0.62 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 80 17 25 137 0 78 472 2038 559 401 3112 1388 Arrive On Green 0.05 0.05 0.05 0.05 0.00 0.05 0.74 0.74 0.74 0.20 1.00 1.00 Sat Flow, veh/h 673 340 507 1570 0 1585 557 2755 756 1781 3554 1585 Grp Volume(v), veh/h 36 0 0 16 0 52 8 796 801 374 822 190 Grp Sat Flow(s),veh/h/ln 1520 0 0 1570 0 1585 557 1777 1734 1781 1777 1585 Q Serve(g_s), s 1.6 0.0 0.0 0.0 0.0 3.9 0.5 25.4 26.8 8.8 0.0 0.0 Cycle Q Clear(g_c), s 2.7 0.0 0.0 1.0 0.0 3.9 0.5 25.4 26.8 8.8 0.0 0.0 Prop In Lane 0.56 0.33 1.00 1.00 1.00 0.44 1.00 1.00 Lane Grp Cap(c), veh/h 121 0 0 137 0 78 472 1314 1282 401 3112 1388 V/C Ratio(X) 0.30 0.00 0.00 0.12 0.00 0.67 0.02 0.61 0.62 0.93 0.26 0.14 Avail Cap(c_a), veh/h 545 0 0 540 0 535 472 1314 1282 647 3112 1388 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 55.5 0.0 0.0 54.7 0.0 56.1 4.1 7.4 7.6 20.2 0.0 0.0 Incr Delay (d2), s/veh 1.3 0.0 0.0 0.4 0.0 9.4 0.1 2.1 2.3 14.4 0.2 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 0.0 0.0 0.5 0.0 1.8 0.1 9.1 9.5 9.0 0.1 0.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 56.8 0.0 0.0 55.1 0.0 65.5 4.2 9.5 9.9 34.7 0.2 0.2 LnGrp LOS E A A E A E A A A C A A Approach Vol, veh/h 36 68 1605 1386 Approach Delay, s/veh 56.8 63.0 9.6 9.5 Approach LOS E E A A Timer - Assigned Phs 1 2 4 6 8 Phs Duration (G+Y+Rc), s 16.4 93.2 10.4 109.6 10.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 28.5 37.5 40.5 70.5 40.5 Max Q Clear Time (g_c+I1), s 10.8 28.8 4.7 2.0 5.9 Green Ext Time (p_c), s 1.1 6.5 0.2 8.1 0.2 Intersection Summary HCM 6th Ctrl Delay 11.3 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2024 Total PM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 0 4 67 1 166 1 702 43 95 833 91 Future Volume (veh/h) 13 0 4 67 1 166 1 702 43 95 833 91 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 28 0 12 92 4 208 4 771 52 112 868 198 Peak Hour Factor 0.46 0.92 0.33 0.73 0.25 0.80 0.25 0.91 0.83 0.85 0.96 0.46 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 127 9 36 257 10 236 429 2357 159 537 2757 1230 Arrive On Green 0.15 0.00 0.15 0.15 0.15 0.15 0.70 0.70 0.70 0.08 1.00 1.00 Sat Flow, veh/h 509 60 244 1329 67 1585 529 3378 228 1781 3554 1585 Grp Volume(v), veh/h 40 0 0 96 0 208 4 405 418 112 868 198 Grp Sat Flow(s),veh/h/ln 813 0 0 1396 0 1585 529 1777 1829 1781 1777 1585 Q Serve(g_s), s 2.3 0.0 0.0 0.0 0.0 15.4 0.3 10.7 10.7 2.0 0.0 0.0 Cycle Q Clear(g_c), s 10.0 0.0 0.0 7.6 0.0 15.4 0.3 10.7 10.7 2.0 0.0 0.0 Prop In Lane 0.70 0.30 0.96 1.00 1.00 0.12 1.00 1.00 Lane Grp Cap(c), veh/h 172 0 0 267 0 236 429 1240 1276 537 2757 1230 V/C Ratio(X) 0.23 0.00 0.00 0.36 0.00 0.88 0.01 0.33 0.33 0.21 0.31 0.16 Avail Cap(c_a), veh/h 210 0 0 309 0 284 429 1240 1276 888 2757 1230 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 48.6 0.0 0.0 46.7 0.0 50.0 5.5 7.1 7.1 4.5 0.0 0.0 Incr Delay (d2), s/veh 0.7 0.0 0.0 0.8 0.0 22.8 0.0 0.7 0.7 0.2 0.3 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.0 0.0 2.7 0.0 7.6 0.0 4.0 4.1 0.6 0.1 0.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 49.3 0.0 0.0 47.5 0.0 72.9 5.6 7.8 7.8 4.6 0.3 0.3 LnGrp LOS D A A D A E A A A A A A Approach Vol, veh/h 40 304 827 1178 Approach Delay, s/veh 49.3 64.8 7.8 0.7 Approach LOS D E A A Timer - Assigned Phs 1 2 4 6 8 Phs Duration (G+Y+Rc), s 9.4 88.2 22.4 97.6 22.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 28.5 56.5 21.5 89.5 21.5 Max Q Clear Time (g_c+I1), s 4.0 12.7 12.0 2.0 17.4 Green Ext Time (p_c), s 0.3 6.3 0.1 8.8 0.5 Intersection Summary HCM 6th Ctrl Delay 12.3 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2040 BG AM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 1 4 9 0 27 5 1311 234 269 753 5 Future Volume (veh/h) 13 1 4 9 0 27 5 1311 234 269 753 5 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 20 4 12 16 0 52 8 1441 349 374 941 8 Peak Hour Factor 0.65 0.25 0.33 0.56 0.92 0.52 0.62 0.91 0.67 0.72 0.80 0.62 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 80 17 25 137 0 78 477 2012 473 400 3112 1388 Arrive On Green 0.05 0.05 0.05 0.05 0.00 0.05 0.70 0.70 0.70 0.27 1.00 1.00 Sat Flow, veh/h 673 340 507 1570 0 1585 591 2855 672 1781 3554 1585 Grp Volume(v), veh/h 36 0 0 16 0 52 8 881 909 374 941 8 Grp Sat Flow(s),veh/h/ln 1520 0 0 1570 0 1585 591 1777 1749 1781 1777 1585 Q Serve(g_s), s 1.6 0.0 0.0 0.0 0.0 3.9 0.5 34.8 38.3 13.0 0.0 0.0 Cycle Q Clear(g_c), s 2.7 0.0 0.0 1.0 0.0 3.9 0.5 34.8 38.3 13.0 0.0 0.0 Prop In Lane 0.56 0.33 1.00 1.00 1.00 0.38 1.00 1.00 Lane Grp Cap(c), veh/h 121 0 0 137 0 78 477 1252 1233 400 3112 1388 V/C Ratio(X) 0.30 0.00 0.00 0.12 0.00 0.67 0.02 0.70 0.74 0.94 0.30 0.01 Avail Cap(c_a), veh/h 545 0 0 540 0 535 477 1252 1233 585 3112 1388 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 55.5 0.0 0.0 54.7 0.0 56.1 5.3 10.4 10.9 26.2 0.0 0.0 Incr Delay (d2), s/veh 1.3 0.0 0.0 0.4 0.0 9.4 0.1 3.3 4.0 17.7 0.