March 20, 2019
Jessie Stonberg
Baseline Engineering Corp.
112 N Rubey Drive
Suite 180
Golden, CO 80403
RE: Breeze Thru Headquarters, FDP190003, Round Number 1 Comments (Round 2 Submittal Responses)
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Development Review Coordinator, Todd Sullivan, at 970-221-6695 or tsullivan@fcgov.com .
Comment Summary:
Development Review Coordinator
Contact: Todd Sullivan, 970-221-6695, tsullivan@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/22/2019
03/01/2019: This submittal will require an additional round of review. Due to the
level and amount of changes, this qualifies for a shortened (2-week) round of review,
and we will provide comments only without a formal meeting.
Comment Response: Thank you for the note, we understand that moving forward, this submittal will
require and additional round of review, qualifying for a shortened round of review.
Submittals are received through each Wednesday at noon for routing that same week.
Please make an appointment with me at least 24 hours in advance.
Department: Planning Services
Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/22/2019
2
02/22/2019: Please see redlines. Several edits required to title page, site plan
and landscape plan.
Comment Response: Redlines on the planning packet cover, site plan, landscape plan, and building
elevations have been addressed.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/26/2019
02/26/2019: Previous comments have been addressed, though please ensure
that the civil FCLWD details that are not clear on PDF will appear clear on
mylar.
Comment Number: 2 Comment Originated: 02/26/2019
03/01/2019: As an update to the original comment, Jeff County in Technical
Services has provided redlines to the legal descriptions specific to the
right-of-way and a utility easement. The draft deeds of dedication are fine to
proceed with signatures -- if it's not inconvenient however, it would be
appreciated if the City's approval name for the easements is changed from
"Rick Richter" to "Chad Crager" and on the right-of-way dedication "Sheri
Langenberger" is changed to "Chad Crager".
Comment Response: Names on the emergency, utility, and right-of-way easements have been
updated to read “Chad Crager.”
With addressing the proposed corrections form Jeff, you can move forward with
the grantor signature(s), notary, and attorney certifications for the deeds of
dedication. When the total number of pages on the dedications is confirmed, I
can verify the recording fee check amount to Larimer County Recorder that
would need to be provided and delivery of the dedications and the recording fee
will allow me to move forward with recording of the dedications. It is not
necessary to have the reception numbers of the recorded deeds on the plans,
but if desired I can help facilitate the timely recordation of these to have the
reception numbers added to the plans.
Feel free to contact me with any follow-up to the dedication process. Please
note that I'll be out of the office on 3/15 until 3/25.
Comment Response: Jessie Stonberg has been in conversation with Marc. Updated deeds of
dedication and easements have been sent to Marc and Jeff for review. Once we receive the okay
from them that no more corrections are to be made, we will have our PLS signature and wait for
word on what the total cost will be.
02/26/2019: The deeds of dedication (pending verification from PFA on the
emergency access easement) are OK to check for closure.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
3
Topic: General
Comment Number: 1 Comment Originated: 02/26/2019
02/26/2019: An analysis is needed to determine if the outfall offsite is stable
down to the channel/wetland area.
Comment Response: 100 YR runoff at LID release point has been determined based on the
capture area. See drainage letter and associated calcs for details.
Comment Number: 2 Comment Originated: 02/26/2019
02/26/2019: Please provide permanent turf reinforcement matting instead of
riprap. If riprap is to be used, it is required to be buried with temporary
reinforcement.
Comment Response: Permanent turf reinforcement matting called out on grading and erosion
control plans.
Comment Number: 3 Comment Originated: 02/26/2019
02/26/2019: Please provide a detail for the outlet works of the rain garden.
Comment Response: Detail for outlet box added to grading plan.
Comment Number: 4 Comment Originated: 02/26/2019
02/26/2019: Please update the text in the drainage report that references the
improvements. The change in the rain garden location does not seem to be
updated in the report.
Comment Response: Text in drainage letter updated to reflect LID alignment change.
Comment Number: 5 Comment Originated: 02/26/2019
02/26/2019: Please update the plans with the updated design as well. There
were a couple places where old leaders were still present.
Comment Response: Plans updated to reflect LID alignment change.
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/26/2019
02/26/2019: AT BUILDING PERMIT SUBMITTAL: Please provide a one line
diagram that shows the main disconnect size and meter sequencing. A copy of
our meter requirements can be found in our electric policies practices and
procedures below.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Comment Response: Thank you for the note. We understand that at time of Building Permit
Submittal, we will provide a one line diagram that shows the main disconnect size and meter
4
sequencing.
