Loading...
HomeMy WebLinkAboutSTODGY BREWING - PDP190012 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSVINE DR LAPORTE AVE MULBERRY ST SHIELDS ST TAFT HILL RD PROJECT LOCATION NCL NCL NCL RL RL LMN LMN LMN LMN LMN CL LMN LMN POL CL T RL LMN LMN A B C D E F G H A B C D E F G H 1 2 3 4 5 1 2 3 4 5 3050 67th Avenue, Suite 200, Greeley, CO 80634 (970) 535-9318 ▪ fax: (970) 535-9854 SHEET: DATE LAST SAVED: August 20, 2019 DATE: August 20, 2019 DRAWN BY: AGPRO REVISIONS: R1 R2 R3 R4 R5 N O T F O R C O N S T R EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING CARPORT EXISTING DECK PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY LARIMER COUNTY CANAL NO. 2 ACCESS ESMT EXISTING WATER MAIN LAPORTE AVE FREY AVE 60' R.O.W. EXISTING DRIVE EXISTING ACCESS EXISTING BRIDGE EXISTING ELECTRIC EXISTING EDGE OF PAVEMENT EXISTING CONCRETE EXISTING DECK EXISTING ACCESS EXISTING PAVEMENT 1760 WEST LAPORTE AVE LLC 1760 WEST LAPORTE AVE LLC ROBINSON MARILYN K/DONALD G BHASKAR ADITI S CASS GAIL D OWENS ANDRE MATTHEW FREDERICK NANCY SALUD HEALTH CENTER LLC (TRANSITION) SALUD HEALTH CENTER LLC (TRANSITION) SALUD HEALTH CENTER LLC (TRANSITION) ZONE -NEIGHBORHOOD CONSERVATION - LOW DENSITY ZONE - TRANSITION ZONE -NEIGHBORHOOD CONSERVATION - LOW DENSITY ZONE - COMMERCIAL LIMITED KOPITZKE ROBERT W EXISTING CONCRETE PAD REMOVE FENCE REMOVE FENCE REMOVE FENCE REMOVE FENCE REMOVE FENCE REMOVE FENCE A B C D E F G H A B C D E F G H 1 2 3 4 5 1 2 3 5055 5053 5054 5056 5057 5055 5054 5051 5052 5053 5054 5050 5051 5052 5053 5055 5055 5055 5051 5052 5053 5054 5056 5056 X X X EXISTING DECK PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY LARIMER COUNTY CANAL NO. 2 LAPORTE AVE (ARTERIAL) FREY AVE EXISTING BRIDGE EXISTING CONCRETE EXISTING DECK EXISTING PAVEMENT R20' R20' ACCESS ESMT RAMP EXISTING ELECTRIC CURB RAMP (BOTH SIDES) R20' R20' PROPOSED FENCE (MATCH EXISTING) PROPOSED LIGHT POLE (TYP) PROPOSED WALL MOUNTED LIGHT (TYP) 1760 WEST LAPORTE AVE LLC 1760 WEST LAPORTE AVE LLC ROBINSON MARILYN K/DONALD G BHASKAR ADITI S CASS GAIL D OWENS ANDRE MATTHEW FREDERICK NANCY SALUD HEALTH CENTER LLC A B C D E F G H A B C D E F G H 1 2 3 4 5 1 2 3 4 5 3050 67th Avenue, Suite 200, Greeley, CO 80634 (970) 535-9318 ▪ fax: (970) 535-9854 SHEET: DATE LAST SAVED: August 16, 2019 DATE: August 20, 2019 DRAWN BY: AGPRO REVISIONS: R1 R2 R3 R4 R5 N O T F O R C O N S T R U C T I O N APPROVAL ONLY! FOR STODGY BREWING CO., LLC GRADING DETAILS GR-2 --/--/-- --/--/-- --/--/-- --/--/-- --/--/-- DESC. DESC. DESC. DESC. DESC. GRADING DETAILS FT COLLINS, CO SHEET 4 OF 9 X X X EXISTING DECK PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY LARIMER COUNTY CANAL NO. 2 EXISTING WATER MAIN LAPORTE AVE FREY AVE EXISTING BRIDGE EXISTING CONCRETE EXISTING DECK EXISTING PAVEMENT SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS E E E E E EXISTING 8" SS MAIN ACCESS ESMT RAMP EXISTING ELECTRIC