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 0.0 0.0 0.5 0.0 1.8 0.1 13.3 14.5 10.8 0.1 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 56.8 0.0 0.0 55.1 0.0 65.5 5.4 13.7 14.8 43.9 0.3 0.0 LnGrp LOS E A A E A E A B B D A A Approach Vol, veh/h 36 68 1798 1323 Approach Delay, s/veh 56.8 63.0 14.2 12.6 Approach LOS E E B B Timer - Assigned Phs 1 2 4 6 8 Phs Duration (G+Y+Rc), s 20.5 89.1 10.4 109.6 10.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 28.5 37.5 40.5 70.5 40.5 Max Q Clear Time (g_c+I1), s 15.0 40.3 4.7 2.0 5.9 Green Ext Time (p_c), s 1.0 0.0 0.2 8.8 0.2 Intersection Summary HCM 6th Ctrl Delay 15.1 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2040 BG PM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 0 4 67 1 166 1 811 43 95 964 13 Future Volume (veh/h) 13 0 4 67 1 166 1 811 43 95 964 13 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 28 0 12 92 4 208 4 891 52 112 1004 28 Peak Hour Factor 0.46 0.92 0.33 0.73 0.25 0.80 0.25 0.91 0.83 0.85 0.96 0.46 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 128 9 37 258 10 237 441 2379 139 483 2755 1229 Arrive On Green 0.15 0.00 0.15 0.15 0.15 0.15 0.70 0.70 0.70 0.08 1.00 1.00 Sat Flow, veh/h 511 59 245 1329 67 1585 547 3412 199 1781 3554 1585 Grp Volume(v), veh/h 40 0 0 96 0 208 4 464 479 112 1004 28 Grp Sat Flow(s),veh/h/ln 815 0 0 1396 0 1585 547 1777 1835 1781 1777 1585 Q Serve(g_s), s 2.3 0.0 0.0 0.0 0.0 15.4 0.3 12.8 12.8 2.0 0.0 0.0 Cycle Q Clear(g_c), s 10.0 0.0 0.0 7.6 0.0 15.4 0.3 12.8 12.8 2.0 0.0 0.0 Prop In Lane 0.70 0.30 0.96 1.00 1.00 0.11 1.00 1.00 Lane Grp Cap(c), veh/h 173 0 0 268 0 237 441 1239 1279 483 2755 1229 V/C Ratio(X) 0.23 0.00 0.00 0.36 0.00 0.88 0.01 0.37 0.37 0.23 0.36 0.02 Avail Cap(c_a), veh/h 221 0 0 321 0 297 441 1239 1279 938 2755 1229 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 48.5 0.0 0.0 46.6 0.0 49.9 5.5 7.4 7.4 4.8 0.0 0.0 Incr Delay (d2), s/veh 0.7 0.0 0.0 0.8 0.0 20.8 0.0 0.9 0.8 0.2 0.4 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.0 0.0 2.7 0.0 7.5 0.0 4.8 5.0 0.6 0.1 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 49.2 0.0 0.0 47.4 0.0 70.7 5.6 8.3 8.3 5.0 0.4 0.0 LnGrp LOS D A A D A E A A A A A A Approach Vol, veh/h 40 304 947 1144 Approach Delay, s/veh 49.2 63.4 8.3 0.8 Approach LOS D E A A Timer - Assigned Phs 1 2 4 6 8 Phs Duration (G+Y+Rc), s 9.4 88.2 22.5 97.5 22.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 35.5 48.5 22.5 88.5 22.5 Max Q Clear Time (g_c+I1), s 4.0 14.8 12.0 2.0 17.4 Green Ext Time (p_c), s 0.3 7.3 0.1 9.9 0.6 Intersection Summary HCM 6th Ctrl Delay 12.3 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2040 Total AM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 1 4 9 0 27 5 1329 234 269 769 118 Future Volume (veh/h) 13 1 4 9 0 27 5 1329 234 269 769 118 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 20 4 12 16 0 52 8 1460 349 374 961 190 Peak Hour Factor 0.65 0.25 0.33 0.56 0.92 0.52 0.62 0.91 0.67 0.72 0.80 0.62 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 80 17 25 137 0 78 404 2016 468 397 3113 1388 Arrive On Green 0.05 0.05 0.05 0.05 0.00 0.05 0.70 0.70 0.70 0.27 1.00 1.00 Sat Flow, veh/h 673 340 506 1571 0 1585 488 2863 664 1781 3554 1585 Grp Volume(v), veh/h 36 0 0 16 0 52 8 889 920 374 961 190 Grp Sat Flow(s),veh/h/ln 1519 0 0 1571 0 1585 488 1777 1751 1781 1777 1585 Q Serve(g_s), s 1.6 0.0 0.0 0.0 0.0 3.9 0.6 35.6 39.3 13.5 0.0 0.0 Cycle Q Clear(g_c), s 2.7 0.0 0.0 1.0 0.0 3.9 0.6 35.6 39.3 13.5 0.0 0.0 Prop In Lane 0.56 0.33 1.00 1.00 1.00 0.38 1.00 1.00 Lane Grp Cap(c), veh/h 121 0 0 137 0 78 404 1251 1233 397 3113 1388 V/C Ratio(X) 0.30 0.00 0.00 0.12 0.00 0.67 0.02 0.71 0.75 0.94 0.31 0.14 Avail Cap(c_a), veh/h 508 0 0 505 0 495 404 1251 1233 477 3113 1388 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 55.5 0.0 0.0 54.7 0.0 56.1 5.3 10.5 11.1 26.8 0.0 0.0 Incr Delay (d2), s/veh 1.3 0.0 0.0 0.4 0.0 9.5 0.1 3.4 4.1 25.0 0.3 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 0.0 0.0 0.5 0.0 1.8 0.1 13.6 14.9 11.6 0.1 0.