HomeMy WebLinkAboutPROSPECT AND COLLEGE HOTEL - PDP190014 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVENTS
Project Location
PROSPECT AND COLLEGE HOTEL
Prospect and
College Hotel
CSU Medical Center
W. Prospect Road
W. Lake Street
Max Transit
S. College Ave.
SITE LOCATION
Project Narrative
PROSPECT AND COLLEGE HOTEL
PROJECT GOAL:
Midtown hotel is located along W. Prospect Road and S. College Ave. Currently the site has a commercial building and parking
lot. The site plan proposes a new 150 unit hotel development that will consist of a six story hotel with patio space and other
guest amenities, updated parking lot facilities, storm water updates, and landscape enhancements. Parking will be available on
site, as well as a shared use agreement with the adjacent property owner to provide access and parking for all businesses.
BACKGROUND:
Currently the site has a large commercial building on the south end of the property which is occupied by both Chuck E. Cheese
and Hello Furniture & Mattress. The northern section of the property is currently a paved parking lot.
1. PROJECT TITLE:
Prospect and College Hotel
2. MEETING DATES:
Conceptual Review Meeting: May 25, 2018 - comments received.
Neighborhood Meeting: N/A
3. GENERAL INFORMATION:
Project Location: South West corner of S College Ave and W Prospect Rd.
Size: 87,481 sf / 2.008 ac
Existing zoning: Employment (C-G)
Proposed zoning: Employment (C-G)
Number of off street parking spaces provided: -
Number of building stories proposed: 6
Maximum building height: 79’
Modifications proposed:
• 5’ average lot line buffer.
• Six Story Stand alone
4. PROPOSED OWNERS:
The proposed ownership structure to be a joint venture between Saunders Commercial Development Company and
Stonebridge Companies
Applicant:
MacMillan Development, LLC
Contact: Stu MacMillan
1928 Linden Ridge Dr, Fort Collins, CO 80524
stu@macmillandevelopment.com
970-215-7000
5. EXISTING OWNERS:
Imago Enterprises
Lester Kaplan
200 S Mason St
Fort Collins, CO 80524
9702227528
LesterKaplan@comcast.net
6. TRANSPORTATION IMPROVEMENTS:
A potential northbound left turn lane on College Avenue that would access the new entrance to the project will be designed
and constructed based on review and approval of the traffic impact study and subsequent approval of the design by the City of
Fort Collins, CDOT and any other pertinent review agencies. At a minimum, a drive over median for dedicated fire access only
will be provided so the site may be accessed while traveling northbound on College Avenue.
7. NEIGHBORHOOD MEETING COMMENTS: N/A
Project Narrative
PROSPECT AND COLLEGE HOTEL
8. SITE DESIGN
The Midtown Hotel is located on the corner of S College Ave and W Prospect Rd in midtown. The lot is rectangular in shape and
fronts the public ROW on the east most side. The design seeks to front the building on the east side fronting S College Ave.
The parking lot will be located on the north west corner of the property that is least visible from S College Ave. Large canopy
trees will be planted along the property boundary that will help screen the lot. Street tree plantings will be planted to meet the
Midtown in Motion Plan along S. College Ave. A vegetative buffer will be provided along S. College Ave consisting of canopy
trees, and native and low water plant species as under story. Native and low water use plants will be utilized throughout the site.
The proposed tree lawns will contain City recommended species.
Vehicular traffic will access The Midtown Hotel off of W. Prospect Road, or S. College Ave. Pedestrian and bicycle traffic will be
able to utilize the existing multi-modal path between the adjoining properties, and the MAX transit station nearby. The sidewalk
along S. College Ave will be designed to meet the Midtown in Motion Plan consisting of a 10’ multi-use path, 8’ wide parkway
with street trees. On site surface parking is provided. Poudre Fire Authority will be able to utilize the on-site (24’ wide, and 26’
wide staging areas) emergency access lane, ambulance and trash trucks will be able to pull into the parking lot and will be able to
exit onto either S College Ave or W Prospect Rd.
9. DISTURBANCES
No existing wetlands, natural habitat areas are being disturbed with this project.
10. TRANSITION TECHNIQUES
The project seeks to transition to the surrounding development through its architectural character as well as parking lot that is
located off of the main street frontages.
11. ARCHITECTURE
This proposed buildings program, massing, and character has evolved directly from the significance of this particular site. Set at
the Southwest corner of the prominent Prospect and College intersection which acts as a major gateway to both Midtown Fort
Collins and the Colorado State campus (CSU). The site is easily walkable to the Spring Creek Trail, CSU campus (and football
stadium), as well as conveniently accessible by car, bike, and the Max Rapid transit access throughout the City. It harvests great
sunlight, as well as holds distinct views of the City and Front Range. Wrapped on the South and West by the adjacent commercial
center, it has opportunity to act as a catalyst for the rest of the intersection creating a unique “place” that synergizes with
neighbors and establishes an onsite energy and vibrancy currently not performing at an urban, “walkable city” level.
This proposed massing and scale is consistent with Existing City policies and standards encouraging “mid-rise density” along the
Max corridor, as well as the City adopted Fixed Growth Management Area encouraging growing inward and upward vs. horizontal
sprawl. The site provides a significant infill opportunity in a location currently underutilized by a 1950s era “big box” surrounded
by strip parking. Furthermore, as Fort Collins and CSU have grown, so has the demand for hospitality options. Presenting an
opportunity to stimulate and energize a gateway site already “bookended” by large scale neighbors.
