Loading...
HomeMy WebLinkAboutMULBERRY CONNECTION - PDP190015 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTCity of Fort Collins Mulberry Connection (Redman Drive and I-25 Frontage Road) Preliminary Drainage Report SEPTEMBER 2019 | VERSION 1 Prepared By: 4582 South Ulster Street, Suite 1500 Denver, CO 80237 Dan L. Skeehan Registered Professional Engineer State of Colorado No. 46391 2 INTRODUCTION The proposed Mulberry Connection Project is located within the Northeast Quarter of Section 9, Township 7 North, Range 68 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, Colorado. The site is bound by: · North: Existing Farmland · East: Interstate 25 (“I-25”) Frontage Road · South: Redman Drive · West: Existing Farmland A vicinity map is provided below. Preliminary Drainage Report Mulberry Connection – Fort Collins, Colorado 3 PROPOSED DEVELOPMENT The site is approximately 13 acres and is existing farm land. The proposed site includes two industrial buildings with associated parking and landscape improvements. EXISTING SITE INFORMATION The soil on the site is primarily Nunn loam (73) and Garrett loam (0), which are classified as Hydrologic Soil Group C and B, respectively. The soil Classification Map can be found in Appendix A. This Site is a part of the Boxelder Creek & Cooper Slough Master Drainage Plan, which is currently under revision and has not been referenced in this design. The existing site is utilized as agricultural land with ground cover primarily made up of crop. According to the Geotechnical Evaluation performed by Ninyo & Moore on July 2, 2019, groundwater was encountered at depths ranging between approximately 8.5 to 12 feet below ground surface. HISTORIC DRAINAGE The existing Site is relativity flat with slopes ranging from 0.5% to 3%. There are currently no existing on- site water quality or detention improvements. The majority of the site currently slopes to the southwest, conveying water into an existing roadside ditch adjacent to Redman Drive, which discharges into Copper Slough approximately 600 feet west of the Site. The site directly north of the Site is collected by an existing drainage ditch along the northern property line, routing all discharges around the Site. I-25 Frontage Road is adjacent to the Site. The width of the Frontage Road drains west onto the Site in the existing condition. The site is located within City of Fort Collins Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map Number 08069C0984H and is designated as an area outside of the 100-year floodplain. The updated FEMA maps is included in Appendix A. DESIGN CRITERIA The City of Fort Collins “Stormwater Criteria Manual, December 2018 Edition,” (Criteria Manual) and the “Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual” Volumes 1, 2, and 3 (Drainage Manual), with latest revisions, were used to prepare the storm calculations. Weighted impervious values were calculated and used for the site area in accordance with the Criteria Manual and Drainage Manual. This Site is a part of the Boxelder Creek & Cooper Slough Master Drainage Plan, which is currently under revision and has not been referenced in this design. Existing storm sewer infrastructure is not present on the Site. An existing drainage ditch is present on both sides of Redman Drive, in addition to the existing concrete irrigation ditch on the northern adjacent property. Hydrologic Criteria The 2-year and 100-year storm event were evaluated for this Site. Rainfall intensity values provided in the Criteria Manual were utilized for the analysis. Impervious values for pavement, roof, and landscape area were taken from the Criteria Manual. Runoff coefficients were calculated per the Criteria Manual. The Rational Method was utilized to calculate the peak runoff values for the minor and major storm event. 