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 56.8 0.0 0.0 55.1 0.0 65.5 5.4 14.0 15.2 51.9 0.3 0.2 LnGrp LOS E A A E A E A B B D A A Approach Vol, veh/h 36 68 1817 1525 Approach Delay, s/veh 56.8 63.1 14.5 12.9 Approach LOS E E B B Timer - Assigned Phs 1 2 4 6 8 Phs Duration (G+Y+Rc), s 20.6 89.0 10.4 109.6 10.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 21.5 47.5 37.5 73.5 37.5 Max Q Clear Time (g_c+I1), s 15.5 41.3 4.7 2.0 5.9 Green Ext Time (p_c), s 0.6 5.3 0.1 10.1 0.2 Intersection Summary HCM 6th Ctrl Delay 15.2 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th Signalized Intersection Summary 2040 Total PM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 13 0 4 67 1 166 1 821 43 95 975 91 Future Volume (veh/h) 13 0 4 67 1 166 1 821 43 95 975 91 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 28 0 12 92 4 208 4 902 52 112 1016 198 Peak Hour Factor 0.46 0.92 0.33 0.73 0.25 0.80 0.25 0.91 0.83 0.85 0.96 0.46 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 124 9 35 252 10 231 383 2394 138 482 2769 1235 Arrive On Green 0.15 0.00 0.15 0.15 0.15 0.15 0.70 0.70 0.70 0.08 1.00 1.00 Sat Flow, veh/h 499 61 240 1328 67 1585 460 3415 197 1781 3554 1585 Grp Volume(v), veh/h 40 0 0 96 0 208 4 469 485 112 1016 198 Grp Sat Flow(s),veh/h/ln 800 0 0 1395 0 1585 460 1777 1835 1781 1777 1585 Q Serve(g_s), s 2.3 0.0 0.0 0.0 0.0 15.5 0.3 12.9 12.9 2.0 0.0 0.0 Cycle Q Clear(g_c), s 10.0 0.0 0.0 7.7 0.0 15.5 0.3 12.9 12.9 2.0 0.0 0.0 Prop In Lane 0.70 0.30 0.96 1.00 1.00 0.11 1.00 1.00 Lane Grp Cap(c), veh/h 168 0 0 262 0 231 383 1246 1286 482 2769 1235 V/C Ratio(X) 0.24 0.00 0.00 0.37 0.00 0.90 0.01 0.38 0.38 0.23 0.37 0.16 Avail Cap(c_a), veh/h 168 0 0 262 0 231 383 1246 1286 832 2769 1235 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 49.0 0.0 0.0 47.0 0.0 50.4 5.4 7.3 7.3 4.7 0.0 0.0 Incr Delay (d2), s/veh 0.7 0.0 0.0 0.9 0.0 33.9 0.0 0.9 0.8 0.2 0.4 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.0 0.0 2.7 0.0 8.3 0.0 4.8 5.0 0.6 0.1 0.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 49.7 0.0 0.0 47.9 0.0 84.3 5.5 8.2 8.1 4.9 0.4 0.3 LnGrp LOS D A A D A F A A A A A A Approach Vol, veh/h 40 304 958 1326 Approach Delay, s/veh 49.7 72.8 8.1 0.7 Approach LOS D E A A Timer - Assigned Phs 1 2 4 6 8 Phs Duration (G+Y+Rc), s 9.4 88.6 22.0 98.0 22.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 28.5 60.5 17.5 93.5 17.5 Max Q Clear Time (g_c+I1), s 4.0 14.9 12.0 2.0 17.5 Green Ext Time (p_c), s 0.3 7.8 0.0 11.1 0.0 Intersection Summary HCM 6th Ctrl Delay 12.5 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th TWSC 2024 Total AM.syn 3: Access & Harmony Road 09/16/2019 Synchro 10 Report Page 1 Intersection Int Delay, s/veh 0.5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 1128 36 0 504 0 32 Future Vol, veh/h 1128 36 0 504 0 32 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - - 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 86 50 50 77 50 50 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1312 72 0 655 0 64 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 692 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - - - - - 6.94 Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - - - - - 3.32 Pot Cap-1 Maneuver - - 0 - 0 386 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - - - - 386 Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB WB NB HCM Control Delay, s 0 0 16.2 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h) 386 - - - HCM Lane V/C Ratio 0.166 - - - HCM Control Delay (s) 16.2 - - - HCM Lane LOS C - - - HCM 95th %tile Q(veh) 0.6 - - - You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th TWSC 2024 Total PM.syn 3: Access & Harmony Road 09/16/2019 Synchro 10 Report Page 1 Intersection Int Delay, s/veh 0.3 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 704 19 0 843 0 22 Future Vol, veh/h 704 19 0 843 0 22 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - - 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 85 50 50 92 50 50 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 828 38 0 916 0 44 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 433 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - - - - - 6.94 Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - - - - - 3.32 Pot Cap-1 Maneuver - - 0 - 0 571 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - - - - 571 Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB WB NB HCM Control Delay, s 0 0 11.8 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h) 571 - - - HCM Lane V/C Ratio 0.077 - - - HCM Control Delay (s) 11.8 - - - HCM Lane LOS B - - - HCM 95th %tile Q(veh) 