Loading...
HomeMy WebLinkAboutPROSPECT AND COLLEGE HOTEL - PDP190014 - SUBMITTAL DOCUMENTS - ROUND 1 - ARCHITECTURAL DETAILS1964 SF LOUNGE / BAR 463 SF AC KITCHEN / BREAKFAST 278 SF WATER HEATER ROOM 238 SF STAIR 2 155 SF ELEVATORS 433 SF LIBRARY 1391 SF LOBBY LOUNGE 162 SF MEDIA SALON 162 SF MEDIA SALON 127 SF SALES OFFICE 689 SF LAUNDRY 201 SF FIRE PUMP & WATER ENTRY 70 SF BOH / LOADING 1018 SF BOH KITCHEN 692 SF MEETING ROOM RECESSED SLAB AT FREEZER/COLD STORAGE 191 SF FRONT DESK SUPPORT WORK ROOM 81 SF HR OFFICE FRONT DESK 143 SF MARKET / RETAIL 103 SF LINEN CHUTE RM 214 SF ENTRY VESTIBULE 81 SF GM OFFICE 186 SF WOM RR 290 SF ELECTRICAL 186 SF MENS RR DEVISABLE PARTITION? 188 SF STAIR 1 FEATURE WALL 178 SF ENGINEERING 684 SF EMPLOYEE BREAK ROOM 127 SF MDF 783 SF CIRCULATION 1166 SF FITNESS 61 SF MEN RR 61 SF WOM RR 53 SF LAUNDRY OFFICE ROOF CANOPY ABOVE TRELLIS SLATS GENERATOR TRASH (6-YARD) RECY. (6-YARD) TRANS. ROOF CANOPY ABOVE 14'-0" ISS. # copyright 2019 DESCRIPTION DATE FOR REFERENCE ONLY NOT FOR CONSTRUCTION ARCHITECT'S PROJECT NUMBER OWNER ARCHITECT 4240 ARCHITECTURE INC 3507 RINGSBY COURT, SUITE #117 DENVER, CO 80216 t: 303.292.3388 9/17/2019 5:14:11 PM A6 LEVEL 01 & TRASH / UTILITY ENCLOSURE PLAN 21201.00 SAUNDERS FORT COLLINS HOTEL 1623 S COLLEGE AVE FORT COLLINS, CO SAUNDERS COMMERCIAL DEVELOPMENT COMPANY S.A. MIRO 4582 S ULSTER STREET #750 DENVER, CO 80237 STRUCTURAL ENGINEER ME ENGINEERS 14143 DENVER W PKWY, SUITE 300 GOLDEN, CO 80401 M,E,P,FP ENGINEER SANDERSON STEWART 425 WEST MULBERRY ST, SUITE 201 FORT COLLINS, CO 80521 CIVIL ENGINEER RUSSELL + MILLS 506 S COLLEGE AVE. UNIT A FORT COLLINS, CO 80524 LANDSCAPE ARCHITECT t: 303.741.3737 t: 303.421.6655 t: 855.656.5255 t: 970.484.8855 GENERAL SAUNDERS CONSTRUCTION CONTRACTOR t: 303.699.9000 1705 17TH STREET, SUITE 350 DENVER, CO 80202 SCALE: 1" = 10'-0" LEVEL 01 & TRASH / UTILITY ENCLOSURE PLAN