4 Peak runoff values were calculated for the existing conditions of the Site, which the 2-year existing peak runoff informed the allowable release from the Site in the proposed conditions in the 100-year storm event. Topographic survey of the Site was utilized to delineate existing sub-basins for the Site. An Existing Drainage Map is provided in Appendix B and all hydrologic calculations are provided in Appendix C. The proposed site layout and grading was utilized to delineate sub-basins for the proposed condition, as shown in the Proposed Drainage Map included in Appendix B. Peak runoff values for the proposed sub- basins were calculated using the Rational Method. Hydrologic calculations are provided in Appendix C. Water Quality Capture Volumes for each on-site sub-basin was calculated per the methods described in the Criteria Manual. The Modified FAA Method, as described in the Criteria Manual, was utilized to calculate the required detention volume for the Site in the proposed conditions. Water quality and detention calculations are provided in Appendix C. DRAINAGE PLAN GENERAL CONCEPT The Site in the proposed conditions was divided into five onsite sub-basins which are described in greater detail in the following section. BMPs were selected utilizing the four step process outlined in Volume 3, Chapter 1, Section 4 of the Drainage Manual: 1. Employ runoff reduction practices - The redevelopment on an urban site provides limited opportunities to employ runoff reduction practices. The Site has been developed to install landscaping wherever pavement (or building) is not required. Additionally, impervious areas have been disconnected from storm sewer infrastructure at all feasible locations. 2. Implement BMPs that provide a water quality capture volume with a slow release – 7.66 acres of the Site (Drainage Basins B and C) will be treated with bioretention via three rain gardens. The total proposed impervious surface area is 9.12 acres (including pavement and roofs), with 5.39 acres of that being treated with bioretention. Thus, 59% of the Site’s impervious area will be treated with LIDs. A variance request has been included with this report for not meeting the required 75% treatment of impervious areas with LID. The three proposed rain gardens are shown on the Proposed Drainage Map in Appendix B and calculations are provided in Appendix D. 3. Stabilize streams – Not applicable. 4. Implement site specific and other source control BMPs – During construction, the site will include silt fence to reduce potential for contamination discharges at the perimeter. Site access will be provided through an area of vehicle tracking control to reduce tracking of contamination offsite which will be further controlled with street sweeping and rock socks along Redman Drive. Proposed storm sewer will have inlet protection. Additionally, diversion ditches routing water to a sediment basin will be installed at the beginning of construction. SPECIFIC DETAILS Runoff generated by three of the five on-site basins (12.75 acres of the total 13.07 acres – 98% of the Site) will be routed to LID features and the proposed extended detention pond via surface flow and limited storm sewer. The proposed extended detention pond will outfall to an existing drainage swale directly upstream of Cooper Slough. Two on-site basins (0.32 acres – 2% of the Site) will surface flow off-site and not be treated for water quality or be detained. The 100-year release rate from the proposed extended detention pond was calculated to take into account these undetained flows. Two offsite sub-basins are included in the drainage analysis to properly size all proposed drainage features. The Proposed Drainage Map included Preliminary Drainage Report Mulberry Connection – Fort Collins, Colorado 5 in Appendix B shows the five sub-basins and each basin is described