Comment Number: 2 Comment Originated: 02/26/2019
02/26/2019: AT BUILDING PERMIT SUBMITTAL: A commercial service
information form (C-1 form) and a one-line diagram for all commercial meters
will need to be completed and submitted to Light & Power Engineering for
review. A link to the C-1 form is below:
http://www.fcgov.com/utilities/business/builders-and-developers/development-
forms-guidelines-regulations
Comment Response: Thank you for the note. We understand that at time of Building Permit
Submittal, a commercial service information form (C-1 form) and a one-line diagram for all
commercial meters will need to be completed and submitted to Light & Power Engineering for review.
Comment Number: 3 Comment Originated: 02/26/2019
02/26/2019: INFORMATION: Electric capacity fees, development fees, building
site charges and any system modification charges necessary to feed the site
will apply to this development. Please contact me or visit the following website
for an estimate of charges and fees related to this project:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-
development-fees
Comment Response: Thank you for the note. We understand there will be fess associated with this
development.
Comment Number: 4 Comment Originated: 02/26/2019
02/26/2019: INFORMATION: Please contact Tyler Siegmund with Light &
Power Engineering if you have any questions at 970.416.2772. Please
reference our policies, construction practices, development charge processes,
electric service standards, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers
Comment Response: Thank you for the note. We will make sure to contact Tyler Siegmund with any
questions.
Comment Number: 5 Comment Originated: 02/28/2019
02/28/2019: AT BUILDING PERMIT SUBMITTAL: Development charges may
apply to this project. Depending on how the metering for the commercial service
is modified and by adding 10 residential units to the building, fees may apply.
Once the one-line diagram is submitted for review to see proposed meter
sequencing, I can evaluate if any fees will apply to this project. Please contact
me if you would like to discuss.
Comment Response: Thank you for the note. We understand that at the time of Building Permit Submittal,
development charges may apply to this project.
Department: Internal Services
Contact: Jonathon Nagel, 970-416-2701, jnagel@fcgov.com
5
Topic: General
Comment Number: 1 Comment Originated: 02/26/2019
02/26/2019: FOR APPROVAL: 6-yard dumpsters for trash and recycling will not
work in the proposed configuration. 6-yard dumpsters are stationary and require
service trucks to be able to pull immediately up to the dumpster. 4-yard
dumpsters are the largest rolling dumpster available.
Comment Response: Receptacles for trash and recycling have been changed to 4-yard dumpsters.
Comment Number: 2 Comment Originated: 02/26/2019
02/26/2019: INFORMATION ONLY: As previously commented in PDP for 10
residential units you are likely to need 4.25 cubic-yards of trash service per
week and 2.75 cubic-yards of recycling. With the commercial usage as well I
would recommend a 4-yard for trash (serviced twice weekly, adjusted as
needed) and a 4-yard for recycling (serviced once a week, adjusted as needed)
Comment Response: Receptacles for trash and recycling have been changed to 4-yard dumpsters,
and we will plan for starting with a servicing twice weekly for trash and once weekly for recycling.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/19/2019
02/19/2019: FOR APPROVAL. For timely success a heavy seeding rate
should be used. On native seed mix table update to show:
14.54 lbs./acre (drill seed rate)
29.08 lbs./acre (broadcast rate)
Comment Response: Notes per native seed mix table have been updated.
Comment Number: 2 Comment Originated: 02/19/2019
02/19/2019: INFORMATION ONLY. Thank you for selecting 3000K CCT on the
luminaire schedule and supporting City Night Sky Objectives. Note especially
LED light fixtures, cooler color temperatures are harsher at night and cause
more disruption to circadian (biological) rhythms for both humans and wildlife.
Warmer color temperature (warm white, 3000K or less) for any LED light
fixtures is preferred. Please also consider fixtures with motion-sensing or
dimming capabilities so that light levels can be adjusted as needed. Site light
sources shall be fully shielded and down-directional to minimize up-light, light
spillage and glare [see LUC 3.2.4(D)(3)]. For further information regarding
health effects please see:
http://darksky.org/ama-report-affirms-human-health-impacts-from-leds/
Comment Response: Thank you for the note. We will utilize the link for further information.
Department: Forestry
6
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: Construction Drawings
Comment Number: 13 Comment Originated: 02/25/2019
2/25/2019:
On sheet C5 of the Utility Plans, please update the note that reads: EX. TREE
TO BE RELOCATED AND REPLACED IF NECESSARY, to instead read: EX
TREE TO BE REMOVED AND MITIGATED. Please include the City of Fort
Collins Tree Protection Notes to this sheet.
Comment Response: Note on Utility Plan Sheet C5 has been updated to read “EX. TREE TO BE
REMOVED AND MITIGATED.”
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 02/22/2019
02/27/2019: FOR INFORMATION
The project team will be providing the Fire Lane signage plan at the next
submittal
02/22/2019: FOR INFORMATION
All PFA comments have been resolved at this time.