0.2 - - - You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th TWSC 2040 Total AM.syn 3: Access & Harmony Road 09/16/2019 Synchro 10 Report Page 1 Intersection Int Delay, s/veh 0.5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 1303 36 0 592 0 32 Future Vol, veh/h 1303 36 0 592 0 32 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - - 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 86 50 50 77 50 50 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1515 72 0 769 0 64 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 794 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - - - - - 6.94 Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - - - - - 3.32 Pot Cap-1 Maneuver - - 0 - 0 331 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - - - - 331 Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB WB NB HCM Control Delay, s 0 0 18.5 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h) 331 - - - HCM Lane V/C Ratio 0.193 - - - HCM Control Delay (s) 18.5 - - - HCM Lane LOS C - - - HCM 95th %tile Q(veh) 0.7 - - - You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th TWSC 2040 Total PM.syn 3: Access & Harmony Road 09/16/2019 Synchro 10 Report Page 1 Intersection Int Delay, s/veh 0.3 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 813 19 0 988 0 22 Future Vol, veh/h 813 19 0 988 0 22 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - - 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 85 50 50 92 50 50 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 956 38 0 1074 0 44 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 497 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - - - - - 6.94 Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - - - - - 3.32 Pot Cap-1 Maneuver - - 0 - 0 519 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - - - - 519 Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB WB NB HCM Control Delay, s 0 0 12.6 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h) 519 - - - HCM Lane V/C Ratio 0.085 - - - HCM Control Delay (s) 12.6 - - - HCM Lane LOS B - - - HCM 95th %tile Q(veh) 0.3 - - - You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th TWSC 2024 Total AM.syn 5: Shields Street & Access 09/16/2019 Synchro 10 Report Page 1 Intersection Int Delay, s/veh 1.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 129 18 1160 930 127 Future Vol, veh/h 0 129 18 1160 930 127 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 0 0 - - - Veh in Median Storage, # 1 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 50 50 50 85 85 50 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 258 36 1365 1094 254 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1976 674 1348 0 - 0 Stage 1 1221 - - - - - Stage 2 755 - - - - - Critical Hdwy 6.84 6.94 4.14 - - - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 2.22 - - - Pot Cap-1 Maneuver *124 *685 738 - - - Stage 1 *523 - - - - - Stage 2 *572 - - - - - Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver *118 *685 738 - - - Mov Cap-2 Maneuver *289 - - - - - Stage 1 *497 - - - - - Stage 2 *572 - - - - - Approach EB NB SB HCM Control Delay, s 13.4 0.3 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR Capacity (veh/h) 738 - - 685 - - HCM Lane V/C Ratio 0.049 - - 0.377 - - HCM Control Delay (s) 10.1 - 0 13.4 - - HCM Lane LOS B - A B - - HCM 95th %tile Q(veh) 0.2 - - 1.8 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th TWSC 2024 Total PM.syn 5: Shields Street & Access 09/16/2019 Synchro 10 Report Page 1 Intersection Int Delay, s/veh 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 90 10 880 935 67 Future Vol, veh/h 0 90 10 880 935 67 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 0 150 - - - Veh in Median Storage, # 1 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 50 50 50 92 92 50 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 180 20 957 1016 134 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1602 575 1150 0 - 0 Stage 1 1083 - - - - - Stage 2 519 - - - - - Critical Hdwy 6.84 6.94 4.14 - - - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 2.22 - - - Pot Cap-1 Maneuver *228 *685 964 - - - Stage 1 *646 - - - - - Stage 2 *671 - - - - - Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver *223 *685 964 - - - Mov Cap-2 Maneuver *395 - - - - - Stage 1 *633 - - - - - Stage 2 *671 - - - - - Approach EB NB SB HCM Control Delay, s 12.1 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR Capacity (veh/h) 964 - - 685 - - HCM Lane V/C Ratio 0.021 - - 0.263 - - HCM Control Delay (s) 8.8 - 0 12.1 - - HCM Lane LOS A - A B - - HCM 95th %tile Q(veh) 0.1 - - 1.1 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th TWSC 2040 Total AM.syn 5: Shields Street & Access 09/16/2019 Synchro 10 Report Page 1 Intersection Int Delay, s/veh 1.