HomeMy WebLinkAboutFORT COLLINS MONTESSORI SCHOOL - SPA190003 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPrepared For:
Hauser Architects, P.C.
3780 East 15th Street, Suite 201
Loveland, CO 80538
970-669-8220
Prepared By:
Coffey Engineering & Surveying, LLC
4045 St. Cloud Drive, Suite 180
Loveland, CO 80538
970-622-2095
Project No. 2259.03
October 18, 2019
FINAL DRAINAGE REPORT
FORT COLLINS MONTESSORI SCHOOL
1109 W HARMONY
FORT COLLINS, CO 80526
Fort Collins Montessori School
FINAL DRAINAGE REPORT
ENGINEER’S CERTIFICATION
I hereby certify that this Final Drainage Report for the design of stormwater management
facilities for the Fort Collins Montessori School site was prepared by me, or under my direct
supervision, in accordance with the provisions of the City of Fort Collins Stormwater Criteria
Manual for the owners thereof.
Troy W. Campbell, P.E.
Registered Professional Engineer
State of Colorado No. 41159
I. Table of Contents
I. GENERAL LOCATION AND DESCRIPTION ......................................... 1
A. Location .................................................................................................................... 1
B. Description of Property ........................................................................................... 1
II. DRAINAGE BASINS AND SUB-BASINS .................................................. 1
A. Major Basin Description ......................................................................................... 2
B. Sub-Basin Description ............................................................................................. 2
III. DRAINAGE CRITERIA ............................................................................... 3
A. Regulations ............................................................................................................... 3
B. Implementation of the “Four Step Process” .......................................................... 3
C. Development Criteria Reference and Constraints ................................................ 4
D. Hydrological Criteria............................................................................................... 5
E. Hydraulic Criteria ................................................................................................... 5
F. Modifications of Criteria ......................................................................................... 6
IV. DRAINAGE FACILITY DESIGN ............................................................... 6
A. General Concept....................................................................................................... 6
B. Specific Details ......................................................................................................... 6
V. CONCLUSIONS ............................................................................................. 6
A. Compliance with Standards .................................................................................... 6
B. Drainage Concept..................................................................................................... 7
VI. REFERENCES ............................................................................................... 7
VII. APPENDICES
A. Hydrologic Computations
Vicinity Map
Fort Collins Flood Map
FEMA FIRM Map Panel 08069C0979H
USGS Soil Map
Figure 3.4-1 Fort Collins Rainfall Intensity Curve
Table 3.4-1Fort Collins Rainfall Intensity Table
Table 3.2-2 Surface Type - Runoff Coefficients
Rational Method Calculated Composite C Tables
Rational Method Calculated Imperviousness
Rational Method Calculated Flows
B. Hydraulic Computations
Fort Collins Modified FAA Method Ponds 1-4
Stage-Storage Sizing for Detention Ponds
Water Quality Capture Volume Calculation
Restrictor Plate Calculation
Outlet Calculations
Infiltration Calculation
Spillway Calculation
Linear Bioretention Cross-Section A-A
Swale Cross-Section B-B
2' Curb Cut Calculation
Rip Rap Calculation
C. Map Pocket
Drainage Plan
Outlet Structure Detail
PAGE | 1
I. GENERAL LOCATION AND DESCRIPTION
A. Location
The proposed site is located in the northeast quarter (NE ¼) of Section 3, Township 6
North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of
Colorado. Specifically, the property is located southwest of the intersection of West
Harmony Road and South Shields Street. The property address is 1109 West Harmony
Road, Fort Collins, Colorado, 80526. (Please see the vicinity map located in the
Appendix A).
B. Description of Property
The site is 4.29 acres currently zoned as low-density mixed-use neighborhood district
(LMN). The existing site consists of a residence, detached garage, various outbuildings,
gravel access drive and native vegetation. The site is bound by Harmony Road to the
north, Shields Street to the east, and residential lots to the south and west.
The existing site is comprised of two sub-basins. The northern portion of the site,
approximately 2.17 acres, drains to the northeast corner of the site at a slope of
approximately 3 percent to an existing 3’x3’ area inlet. The southern portion of the site,
approximately 2.12 acres, sheet flows to the south onto the adjacent property.
According to the NRCS soils map survey, the native soils consist of Altvan-Satanta
Loams (a United States Department of Agriculture Type “B” hydrologic soil). These
soils have a moderate rate of water transmission.
There are no active irrigation facilities located within the proposed site area.
The development of the site will occur in two phases. This drainage report will address
the improvements for only phase I. The development of phase I consists of the
construction of a 14,700-sf Montessori school, two temporary modular buildings,
concrete sidewalks, playground area, right turn lane off Shields Street and landscaping
improvements. Parking will be provided to the north of the proposed building on an
asphalt parking lot with concrete curb and gutter allowing for site drainage. The site will
utilize four on-site detention ponds connected by equalizer pipes. The detention ponds
were designed to accommodate developed flows from both phases of development.
PAGE | 2
II. DRAINAGE BASINS AND SUB-BASINS
A. Major Basin Description
The proposed site is located within the Mail Creek Basin, located in southwest Fort Collins.
The basin has a drainage area of approximately 1676 acres and is primarily located between
Taft Hill Road and Lemay Avenue between Horsetooth Road and County Road 36. The
basin generally drains from west to east to the confluence of Mail Creek and Fossil Creek,
and ultimately to Fossil Creek Reservoir.
The site is located within the FEMA Firm Map Panel 08069C1000F but is outside of the
FEMA floodplain and floodway (see FEMA Firm Map Panel in Appendix A).
B. Sub-Basin Description
Historically, the northern portion of the site drains to the northeast corner of the site to an
existing storm sewer inlet and the southern portion of the site sheet flows to the adjacent
property to the south.
The developed site is delineated into seven sub-basins, that will generally follow historic
drainage patterns.
Sub-basin P1, (0.89 acres), consists of the northwest portion of the site, and is comprised of
a portion of the proposed building, asphalt parking lot, concrete sidewalks and landscaped
area. Runoff is directed north to the low point of the proposed parking lot. Runoff flows
through a curb cut to the proposed linear bioretention swale then east to the northern portion
of the proposed detention pond. This basin produces roughly 6.18 cfs of flow during a 100-
year event.
