HomeMy WebLinkAboutPROSPECT AND COLLEGE HOTEL - PDP190014 - SUBMITTAL DOCUMENTS - ROUND 1 - SUPPORTING DOCUMENTATIONPreliminary Water Report
for
Prospect and College Hotel
Fort Collins, CO
Prepared For
Saunders Commercial Development Company
1705 17th Street, Suite 350
Denver, CO, 80202
9/16/2019
Project No. 18111
September 16, 2019
Project No. 18111
PRELIMINARY WATER REPORT
FOR
PROSPECT AND COLLEGE HOTEL
A PORTION OF LOT 2 OF FOX SHOPPING CENTER SUBDIVISION
FORT COLLINS, COLORADO
OVERVIEW NARRATIVE
The proposed College and Prospect Hotel is located on a Portion of Lot 2 of Fox Shopping Center
Subdivision. The site has a net area of approximately 2.0083 acres and is located within the city limits
of Fort Collins.
The proposed project will consist of a new 6-story hotel building with approximately 83,356 square-
feet of gross floor area and supporting utilities consisting of storm sewer, sanitary sewer and waterline
improvements. Surface improvements include a new paved parking lot, landscaped areas and concrete
sidewalk surrounding the buildings. Part of the City of Fort Collins required improvements will include
the extension of utility services from existing sewer, water, and storm drain that are not located within
the boundary of Lot 2.
The purpose of this report is to verify that the existing off-site 6-inch cast iron water main adjacent
to- and west of the subject property is sufficiently sized to deliver adequate fire flow to the proposed
building on Lot 2.
1. Existing and Proposed Water System
The existing water line to be analyzed is a 6-inch cast iron main installed in 1969. This main
connects to a newly installed 8-Inch PVC main in the adjacent property to the south and
connects to an 8-inch main across West Prospect Road to the north. There is an existing fire
hydrant at the northwest corner of Lot 2 (referred to in this report as “North FH”) and an
existing fire hydrant approximately 250 feet to the south of Lot 2 (referred to in this report
as “South FH”).
P:02015.21_College and Prospect Hotel_Prelim Wat Rpt_18111 2 9/16/19
Fire flow tests were performed by the City for the existing north and south hydrants with the
results as follows:
North FH:
Static pressure: 85 PSI
Residual pressure: 80 PSI
South FH:
Static pressure: 90 PSI
Residual pressure: 75 PSI
Flow Hydrant:
Flowed Nozzle Size: 4.5 IN
Flowed at: 38 PSI
Flow: 2041 GPM
Proposed services to serve the building from the existing 6-inch water main includes a 3-inch
domestic service and a 6-inch fire supply line. A new fire hydrant is also proposed off the
northwest corner of the proposed building.
2. Criteria and Assumptions
The criteria used for the required fire flow was the Table B105.1 of the 2015 IFC. Based on
the construction type of IIA, gross floor area to be sprinkled of 83,320 square feet and an
occupancy group of R-1, the required fire flow was determined to be 4,250 gpm. Because the
building will be sprinkled, a reduction of 75% was used to bring the revised fire flow to
1,063 gpm. 1,500 gpm at 20 psi residual pressure was used, however, since this is the
minimum required.
An assumed peak demand for the building was assumed at 400 gpm based on meter flows
from the AWWA Manual N-22 for a 3-inch meter and service line (maximum flow from the
manual is 350 gpm). Final peak demand, however, will need to be verified by the MEP.
Based on a 6-inch fire supply line, the maximum demand for the sprinkler system from
NFPA 20, Section A-2-9.4 and assuming a fire pump at 15 fps, 1,400 gpm was assumed
(maximum flow from the NFPA was 1,322 gpm). In talking with Poudre Fire Authority, this
would be very conservative. Final peak demand, however, will need to be verified by the fire
suppression designer.
3. Modeling and Results
The following is a summary of the scenarios employed:
P:02015.21_College and Prospect Hotel_Prelim Wat Rpt_18111 3 9/16/19
Scenario #1: Static Condition
The static scenario was modeled first, which established
available water pressures for the site with no demands
placed on the system. This model demonstrates that all
pressure requirements are maintained.