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 129 18 1361 1091 127 Future Vol, veh/h 0 129 18 1361 1091 127 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 0 150 - - - Veh in Median Storage, # 2 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 50 50 50 92 92 50 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 258 36 1479 1186 254 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 2125 720 1440 0 - 0 Stage 1 1313 - - - - - Stage 2 812 - - - - - Critical Hdwy 6.84 6.94 4.14 - - - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 2.22 - - - Pot Cap-1 Maneuver *117 *633 717 - - - Stage 1 *526 - - - - - Stage 2 *474 - - - - - Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver *111 *633 717 - - - Mov Cap-2 Maneuver *330 - - - - - Stage 1 *500 - - - - - Stage 2 *474 - - - - - Approach EB NB SB HCM Control Delay, s 14.5 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR Capacity (veh/h) 717 - - 633 - - HCM Lane V/C Ratio 0.05 - - 0.408 - - HCM Control Delay (s) 10.3 - 0 14.5 - - HCM Lane LOS B - A B - - HCM 95th %tile Q(veh) 0.2 - - 2 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) HCM 6th TWSC 2040 Total PM.syn 5: Shields Street & Access 09/16/2019 Synchro 10 Report Page 1 Intersection Int Delay, s/veh 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 90 10 1032 1097 67 Future Vol, veh/h 0 90 10 1032 1097 67 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 0 150 - - - Veh in Median Storage, # 1 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 50 50 50 92 92 50 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 180 20 1122 1192 134 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1860 663 1326 0 - 0 Stage 1 1259 - - - - - Stage 2 601 - - - - - Critical Hdwy 6.84 6.94 4.14 - - - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 2.22 - - - Pot Cap-1 Maneuver *142 *633 846 - - - Stage 1 *584 - - - - - Stage 2 *622 - - - - - Platoon blocked, % 1 1 1 - - - Mov Cap-1 Maneuver *139 *633 846 - - - Mov Cap-2 Maneuver *331 - - - - - Stage 1 *570 - - - - - Stage 2 *622 - - - - - Approach EB NB SB HCM Control Delay, s 12.9 0.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR Capacity (veh/h) 846 - - 633 - - HCM Lane V/C Ratio 0.024 - - 0.284 - - HCM Control Delay (s) 9.4 - 0 12.9 - - HCM Lane LOS A - A B - - HCM 95th %tile Q(veh) 0.1 - - 1.2 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School APPENDIX F Queueing Analysis Worksheets Queues 2024 Total AM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) 292 902 231 227 439 318 176 951 180 422 883 55 v/c Ratio 0.67 0.86 0.38 0.82 0.43 0.47 0.54 0.91 0.30 0.89 0.74 0.09 Control Delay 29.8 49.4 7.5 52.2 36.2 5.9 70.4 49.1 10.0 71.9 40.6 1.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 29.8 49.4 7.5 52.2 36.2 5.9 70.4 49.1 10.0 71.9 40.6 1.6 Queue Length 50th (ft) 140 343 11 116 143 0 74 308 3 168 324 0 Queue Length 95th (ft) 168 400 27 156 161 29 90 #490 m67 #257 370 0 Internal Link Dist (ft) 341 907 438 485 Turn Bay Length (ft) 325 225 400 275 225 325 300 175 Base Capacity (vph) 445 1077 627 291 1046 692 529 1042 593 479 1195 597 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.66 0.84 0.37 0.78 0.42 0.46 0.33 0.91 0.30 0.88 0.74 0.09 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Queues 2024 Total PM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) 195 606 146 289 688 391 163 640 193 369 752 113 v/c Ratio 0.64 0.73 0.30 0.79 0.71 0.54 0.52 0.59 0.31 0.72 0.58 0.18 Control Delay 31.5 47.5 6.8 41.3 43.0 5.9 55.5 42.0 11.9 56.5 35.3 10.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 31.5 47.5 6.8 41.3 43.0 5.9 55.5 42.0 11.9 56.5 35.3 10.1 Queue Length 50th (ft) 96 233 0 151 254 0 62 181 0 142 242 9 Queue Length 95th (ft) 79 245 5 178 290 67 82 #403 69 186 #412 40 Internal Link Dist (ft) 341 907 438 485 Turn Bay Length (ft) 325 225 400 275 225 325 300 175 Base Capacity (vph) 566 1082 585 529 1065 749 615 1086 619 577 1292 638 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.34 0.56 0.25 0.55 0.65 0.52 0.27 0.59 0.31 0.64 0.58 0.18 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Queues 2040 Total AM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) 324 1047 271 252 516 373 207 1115 212 496 1022 65 v/c Ratio 0.89 0.97 0.43 1.09 0.49 0.54 0.58 0.98 0.33 1.12 0.84 0.10 Control Delay 53.9 63.2 10.5 116.3 36.8 10.3 63.5 58.8 12.3 127.0 43.9 0.