in further detail below. Table 1 summarizes the tributary areas, impervious areas, imperviousness, and peak flows from each sub-basin. Full calculations are included in Appendix C. Sub-basin A Sub-basin A is 5.09 acres and consists of on-site parking, sidewalk, one of the buildings, and landscape areas that surface flow to two curb cuts routing flows into the proposed extended detention pond. Water quality treatment for runoff from this sub-basin will occur within the proposed extended detention pond. Sub-basin B Sub-basin B is 3.86 acres and consists of on-site parking, sidewalk, loading dock, and landscaped areas. Runoff within this sub-basin surface flow to a proposed 8-foot valley gutter routing water south to a proposed curb cut. The curb cut is connected to proposed Rain Garden B2. A culvert beneath the access drive will allow Rain Garden B2 to be utilized for water quality treatment of this runoff as well. Storm events greater than the water quality volume will be routed through Rain Garden B2 and B1 into the proposed extended detention pond via storm pipe. Sub-basin C Sub-basin C is 3.80 acres and consists of on-site parking, sidewalk, on of the buildings, and landscaped areas. Runoff within this sub-basin will surface flow east into Rain Garden C, which will provide water quality treatment. Storm events greater than the water quality volume will be routed through Rain Garden C, into Rain Gardens B1 and B2 and finally into the proposed extended detention pond via storm pipe. Sub-basin O1 Sub-basin O1 is 0.21 acres and consists of on-site landscaped area and a portion of the west access drive. Runoff within this sub-basin will surface flow offsite and water quality treatment nor detention will be provided for this sub-basin. Sub-basin O2 Sub-basin O2 is 0.11 acres and consists of on-site landscaped areas. Runoff within this sub-basin will surface flow offsite to the proposed swale on the eastern property boundary. Water quality treatment nor detention will be provided for this sub-basin. Sub-basin OS1 Sub-basin OS1 is 0.22 acres and consists of off-site landscaped area and I-25 Frontage Road. Runoff within this sub-basin will flow to the proposed drainage swale on the eastern property boundary, following historic drainage patterns. Areal imagery indicates that an existing culvert is at the corner of I-25 Frontage Road and Redman Drive, convey flows south to an existing roadside swale. Water quality treatment nor detention will be provided for this sub-basin on the proposed site. Additionally, this basin is not included as a part of the total Site improvement area, as proposed off-site improvements will improve existing conditions and maintain historic drainage patterns. 6 Sub-basin OS2 Sub-basin OS is 0.70 acres and consists of a portion of Redman Drive and offsite landscape area. Runoff within this sub-basin will surface flow to the existing drainage ditch on the north side of Redman Drive. Water quality treatment nor detention will be provided for this sub-basin. Additionally, this basin is not included as a part of the total Site improvement area, as proposed off-site improvements will improve existing conditions and maintain historic drainage patterns. Table 1. Summary of proposed drainage sub-basins. Basin ID Total Tributary Area (acres) Impervious Area (acres)1 Imperviousness 2-Year Peak Flow (CFS) 100-Year Peak Flow (CFS) A 5.09 3.69 69% 7.62 33.20 B 3.86 2.80 73% 6.00 24.79 C 3.80 2.59 64% 5.52 24.13 O1 0.21 0.04 21% 0.14 0.59 O2 0.11 0.00 2% 0.04 0.16 OS1 0.22 0.00 2% 0.07 0.31 OS2 0.70 0.23 34% 0.62 2.68 Total On-Site 13.07 9.12 67% 19.32 82.87 Total On-Site to Detention 12.75 9.08 69% 19.14 82.12 Total Off-Site 0.92 0.23 26% 0.18 0.75 1. Includes pavement and roof areas. VARIANCE REQUESTS Site constraints, including the relative flatness of the Site and proximity to