The project program consists of a 150 room hotel with residential on floors 02-06, creating privacy and views. Level 01 consists of
the check-in lobby, lounge, food and beverage, fitness, meeting spaces, library, and outdoor terrace and, back of house services.
These public amenity spaces activate the ground level along College Ave with transparency consistent to the historic neighboring
context.
3.5.1 – Building and Project Compatibility
(A) Purpose. The project will be compatible at this gateway intersection as a private development balancing with the scale of the
CSU Medical Center institutional development to the North. This displays a City growth of mid-rise density synergistic with the
growth of the institution and enhances the quality of the Midtown area.
(B) General Standard. With an architectural character consistent with semi-urban hotels in the Rocky Mountain Region, the
project is intuitive in its program while being compatible with its surrounding buildings in form and scale. The proportions,
use of materials, and detailing, trace back to the roots, colors and spirit of Fort Collins and the Front Range area. The masonry
color tones are complementary of the CSU aesthetic and historic local use of regional stone, reinterpreting these traditions in a
contemporary way. The relationship to the street is consistent with the Midtown-in-Motion plan continuing the greenbelt buffer
along College and internalizing parking on the site.
(C) Building Size, Height, Bulk, Mass, Scale. The projects presence infills this corridor of College Ave, bookended by larger
development such as Summit Student Housing to the South and the CSU Medical Center to the North. Having a complementary
Project Narrative
PROSPECT AND COLLEGE HOTEL
prominence and height and helping to densifying this commercial area and set precedence for future growth. The two primary
forms of masonry and metal panel interlock as complementary forms grounding the building along the base while lightening the
elevated form. As the materials transition along the most public (College Ave.) façade the building has a stepback at Level 04
providing depth and distinction between the forms.
(D) Privacy Considerations. Distinction between public and private areas have been made by locating residential on the upper
floors leveraging privacy and views. Meanwhile, the ground level is reserved for public interaction, amenities and services, staying
consistent with historic architectural trends in the area.
(E) Building materials. The project materiality is comprised of three primary materials masonry, metal panel, and aluminum framed
glazing. All consisting of natural colors derived from the area, using traditional materiality in contemporary ways. Horizontal
entry canopies intuitively identify the main and secondary entrances at a pedestrian scale with wood/composite soffits bringing
warmth and tactility. Colors and tones are of matte natural finish to alleviate glare or reflectivity. Aluminum window bays help
identify public (storefront) and private (hotel room) areas in a pedestrian scale with the use of mullions and traditional proportions.
Furthermore, the window detailing uses vertical dividers to create shadow in masonry, while angled metal window trim creates
directionality in within the metal panel system.
(F) Building Color. Similar to the simplicity of the materiality, the building colors are comprised of three primary colors; buff
(beige), medium bronze, and rust/copper. The buff color of the masonry is complementary to the buff shiner stone locally quarried
and used frequently on the CSU campus. However, by using a Norman bond masonry it promotes horizontality and brings down
the building verticality at a detail level, while integrating traditional brick coursing patterns. The medium bronze perforated panel
acts as a screen for mechanical louvers while emphasizing depth to the masonry and interweaves a secondary material surface
articulating the window bays and corners. Finally, the rust/copper colored metal panel speaks to natural colors of clay in the Front
Range area and masonry of the Downtown Fort Collins.
(G) Building Height Review. The approved Stand Alone Modification process was critical to the project feasibility from a hotel
scale standpoint which responds to the market demand for a fresh and quality hotel experience walking distance to Midtown and
the CSU campus. The position of the building is setback from all property lines while also holding a build-to edge along Colorado
Ave, and internalizing parking. This positioning minimizes light and shadow impact to neighboring properties, withholds the
Midtown-in-Motion plan, and creates safe Southern facing porte cohere entry.
(H) Land Use Transition. The land uses in the area are consistent in scale and density and the project has buffering zones or
compatibility on all property lines.
(I) Outdoor Storage Areas/Mechanical Equipment. The loading dock, trash/recycling, generators, and transformers are all in
one masonry enclosure integrated with the building design and located internal to the site parking. Rooftop equipment will be
screened.
12. PHASING SCHEDULE
No phasing is proposed with this development.
13. UTILITIES
On-Site easements to be provided will include utility easements for domestic and fire supply line services, fire hydrant and branch
line, storm sewer lines, sanitary service and private utility easements. Off-Site easements needed will be for storm sewer and
sanitary sewer service lines. Some vacation of existing easements will be needed to re-center on existing utilities or because they
are no longer needed.
14. LIGHTING
All lighting will meet City of Fort Collins requirements. A photometric plan has been submitted.
15. STORM WATER:
Per the City’s requests, a portion of the stormwater associated with Lot 2 is now proposed to be rerouted to discharge into an
existing drainage channel to the west in an effort to reduce the current flooding that’s occurring at College and Prospect. The
existing 6-Inch cast iron water main was modeled to include peak demand and fire flow for the proposed building and it was
determined that this existing main did not need to be upsized. No other utility issues or constraints were noted.