Sub-basin P2, (1.45 acres), consists of the southwestern portion of the site, and is comprised
of a portion of the proposed building, existing greenhouse and concrete sidewalks,
playground areas and detention pond. Runoff is directed southwest towards the proposed
detention pond. Runoff is then directed through a storm pipe to the ultimate outlet point
located in the sub-basin P3 detention pond. This basin produces roughly 3.30 cfs of flow
during a 100-year event.
Sub-basin P3, (0.53 acres), consists of the northeast portion of the site, and is comprised of a
portion of the asphalt drive aisle, concrete sidewalks and detention pond. The asphalt drive
aisle is shaped as an oval with the detention pond located in the center. Runoff drains
towards the center of the drive aisle through curb cuts to the proposed detention pond.
Runoff exits the proposed detention pond through an outlet structure designed to release
runoff at the 2-year historic rate. This basin produces roughly 4.57 cfs of flow during a 100-
year event.
PAGE | 3
Sub-basin P4, (0.39 acres), consists of the southeast portion of the site, and is comprised of a
portion of the asphalt drive aisle, landscaping and detention pond. Runoff drains east
towards the flowline of the drive aisle then south to a proposed curb cut to the proposed
detention pond. Runoff exits the proposed detention pond through a storm pipe to the
proposed detention pond located in sub-basin P3. This basin produces roughly 2.28 cfs of
flow during a 100-year event.
Sub-basin P5, (0.07 acres), consists of the central portion of the site, and is comprised of a
portion of the proposed building, concrete sidewalks and landscaping. Runoff is directed
towards a 12” catch basin located at the center of the basin. Runoff is directed through a
storm pipe to the proposed detention pond located in sub-basin P3. This basin produces
roughly 0.72 cfs of flow during a 100-year event.
Sub-basin P6, (1.55 acres), consists of the south-central portion of the site, and is comprised
of landscaped area. Runoff sheet flows south to the adjacent property. This basin produces
roughly 0.89 cfs of flow during a 100-year event, which is less than the historic rate of 1.50
cfs that currently drains onto the property to the south.
Sub-basin P7, (0.13 acres), consists of the northeastern portion of the site, and is comprised
of landscaped area. Runoff sheet flows east to the flowline of South Shields Street. This
basin produces roughly 0.16 cfs of flow during a 100-year event.
Currently, offsite flows do not enter the site property. This will not change after the site has
been developed.
III. DRAINAGE CRITERIA
C. Regulations
Drainage design criteria specified in the Fort Collins Stormwater Criteria Manual and the
Urban Storm Drainage Criteria Manual, Volume 3 by the Urban Drainage and Flood
Control District (UDFCD) have been referenced in the preparation of this study.
D. Implementation of the “Four Step Process”
Our stormwater management strategy utilizes the “Four Step Process” to minimize adverse
impacts of urbanization on receiving waters, as follows:
Step 1 – Employ Runoff Reduction Practices.
To reduce runoff peaks, volumes and pollutant loads from urbanizing areas, implement LID
strategies, including Minimizing Directly Connected Impervious Area (MDCIA). LID
practices reduce unnecessary impervious areas and route runoff from impervious surfaces
PAGE | 4
over permeable areas to slow runoff (increase time of concentration) and promote
infiltration.
A linear bioretention swale will be utilized to minimize the directly connected impervious
areas. Runoff from the northern portion asphalt parking lot will be routed through a
bioswale to slow flows and allow for infiltration. The site contains Type “B” soils, which
will also help promote infiltration.
Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV)
with Slow Release.
After runoff has been minimized, the remaining runoff should be treated through capture
and slow release of the WQCV. Extended detention basins will be utilized to ensure that
runoff is released at the 2-year historic rate and provided water quality during minor storm
events.
Step 3 – Stabilize Drainageways.
Mail Creek is the governing drainageway for the proposed site. By improving the water
quality, limiting runoff to 2-year historic rates and increasing infiltration, the likelihood of
bed and bank erosion caused by runoff from this site is reduced. The Mail Creek Master
Plan update is currently underway. The development of this site will not impede the
progress of the master plan.
Step 4 – Implement Site Specific and Other Source Control BMPs.
Linear Bioretention (Bioswale): Linear bioretention has low longitudinal slopes and broad
cross-sections that convey flow in a slow and shallow manner, thereby facilitating
sedimentation and filtering while limiting erosion. Berms or check dams may be
incorporated into the facility to reduce velocities and encourage settling and infiltration.
Linear bioretention is an integral part of the LID concept.
Extended Detention Basin: An extended detention basin (EDB) is a sedimentation basin
designed to detain stormwater for many hours after storm runoff ends. This BMP is similar
to a detention basin used for flood control, however; the EBD uses a much smaller outlet
that extends the emptying time of the more frequently occurring runoff events to facilitate
pollutant removal.
E. Development Criteria Reference and Constraints
The criteria used as the basis for analysis and design of stormwater management
improvements for this site are found in the references cited.
PAGE | 5
To the knowledge of the author, there are no other capital drainage improvements planned
for the site that would constrain or otherwise influence the design of the stormwater
improvements for this site.
F. Hydrological Criteria
Stormwater runoff is analyzed for storms with 2-year and 100-year return frequencies.
The Rational Method was chosen for this small site. The Rational Method provides that:
Q = CIA, where:
Q = Design flow in cubic feet per second (cfs)
C = Coefficient of runoff for the area under consideration
I = Rainfall intensity for the design storm duration (in/hr)
A = Area of the drainage sub-basin under consideration (ac)
Peak flows were calculated using the Rational Method for the 2-year and 100-year storm
events. This software uses the local 1-hour rainfall depth and Fort Collins rainfall
intensities, calculated as a function of the time of concentration. These values were
obtained by the City of Fort Collins Rainfall Intensity-Duration-Frequency (IDF)
curve/table; Figure 3.4-1 and Table 3.4-1, and can be found in Appendix A. Additionally,
per the City of Fort Collins, the “C’ coefficients have been multiplied by the appropriate
storm frequency factors.
“C” values were taken from Table 3.2-2, Surface Types – Runoff Coefficients (See
Appendix A). Soils of hydrologic soil type “B” dominate the site. Onsite runoff was
calculated to determine the runoff differential between existing and developed conditions for
use in sizing the WQCV as required by the FCSDM. The hydrologic basin parameters and
runoff rates are included in the Appendices.
The design worksheets included in the Appendices to this Final Drainage Report present
documentation of the hydrologic calculations for the on-site storm drainage systems. We
modified Urban Drainage spreadsheets to incorporate Fort Collins criteria as follows:
• The Modified FAA spreadsheet incorporates the rainfall data from the Fort Collins
Stormwater Criteria Manual, Table 3.4-1.
