August 16, 2019
Klara Rossouw
Ripley Design
419 Canyon Ave Suite 200
Fort Collins, CO 80521
RE: Fox Grove Phase 2, PDP190002, Round Number 3
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, please direct your questions through the Development Review Coordinator,
Tenae Beane, at 970-224-6119 or tbeane@fcgov.com.
RESPONSES 10.23.2019
CLIENT; NORTHERN ENGINEERING; RIPLEY DESIGN; CEDAR CREEK ASSOCIATES; DELICH; LC HOMES
Comment Summary:
Department: Planning Services
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 17 Comment Originated: 08/16/2019
08/16/2019: AT FDP, FOR APPROVAL:
Landscaping proximity to the trail section – landscaping needs to be shifted so
that it does not need to be moved and will not be damaged by construction of
the future trail section, which appears to be 24 feet wide. The 24 feet includes 3
foot mowing strips on each side. The remainder of the 30 foot easement would
be not more than 4:1 per the Parks Dept. section.
Response: All trees and shrubs proposed close to the future trail has been adjusted to remain outside of the limits of construction to
avoid any loss once the trail does get built.
Response: The Trail area is graded with 18’ width of 2% cross-slope. As discussed in the meeting on 8/22/19, the 3’ shoulder are
between 2%-5% for the majority of the alignment. For a short distance the cross-slope of the shoulder varies between 5% to 4:1.
This is due to the existing floodway. This area is very limited.
Comment Number: 18 Comment Originated: 08/16/2019
08/16/2019: AT FDP, FOR APPROVAL:
2
Does the detention area accommodate the future pavement of the regional
trail? Does it need to?
Response: The area adjacent to the detention area adequately accommodates the future trail section.
Response: The detention pond accommodates the future trail. The 100-yr ponding is outside of the trail easement.
Comment Number: 19 Comment Originated: 08/16/2019
08/16/2019: AT FDP, FOR APPROVAL:
There appear to be grading/cross slope issues indicated by the proposed
contour lines shown within the trail easement. Also contour lines don’t appear to
be consistent with the slope percentages shown on the grading plan. Low walls
may be needed in several locations. Please see redlines.
Response: The Trail area is graded with 18’ width of 2% cross-slope. As discussed in the meeting on 8/22/19, the 3’ shoulder are
between 2%-5% for the majority of the alignment. For a short distance the cross-slope of the shoulder varies between 5% to 4:1.
This is due to the existing floodway. This area is very limited.
Comment Number: 20 Comment Originated: 08/16/2019
08/16/2019: FOR HEARING PLANS:
All of the labels for the access easement on the site plan and the plat need to be
updated to say: “Public Access and Trail Easement”
Response: The easement label was updated prior to hearing.
Response: Labels for the access easement on the site plan have been updated to say: “Public Access and Trail Easement”
Comment Number: 21 Comment Originated: 08/16/2019
08/16/2019: AT FDP, FOR APPROVAL:
Please see redlines.
Response: Redlines received and addressed with this submittal.
Comment Number: 22 Comment Originated: 08/16/2019
08/16/2019: AT FDP, FOR APPROVAL:
Need street names signed off on by GIS prior to mylar with a full round of review.
Response: Acknowledged. See response to comment #3 under GIS.
Comment Number: 23 Comment Originated: 08/16/2019
08/16/2019:AT FDP, FOR APPROVAL:
Water/sewer service lines are not shown on the landscape plans. I’m OK with
deferring this to FDP.
Response: Water and sewer service lines have been added to the landscape plans.
Comment Number: 24 Comment Originated: 08/16/2019
08/16/2019:AT FDP, FOR APPROVAL:
Appear to be too many city street lights shown on the plans. Please see
redlines. Please coordinate this with city L&P prior to FDP submittal.
Response: L&P provided streetlight locations.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 18 Comment Originated: 07/09/2019
07/09/2019: FOR FINAL PLAN APPROVAL. Elaborate on removal via passive
relocation of approximately 0.30ac of black-tailed prairie dogs from limits of
development (LOD). Details will be included in the Development Agreement.
Implementation of the technique will be verified by City staff prior to issuance of
3
Development Construction Permit (DCP). Please submit a formal written and
signed statement from the property owner of the receiving site that is providing
permission to direct prairie dogs onto that property. Essentially that the property
owner is willing to accept prairie dogs.