EXISTING COMMUNICATIONS TO BE RELOCATED (VERIFY) CLEANOUT INV 5044.54 EXISTING SSMH CURB RAMP (BOTH SIDES) 60' R.O.W. 12' ADDITIONAL R.O.W. 15' UTIL ESMT 6' WALK 87 LF 4" PVC @ 2.0% 45 LF 4" PVC @ 2.0% PROPOSED C&G 25' 50' PARKWAY (WIDTH VARIES) EXISTING WATER CURB STOP EXISTING WATER SERVICE (TO BE ABANDONED) EXISTING GAS SERVICE 1760 WEST LAPORTE AVE LLC 1760 WEST LAPORTE AVE LLC A B C D E F G H A B C D E F G H 1 2 3 4 5 1 2 3 4 5 3050 67th Avenue, Suite 200, Greeley, CO 80634 (970) 535-9318 ▪ fax: (970) 535-9854 SHEET: DATE LAST SAVED: August 19, 2019 DATE: August 20, 2019 DRAWN BY: AGPRO REVISIONS: R1 R2 R3 R4 R5 N O T F O R C O N S T R U C T I O N APPROVAL ONLY! FOR STODGY BREWING CO., LLC UTILITY DETAILS UT-2 --/--/-- --/--/-- --/--/-- --/--/-- --/--/-- DESC. DESC. DESC. DESC. DESC. UTILITY DETAILS FT COLLINS, CO NOTE: 5055 5053 5054 5056 5057 5055 5054 5051 5052 5053 5054 5050 5051 5052 5053 5055 5055 5055 5051 5052 5053 5054 5056 5056 X X X EXISTING DECK PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY LARIMER COUNTY CANAL NO. 2 LAPORTE AVE (ARTERIAL) FREY AVE EXISTING BRIDGE EXISTING CONCRETE EXISTING DECK EXISTING PAVEMENT R20' R20' ACCESS ESMT RAMP EXISTING ELECTRIC CURB RAMP (BOTH SIDES) R20' R20' PROPOSED FENCE (MATCH EXISTING) PROPOSED LIGHT POLE (TYP) PROPOSED WALL MOUNTED LIGHT (TYP) 1760 WEST LAPORTE AVE LLC 1760 WEST LAPORTE AVE LLC ROBINSON MARILYN K/DONALD G BHASKAR ADITI S CASS GAIL D OWENS ANDRE MATTHEW FREDERICK NANCY SALUD HEALTH CENTER LLC X PROPERTY BOUNDARY LAPORTE AVE (ARTERIAL) FREY AVE 60' R.O.W. EXISTING BRIDGE EXISTING PAVEMENT 12' ADDITIONAL R.O.W. 15' UTIL ESMT 6' WALK 24' PROPOSED C&G FULL DEPTH ASPHALT 0+00 1+00 2+00 3+00 4+00 4+50 BEGIN CURB & GUTTER STA. 0+50.00 (25.00', L) BEGIN CURB RETURN STA. 1+05.02 (25.00', L) 1760 WEST LAPORTE AVE LLC ROBINSON MARILYN K/DONALD G BHASKAR ADITI S CASS GAIL D OWENS ANDRE MATTHEW FREDERICK NANCY SALUD HEALTH CENTER LLC ZONE -NEIGHBORHOOD CONSERVATION - LOW DENSITY ZONE -NEIGHBORHOOD CONSERVATION - LOW DENSITY KOPITZKE ROBERT W 24' ACCESS ESMT EXISTING ELEC EXISTING COMM (PROTECT IN PLACE) (PROTECT IN PLACE) EXISTING COMM (RELOCATED BY OTHERS) MODIFIED CURB RAMP CURB RAMP (ATTACHED SIDEWALK) ROAD CL ALIGNMENT END CURB RETURN STA. 1+69.02 (25.00', L) CL 24' WIDE DRIVEWAY STA. 1+37.02 (25.00', L) CL 24' WIDE DRIVEWAY STA. 3+23.01 (24.93', L) BEGIN CURB RETURN STA. 2+91.00 (25.00', L) END CURB RETURN STA. 3+55.01 (24.86', L) SAWCUT LINE LARIMER COUNTY CANAL NO. 2 R20' R20' R20' R20' CURB RAMP BEGIN ASPHALT TAPER STA. 0+10.06 (18.27', L) EXISTING FL EXISTING EDGE STODGY BREWING CO., LLC ROAD DETAILS RD-2 --/--/-- --/--/-- --/--/-- --/--/-- --/--/-- DESC. DESC. DESC. DESC. DESC. A B C D E F G H A B C D E F G H 1 2 3 4 5 1 2 3 4 5 3050 67th Avenue, Suite 200, Greeley, CO 80634 (970) 535-9318 ▪ fax: (970) 535-9854 SHEET: DATE LAST SAVED: August 19, 2019 DATE: August 20, 2019 DRAWN