G. Hydraulic Criteria
Within this development, all runoff will be conveyed on the surface, initially as sheet flow
and subsequently as concentrated flow in swales, bioswales, and curb & gutter. The
assessment of required capacity and the sizing of the respective components of the drainage
system are based on the anticipated runoff from the 100-year storm event. The surface
runoff will culminate into an on-site detention pond.
PAGE | 6
H. Modifications of Criteria
There are no modifications or variances requested in connection with the design of the
stormwater management for the Fort Collins Montessori School development.
IV. DRAINAGE FACILITY DESIGN
I. General Concept
The storm drainage system is designed to safely convey developed storm flows by sheet
flow, pipe flow, concentrated swale and gutter flow to the detention pond.
The design worksheets included in the Appendices to this Final Drainage Report present
details of the hydrologic and hydraulic calculations pertinent to the design of the on-site
storm drainage system. A drainage plan, showing the proposed development of the site and
developed drainage patterns is included in the map pocket following the Appendices.
J. Specific Details
The site will utilize on-site detention ponds located throughout. Runoff will enter the
detention system through a proposed bioswale or through a series of storm sewer PVC
pipes. The proposed detention ponds have a capacity of approximately 25,575 cubic feet.
The required detention for the site is 25,150 cubic feet. The detention pond will drain
through an outlet structure with a release rate of 1.20 cfs. The 100-year release rate was
based off the 2-year historic flow rate. The proposed detention pond will have three
controlled release rates. The detention pond has a water quality volume of 7,100 cubic feet
and a release rate of 0.08 cfs through three ¾” orifices at 1’ intervals. Runoff exceeding the
water quality elevation of 5087.0 will flow through a grated lid into the 18” outlet pipe. This
pipe will be covered by a restrictor plate to control the release rate to 1.20 cfs. Runoff
greater than a 100-year event will exit the detention pond through an emergency spillway at
a rate no greater than the 100-year developed flow. The 100-year WSEL is 5088.60’ with 1’
of freeboard provided.
V. CONCLUSIONS
K. Compliance with Standards
The drainage design for the Fort Collins Montessori School Site follows the requirements of
the Fort Collins Stormwater Criteria Manual as well as the City’s floodplain regulations.
The criteria and recommendations of the Urban Storm Drainage Criteria Manual are also
reflected in the design of the drainage systems.
PAGE | 7
L. Drainage Concept
The drainage design for the Fort Collins Montessori School site will safely convey onsite
flows from the development into extended detention basin. Water quality treatment will be
achieved by the extended detention basin system and linear bioretention.
VI. REFERENCES
“Fort Collins Stormwater Criteria Manual”, City of Fort Collins, Adopted December 2018.
Natural Resources Conservation Service Web Soil Survey at websoilsurvey.nrcs.usda.gov/app
Urban Storm Drainage Criteria Manual, Volumes 1, 2, and 3, Urban Drainage and Flood Control
District, April 2008.
VII. APPENDICES
A. Hydrologic Computations
Vicinity Map
Fort Collins Flood Map
FEMA FIRM Map Panel 08069C0979H
USGS Soil Map
Figure 3.4-1 Fort Collins Rainfall Intensity Curve
Table 3.4-1Fort Collins Rainfall Intensity Table
Table 3.2-2 Surface Type - Runoff Coefficients
Rational Method Calculated Composite C Tables
Rational Method Calculated Imperviousness
Rational Method Calculated Flows
Soil Map—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/28/2019
Page 1 of 3
4485700 4485720 4485740 4485760 4485780 4485800 4485820 4485840 4485860 4485880 4485900
4485700 4485720 4485740 4485760 4485780 4485800 4485820 4485840 4485860 4485880 4485900
491690 491710 491730 491750 491770 491790 491810 491830 491850
491690 491710 491730 491750 491770 491790 491810 491830 491850
40° 31' 25'' N
105° 5' 53'' W
40° 31' 25'' N
105° 5' 46'' W
40° 31' 18'' N
105° 5' 53'' W
40° 31' 18'' N
105° 5' 46'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 50 100 200 300
Feet
0 15 30 60 90
Meters
Map Scale: 1:1,050 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
3 Altvan-Satanta loams, 0 to 3
percent slopes
4.7 100.0%
Totals for Area of Interest 4.7 100.0%
Soil Map—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/28/2019
Page 3 of 3
USGS The National Map: Orthoimagery. Data refreshed April, 2019.
National Flood Hazard Layer FIRMette
0 250 500 1,000 1,500 2,000 Feet
Ü
105°6'8.45"W
40°31'34.63"N
105°5'30.99"W
40°31'7.28"N
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
HAZARD SPECIAL FLOOD AREAS
Without Zone A, V, Base A99 Flood Elevation (BFE)
With BFE or Depth Zone AE, AO, AH, VE, AR
Regulatory Floodway
0.of 2% 1% Annual annual Chance chance Flood flood with Hazard, average Areas
depth areasdrainage of less less than than one one foot square or with mile
Zone X
Future ChanceAnnual Conditions Flood Hazard 1%
Zone X
Area Levee.to with See Reduced Notes. Flood Risk due
Zone X
Area with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This digital map flood complies maps if with it is FEMA's not void standards as described for the below. use of
The accuracy basemap standards shown complies with FEMA's basemap
The authoritative flood hazard NFHL information web services is derived provided directly by FEMA. from This the map
was reflectnot exported changes on or 8/amendments 28/2019 at 2:subsequent 46:08 PM to and this does date and
time. becomeor The superseded NFHL and effective by new data information over time. may change
This elementsmap map image do not is appear: void if basemap the one or imagery, more of flood the following zone labels,
legend, FIRM panel scale number, bar, map and creation FIRM effective date, community date. Map identifiers,images for
unmapped regulatoryfor purposes. and unmodernized areas cannot be used
Legend
OTHER FLOOD AREAS HAZARD OF
OTHER AREAS
STRGUECNTUERREASL
FEATURES OTHER
MAP PANELS
8
1:6,000
B 20.2
The point pin selected displayed by the on the user map and is does an approximate not represent
an authoritative property location.