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 53.9 63.2 10.5 116.3 36.8 10.3 63.5 58.8 12.3 127.0 43.9 0.3 Queue Length 50th (ft) 170 421 33 ~168 173 37 88 373 31 ~227 381 0 Queue Length 95th (ft) #204 #520 46 #240 188 67 m102 #564 m70 #336 428 0 Internal Link Dist (ft) 341 907 438 485 Turn Bay Length (ft) 325 225 400 275 225 325 300 175 Base Capacity (vph) 363 1076 629 231 1046 685 615 1135 648 443 1222 636 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.89 0.97 0.43 1.09 0.49 0.54 0.34 0.98 0.33 1.12 0.84 0.10 Intersection Summary ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Queues 2040 Total PM.syn 1: Harmony Road & Shields Street 09/16/2019 Synchro 10 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) 211 702 172 332 807 459 191 751 225 433 876 133 v/c Ratio 0.64 0.70 0.30 0.85 0.72 0.56 0.56 0.89 0.41 0.79 0.83 0.25 Control Delay 27.6 41.5 5.3 44.4 39.8 5.2 57.5 61.3 16.3 59.3 48.5 15.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 27.6 41.5 5.3 44.4 39.8 5.2 57.5 61.3 16.3 59.3 48.5 15.4 Queue Length 50th (ft) 92 256 0 165 290 0 75 247 0 165 332 21 Queue Length 95th (ft) 69 260 2 199 321 65 97 #582 80 #225 #651 60 Internal Link Dist (ft) 341 907 438 485 Turn Bay Length (ft) 325 225 400 275 225 325 300 175 Base Capacity (vph) 573 1142 627 547 1153 825 615 846 549 579 1059 540 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.37 0.61 0.27 0.61 0.70 0.56 0.31 0.89 0.41 0.75 0.83 0.25 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Queues 2024 Total AM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Lane Group EBT WBT WBR NBL NBT SBL SBT SBR Lane Group Flow (vph) 36 16 52 8 1597 374 823 190 v/c Ratio 0.35 0.16 0.35 0.02 0.75 0.78 0.26 0.13 Control Delay 48.6 55.4 19.4 12.2 20.4 30.0 2.8 1.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 48.6 55.4 19.4 12.2 20.4 30.0 2.8 1.4 Queue Length 50th (ft) 18 12 0 2 446 209 56 0 Queue Length 95th (ft) 8 35 4 7 645 220 112 16 Internal Link Dist (ft) 157 101 196 616 Turn Bay Length (ft) 175 225 325 200 Base Capacity (vph) 499 558 570 395 2136 490 3137 1424 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.07 0.03 0.09 0.02 0.75 0.76 0.26 0.13 Intersection Summary You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Queues 2024 Total PM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Lane Group EBT WBT WBR NBL NBT SBL SBT SBR Lane Group Flow (vph) 40 96 208 4 823 112 868 198 v/c Ratio 0.20 0.59 0.57 0.01 0.33 0.21 0.30 0.15 Control Delay 8.8 64.1 12.5 7.0 7.4 2.7 2.0 0.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 8.8 64.1 12.5 7.0 7.4 2.7 2.0 0.4 Queue Length 50th (ft) 0 72 0 1 109 7 29 0 Queue Length 95th (ft) 21 31 42 2 178 22 73 0 Internal Link Dist (ft) 157 101 196 616 Turn Bay Length (ft) 175 225 325 200 Base Capacity (vph) 288 255 454 434 2505 740 2868 1320 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.14 0.38 0.46 0.01 0.33 0.15 0.30 0.15 Intersection Summary You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Queues 2040 Total AM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Lane Group EBT WBT WBR NBL NBT SBL SBT SBR Lane Group Flow (vph) 36 16 52 8 1809 374 961 190 v/c Ratio 0.35 0.16 0.35 0.02 0.86 0.79 0.31 0.13 Control Delay 48.6 55.4 19.4 12.6 25.9 35.9 2.5 1.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 48.6 55.4 19.4 12.6 25.9 35.9 2.5 1.1 Queue Length 50th (ft) 18 12 0 2 584 238 52 0 Queue Length 95th (ft) 8 35 4 7 #888 m240 m114 m9 Internal Link Dist (ft) 157 101 196 616 Turn Bay Length (ft) 175 225 325 200 Base Capacity (vph) 463 517 532 338 2107 472 3137 1424 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.08 0.03 0.10 0.02 0.86 0.79 0.31 0.13 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Queues 2040 Total PM.syn 2: Shields Street & Westbury Drive 09/16/2019 Synchro 10 Report Page 1 Lane Group EBT WBT WBR NBL NBT SBL SBT SBR Lane Group Flow (vph) 40 96 208 4 954 112 1016 198 v/c Ratio 0.21 0.62 0.58 0.01 0.38 0.24 0.35 0.15 Control Delay 9.4 67.2 13.2 6.0 7.4 3.4 2.2 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 9.4 67.2 13.2 6.0 7.4 3.4 2.2 0.2 Queue Length 50th (ft) 0 72 0 1 132 6 30 0 Queue Length 95th (ft) 22 32 43 1 197 m15 68 0 Internal Link Dist (ft) 157 101 196 616 Turn Bay Length (ft) 175 225 325 200 Base Capacity (vph) 240 208 408 377 2526 697 2886 1327 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.17 0.46 0.51 0.01 0.38 0.16 0.35 0.15 Intersection Summary m Volume for 95th percentile queue is metered by upstream signal. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School APPENDIX G Student Drop-Off and Pick-Up Queuing Analysis Worksheets MSTA School Traffic Calculations AM and PM Peak Traffic Estimates (These numbers do not reflect peak hour traffic volumes) School Name: This is an Urban Charter Version: 111015 AM PM Avg. PM PM PM Average Cars / Cars / Car At one Total Peak Queue Student Student Length Time Vehicles Vehicles Length 30% 55.94% 39.15% 22.19 48.67% Grade K-10 160 20 63 31 680 199 126 885 2 15 52.91% 47.50% 22.19 46.12% Grade 11 50.08% 47.58% 22.83 55.71% Grade 12 Sum >> 160 20 63 31 680 199 126 885 204 Grade K-10 AM Trips Generated PM Trips Generated Direction Parents Buses Staff Trips Parents Buses Staff Trips IN 90 20 110 63 63 OUT 90 90 63 63 ADT 199 126 345 AM Trips Generated PM Trips Generated Direction Parents Buses Staff Trips Parents Buses Staff Trips - Average Queue Length does not IN include an alternative traffic pattern OUT required for high traffic demand days. - Average Queue Length may include the Student Loading Zone. AM Trips Generated PM Trips Generated - Peak traffic volumes at schools Direction Parents Buses Staff Trips Parents Buses Staff Trips normally occur within a 30-minute IN time period. (justifying a PHF of 0.5) OUT In 110 In 63 Out 90 Out 63 Total 199 Total 126 345 All AM TRIPS All PM TRIPS NOTES High Demand Length Calculations AM K-10 Trips PM K-10 Trips AM 11 Trips Total PM Trips PM 11 Trips Fort Collins Montessori School - Opening Enrollment AM 12 Trips PM 12 Trips MSTA School Queue Input Type School Student Population Number of Buses Staff Members Student Drivers Total AM Trips MSTA School Traffic Calculations AM and PM Peak Traffic Estimates (These numbers do not reflect peak hour traffic volumes) School Name: This is an Urban Charter Version: 111015 AM PM Avg. PM PM PM Average Cars / Cars / Car At one Total Peak Queue Student Student Length Time Vehicles Vehicles Length 30% 55.94% 39.15% 22.19 48.67% Grade K-10 300 20 118 57 1274 356 236 1657 4 27 52.91% 47.50% 22.19 46.12% Grade 11 50.08% 47.58% 22.83 55.71% Grade 12 Sum >> 300 20 118 57 1274 356 236 1657 382 Grade K-10 AM Trips Generated PM Trips Generated Direction Parents Buses Staff Trips Parents Buses Staff Trips IN 168 20 188 118 118 OUT 168 168 118 118 ADT 356 236 612 AM Trips Generated PM Trips Generated Direction Parents Buses Staff Trips Parents Buses Staff Trips - Average Queue Length does not IN include an alternative traffic pattern OUT required for high traffic demand days. - Average Queue Length may include the Student Loading Zone. AM Trips Generated PM Trips Generated - Peak traffic volumes at schools Direction Parents Buses Staff Trips Parents Buses Staff Trips normally occur within a 30-minute IN time period. (justifying a PHF of 0.5) OUT In 188 In 118 Out 168 Out 118 Total 356 Total 236 612 All AM TRIPS All PM TRIPS NOTES High Demand Length Calculations AM K-10 Trips PM K-10 Trips AM 11 Trips Total PM Trips PM 11 Trips Fort Collins Montessori School - Full Capacity Enrollment AM 12 Trips PM 12 Trips MSTA School Queue Input Type School Student Population Number of Buses Staff Members Student Drivers Total AM Trips Kimley-Horn and Associates, Inc. 096781002 – Fort Collins Montessori School APPENDIX H Conceptual Site Plan WEST HARMONY ROAD (PUBLIC ROW) SOUTH SHIELDS STREET (PUBLIC ROW) WESTBURY PUD 1ST REC. NO. 94098087 LOT 16 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 TRACT B SUBJECT PARCEL 187,034 SQ. FT. 4.294 ACRES 4626 SOUTH SHIELDS ST. PARCEL NO. 9603100009 ∆ ∆ ∆ DETENTION AREA DROP OFF LANE DROP OFF ENHANCED CONCRETE PLAZA AREA CONNECTING CONCRETE WALK TO EXISTING WALK FUTURE EMERGENCY ACCESS GATE PRIMARY PLAYGROUND (3-5 YRS.) PROPOSED PRIMARY SCHOOL CONCRETE PATIO, (TYP) PROPOSED TRASH ENCLOSURE PROPOSED RIGHT-IN / RIGHT-OUT W HARMONY RD (EAST BOUND) S SHIELDS ST (SOUTH BOUND) EXISTING MEDIAN EXISTING MEDIAN 380.6' PROPOSED ADMINISTRATION EXISTING WOOD OUT BUILDING TO REMAIN FUTURE ELEMENTRAY TEMPORARY FENCE RIGHT-IN / RIGHT-OUT / LEFT-IN 380.2' FENCE WITH PEDESTRIAN ACCESS GATE EXISTING 8' WIDE WALK EXISTING 8' WIDE WALK PROPOSED CONCRETE WALK 9' (TYP) 7' 17' 24' 17' WESTBURY PUD 1ST (RL) EXISTING RESIDENTIAL FRONT RANGE COMMUNITY COLLEGE (RL) PINEVIEW PUD PH II (NC) VACANT PINEVIEW PUD PH II (MMN) WOODLANDS CONDOS PUD (MMN) RESIDENTIAL 1109 W HARMONY RD (LMN) WESTBURY PUD 