Scenario #2: Fire Flow and Peak Demand
The second scenario was run with the peak hour demand
of the proposed hotel and fire flow. 1,500 GPM was
used at the proposed hydrant. An assumed value of 400
GPM for the peak demand of the hotel, and a value of
1,400 GPM was assumed for the fire sprinklers within
the building.
The modeling information is presented in the Appendix.
Based on the analyzed scenarios given the outlined assumptions, the existing 6-inch cast iron
water main, from which the proposed domestic service, fire supply line and fire hydrant will be
served, is adequately sized to deliver the required peak demand and fire flows for the proposed
building on Lot 2.
This report will be revised and a final report will be issued once the final demands are more
accurately determined.
If you have any questions or need additional information please contact me at 970/488-0169 or
email me at csonnier@sandersonstewart.com. Thank you.
SANDERSON STEWART
Charles Sonnier, PE
Senior Engineer/Project Manager
SCENARIO #1 - STATIC ANALYSIS
Midtown Fort Collins Hotel – Fort Collins, CO
18111
Preliminary Water Report Analysis
Static
Junction Table - Time: 0.00 hours
Pressure
(psi)
Hydraulic
Grade
(ft)
Demand
(gpm)
Demand
Collection
Elevation Zone
(ft)
ID Label
<Collection: 0 0 5,209.90 91
32 J1 5,000.00 <None> items>
<Collection: 0 0 5,209.90 91
34 J5 5,000.00 <None> items>
<Collection: 0 0 5,209.90 91
36 J6 5,000.00 <None> items>
<Collection: 0 0 5,209.90 91
38 J7 5,000.00 <None> items>
<Collection: 0 0 5,209.90 91
40 J8 5,000.00 <None> items>
<Collection: 0 0 5,209.90 91
42 J9 5,000.00 <None> items>
<Collection: 0 0 5,209.90 91
59 J4 5,000.00 <None> items>
<Collection: 0 0 5,209.90 91
62 J2 5,000.00 <None> items>
<Collection: 1 0 5,209.90 91
65 J10 5,000.00 <None> item>
<Collection: 1 0 5,209.90 91
66 J12 5,000.00 <None> item>
<Collection: 0 0 5,209.90 91
70 J3 5,000.00 <None> items>
<Collection: 1 0 5,209.90 91
73 J11 5,000.00 <None> item>
27 Siemon Company Drive Suite 200 W Watertown, CT Page 1 of 8
06795 USA +1-203-755-1666
9/16/2019
WaterCAD CONNECT Edition Update 1
WATER MODEL.wtg Bentley Systems, Inc. Haestad Methods Solution Center [10.01.01.04]
Preliminary Water Report Analysis
Reservoir Table - Time: 0.00 hours
Hydraulic
Grade
(ft)
Flow (Out net)
(gpm)
Elevation Zone
(ft)
ID Label
SOUTH 5,002.00 <None> 0 5,002.00
46 RESERVOIR
NORTH 5,003.00 <None> 0 5,003.00
47 RESERVOIR
27 Siemon Company Drive Suite 200 W Watertown, CT Page 2 of 8
06795 USA +1-203-755-1666
9/16/2019
WaterCAD CONNECT Edition Update 1
WATER MODEL.wtg Bentley Systems, Inc. Haestad Methods Solution Center [10.01.01.04]
Preliminary Water Report Analysis
Pump Table - Time: 0.00 hours
Pump Head
(ft)
Flow (Total)
(gpm)
Hydraulic
Grade
(Discharge)
(ft)
Hydraulic
Grade
(Suction)
(ft)
Pump Status (Initial)
Definition
Elevation
(ft)
ID Label
NORTH 5,000.00 North Pump On 5,003.00 5,209.90 0 0.00
31 HYDRANT
SOUTH 5,002.00 South Pump On 5,002.00 5,209.90 0 207.90
84 HYDRANT
27 Siemon Company Drive Suite 200 W Watertown, CT Page 3 of 8
06795 USA +1-203-755-1666
9/16/2019
WaterCAD CONNECT Edition Update 1
WATER MODEL.wtg Bentley Systems, Inc. Haestad Methods Solution Center [10.01.01.04]
Preliminary Water Report Analysis
Pipe Table - Time: 0.00 hours
Has Check
Valve?