the ultimate outfall require variances to the standard criteria, as described in the Criteria Manual, to be requested. The following variances are requested. Section 6.0: Low Impact Development: “…2) 75% of all newley added or modified impervious area must be treated by LID techniques…” Water quality treatment through the design of LID features was utilized to the extent practicable. As currently proposed, 59% of the Site’s impervious area will be treated with LIDs. Chapter 8, Section 3.4: Freeboard: “…Twelve inches (12”) of freeboard is to be provided within the detention basin, measured vertically from the 100-year water surface elevation to the top of the basin, or Preliminary Drainage Report Mulberry Connection – Fort Collins, Colorado 7 measured from the emergency spillway elevation (if it is higher than the 100-year water surface elevation) to the top of the basin…” The proposed extended detention basin 100-year water surface elevation is less than 1-foot from the top of berm along the east side of the proposed basin. Freeboard in this area is measured going into the parking lot. A minimum of 1-foot of freeboard from the 100-year water surface elevation and all proposed building finished floor elevations is provided. EROSION CONTROL The Erosion Control Criteria and all Erosion Control Materials will be provided in the Final Drainage Report. CONCLUSIONS COMPLIANCE WITH STANDARDS Except for the two variances listed above, the Mulberry Connection project is in compliance with City of Fort Collins criteria for storm drainage design. The “Fort Collins Stormwater Criteria Manual, December 2018 Edition,” and the Urban Drainage Flood Control District “Urban Storm Drainage Criteria Manual Volumes 1, 2, and 3 have been utilized for reference. SUMMARY OF CONCEPT The proposed drainage concept is to surface flow runoff from impervious areas to pervious area to the extent practicable. Three rain gardens are proposed to treat the WQCV from as much of the Site as possible. An extended detention pond is proposed to detain the on-site 100-year runoff volume to the 2- year historic on-site flow and treat the WQCV for the remainder of the Site. Downstream impacts due to the development of this Site are not anticipated. REFERENCES Fort Collins Stormwater Criteria Manual, December 2018 Edition, City of Fort Collins. Urban Storm Drainage Criteria Manual, Volume 1-3, Urban Drainage and Flood Control District, Denver, CO; January 2016, with latest revisions. APPENDICES A. NRCS Data and FEMA Map B. Existing and Proposed Drainage Map C. Hydrologic Calculations D. Hydraulic Calculations 8 APPENDIX A United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Larimer County Natural Area, Colorado Resources Conservation Service August 15, 2019 6 Custom Soil Resource Report Soil Map 4493280 4493330 4493380 4493430 4493480 4493530 4493580 4493280 4493330 4493380 4493430 4493480 4493530 4493580 499430 499480 499530 499580 499630 499680 499730 499780 499830 499880 499430 499480 499530 499580 499630 499680 499730 499780 499830 499880 40° 35' 35'' N 105° 0' 25'' W 40° 35' 35'' N 105° 0' 4'' W 40° 35' 24'' N 105° 0' 25'' W 40° 35' 24'' N 105° 0' 4'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 100 200 400 600 Feet 0 30 60 120 180 Meters Map Scale: 1:2,260 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 40 Garrett loam, 0 to 1 percent slopes 5.6 27.8% 53 Kim loam, 1 to 3 percent slopes 0.0 0.0% 63 Longmont clay, 0 to 3 percent slopes 0.6 2.8% 73 Nunn clay loam, 0 to 1 percent slopes 13.9 69.4% 76 Nunn clay loam, wet, 1 to 3 percent slopes 0.0 0.1% Totals for Area of Interest 20.0 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. Custom Soil Resource Report 8 19 Custom Soil Resource Report Map—Hydrologic Soil Group 4493280 4493330 4493380 4493430 4493480 4493530 4493580 4493280 4493330 4493380 4493430 