2ND (RL) EXISTING RESIDENTIAL 4626 S SHIELDS ST (LMN) EXISTING RESIDENTIAL OLT CT (EXISTING STREET TO THE SOUTH) FUTURE ASPHALT EMERGENCY ACCESS TURN-AROUND 11 10 14 8 9 5 24' 24' HC HC HC VAN) ( 95' 24' TEMPORARY MODULAR EMERGENCY GATE ONLY DROP OFF QUEUE THROUGH LANE THROUGH LANE TO RIGHT-OUT ONLY AT HARMONY RD FUTURE PARKING EXIT RIGHT-OUT ONLY AT SHIELDS ST DROP OFF QUEUE DROP OFF QUEUE FUTURE ASPHALT EMERGENCY ACCESS DRIVE 24' NATURAL PLAY AREA ELEMENTARY PLAYGROUND (5-12 YRS.) PLAZA PRIMARY OPEN AREA (3-5 YRS.) OPEN SPACE 8' 5' 8' 5' 11' DETENTION AREA ENHANCED CROSSWALK FUTURE MULTI-PURPOSE TEMPORARY MODULAR 51.9' EXISTING 6' HT. WOOD PRIVACY FENCE ALONG ENTIRE WEST BOUNDARY TO REMAIN 48" HT. PLAYGROUND FENCE 48" HT. PLAYGROUND FENCE PLAYGROUND HEADER, (TYP) FUTURE CONCRETE WALK FUTURE CONNECTING CONCRETE WALK TO EXISTING WALK NORTH 0 SCALE: 20' 40' 80' 120' 1" = 40' TFG Design, LLC 138 E 4th Street, STE #1 Loveland CO 80537 (970) 669.3737 LANDSCAPE ARCHTIECTURE PLANNNIG SHEET OF SHEET NUMBER: SHEET TITLE: REVISIONS: PROJECT INFORMATION: OWNER: DRAWN BY: David Kasprzak FILE LOCATION: X:\Shared\Projects\177 hauser architects\177-1902fc fort collins montessori school\AutoCAD\177-1902fc fort collins montessori school\DWG\Exhibits\EX2.1 SITE PLAN EXHIBIT.dwg PLOT DATE: 9/16/2019 11:39 AM PROJECT NUMBER: DATE: PHASE: www.tfgdesign.com THIS DRAWING, AS AN INSTRUMENT OF SERVICE, IS AND SHALL REMAIN THE PROPERTY OF TFG DESIGN, LLC. - THE FRONTERRA GROUP AND SHALL NOT BE REPRODUCED, PUBLISHED OR USED IN ANY WAY WITHOUT THE P ERMISSION O F T H E L ANDSCAPE ARCHITECT. The Group FronTerra 1 1 EX2.1 SITE PLAN TIS EXHIBIT SPAR (SDP) OCT 1 , 2019 177-1902FC LARIMER FORT COLLINS, COLORADO 80525 1109 W HARMONY RD PRELIMINARY SPAR SITE DEVELOPMENT PLAN FORT COLLINS MONTESSORI SCHOOL Fort Collins, Colorado Fort Collins Montessori School Calculated 9/17/2019 By:_______ Calculated 9/17/2019 By:_______ 837 890 1727 Right 166 Thru 1 Left 67 U Turns 0 Out InTotal 138 234 372 Left 1 Thru 658 Right 43 U Turns 0 Out In Total 853 702 1555 Left 13 Thru 0 Right 4 U Turns 0 OutTotal In 15 17 32 Peak Hour Begins at 02:45 PM Automobiles Peak Hour Data North Out In Total 1104 885 1989 Right 27 Thru 0 Left 9 U Turns 0 Out InTotal 504 36 540 Left 5 Thru 1064 Right 234 U Turns 0 Out In Total 624 1303 1927 Left 13 Thru 1 Right 4 U Turns 0 OutTotal In 10 18 28 Peak Hour Begins at 07:30 AM Automobiles Peak Hour Data North 4 Out In Total 951 1019 1970 Right 339 Thru 602 Left 194 U Turns 0 Out InTotal 925 1135 2060 Left 118 Thru 554 Right 152 U Turns 0 Out In Total 892 824 1716 Left 58 Thru 453 Right 85 U Turns 1 OutTotal In 802 597 1399 Peak Hour Begins at 02:45 PM Automobiles Peak Hour Data North Right 233 Thru 322 Left 102 U Turns 1 Out InTotal 1230 658 1888 Left 121 Thru 796 Right 163 U Turns 0 Out In Total 885 1080 1965 Left 127 Thru 685 Right 154 U Turns 5 OutTotal In 480 971 1451 Peak Hour Begins at 07:30 AM Automobiles Peak Hour Data North 67’ 102’ 80’ 336’ 60’ 325’ 225’ 400’ 275’ 225’ DL 325’ 350’ DL 175’ Shields St & Westbury Dr Eastbound Right Northbound Left Southbound Left Southbound Right 175’ 225’ 325’ 200’ 42’ 25’ 220’ 25’ 175’ 225’ 325’ 200’ 43’ 25’ 240’ 25’ 175’ 225’ 325’ 200’ Harmony Rd Access Northbound Right DNE 25’ C 25’ C Shields St Access Northbound Left Eastbound Right DNE DNE 25’ 45’ 150’ C 25’ 50’ 150’ C DL = Dual Lefts; DNE = Does Not Exist; C = Continuous Lane As shown in the table representing the queuing results, all anticipated queues are accommodated or managed within existing turn bay lengths with school project traffic in the 2024 project build out. At the time of project build-out, it is recommended that a 150-foot northbound left turn lane be striped at the Shields Street project access. There is currently sufficient pavement width in a full lane striped median to designate this left turn lane without widening Shields Street. By 2040, if future traffic volumes are realized, the southbound dual left turning lanes at the intersection of Harmony Road and Shields Street may need to be extended from 300 feet to 350 feet. 5.4 Student Drop-Off and Pick-Up Queuing Analysis Based on the student drop-off/pick-up vehicle queuing analysis with 300 students, 1,275 feet of vehicle stacking should be provided in order to accommodate the anticipated vehicle demands (calculations are attached in Appendix G). The Shields Street project access will primarily serve the proposed drop-off/pick-up lanes near the east side of the school building. The