The FDC is noted on the provided plan in the correct location
The Fire-Lane No Parking signage was approved for PDP but does not appear
in the provided documents for FDP. Please provide this at next submittal.
When you submit for your building permit though the City of Fort Collins please
be advised Poudre Fire Authority is an additional and separate submittal. The
link for Poudre Fire Authority’s plan review application can be found at
https://www.poudre-fire.org/online-services/contractors-plan-reviews-and-permit
s/new-building-plan-review-application.
Comment Response: Thank you for your note. We understand that when a Building Permit is
submitted, an additional and separate submittal is due for the Poudre Fire Authority.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 6 Comment Originated: 02/25/2019
02/25/2019: FOR APPROVAL:
There are line over text issues. See redlines.
Comment Response: Line over text issues have been addressed per redlines.
Comment Number: 7 Comment Originated: 02/25/2019
02/25/2019: FOR APPROVAL:
The smaller text does not scan or reproduce well. The text needs to increase in
7
size. See examples of text on redlines.
Comment Response: Text size has been increased across the elevations per redline comments.
Topic: Construction Drawings
Comment Number: 10 Comment Originated: 02/25/2019
02/25/2019: FOR APPROVAL:
The Benchmark Statement has been revised. Please provide the following
information for the Benchmark Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 - X.XX’.
Comment Response: Benchmark text updated to exactly as stated above. (only one benchmark used)
Comment Number: 11 Comment Originated: 02/25/2019
02/25/2019: FOR APPROVAL:
All Benchmark Statements must match on all sheets.
Comment Response: All Benchmark text updated to exactly as stated above. (only one benchmark used)
Comment Number: 12 Comment Originated: 02/26/2019
02/26/2019: FOR APPROVAL:
Some of the sheet titles in the sheet index do not match the noted sheets. See
redlines.
Comment Response: Sheet titles made to match index exactly.
Comment Number: 13 Comment Originated: 02/26/2019
02/26/2019: FOR APPROVAL:
There are line over text issues. See redlines.
Comment Response: All text adjusted to not be affected by overlapping linework.
8
Comment Number: 14 Comment Originated: 02/26/2019
02/26/2019: FOR APPROVAL:
All reception numbers for documents recorded by separate document must be
added prior to mylars.
Comment Response: Comment noted. Recordation numbers to be added to mylars.
Comment Number: 15 Comment Originated: 02/26/2019
02/26/2019: FOR APPROVAL:
The Fort Collins-Loveland Water District details on sheet C8 need to be
cleaned up. They will not scan or reproduce. See redlines.
Comment Response: Details fixed. CAD details found and used for those affected.
Topic: Easements
Comment Number: 16 Comment Originated: 02/26/2019
02/26/2019: FOR APPROVAL:
There are minor issues. See redlines.
Comment Response: Updates have been made to the easement documents per redline comments.
Topic: Landscape Plans
Comment Number: 8 Comment Originated: 02/25/2019
02/25/2019: FOR APPROVAL:
There are line over text issues. See redlines.
Comment Response: Redlines over text on the landscape plan have been addressed.
Comment Number: 9 Comment Originated: 02/25/2019
02/25/2019: FOR APPROVAL:
Some of the sheet titles & numbers in the sheet index do not match the noted
sheets. See redlines.
Comment Response: Sheet titles and corresponding numbers in the sheet index have been
updated.
Topic: Site Plan
Comment Number: 1 Comment Originated: 02/25/2019
02/25/2019: FOR APPROVAL:
Please revise the sub-title as marked. See redlines.
Comment Response: Subtitle on the cover sheet and all appropriate sheets have been updated per
redline notes.
Comment Number: 2 Comment Originated: 02/25/2019
02/25/2019: FOR APPROVAL:
9
Some of the sheet titles & numbers in the sheet index do not match the noted
sheets. See redlines.
Comment Response: Sheet titles and corresponding numbers in the sheet index have been updated.
Comment Number: 3 Comment Originated: 02/25/2019
02/25/2019: FOR APPROVAL:
There are line over text issues. See redlines.
Comment Response: Redlines over text on the site plan have been addressed.
Comment Number: 4 Comment Originated: 02/25/2019
02/25/2019: FOR APPROVAL:
All reception numbers for documents recorded by separate document must be
added prior to mylars.
Comment Response: Reception numbers for documents recorded by separate document will be
added prior to mylars.
Comment Number: 5 Comment Originated: 02/25/2019
02/25/2019: FOR APPROVAL:
Some of the right of way descriptions shown are incorrect. See redlines.
Comment Response: Right of Way descriptions have been updated per redlines.