4493480 4493530 4493580 499430 499480 499530 499580 499630 499680 499730 499780 499830 499880 499430 499480 499530 499580 499630 499680 499730 499780 499830 499880 40° 35' 35'' N 105° 0' 25'' W 40° 35' 35'' N 105° 0' 4'' W 40° 35' 24'' N 105° 0' 25'' W 40° 35' 24'' N 105° 0' 4'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 100 200 400 600 Feet 0 30 60 120 180 Meters Map Scale: 1:2,260 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as Table—Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 40 Garrett loam, 0 to 1 percent slopes B 5.6 27.8% 53 Kim loam, 1 to 3 percent slopes B 0.0 0.0% 63 Longmont clay, 0 to 3 percent slopes D 0.6 2.8% 73 Nunn clay loam, 0 to 1 percent slopes C 13.9 69.4% 76 Nunn clay loam, wet, 1 to 3 percent slopes C 0.0 0.1% Totals for Area of Interest 20.0 100.0% Rating Options—Hydrologic Soil Group Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Custom Soil Resource Report 21 9 APPENDIX B MULBERRY CONNECTION CITY OF FORT COLLINS UTILITY PLANS FOR REVIEW ONLY NOT FOR Kimley-Horn and Associates, Inc. CONSTRUCTION OF 6 R Know what's below. Call before you dig. 096501004_DRN_PROP LEGEND NORTH 6 10 APPENDIX C POUDRE VALLEY DEVELOPMENT DATE: 9/20/2019 096501004 HMO DLS TYPE B/C SOIL ASPHALT/C ONCRETE ROOFTOP GRAVEL LAWNS, SANDY SOIL, FLAT SLOPE LAWNS, SANDY SOIL, AVG SLOPE LAND USE: AREA AREA AREA AREA AREA 2-YR RUNOFF COEFFICIENT 0.95 0.95 0.50 0.10 0.15 5-YR RUNOFF COEFFICIENT 0.95 0.95 0.50 0.10 0.15 100-YR RUNOFF COEFFICIENT 1.19 1.19 0.63 0.13 0.19 IMPERVIOUS % 100% 90% 40% 2% 2% ASPHALT/CONCRERTOEOFTOP GRAVEL LAWNS, SANDY SOIL, FLAT SLOPE LAWNS, SANDY SOIL, AVG SLOPE TOTAL DESIGN DESIGN AREA AREA AREA AREA AREA AREA BASIN POINT (AC) (AC) (AC) (AC) (AC) (AC) Cc(2) Cc(5) Cc(100) Imp % EX1 EX1 0.29 0.00 0.00 0.00 12.81 13.10 0.17 0.17 0.21 4% EX2 EX2 0.23 0.00 0.00 0.00 0.47 0.69 0.41 0.41 0.52 34% EX3 EX3 0.46 0.00 0.00 0.00 0.20 0.66 0.71 0.71 0.88 70% A A 1.54 2.15 0.00 1.40 0.00 5.09 0.72 0.72 0.90 69% B B 2.80 0.00 0.00 0.00 1.06 3.86 0.73 0.73 0.91 73% C C 0.87 1.63 0.00 0.00 1.21 3.72 0.69 0.69 0.86 64% O1 O1 0.04 0.00 0.00 0.00 0.17 0.21 0.30 0.30 0.38 21% O2 O2 0.00 0.00 0.00 0.00 0.14 0.14 0.15 0.15 0.19 2% TOTAL ON-SITE 13.02 0.70 0.70 0.87 67% TOTAL TO DETENTION 12.67 0.71 0.71 0.89 69% OS1 OS1 0.00 0.00 0.00 0.00 0.22 0.22 0.15 0.15 0.19 2% OS2 OS2 0.23 0.00 0.00 0.00 0.47 0.70 0.42 0.42 0.52 34% CHECKED BY: PROJECT NUMBER: CALCULATED BY: NOTE: C2-YR*1.00 PER FCSCM TABLE 3-2-3 OFF-SITE BASINS ON-SITE BASINS RUNOFF COEFFICIENTS - IMPERVIOUS CALCULATION PROJECT NAME: COMPOSITE RUNOFF COEFFICIENT NOTE: C2-YR*1.25 PER FCSCM TABLE 3-2-3 EXISTING BASINS POUDRE VALLEY DEVELOPMENT DATE: 9/20/2019 096501004 HMO DLS FINAL Tc DESIGN AREA C2 LENGTH SLOPE Ti LENGTH SLOPE R VEL Tt MAX Tc MIN Tc BASIN Ac Ft % Min. Ft. % fps Min. Min. Min. Min. Min. EX1 13.10 0.17 500 0.6% 210.0 600 0.6% 0.654 6.9 1.4 211.4 12.8 5.0 12.8 EX2 0.69 0.41 62 0.4% 62.8 1,434 0.5% 0.654 5.9 4.0 66.8 10.3 5.0 10.3 EX3 0.66 0.71 75 3.0% 20.5 465 0.6% 0.654 6.8 1.1 21.6 10.4 5.0 10.4 A 5.09 0.72 275 3.0% 38.3 -- 0.0% 0.195 0.0 -- 38.3 11.5 5.0 11.5 B 3.86 0.73 190 1.3% 41.1 2,000 0.5% 0.195 2.7 12.2 53.3 11.1 5.0 11.1 C 3.72 0.69 260 2.3% 43.5 -- 0.0% 0.195 0.0 -- 43.5 11.4 5.0 11.4 O1 0.21 0.30 40 5.1% 25.4 -- 0.0% 0.195 0.0 -- 25.4 10.2 5.0 10.2 O2 0.14 0.15 75 3.0% 49.5 465 0.6% 0.195 3.0 2.5 52.1 10.4 5.0 10.4 OS1 0.220 0.15 83 14.0% 31.2 480 1.0% 0.654 8.6 0.9 32.1 10.5 5.0 10.5 OS2 0.700 0.42 200 2.0% 66.7 585 0.5% 0.654 6.1 1.6 68.3 11.1 5.0 11.1 TIME OF CONCENTRATION MAXIMUM & MINIMUM TIME OF CONCENTRATION PROJECT NAME: PROJECT NUMBER: DATA INITIAL/OVERLAND TIME (Ti) CHANNELIZED TIME (Tt) SUB-BASIN CALCULATED BY: ON-SITE BASINS CHECKED BY: Tc 2-YEAR OFF-SITE BASINS EXISTING BASINS ܶ௜ = 1.87(1.1 − ܮ (௙ܥݔܥ య ܵ ܸ = 1.49 ܶ௖ = ܶ௜ + ܶ௧ ݊ ܴଶ/ଷܵଵ/ଶ ܶ௖,௠௔௫ = 1 80ܮ 10 + POUDRE