Response: The prairie dogs will be removed via passive relocation. A third part entity will be engaged to complete Colorado Parks
and Wildlife permitting for guiding prairie dogs from source area to the adjacent property to the west. Letters of reference shall be
provided prior to initiating the relocation; a detailed timeline shall be provided, and the city environmental planner should be notified
of activities. The property owner has submitted a singed letter of intent agreeing to this process.
Comment Number: 25 Comment Originated: 08/08/2019
08/08/2019: READY FOR HEARING. Thank you for removing the two western
lots encroaching into Boxelder Creek natural habitat buffer setback.
Environmental Planning is ready for Hearing.
Response: Lots have been removed and approved at this time.
Department: Forestry
Contact: Nils Saha, nsaha@fcgov.com
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 07/08/2019
07/08/2019: FOR FINAL
Please show locations of the water and sewer service lines to individual lots on
the landscape plan for review.
Response: Water and sewer service lines have been added to the landscape plan.
Comment Number: 5 Comment Originated: 07/08/2019
07/08/2019: FOR FINAL
Trees should be planted at least 8’ away from the edge of driveways. Please
see redlines and adjust tree placement accordingly.
Response: Trees have been adjusted to be a distance of 8’ away from driveways.
Comment Number: 7 Comment Originated: 07/08/2019
07/08/2019: FOR FINAL
Please fix the following errors on the species list:
Picea pungens ‘Baby Blue Eyes’
Malus ‘Red Barron’
Prunus salicina
Response: Species list errors have been adjusted
Comment Number: 8 Comment Originated: 07/08/2019
08/13/2019: FOR FINAL
Final tree count to be determined at FDP.
07/08/2019: BY HEARING
The total tree count is incorrect. 140 trees are proposed on the list. Please
update the count and adjust diversity percentages.
Response: Tree counts have been updated and total tree count matches tree diversity table.
Department: Internal Services
Contact: Katy Hand, khand@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 07/08/2019
4
Please visit our website for a list of current adopted building codes and local
amendments:
https://www.fcgov.com/building/codes.php
Response: Acknowledged.
Comment Number: 2 Comment Originated: 07/08/2019
New homes must be EV / PV ready (conduit in place).
Response: Acknowledged.
Comment Number: 3 Comment Originated: 07/08/2019
It appears that many of the setbacks are 5ft. Be aware that if the exterior walls of
the house are to be located at 5ft from the property line, roof overhangs and
other projections at 5ft or less must be fire protected per table R302.1(1)
Response: Acknowledged.
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/05/2019
03/05/2019: INFORMATION:
Light and Power has conduit stubbed at the Fox Grove Dr and Vixen Dr road
extensions for phase II. Light and Power will extend conduit and electric facilities
in the parkway to feed phase II.
Response: We have coordinated with L&P. L&P has provided the electric design. The design has been added to our plans.
Comment Number: 2 Comment Originated: 03/05/2019
03/05/2019: INFORMATION:
Electric capacity fees, development fees, building site charges and any system
modification charges necessary to feed the site will apply to this development.
Please contact me or visit the following website for an estimate of charges and
fees related to this project:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Response: Acknowledged.
Comment Number: 3 Comment Originated: 03/05/2019
03/05/2019: INFORMATION:
Streetlight placement on public roads will need to be coordinated with Light &
Power. Shaded trees are required to maintain 40 feet of separation and
ornamental trees are required to maintain 15 feet of separation from
streetlights. A link to the City of Fort Collins street lighting requirements can be
found below:
http://www.larimer.org/engineering/GMARdStds/Ch15_04_01_2007.pdf
Response: We have provided 40 feet of separation for all shade trees and 15 feet for all ornamental trees
Comment Number: 4 Comment Originated: 03/05/2019
03/05/2019: INFORMATION:
Light & Power will need AutoCAD files of the site plan, utility plans, and
landscape drawings once approved.
Response: Noted, will provide once approved.
Response: Noted, will provide Cad once plans are approved.