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.4 Intensity-Duration-Frequency Curves for Rational Method
Page 8
Table 3.4-1. IDF Table for Rational Method
Duration
(min)
Intensity
2-year
(in/hr)
Intensity
10-year
(in/hr)
Intensity
100-year
(in/hr)
Duration
(min)
Intensity
2-year
(in/hr)
Intensity
10-year
(in/hr)
Intensity
100-year
(in/hr)
5 2.85 4.87 9.95
39 1.09 1.86 3.8
6 2.67 4.56 9.31
40 1.07 1.83 3.74
7 2.52 4.31 8.80
41 1.05 1.80 3.68
8 2.40 4.10 8.38
42 1.04 1.77 3.62
9 2.30 3.93 8.03
43 1.02 1.74 3.56
10 2.21 3.78 7.72
44 1.01 1.72 3.51
11 2.13 3.63 7.42
45 0.99 1.69 3.46
12 2.05 3.50 7.16
46 0.98 1.67 3.41
13 1.98 3.39 6.92
47 0.96 1.64 3.36
14 1.92 3.29 6.71
48 0.95 1.62 3.31
15 1.87 3.19 6.52
49 0.94 1.6 3.27
16 1.81 3.08 6.30
50 0.92 1.58 3.23
17 1.75 2.99 6.10
51 0.91 1.56 3.18
18 1.70 2.90 5.92
52 0.9 1.54 3.14
19 1.65 2.82 5.75
53 0.89 1.52 3.10
20 1.61 2.74 5.60
54 0.88 1.50 3.07
21 1.56 2.67 5.46
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.4 Intensity-Duration-Frequency Curves for Rational Method
Page 9
Figure 3.4-1. Rainfall IDF Curve – Fort Collins
Composite C Values
Fort Collins Montessori School
Total Area Minor (2-YR) Major (100-YR)
(acres)
Runoff
Coefficent
Runoff Coefficent
- E1 0.00 0.05 0.24 0.10 1.78 2.17 0.20 0.25
- E2 0.00 0.00 0.00 0.01 2.11 2.12 0.10 0.13
- Site 0.00 0.05 0.24 0.11 3.89 4.29 0.15 0.19
1 P1 0.31 0.08 0.00 0.13 0.37 0.89 0.60 0.75
2 P2 0.00 0.09 0.07 0.20 1.09 1.45 0.29 0.36
3 P3 0.25 0.10 0.00 0.02 0.16 0.53 0.69 0.87
4 P4 0.16 0.01 0.00 0.00 0.22 0.39 0.47 0.59
5 P5 0.00 0.02 0.00 0.04 0.01 0.07 0.83 1.00
- P6 0.00 0.01 0.03 0.02 0.77 0.83 0.15 0.18
- P7 0.00 0.00 0.00 0.00 0.13 0.13 0.10 0.13
Phase I Site 0.72 0.31 0.10 0.41 2.75 4.29 0.39 0.49
Phase II Full Site 1.03 0.37 0.10 0.73 2.06 4.29 0.53 0.66
Notes: Values from Fort Collins Stormwater Criteria Manual Table 3.2-2
Developed
Design Point Basin(s)
Existing
Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres)
RJP Rational Method Flow Calculations.xlsx 10/14/2019
Imperviousness
Fort Collins Montessori School
Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres) Total Area Percent
(I = 100) (I = 100) (I = 40) (I = 90) (I = 2) (acres) Imperviousness
- E1 0.00 0.05 0.24 0.10 1.78 2.17 13%
- E2 0.00 0.00 0.00 0.01 2.11 2.12 2%
- Site 0.00 0.05 0.24 0.11 3.89 4.29 8%
1 P1 0.31 0.08 0.00 0.13 0.37 0.89 58%
2 P2 0.00 0.09 0.07 0.20 1.09 1.45 22%
3 P3 0.25 0.10 0.00 0.02 0.16 0.53 70%
4 P4 0.16 0.01 0.00 0.00 0.22 0.39 45%
5 P5 0.00 0.02 0.00 0.04 0.01 0.07 80%
- P6 0.00 0.01 0.03 0.02 0.77 0.83 7%
- P7 0.00 0.00 0.00 0.00 0.13 0.13 2%
Phase I Site 0.72 0.31 0.10 0.41 2.75 4.29 35%
Phase II Full Site 1.03 0.37 0.10 0.73 2.06 4.29 50%
Notes: Values from Fort Collins Stormwater Criteria Manual Table 4.1-3
Developed
Design Point Basin (s)
Existing
RJP Rational Method Flow Calculations.xlsx 10/14/2019
Individual Basin Flow Calculations
Fort Collins Montessori School
Area Minor Major
(acres)
Composite
"C"
Composite
"C"
Length
(ft)
Slope
(%)
Minor tov
(min)a
Major tov
(min)a
Length
(ft)
Slope
(%)
Channel
Type
Velocity
(fps)c
tt (min)
Minor TC
(min)
Major TC (min) 2-yr 100-yr 2-yr 100-yr
D1 E1 2.17 0.20 0.25 200 3.00 15.94 15.04 0 0.50 PA 1.41 0.00 15.94 15.04 1.87 6.52 0.82 3.59
D2 E2 2.12 0.10 0.13 200 3.00 17.70 17.24 0 0.50 PA 1.41 0.00 17.70 17.24 1.70 5.92 0.37 1.63
D3 Site 4.29 0.15 0.19 200 3.00 16.81 16.12 0 0.50 PA 1.41 0.00 16.81 16.12 1.81 6.30 1.20 5.21
1 P1 0.89 0.60 0.75 100 2.00 7.23 5.09 100 0.50 GW 1.06 1.5713 8.80 6.66 2.40 9.31 1.27 6.18
2 P2 1.45 0.29 0.36 210 2.00 16.87 15.37 0 0.50 GW 1.06 0.0000 16.87 15.37 1.75 6.30 0.73 3.30
3 P3 0.53 0.69 0.87 26 3.00 2.60 1.49 90 0.50 PA 1.41 1.0607 5.00 5.00 2.85 9.95 1.05 4.57
4 P4 0.39 0.47 0.59 35 2.00 5.35 4.35 130 0.50 PA 1.41 1.5321 6.88 5.88 2.67 9.95 0.49 2.28
5 P5 0.07 0.83 1.00 10 2.00 1.23 0.45 0 0.50 GW 1.06 0.0000 5.00 5.00 2.85 9.95 0.17 0.70
- P6 0.83 0.15 0.18 200 2.00 19.40 18.66 0 0.50 GW 1.06 0.0000 19.40 18.66 1.65 5.92 0.20 0.89
- P7 0.13 0.10 0.13 60 15.00 5.72 5.58 0 0.50 GW 1.06 0.0000 5.72 5.58 2.85 9.95 0.04 0.16
Phase I Site 4.29 0.39 0.49 100 2.00 10.13 8.71 100 0.50 GW 1.06 1.5713 11.70 10.29 2.13 7.72 3.61 16.34
Phase II Full Site 4.29 0.53 0.66 100 2.00 8.17 6.26 100 0.50 GW 1.06 1.5713 9.74 7.83 2.30 8.80 5.24 25.07
Notes:
HM = Heavy Meadow, TF = Tillage/field, PL = Short pasture and lawns, BG = Nearly bare ground, GW = Grassed Waterway, PA = Paved Areas
Design
Point
Developed
Existing
Initial/Overland Time Final TC Intensity (in/hr) Basin Flows (cfs)
Basin (s)
Travel Time
RJP Rational Method Flow Calculations.xlsx 10/14/2019
B. Hydraulic Computations
Fort Collins Modified FAA Method Ponds 1-4
Stage-Storage Sizing for Detention Ponds