VALLEY DEVELOPMENT DATE: 9/20/2019 096501004 HMO DLS FINAL Tc DESIGN AREA C100 LENGTH SLOPE Ti LENGTH SLOPE R VEL Tt MAX Tc MIN Tc BASIN Ac Ft % Min. Ft. % fps Min. Min. Min. Min. Min. EX1 13.10 0.21 500 0.6% 200.5 600 0.6% 0.654 6.9 1.4 202.0 12.8 5.0 12.8 EX2 0.69 0.52 62 0.4% 53.4 1,434 0.5% 0.654 5.9 4.0 57.4 10.3 5.0 10.3 EX3 0.66 0.88 75 3.0% 11.3 465 0.6% 0.654 6.8 1.1 12.4 10.4 5.0 10.4 A 5.09 0.90 275 0 20.5 -- 0 0.654 0.0 -- 20.5 11.5 5.0 11.5 B 3.86 0.91 190 0 20.8 2,000 0 0.654 6.1 5.5 26.3 11.1 5.0 11.1 C 3.72 0.86 260 0 25.3 -- 0 0.654 0.0 -- 25.3 11.4 5.0 11.4 O1 0.21 0.38 40 0 23.0 -- 0 0.654 0.1 -- 23.0 10.2 5.0 10.2 O2 0.14 0.19 75 0 47.6 465 0 0.654 6.8 1.1 48.7 10.4 5.0 10.4 OS1 0.220 0.19 83 14.0% 29.9 480 1.0% 0.654 8.6 0.9 30.9 10.5 5.0 10.5 OS2 0.700 0.52 200 2.0% 56.6 585 0.5% 0.654 6.1 1.6 58.2 11.1 5.0 11.1 CHECKED BY: TIME OF CONCENTRATION 100-YEAR PROJECT NAME: PROJECT NUMBER: CALCULATED BY: EXISTING BASINS ON-SITE BASINS OFF-SITE BASINS SUB-BASIN INITIAL/OVERLAND CHANNELIZED TIME Tc MAXIMUM & MINIMUM DATA TIME (Ti) (Tt) TIME OF CONCENTRATION ܶ௜ = 1.87(1.1 − ܮ (௙ܥݔܥ య ܵ ܸ = 1.49 ܶ௖ = ܶ௜ + ܶ௧ ݊ ܴଶ/ଷܵଵ/ଶ ܶ௖,௠௔௫ = 1 80ܮ 10 + PROJECT NAME: POUDRE VALLEY DEVELOPMENT DATE: PROJECT NUMBER: 096501004 CALCULATED BY: HMO CHECKED BY: DLS REMARKS DESIGN POINT DESIGN BASIN AREA (AC) RUNOFF COEFF C2 tc (min) C*A(ac) I (in/hr) Q (cfs) tc(max) S(C*A) (ac) I (in/hr) Q (cfs) SLOPE (%) STREET FLOW(cfs DESIGN FLOW(cfs ) SLOPE (%) PIPE SIZE (in) LENGTH (ft) VELOCIT Y tt (min) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) EX1 EX1 13.10 0.17 12.78 2.20 2.00 4.40 EX2 EX2 0.69 0.41 10.34 0.29 2.18 0.62 EX3 EX3 0.66 0.71 10.42 0.47 2.18 1.01 A A 5.09 0.72 11.53 3.65 2.09 7.62 B B 3.86 0.73 11.06 2.82 2.13 6.00 C C 3.72 0.69 11.44 2.56 2.09 5.36 O1 O1 0.21 0.30 10.22 0.06 2.19 0.14 O2 O2 0.14 0.15 10.42 0.02 2.18 0.05 OS1 OS1 0.22 0.15 10.46 0.03 2.17 0.07 OS2 OS2 0.70 0.42 11.11 0.29 2.12 0.62 ON-SITE BASINS OFF-SITE BASINS EXISTING BASINS STORM LINE PROJECT NAME: POUDRE VALLEY DEVELOPMENT DATE: PROJECT NUMBER: 096501004 CALCULATED BY: HMO CHECKED BY: DLS REMARKS DESIGN POINT DESIGN BASIN AREA (AC) RUNOFF COEFF C100 tc (min) C*A(ac) I (in/hr) Q (cfs) tc(max) S(C*A) (ac) I (in/hr) Q (cfs) SLOPE (%) STREET FLOW(cfs) DESIGN FLOW(cfs) SLOPE (%) PIPE SIZE (in) LENGTH (ft) VELOCITY (fps) tt (min) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) EX1 EX1 13.10 0.21 12.78 2.75 6.79 18.66 EX2 EX2 0.69 0.52 10.34 0.36 7.62 2.72 EX3 EX3 0.66 0.88 10.42 0.58 7.59 4.42 A A 5.09 0.90 11.53 4.56 7.28 33.20 B B 3.86 0.91 11.06 3.52 7.04 24.79 C C 3.72 0.86 11.44 3.21 7.31 23.43 O1 O1 0.21 0.38 10.22 0.08 7.65 0.59 O2 O2 0.14 0.19 10.42 0.03 7.59 0.20 OS1 OS1 0.22 0.19 10.46 0.04 7.58 0.31 OS2 OS2 0.70 0.52 11.11 0.36 7.39 2.68 STANDARD FORM SF-3 STORM DRAINAGE DESIGN - RATIONAL METHOD 100 YEAR EVENT 9/20/2019 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME STORM LINE PROJECT NAME: POUDRE VALLEY DEVELOPMENT DATE: 9/20/2019 PROJECT NUMBER:096635000 CALCULATED BY: HMO CHECKED BY: DLS Q2 Q100 EX1 EX1 13.10 4.40 18.66 EX2 EX2 0.69 0.62 2.72 EX3 EX3 0.66 1.01 4.42 14.46 6.03 25.80 A A 5.09 7.62 33.20 B B 3.86 6.00 24.79 C C 3.72 5.36 23.43 O1 O1 0.21 0.14 0.59 O2 O2 0.14 0.05 0.20 13.02 19.17 82.21 12.67 18.98 81.42 OS1 OS1 0.22 0.07 0.31 OS2 OS2 0.70 0.62 2.68 0.92 0.69 3.00 ON-SITE BASINS OFF-SITE BASINS TOTAL TOTAL TOTAL TOTAL ON-SITE TO DETENTION EXISTING BASINS DESIGN POINT RATIONAL CALCULATIONS SUMMARY TRIBUTARY BASINS TRIBUTARY AREA (AC) PEAK FLOWS (CFS) 4582 S. Ulster Street - Suite 1500 Denver, Colorado 80237 Project: Mulberry Connection Prepared By: HMO Project Number: 096501004 Checked By: DLS Date: 20-Sep-19 Water Quality Capture Volume - Basin A Contributing Basin Characteristics Site Area = 5.09 61% - - Hydrologic Soil Group A = Hydrologic Soil Group B = Hydrologic