Hazen-Williams
C
Diameter Material
(in)
Length Start Node Stop Node
(Scaled)
(ft)
ID Label
NORTH J1 24.0 Cast Iron 130.0 False
33 P2 10 HYDRANT
37 P7 77 J5 J6 8.0 Cast Iron 130.0 False
39 P8 123 J6 J7 8.0 Cast Iron 130.0 False
41 P9 28 J8 J7 8.0 Cast Iron 130.0 False
43 P10 11 J9 J8 8.0 Cast Iron 130.0 False
NORTH 24.0 Cast Iron 130.0 False
HYDRANT
NORTH
48 P1 10 RESERVOIR
63 P3 137 J1 J2 6.0 Cast Iron 130.0 False
67 P15 160 J4 J12 6.0 PVC 150.0 False
68 P13 111 J2 J10 6.0 PVC 150.0 False
69 P6 266 J4 J5 6.0 Cast Iron 130.0 False
71 P4 65 J2 J3 6.0 Cast Iron 130.0 False
72 P5 8 J3 J4 6.0 Cast Iron 130.0 False
74 P14 160 J3 J11 3.0 PVC 150.0 False
SOUTH 24.0 Cast Iron 130.0 False
HYDRANT
SOUTH
85 P12 11 RESERVOIR
SOUTH J9 24.0 Cast Iron 130.0 False
86 P11 97 HYDRANT
Length (User
Defined)
(ft)
Has User
Defined
Length?
Headloss
Gradient
(ft/ft)
Velocity
(ft/s)
Flow
(gpm)
Minor Loss
Coefficient
(Local)
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
SCENARIO #2 – PEAK DEMAND +
FIRE FLOW
Midtown Fort Collins Hotel – Fort Collins, CO
18111
Preliminary Water Report Analysis
Peak Demand + Fireflow
Junction Table - Time: 0.00 hours
Pressure
(psi)
Hydraulic
Grade
(ft)
Demand
(gpm)
Demand
Collection
Elevation Zone
(ft)
ID Label
<Collection: 0 0 5,188.03 81
32 J1 5,000.00 <None> items>
<Collection: 0 0 5,185.07 80
34 J5 5,000.00 <None> items>
<Collection: 0 0 5,187.65 81
36 J6 5,000.00 <None> items>
<Collection: 0 0 5,191.74 83
38 J7 5,000.00 <None> items>
<Collection: 0 0 5,192.68 83
40 J8 5,000.00 <None> items>
<Collection: 0 0 5,193.05 84
42 J9 5,000.00 <None> items>
<Collection: 0 0 5,149.20 65
59 J4 5,000.00 <None> items>
<Collection: 0 0 5,150.63 65
62 J2 5,000.00 <None> items>
<Collection: 1 1,500 5,137.28 59
65 J10 5,000.00 <None> item>
<Collection: 1 1,400 5,132.17 57
66 J12 5,000.00 <None> item>
<Collection: 0 0 5,149.20 65
70 J3 5,000.00 <None> items>
<Collection: 1 500 5,075.44 33
73 J11 5,000.00 <None> item>
27 Siemon Company Drive Suite 200 W Watertown, CT Page 5 of 8
06795 USA +1-203-755-1666
9/16/2019
WaterCAD CONNECT Edition Update 1
WATER MODEL.wtg Bentley Systems, Inc. Haestad Methods Solution Center [10.01.01.04]
Preliminary Water Report Analysis
Peak Demand + Fireflow
Reservoir Table - Time: 0.00 hours
Hydraulic
Grade
(ft)
Flow (Out net)
(gpm)
Elevation Zone
(ft)
ID Label
SOUTH 5,002.00 <None> 1,382 5,002.00
46 RESERVOIR
NORTH 5,003.00 <None> 2,018 5,003.00
47 RESERVOIR
27 Siemon Company Drive Suite 200 W Watertown, CT Page 6 of 8
06795 USA +1-203-755-1666
9/16/2019
WaterCAD CONNECT Edition Update 1
WATER MODEL.wtg Bentley Systems, Inc. Haestad Methods Solution Center [10.01.01.04]
Preliminary Water Report Analysis
Peak Demand + Fireflow
Pump Table - Time: 0.00 hours
Pump Head
(ft)
Flow (Total)
(gpm)
Hydraulic
Grade
(Discharge)
(ft)
Hydraulic
Grade
(Suction)
(ft)
Pump Status (Initial)
Definition
Elevation
(ft)
ID Label
NORTH 5,000.00 North Pump On 5,003.00 5,188.04 2,018 185.04
31 HYDRANT
SOUTH 5,002.00 South Pump On 5,002.00 5,193.07 1,382 191.07
84 HYDRANT
27 Siemon Company Drive Suite 200 W Watertown, CT Page 7 of 8
06795 USA +1-203-755-1666
9/16/2019
WaterCAD CONNECT Edition Update 1
WATER MODEL.wtg Bentley Systems, Inc. Haestad Methods Solution Center [10.01.01.04]
Preliminary Water Report Analysis
Peak Demand + Fireflow
Pipe Table - Time: 0.00 hours
Has Check
Valve?