Water Quality Capture Volume Calculation
Restrictor Plate Calculation
Outlet Calculations
Infiltration Calculation
Spillway Calculation
Linear Bioretention Cross-Section A-A
Swale Cross-Section B-B
2' Curb Cut Calculation
Rip Rap Calculation
Project: Fort Collins Montessori School
Basin ID:
Design Information Input:
Detemination of MINOR Detention Volume Using Modified FAA Method: Detemination of MAJOR Detention Volume Using Modified FAA Method:
Catchment Drainage Area A= 4.29 acres Catchment Drainage Area A= 4.29 acres
Catchment Drainage Imperviousness Ia
= 50 percent Catchment Drainage Imperviousness I
a= 50 percent
Return Period for Detention Control T= 2 years (2 or 100) Return Period for Detention Control T= 100 years (2 or 100)
Time of Concentration of Watershed Tc= 10 minutes Time of Concentration of Watershed Tc= 8 minutes
NRCS Soil Group Type= B A, B, C, or D NRCS Soil Group Type= B A, B, C, or D
Allowable Unit Release Rate q= 0.018 cfs/acre Allowable Unit Release Rate q= 0.28 cfs/acre
Runoff Coefficient C= 0.49 Runoff Coefficient C= 0.66
Inflow Peak Runoff Qp-in= 5.21 cfs Inflow Peak Runoff Qp-in= 28.35 cfs
Allowable Peak Outflow Rate Qp-out= 0.08 cfs Allowable Peak Outflow Rate Qp-out= 1.20 cfs
Modified FAA Minor Storage Volume= 6,864 cubic feet Modified FAA Major Storage Volume= 25,142 cubic feet
Rainfall Rainfall Inflow Outflow Storage Rainfall Rainfall Inflow Outflow Storage
Duration Intensity Volume Volume Volume Duration Intensity Volume Volume Volume
minutes inches / hr cubic feet cubic feet cubic feet minutes inches / hr cubic feet cubic feet cubic feet
(input) (output) (output) (output) (output) (input) (output) (output) (output) (output)
0 0.00 0 0 0 0 0.00 0 0 0
5 2.85 1,797 23 1,774 5 9.95 7,607 359 7,247
10 2.21 2,787 46 2,741 10 7.72 11,804 718 11,085
15 1.87 3,538 69 3,468 15 6.52 14,953 1,077 13,876
20 1.61 4,061 93 3,969 20 5.60 17,124 1,436 15,688
25 1.43 4,509 116 4,393 25 4.98 19,036 1,795 17,240
30 1.30 4,919 139 4,780 30 4.52 20,733 2,154 18,578
35 1.17 5,165 162 5,003 35 4.08 21,833 2,514 19,320
40 1.07 5,398 185 5,213 40 3.74 22,873 2,873 20,001
45 0.99 5,619 208 5,410 45 3.46 23,806 3,232 20,574
50 0.92 5,802 232 5,570 50 3.23 24,693 3,591 21,102
55 0.87 6,035 255 5,780 55 3.03 25,480 3,950 21,530
60 0.82 6,205 278 5,927 60 2.86 26,237 4,309 21,928
65 0.78 6,395 301 6,093 65 2.71 26,933 4,668 22,265
70 0.73 6,445 324 6,121 70 2.59 27,720 5,027 22,693
75 0.70 6,622 347 6,274 75 2.48 28,439 5,386 23,052
80 0.66 6,659 371 6,289 80 2.38 29,111 5,745 23,366
85 0.64 6,861 394 6,467 85 2.29 29,761 6,104 23,657
90 0.61 6,924 417 6,507 90 2.21 30,411 6,463 23,948
95 0.58 6,950 440 6,509 95 2.13 30,938 6,822 24,116
100 0.56 7,063 463 6,600 100 2.06 31,496 7,181 24,315
105 0.54 7,151 486 6,665 105 2.00 32,108 7,541 24,568
110 0.52 7,214 510 6,705 110 1.94 32,628 7,900 24,728
115 0.51 7,397 533 6,864 115 1.88 33,056 8,259 24,797
120 0.49 7,416 556 6,860 120 1.84 33,759 8,618 25,142
City of Fort Collins Modified FAA Method
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.09 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5083.60 (input) 0 0.000 0.000
5084.00 0.00 0.00 263 53 0.006 0.001
5084.50 0.00 0.00 856 332 0.020 0.008
5085.00 0.00 0.00 1,353 885 0.031 0.020
5085.50 0.00 0.00 1,837 1,682 0.042 0.039
5086.00 0.00 0.00 2,348 2,728 0.054 0.063
5086.50 0.00 0.00 2,883 4,036 0.066 0.093
5087.00 0.00 0.00 3,444 5,618 0.079 0.129
5087.50 0.00 0.00 4,029 7,486 0.092 0.172
5088.00 0.00 0.00 4,640 9,653 0.107 0.222
5088.50 0.00 0.00 5,275 12,132 0.121 0.279
5088.60 0.00 0.00 5,405 12,666 0.124 0.291 100-YR
5089.10 0.00 0.00 5,070 15,285 0.116 0.351
5089.60 0.00 0.00 6,770 18,245 0.155 0.419
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Detention Pond 1
Detention Pond 1_v2.35.xls, Basin 10/14/2019, 4:57 PM
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.09 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5086.10 (input) 0 0.000 0.000
5086.50 0.00 0.00 95 19 0.002 0.000
5087.00 0.00 0.00 190 90 0.004 0.002
5087.50 0.00 0.00 560 278 0.013 0.006
5088.00 0.00 0.00 924 649 0.021 0.015
5088.50 0.00 0.00 1,321 1,210 0.030 0.028
5088.60 0.00 0.00 1,404 1,346 0.032 0.031 100-YR
5089.10 0.00 0.00 1,837 2,157 0.042 0.050
5089.60 0.00 0.00 2,300 3,191 0.053 0.073
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Detention Pond 2
Detention Pond 2_v2.35.xls, Basin 10/14/2019, 4:01 PM
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.09 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5084.95 (input) 0 0.000 0.000
5085.00 0.00 0.00 31 1 0.001 0.000
5085.50 0.00 0.00 374 102 0.009 0.002
5086.00 0.00 0.00 815 399 0.019 0.009
5086.50 0.00 0.00 1,249 915 0.029 0.021
5087.00 0.00 0.00 1,718 1,657 0.039 0.038
5087.50 0.00 0.00 2,220 2,642 0.051 0.061