Soil Group C = Hydrologic Soil Group D = Water Quality Capture Volume FCSCM Equation 7-1 WQ Watershed Inches = a*(0.91i 3 -1.19i 2 +.078i) a12 = 0.8 (12-Hr Drain Time) a40 = 1.0 (40-Hr Drain Time) FCSCM Equation 7-2 WQCV = (WQCV/12)*(Area)*1.2 WQCV Impervious (Site) = 61% a = 0.8 WQ Watershed Inches (Site) = 0.192 WQCV Area (Site) = 5.09 WQ Capture Volume (Site) = 0.098 AC-FT 0.098 AC-FT 4,249 CU-FT Area (AC) Impervious (%) Watershed Flow Length (ft) Watershed Flow Slope (ft/ft) Site WQ Volume WQCV A - 9/18/2019 4582 S. Ulster Street - Suite 1500 Denver, Colorado 80237 Project: Mulberry Connection Prepared By: HMO Project Number: 096501004 Checked By: DLS Date: 20-Sep-19 Water Quality Capture Volume - Basin B Contributing Basin Characteristics Site Area = 3.86 73% - - Hydrologic Soil Group A = Hydrologic Soil Group B = Hydrologic Soil Group C = Hydrologic Soil Group D = Water Quality Capture Volume FCSCM Equation 7-1 WQ Watershed Inches = a*(0.91i 3 -1.19i 2 +.078i) a12 = 0.8 (12-Hr Drain Time) a40 = 1.0 (40-Hr Drain Time) FCSCM Equation 7-2 WQCV = (WQCV/12)*(Area)*1.2 WQCV Impervious (Site) = 73% a = 0.8 WQ Watershed Inches (Site) = 0.231 WQCV Area (Site) = 3.86 WQ Capture Volume (Site) = 0.089 AC-FT 0.089 AC-FT 3,891 CU-FT Site WQ Volume Area (AC) Impervious (%) Watershed Flow Length (ft) Watershed Flow Slope (ft/ft) WQCV B - 9/18/2019 4582 S. Ulster Street - Suite 1500 Denver, Colorado 80237 Project: Mulberry Connection Prepared By: HMO Project Number: 096501004 Checked By: DLS Date: 20-Sep-19 Water Quality Capture Volume - Basin C Contributing Basin Characteristics Site Area = 3.72 64% - - Hydrologic Soil Group A = Hydrologic Soil Group B = Hydrologic Soil Group C = Hydrologic Soil Group D = Water Quality Capture Volume FCSCM Equation 7-1 WQ Watershed Inches = a*(0.91i 3 -1.19i 2 +.078i) a12 = 0.8 (12-Hr Drain Time) a40 = 1.0 (40-Hr Drain Time) FCSCM Equation 7-2 WQCV = (WQCV/12)*(Area)*1.2 WQCV Impervious (Site) = 64% a = 0.8 WQ Watershed Inches (Site) = 0.200 WQCV Area (Site) = 3.72 WQ Capture Volume (Site) = 0.074 AC-FT 0.074 AC-FT 3,245 CU-FT Site WQ Volume Area (AC) Impervious (%) Watershed Flow Length (ft) Watershed Flow Slope (ft/ft) WQCV C - 9/18/2019 PROJECT NAME: Mulberry Connection PROJECT NUMBER: 096501004 CALCULATED BY: HMO CHECKED BY: DLS 2-yr Historic Flow 4.4 CFS DATE: 9/20/2019 O1 100-yr Flow 0.59 CFS O2 100-yr Flow 0.2 CFS Allowed Release Rate 3.61 CFS 12.75 3.61 0.89 Duration, Td Rainfall Intensity, I Inflow Volume, Vi Outflow Volume, Vo Storage Volume, Vs Storage Volume, Vs (min) (in/hr) (CF) (CF) (CF) (AC) 5 9.95 33872 1083 32789 0.75 10 7.72 52562 2166 50396 1.16 15 6.52 66587 3249 63338 1.45 20 5.60 76255 4332 71923 1.65 25 4.98 84766 5415 79351 1.82 30 4.52 92323 6498 85825 1.97 35 4.08 97225 7581 89644 2.06 40 3.74 101855 8664 93191 2.14 45 3.46 106008 9747 96261 2.21 50 3.23 109957 10830 99127 2.28 55 3.03 113464 11913 101551 2.33 60 2.86 116834 12996 103838 2.38 65 2.71 119932 14079 105853 2.43 70 2.59 123438 15162 108276 2.49 75 2.48 126638 16245 110393 2.53 80 2.38 129634 17328 112306 2.58 85 2.29 132527 18411 114116 2.62 90 2.21 135421 19494 115927 2.66 95 2.13 137770 20577 117193 2.69 Basin WQCV (ac-ft) 100 2.06 140255 21660 118595 2.72 A 0.098 105 2.00 142979 22743 120236 2.76 B 0.089 110 1.94 145293 23826 121467 2.79 C 0.074 115 1.88 147200 24909 122291 2.81 120 1.84 150332 25992 124340 2.85 Required: 2.95 100-yr Detention + Basin A WQCV MODIFIED FAA DETENTION SIZING BASIN A 100-YEAR Area (A) DETENTION VOLUME BY MODIFIED FAA METHOD - 100 YEAR acres (Basins A, B, & C) ALLOWED RELEASE RATE CALCULATION Release Rate (R)' 100-Year Runoff Coefficient (C)' CALCULATIONS cfs (Historic 2-yr flow) Composite of entire proposed area 11 APPENDIX D 990 South Broadway - Suite 200 Denver, Colorado 80209 Project: Mulberry Connection Project Number: 96501004 Date: Prepared By: HMO Checked By: DLS BioRetention B WQCV Required 3,891 cf Infiltration Rate 300 min/inch Drain Time 12 hours Drian Time 720 min Infiltration Depth 2 inches Infiltration Depth 0.2 ft Raingarden B1 Raingarden B2 Total Volume of Basin 3276 cf Total Volume of Basin 596 cf Area of Bottom 860 sf Area of Bottom 106 sf Ponding Depth 1 ft Ponding Depth 0.4 ft Volume at 1 ft Depth 3276 cf Volume at 1 ft Depth 596 cf Bioretention Sand Media Depth 18 in Bioretention Sand Media Depth 18 in Bioretention Sand Media Void Ratio 0.14 Bioretention Sand Media Void Ratio 0.14 Volume w/in 1-ft Ponding Depth 3,276 cf Volume w/in Ponding Depth 596 cf Volume w/in Bioretention Media 181 cf Volume w/in Bioretention Media 22 cf Volume Infiltrated 172 cf Volume Infiltrated 21 cf TOTAL VOLUME 3,629 cf TOTAL VOLUME 639 cf TOTAL WQCV PROVIDED 4,268 cf September 20, 2019 990 South Broadway - Suite 200 Denver, Colorado 80209 Project: Mulberry Connection Project Number: 96501004 Date: Prepared By: HMO Checked By: DLS BioRetention C WQCV Required 3,245 cf Infiltration Rate 300 min/inch Drain Time 12 hours Drian Time 720 min Infiltration Depth 2 inches Infiltration Depth 0.2 ft Total Volume of Basin 6701 cf Area of Bottom 3800 sf Ponding Depth 1 ft Volume at 1 ft Depth 6701 cf Bioretention Sand Media Depth 18 in Bioretention Sand Media Void Ratio 0.14 Volume w/in 1-ft Ponding Depth 6,701 cf Volume w/in Bioretention Media 798 cf Volume Infiltrated - cf Assume no infiltration TOTAL VOLUME 7,499 cf WQCV 7,499 cf WQCV Water Surface 4,953.00 ft September 20, 2019 PROJECT NAME: PROJECT NUMBER: 096755001 CALCULATED BY: HMO CHECKED BY: DLS DATE: 9/20/2019 PRISMOIDAL METHOD Prismoidal Calculation Method = (1/3)*(ELEV1-ELEV2)*(AREA1+AREA2)+(SQRT(AREA1*AREA2)) ELEV. AREA VOLUME ACCUM. VOL. ACCUM. VOL. (FT) (SQ FT.) (CU FT) (CU FT) (AC-FT) 4947.5 4,662 0 0 0.00 4948 11,657 3,948 3,948 0.09 WQCV (0.097 AC-FT) = 4950.59 4948.5 18,361 7,441 11,390 0.26 4949 22,999 10,318 21,708 0.50 4949.5 25,418 12,099 33,807 0.78 4950 27,819 13,305 47,112 1.08 4950.5 30,279 14,520 61,632 1.41 4951 32,798 15,765 77,397 1.78 4951.5 35,376 17,039 94,437 2.17 4952 38,012 18,343 112,780 2.59 4952.5 40,707 19,676 132,456 3.04 100-YR (2.85 AC-FT) = 4952.29 4953 43,470 21,040 153,496 3.52 STAGE-STORAGE ANALYSIS BASIN A BASIN A PROJECT NAME: PROJECT NUMBER: 096755001 CALCULATED BY: HMO CHECKED BY: DLS DATE: 9/20/2019 PRISMOIDAL METHOD Prismoidal Calculation Method = (1/3)*(ELEV1-ELEV2)*(AREA1+AREA2)+(SQRT(AREA1*AREA2)) ELEV. AREA VOLUME ACCUM. VOL. ACCUM. VOL. (FT) (SQ FT.) (CU FT) (CU FT) (AC-FT) 4949 860 0 0 0.00 4949.5 3,620 1,041 1,041 0.02 4950 5,378 2,235 3,276 0.08 Orifice plate at Elev 4950 1-ft of ponding 4950.5 7,075 3,104 6,379 0.15 100-yr grate at Elev 4950.5 ELEV. AREA VOLUME ACCUM. VOL. ACCUM. VOL. (FT) (SQ FT.) (CU FT) (CU FT) (AC-FT) 4949.8 106 0 0 0.000 4950 1,520 135 135 0.003 4950.2 3,194 461 596 0.014 Orifice plate at Elev 4950.2 - 0.4-ft of ponding 100-yr grate at Elev 4950.2 1176 0.09 3872 0.16 STAGE-STORAGE ANALYSIS BASIN B RAINGARDEN B1 RAINGARDEN B2 WQ TOTAL 100-YR TOTAL PROJECT NAME: PROJECT NUMBER: 096755001 CALCULATED BY: HMO CHECKED BY: DLS DATE: 9/20/2019 PRISMOIDAL METHOD Prismoidal Calculation Method = (1/3)*(ELEV1-ELEV2)*(AREA1+AREA2)+(SQRT(AREA1*AREA2)) ELEV. AREA VOLUME ACCUM. VOL. ACCUM. VOL. (FT) (SQ FT.) (CU FT) (CU FT) (AC-FT) 4952 3,800 0 0 0.00 4953 10,106 6,701 6,701 0.15 Outlet at 4953 - 1-ft of ponding STAGE-STORAGE ANALYSIS BASIN C RAINGARDEN C (1) EXISTING BASINS ON-SITE BASINS OFF-SITE BASINS (1) STANDARD FORM SF-3 STORM DRAINAGE DESIGN - RATIONAL METHOD 2 YEAR EVENT 9/20/2019 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 13, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 20 accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 13, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 7