5
Comment Number: 5 Comment Originated: 03/05/2019
03/05/2019: INFORMATION:
Please contact Tyler Siegmund with Light & Power Engineering if you have any
questions at 970.416.2772 Please reference our policies, construction
practices, development charge processes, electric service standards, and use
our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers
Response: Thank you.
Department: Outside Agencies
Contact: Boxelder Sanitation, Brian Zick 970-498-0604,
Topic: General
Comment Number: 1 Comment Originated: 03/05/2019
03/05/2019: The District hereby advises as follows:
--There is no objection to this proposal.
1) For Final Platting the following needs to be submitted.
a. Sanitary Sewer plan and profiles
b. Services line locations for all lots
c. BSD standard notes and details
d. BSD approval blocks on all utility sheets
The District has adequate capacity to service the property referenced above.
The District is in full compliance with federal and state water quality
requirements. Please feel free to contact me if you have any questions.
Response: Plan and profiles, service locations, standard note and details, and approval blocks are provided with this FDP plan set.
Contact: ELCO, Randy Siddens, (970) 493-2044,
Topic: General
Comment Number: 2 Comment Originated: 03/12/2019
03/12/2019: The East Larimer County Water District (District) staff has
reviewed material for the proposed
project referenced above and has the following comments:
1. Water Lines to Serve the Development: The water lines shown on the Utility
Plan appear
to be conceptually appropriate.
2. Water Line Easements: Water line easement revisions will be required in the
northwest
area of the development. District staff is in contact with the project’s engineer
(Northern
Engineering) regarding this subject.
3. Water Rights: The District encourages the developer to contact the District
General
Manager to begin discussions on raw water dedication for the project.
Any written agreements required to complete water line connections to the
property must be
completed prior to final approval of the project construction drawings.
6
The District administers design and construction standards for its water
distribution system.
The developer’s engineer should contact the District early in the project design
process to
obtain this information and coordinate the project design with the existing
District facilities.
Response: Easement vacations and rededications will be done by separate document at the time of plat recordation.
Contact: Todd Reidenbach, 970-416-2483,
Topic: General
Comment Number: 3 Comment Originated: 03/15/2019
07/09/2019: UPDATED: GIS - Rollins Den is ok, but there is already a Fox Den
within the LETA service area, so it would need a new name. A list of street
names in use or reserved is found here: http://larimer.org/streets/
Response: Fox Den Drive has been replaced with Nicks Tail Drive.
03/15/2019: I’ve added Rollins Den Dr to the Larimer County Street Inventory
System.
Brook Ct is unacceptable, because there are already a number of Brook and
Brooke names in the Larimer Emergency Telephone Authority service area.
Names can be checked here:
https://www.larimer.org/engineering/subdivisions-and-road-names/street-invent
ory#/streets
Based upon those plans, I don’t see a need for any other names in that section.
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 02/26/2019
02/26/2019:
PFA has no further comments at this time. All are resolved.
>The two hydrants are noted on the plan in appropriate locations.
>The Emergency Access Easement from Foxgrove Phase 1 to the Sunflower
Community will remain in place until the connecting road is built to Prospect.
Response: Noted
Department: Stormwater Engineering
Contact: Mark Taylor, 970-416-2494, mtaylor@fcgov.com
Topic: Construction Drawings
Comment Number: 5 Comment Originated: 03/01/2019
03/01/2019: FOR FINAL - In 1.C (Floodplain), There are no buildings proposed
within the floodplain, so notes 4, 5, and 6 are not necessary.
Response: Additional notes have been removed.
Comment Number: 7 Comment Originated: 03/01/2019
03/01/2019: FOR FINAL - On all applicable sheets; along the western boundary
of the property, the boundary should be noted as a floodway boundary, not flood
fringe.
7
Response: I believe this has been updated on all sheets (plat, utility plans).
Comment Number: 8 Comment Originated: 03/01/2019
03/01/2019: FOR FINAL - Please remove Floodplain Notes 4,5, and 6 on the
Drainage Exhibit.
Response: Additional notes have been removed
Comment Number: 9 Comment Originated: 03/01/2019
03/01/2019: FOR FINAL - Please add cross sections---including stationing and
elevations---as well as BFE lines to this sheet.
Response: BFEs and CSLs are shown.