5088.00 0.00 0.00 2,755 3,885 0.063 0.089
5088.60 0.00 0.00 3,442 5,744 0.079 0.132 100-YR
5089.60 0.00 0.00 4,676 9,803 0.107 0.225
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Detention Pond 3
Detention Pond 3_v2.35.xls, Basin 10/14/2019, 4:02 PM
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.09 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5086.70 (input) 0 0.000 0.000
5087.00 0.00 0.00 130 20 0.003 0.000
5087.50 0.00 0.00 1,437 411 0.033 0.009
5088.00 0.00 0.00 5,188 2,068 0.119 0.047
5088.60 0.00 0.00 7,309 5,817 0.168 0.134 100-YR
5089.60 0.00 0.00 9,152 14,047 0.210 0.322
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Detention Pond 4
Detention Pond 4_v2.35.xls, Basin 10/14/2019, 4:04 PM
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.10 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5083.60 (input) 0 0.000 0.000
5084.00 0.00 0.00 263 53 0.006 0.001
5084.50 0.00 0.00 856 332 0.020 0.008
5085.00 0.00 0.00 1,384 892 0.032 0.020
5085.50 0.00 0.00 2,211 1,791 0.051 0.041
5086.00 0.00 0.00 3,163 3,135 0.073 0.072
5086.50 0.00 0.00 4,227 4,982 0.097 0.114
5087.00 0.00 0.00 5,482 7,409 0.126 0.170 WQCV
5087.50 0.00 0.00 8,246 10,841 0.189 0.249
5088.00 0.00 0.00 13,507 16,280 0.310 0.374
5088.60 0.00 0.00 17,560 25,600 0.403 0.588 100-YR
5089.60 0.00 0.00 22,898 45,829 0.526 1.052
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Detention Pond System
Detention Pond Outlet Design File_v2.35.xls, Basin 10/14/2019, 4:07 PM
Project:
Basin ID:
WQCV Design Volume (Input):
Catchment Imperviousness, Ia = 50.0 percent
Catchment Area, A = 4.29 acres Diameter of holes, D = 0.820 inches
Depth at WQCV outlet above lowest perforation, H = 3 feet Number of holes per row, N = 1
Vertical distance between rows, h = 12.00 inches OR
Number of rows, NL = 3.00
Orifice discharge coefficient, Co = 0.60 Height of slot, H = inches
Slope of Basin Trickle Channel, S = 0.010 ft / ft Width of slot, W = inches
Time to Drain the Pond = 40 hours
Watershed Design Information (Input): 3.4
Percent Soil Type A = 0 %
Percent Soil Type B = 100 %
Percent Soil Type C/D = 0 %
Outlet Design Information (Output):
Water Quality Capture Volume, WQCV = 0.229 watershed inches
Water Quality Capture Volume (WQCV) = 0.082 acre-feet 0.00
Design Volume (WQCV / 12 * Area * 1.2) Vol = 0.098 acre-feet
Outlet area per row, Ao = 0.53 square inches
Total opening area at each row based on user-input above, Ao = 0.53 square inches
Total opening area at each row based on user-input above, Ao = 0.004 square feet
3
Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 ΣΣΣΣ
5083.60 5084.60 5085.60 Flow
5083.60 0.0000 0.0000 0.0000 0.00
5084.00 0.0112 0.0000 0.0000 0.01
5084.50 0.0168 0.0000 0.0000 0.02
5085.00 0.0244 0.0168 0.0000 0.04
5085.50 0.0274 0.0209 0.0112 0.06
5086.00 0.0274 0.0209 0.0112 0.06
5086.50 0.0301 0.0244 0.0168 0.07
5087.00 0.0326 0.0274 0.0209 0.08
5087.50 0.0349 0.0301 0.0244 0.09
5088.00 0.0371 0.0326 0.0274 0.10
5088.60 0.0395 0.0353 0.0306 0.11
5089.60 0.0433 0.0395 0.0353 0.12
Central Elevations of Rows of Holes in feet
Collection Capacity for Each Row of Holes in cfs
STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET
Fort Collins Montessori School
Detention Pond System
Detention Pond Outlet Design File_v2.35.xls, WQCV 10/14/2019, 4:13 PM
Project:
Basin ID:
X
1
#1 Vertical #2 Vertical
Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input) Orifice Orifice
Water Surface Elevation at Design Depth Elev: WS = 5,088.60 feet
Pipe/Vertical Orifice Entrance Invert Elevation Elev: Invert = 5,083.60 feet
Required Peak Flow through Orifice at Design Depth Q = 1.20 cfs
Pipe/Vertical Orifice Diameter (inches) Dia = 18.0 inches
Orifice Coefficient Co = 0.60
Full-flow Capacity (Calculated)
Full-flow area Af = 1.77 sq ft
Half Central Angle in Radians Theta = 3.14 rad
Full-flow capacity Qf = 17.5 cfs
Percent of Design Flow = 1462%
Calculation of Orifice Flow Condition
Half Central Angle (0<Theta<3.1416) Theta = 0.69 rad
Flow area Ao = 0.11 sq ft
Top width of Orifice (inches) To = 11.49 inches
Height from Invert of Orifice to Bottom of Plate (feet) Yo = 0.17 feet
Elevation of Bottom of Plate Elev Plate Bottom Edge = 5,083.77 feet
Resultant Peak Flow Through Orifice at Design Depth Qo = 1.2 cfs
Width of Equivalent Rectangular Vertical Orifice Equivalent Width = 0.65 feet
Centroid Elevation of Equivalent Rectangular Vertical Orifice Equiv. Centroid El. = 5,083.69 feet
Fort Collins Montessori School
Detention Pond System
RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES
Detention Pond Outlet Design File_v2.35.xls, Restrictor Plate 10/14/2019, 4:14 PM
Project:
Basin ID:
Design Information (Input): #1 Horiz. #2 Horiz. #1 Vert. #2 Vert.