Hazen-Williams
C
Diameter Material
(in)
Length Start Node Stop Node
(Scaled)
(ft)
ID Label
NORTH J1 24.0 Cast Iron 130.0 False
33 P2 10 HYDRANT
37 P7 77 J5 J6 8.0 Cast Iron 130.0 False
39 P8 123 J6 J7 8.0 Cast Iron 130.0 False
41 P9 28 J8 J7 8.0 Cast Iron 130.0 False
43 P10 11 J9 J8 8.0 Cast Iron 130.0 False
NORTH 24.0 Cast Iron 130.0 False
HYDRANT
NORTH
48 P1 10 RESERVOIR
63 P3 137 J1 J2 6.0 Cast Iron 130.0 False
67 P15 160 J4 J12 6.0 PVC 150.0 False
68 P13 111 J2 J10 6.0 PVC 150.0 False
69 P6 266 J4 J5 6.0 Cast Iron 130.0 False
71 P4 65 J2 J3 6.0 Cast Iron 130.0 False
72 P5 8 J3 J4 6.0 Cast Iron 130.0 False
74 P14 160 J3 J11 3.0 PVC 150.0 False
SOUTH 24.0 Cast Iron 130.0 False
HYDRANT
SOUTH
85 P12 11 RESERVOIR
SOUTH J9 24.0 Cast Iron 130.0 False
86 P11 97 HYDRANT
Length (User
Defined)
(ft)
Has User
Defined
Length?
Headloss
Gradient
(ft/ft)
Velocity
(ft/s)
Flow
(gpm)
Minor Loss
Coefficient
(Local)
0.000 2,018 1.43 0.000 False 0
0.000 -1,382 8.82 0.033 False 0
0.000 -1,382 8.82 0.033 False 0
0.000 1,382 8.82 0.033 False 0
0.000 1,382 8.82 0.033 False 0
0.000 2,018 1.43 0.000 False 0
0.000 2,018 22.90 0.272 False 0
0.000 1,400 15.89 0.106 False 0
0.000 1,500 17.02 0.121 False 0
0.000 -1,382 15.68 0.135 False 0
0.000 518 5.88 0.022 False 0
0.000 18 0.20 0.000 False 0
0.000 500 22.69 0.461 False 0
0.000 1,382 0.98 0.000 False 0
0.000 1,382 0.98 0.000 False 0
27 Siemon Company Drive Suite 200 W Watertown, CT Page 8 of 8
06795 USA +1-203-755-1666
9/16/2019
WaterCAD CONNECT Edition Update 1
WATER MODEL.wtg Bentley Systems, Inc. Haestad Methods Solution Center [10.01.01.04]
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
0.000 0 0.00 0.000 False 0
27 Siemon Company Drive Suite 200 W Watertown, CT Page 4 of 8
06795 USA +1-203-755-1666
9/16/2019
WaterCAD CONNECT Edition Update 1
WATER MODEL.wtg Bentley Systems, Inc. Haestad Methods Solution Center [10.01.01.04]