Topic: Drainage Report
Comment Number: 4 Comment Originated: 03/01/2019
03/01/2019: FOR FINAL - In 1.C (Floodplain), The Boxelder Floodplain LOMR
has been approved, so there is no need to reference it now. Just refer to the
FEMA regulatory floodplain, and the report title, dated, etc. as would be done
for any other property in a floodplain.
Response: LOMR is no longer referenced.
Comment Number: 6 Comment Originated: 03/01/2019
03/01/2019: FOR FINAL - In 1.C (Floodplain), Please include a FEMA
FIRMette in the report, and reference it's location. The property must be outlined
in red within the FIRMette.
Response: Property is outlined on the Firmette.
Topic: Plat
Comment Number: 1 Comment Originated: 02/28/2019
02/28/2019: FOR FINAL - Along the western boundary of the property, there is
a floodway bounday. What is shown as the flood fringe should be labeled
floodway.
Response: The label has been updated to Floodway.
Comment Number: 2 Comment Originated: 02/28/2019
02/28/2019: FOR FINAL - Please make the floodplain boundary more distinct.
It is hard to distinguish between it and other lines along the southern edge of the
property.
Response: Floodplain linework has been updated to be more distinct.
Topic: Site Plan
Comment Number: 3 Comment Originated: 02/28/2019
02/28/2019: FOR FINAL - Along the western boundary of the property, the
boundary should be noted as a floodway boundary, not flood fringe.
Response: Along the Western boundary we have updated the plan to read floodway and not flood fringe
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 10 Comment Originated: 03/01/2019
07/09/2019: Reminder Comment.
03/01/2019: FOR FINAL - A detailed lot grading plan will be required.
8
Response: A detailed grading plan is provided with FDP.
Comment Number: 11 Comment Originated: 07/09/2019
07/09/2019: FOR FINAL - A forebay is required for the pipe outlet into the rain
garden. Please coordinate with the City on what is required.
Response: A forebay is provided to the rain garden.
Comment Number: 12 Comment Originated: 07/09/2019
07/09/2019: FOR FINAL - Please provide a Pond Depth Gage for the
detention pond and have the detail in the plans.
Response: A pond depth gauge is provided.
Comment Number: 13 Comment Originated: 07/09/2019
07/09/2019: FOR FINAL - It appears some of the concrete pan in the swale
adjacent to the rain garden could be eliminated with some grade adjustments.
Response: The rain garden has been reconfigured, a portion of the pan is no longer shown.
Comment Number: 14 Comment Originated: 07/09/2019
07/09/2019: FOR FINAL - Why is the rain garden underdrain connecting into
the storm sewer manhole upstream?
Response: The underdrain is no longer connected to the manhole.
Comment Number: 15 Comment Originated: 07/09/2019
07/09/2019: FOR FINAL - Additional comments to follow during FDP when
additional information is submitted. Also, all existing floodplain comments will
be reviewed at FDP
Response: Acknowledged.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 02/27/2019
07/09/2019: INFORMATION ONLY:
Unless required during PDP, a complete review of all plans will be done at
FDP.
02/27/2019: INFORMATION ONLY:
Unless required during PDP, a complete review of all plans will be done at
FDP.
Response: Acknowledged.
Response: Noted
Topic: Plat
Comment Number: 1 Comment Originated: 02/27/2019
07/09/2019: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter.
02/27/2019: FOR APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
9
letter.
Response: Updates have been made.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 03/05/2019
07/09/2019: FOR FINAL:
We'll need a signing and striping plan. Please include stop signs, including at
the intersection of Vixen Drive and Fox Grove Drive. Please include street
name signs, (you'll need street name signs at "L" roadway corners even though
you won't have stop signs there). Also show stop signs on the landscaping
plans and ensure street trees are at least 50 ft from stop signs for visibility.
03/05/2019: FOR FINAL: We'll need to review detailed signing and striping
plans
Response: Sign callouts are provided on the roadway plan and profiles sheets.
Response: Sign locations have been coordinated with civil, and are now accommodated for in the landscape plans
Comment Number: 4 Comment Originated: 07/09/2019
07/09/2019: FOR INFORMATION:
Thank you for the additional information on ped LOS and connectivity to the
north. The information provided is sufficient to address the issue.
Response: Acknowledged.