Circular Opening: Diameter in Inches Dia. = inches
OR
Rectangular Opening: Width in Feet W = 3.00 0.65 ft.
Length (Height for Vertical) L or H = 3.00 0.17 ft.
Percentage of Open Area After Trash Rack Reduction % open = 50 100 %
Orifice Coefficient Co
= 0.67 0.60
Weir Coefficient Cw
= 3.00
Orifice Elevation (Bottom for Vertical) Eo
= 5087.00 5,083.60 ft.
Calculation of Collection Capacity:
Net Opening Area (after Trash Rack Reduction) Ao
= 4.50 0.11 sq. ft.
OPTIONAL: User-Overide Net Opening Area Ao
= sq. ft.
Perimeter as Weir Length Lw
= 9.00 ft.
OPTIONAL: User-Overide Weir Length Lw
= ft.
Top Elevation of Vertical Orifice Opening, Top = 5083.77 ft.
Center Elevation of Vertical Orifice Opening, Cen = 5083.69 ft.
Horizontal Orifices Vertical Orifices
Labels Water WQCV #1 Horiz. #1 Horiz. #2 Horiz. #2 Horiz. #1 Vert. #2 Vert. Total Target Volumes
for WQCV, Minor, Surface Plate/Riser Weir Orifice Weir Orifice Collection Collection Collection for WQCV, Minor,
& Major Storage Elevation Flow Flow Flow Flow Flow Capacity Capacity Capacity & Major Storage
W.S. Elevations ft cfs cfs cfs cfs cfs cfs cfs cfs Volumes
(input) (linked) (User-linked) (output) (output) (output) (output) (output) (output) (output) (link for goal seek)
5083.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5084.00 0.01 0.00 0.00 0.00 0.00 0.30 0.00 0.01
5084.50 0.02 0.00 0.00 0.00 0.00 0.48 0.00 0.02
5085.00 0.04 0.00 0.00 0.00 0.00 0.61 0.00 0.04
5085.50 0.06 0.00 0.00 0.00 0.00 0.71 0.00 0.06
5086.00 0.06 0.00 0.00 0.00 0.00 0.81 0.00 0.06
5086.50 0.07 0.00 0.00 0.00 0.00 0.89 0.00 0.07
5087.00 0.08 0.00 0.00 0.00 0.00 0.96 0.00 0.08 WQCV
5087.50 0.09 9.55 17.11 0.00 0.00 1.03 0.00 1.03
5088.00 0.10 27.00 24.20 0.00 0.00 1.10 0.00 1.10
5088.60 0.11 54.64 30.60 0.00 0.00 1.17 0.00 1.17 100-Year
5089.60 0.12 113.19 39.01 0.00 0.00 1.29 0.00 1.29
Routing 3: Single Stage - Water flows through WQCV plate and #1 horizontal opening into #1 vertical opening. This flow will be
applied to culvert sheet (#2 vertical & horizontal openings is not used).
STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL)
Fort Collins Montessori School
Detention Pond System
Current Routing Order is #3
W.S. EL. WQ
W.S. EL. Minor
W.S. EL. Major
WQ
H1
H2
V1 V2
Routing Order #1 (Standard)
V1
W.S. EL. WQ
W.S. EL. Design Storm
Project:
Basin ID:
Design Information (input):
Bottom Length of Weir L = 8.00 feet
Angle of Side Slope Weir Angle = 45.00 degrees
Elev. for Weir Crest EL. Crest = 5,088.60 feet
Coef. for Rectangular Weir Cw = 2.50
Coef. for Trapezoidal Weir Ct = 2.20
Calculation of Spillway Capacity (output):
Water Rect. Triangle Total Total
Surface Weir Weir Spillway Pond
Elevation Flowrate Flowrate Release Release
ft. cfs cfs cfs cfs
(linked) (output) (output) (output) (output)
5083.60 0.00 0.00 0.00 0.00
5084.00 0.00 0.00 0.00 0.00
5084.50 0.00 0.00 0.00 0.00
5085.00 0.00 0.00 0.00 0.00
5085.50 0.00 0.00 0.00 0.00
5086.00 0.00 0.00 0.00 0.00
5086.50 0.00 0.00 0.00 0.00
5087.00 0.00 0.00 0.00 0.00
5087.50 0.00 0.00 0.00 0.00
5088.00 0.00 0.00 0.00 0.00
5088.60 0.00 0.00 0.00 0.00
5089.60 20.00 2.20 22.20 22.20
STAGE-DISCHARGE SIZING OF THE SPILLWAY
Fort Collins Montessori School
Detention Pond System
Detention Pond Outlet Design File_v2.35.xls, Spillway 10/14/2019, 4:15 PM
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Oct 1 2019
Linear Bioretention
Trapezoidal
Bottom Width (ft) = 2.00
Side Slopes (z:1) = 8.00, 8.00
Total Depth (ft) = 0.50
Invert Elev (ft) = 5089.65
Slope (%) = 0.50
N-Value = 0.035
Calculations
Compute by: Known Q
Known Q (cfs) = 1.39
Highlighted
Depth (ft) = 0.31
Q (cfs) = 1.390
Area (sqft) = 1.39
Velocity (ft/s) = 1.00
Wetted Perim (ft) = 7.00
Crit Depth, Yc (ft) = 0.20
Top Width (ft) = 6.96
EGL (ft) = 0.33
0 1 2 3 4 5 6 7 8 9 10 11 12
Elev (ft) Depth (ft)
Section
5089.00 -0.65
5089.50 -0.15
5090.00 0.35
5090.50 0.85
5091.00 1.35
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Friday, Oct 4 2019
Swale Cross Section
Triangular
Side Slopes (z:1) = 12.00, 6.00
Total Depth (ft) = 1.50
Invert Elev (ft) = 5090.72
Slope (%) = 1.00
N-Value = 0.030
Calculations
Compute by: Known Q
Known Q (cfs) = 3.30
Highlighted
Depth (ft) = 0.45
Q (cfs) = 3.300
Area (sqft) = 1.82
Velocity (ft/s) = 1.81
Wetted Perim (ft) = 8.16
Crit Depth, Yc (ft) = 0.39
Top Width (ft) = 8.10
EGL (ft) = 0.50
0 5 10 15 20 25 30 35 40
Elev (ft) Depth (ft)
Section
5090.00 -0.72
5090.50 -0.22
5091.00 0.28
5091.50 0.78
5092.00 1.28
5092.50 1.78
5093.00 2.28
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Oct 14 2019
2 Foot Curb Cut
Rectangular
Bottom Width (ft) = 2.00
Total Depth (ft) = 0.50
Invert Elev (ft) = 5090.38
Slope (%) = 3.00
N-Value = 0.013
Calculations
Compute by: Known Q
Known Q (cfs) = 6.18
Highlighted
Depth (ft) = 0.38
Q (cfs) = 6.180
Area (sqft) = 0.76
Velocity (ft/s) = 8.13
Wetted Perim (ft) = 2.76
Crit Depth, Yc (ft) = 0.50
Top Width (ft) = 2.00
EGL (ft) = 1.41
0 .5 1 1.5 2 2.5 3
Elev (ft) Depth (ft)
Section
5090.00 -0.38
5090.25 -0.13
5090.50 0.12
5090.75 0.37
5091.00 0.62
Reach (ft)
Q = Flow from Basin Basin Q= 6.18 cfs
A= 0.760 ft2
S = Channel Slope: ft/ft S= 0.03 ft/ft
V = Velocity of Flow: ft/s V = 8.13 ft/s
Gs = Specific Gravity (2.5 default if not known) Gs = 2.5
Type D50 (in)
VL < 3.3 6
L ≥ 3.3 - < 4.0 9 = 3.43
M ≥ 4.0 - < 4.6 12
H ≥ 4.6 - < 5.6 18
VH ≥ 5.6 - 6.4 24 Type = VL
D50 = 6 in
Grouted YES
Rip Rap Protection
Fort Collins Montessori School
The minimum mean particle size (intermediate dimension) by weigth for riprap, commonly
known as the D50, is six (6) inches.
Riprap Size
Riprap Type
Input Design Parameters
4.4.4.3. Riprap Specifications and Applicability
= (��
�.��
)/ ��
− 1
�.��
(��
�.��
)/ ��
− 1
�.��
C. Map Pocket
Drainage Plan
Outlet Structure Detail
ONLY
N
UTILITY PLANS FOR
FORT COLLINS MONTESSORI SCHOOL
ENGINEERING & SURVEYING
4045 St. Cloud Drive, Suite 180
Loveland, CO 80538
[P] 970-622-2095 [F] 970-461-4469 1109 W HARMONY ROAD
NE1
4 OF SECTION 3, T6N, R69W, 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
DWG. NAME
15
NO. REVISION DATE
SHEET NO.
OF
PROJECT:
DATE:
DESIGNER:
DRAFTER:
CHECKED BY:
APPROVED BY:
2259.03
09/07/18
TWC
TWC
NOT FOR CONSTRUCTION
PRELIMINARY
Know what's below.
Call before you dig.
R
BENCHMARK STATEMENT
LEGEND:
DRAINAGE & EROSION CONTROL PLAN
C-11
11
___
___
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
PROPOSED BASIN FLOWS
STANDARD EROSION AND SEDIMENT CONSTRUCTION PLAN NOTES
EROSION BMP LEGEND
DETENTION SUMMARY
UTILITY PLANS FOR
FORT COLLINS MONTESSORI SCHOOL
ENGINEERING & SURVEYING
4045 St. Cloud Drive, Suite 180
Loveland, CO 80538
[P] 970-622-2095 [F] 970-461-4469 1109 W HARMONY ROAD
NE1
4 OF SECTION 3, T6N, R69W, 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
DWG. NAME
15
NO. REVISION DATE
SHEET NO.
OF
PROJECT:
DATE:
DESIGNER:
DRAFTER:
CHECKED BY:
APPROVED BY:
2259.03
09/07/18
TWC
TWC
NOT FOR CONSTRUCTION
PRELIMINARY
Know what's below.
Call before you dig.
R
DETAIL SHEET 4
C-15
15
RJP
RJP
DETAIL
NOT TO SCALE
SECTION C SECTION B
SECTION A
WATER QUALITY OUTLET STRUCTURE - PLAN VIEW
EARTHEN SPILLWAY ELEVATION
DR-1A
WATER QUALITY OUTLET STRUCTURE DETAIL
WQ
H1
Routing Order #3 (Single Stage) Routing Order #4
V2
V1
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ
W.S. EL. Emergency Spillway
Emergency Overflow into Pipe- H2
V2
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ V1
Routing Order #2
Detention Pond Outlet Design File_v2.35.xls, Outlet 10/14/2019, 4:14 PM
55 0.87 1.48 3.03
22 1.53 2.61 5.32
56 0.86 1.47 2.99
23 1.49 2.55 5.20
57 0.85 1.45 2.96
24 1.46 2.49 5.09
58 0.84 1.43 2.92
25 1.43 2.44 4.98
59 0.83 1.42 2.89
26 1.4 2.39 4.87
60 0.82 1.4 2.86
27 1.37 2.34 4.78
65 0.78 1.32 2.71
28 1.34 2.29 4.69
70 0.73 1.25 2.59
29 1.32 2.25 4.60
75 0.70 1.19 2.48
30 1.30 2.21 4.52
80 0.66 1.14 2.38
31 1.27 2.16 4.42
85 0.64 1.09 2.29
32 1.24 2.12 4.33
90 0.61 1.05 2.21
33 1.22 2.08 4.24
95 0.58 1.01 2.13
34 1.19 2.04 4.16
100 0.56 0.97 2.06
35 1.17 2.00 4.08
105 0.54 0.94 2.00
36 1.15 1.96 4.01
110 0.52 0.91 1.94
37 1.16 1.93 3.93
115 0.51 0.88 1.88
38 1.11 1.89 3.87
120 0.49 0.86 1.84
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 13, Sep 10, 2018
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 11, 2018—Aug
12, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/28/2019