BY: AGPRO REVISIONS: R1 R2 R3 R4 R5 N O T F O R C O N S T R U C T I O N APPROVAL ONLY! FOR ROAD DETAILS FT COLLINS, CO SHEET 9 OF 9 OF PAVEMENT 701 RD-2 707.1 RD-2 707.1 RD-2 1602 RD-2 1603 RD-2 VERT. SCALE: 1" = 5' 5040 5045 5050 5055 5060 5040 5045 5050 5055 5060 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 -1.15% -1.12% -1.00% -0.50% -0.50% -1.63% -1.15% STA: 0+50.00 EL=5053.72 STA: 1+00.00 EL=5053.15 STA: 1+50.00 EL=5052.58 STA: 2+00.00 EL=5052.02 STA: 2+50.00 EL=5051.52 STA: 3+00.00 EL=5051.27 STA: 3+33.64 EL=5051.10 STA: 4+00.00 EL=5050.02 PROFILE GRADE (PG) EXISTING GROUND SURFACE VARIES 17' 25' 25' & VARIES 6' WALK 2' 12' ADDITIONAL R.O.W. 60' R.O.W. EXISTING EOP CL ROAD VARIES VARIES FULL DEPTH ASPHALT 3" GRADE S 7" GRADE SG 4:1 TYPICAL ROAD CROSS SECTION NTS 2% 2% PROFILE GRADE (PG) EXISTING GROUND SURFACE EXISTING CURB & GUTTER (WHERE SHOWN) FLOWLINE (FL) PROPOSED CURB & GUTTER PREPARED SUBBASE PREPARED SUBGRADE PREPARED SUBGRADE A B C D E F G H A B C D E F G H 1 2 3 4 5 1 2 3 4 5 3050 67th Avenue, Suite 200, Greeley, CO 80634 (970) 535-9318 ▪ fax: (970) 535-9854 SHEET: DATE LAST SAVED: August 19, 2019 DATE: August 20, 2019 DRAWN BY: AGPRO REVISIONS: R1 R2 R3 R4 R5 N O T F O R C O N S T R U C T I O N APPROVAL ONLY! FOR STODGY BREWING CO., LLC LAPORTE AVE PLAN & PROFILE RD-1 --/--/-- --/--/-- --/--/-- --/--/-- --/--/-- DESC. DESC. DESC. DESC. DESC. N LAPORTE AVE PLAN & PROFILE FT COLLINS, CO 0 20 SCALE: 1" =20' PLAN VIEW PROFILE VIEW 0 0 20' H 5' V NOTE 1. SEE SHEET RD-2 FOR TYPICAL DETAILS. SHEET 8 OF 9 (TRANSITION) SALUD HEALTH CENTER LLC (TRANSITION) SALUD HEALTH CENTER LLC (TRANSITION) ZONE -NEIGHBORHOOD CONSERVATION - LOW DENSITY ZONE - TRANSITION ZONE -NEIGHBORHOOD CONSERVATION - LOW DENSITY ZONE - COMMERCIAL LIMITED KOPITZKE ROBERT W BUILDING A (EXISTING) BUILDING B (EXISTING) CONCRETE PATH LOW SCREEN WALL LOW SCREEN WALL LOW SCREEN WALL 5055 5052 5053 5054 5056 5050 5051 5052 5053 2.0% 2.0% 2.2% 2.1% RETAINING WALL ( H = 2' - 0.5') 60' R.O.W. 12' ADDITIONAL R.O.W. 15' UTIL ESMT & BLDG SETBACK 6' WALK 24' PROPOSED C&G 25' 50' 24' 7.7% 4.4% 4.2% 3.7% 7.7% 5.6% 25.3% 10.4% 5056 EXISTING VEGETATION EXISTING VEGETATION TRUE GRID PERMEABLE PAVERS STODGY BREWING CO., LLC DRAINAGE PLAN DR-2 --/--/-- --/--/-- --/--/-- --/--/-- --/--/-- DESC. DESC. DESC. DESC. DESC. N A B C D E F G H A B C D E F G H 1 2 3 4 5 1 2 3 4 5 3050 67th Avenue, Suite 200, Greeley, CO 80634 (970) 535-9318 ▪ fax: (970) 535-9854 SHEET: DATE LAST SAVED: August 20, 2019 DATE: August 20, 2019 DRAWN BY: AGPRO REVISIONS: R1 R2 R3 R4 R5 N O T F O R C O N S T R U C T I O N APPROVAL ONLY! FOR DRAINAGE PLAN FT COLLINS, CO 0 20 SCALE: 1" =20' SHEET 7 OF 9 PLAN VIEW 4.0% EXISTING GROUND SURFACE CONTOUR AND ELEVATION, FT PROPOSED GROUND SURFACE CONTOUR AND ELEVATION, FT FLOW DIRECTION AND SLOPE 5296 LEGEND 5296 1. NO 100 -YR FLOODPLAIN MAPPED IN THIS AREA. NOTE VALVE BOX MAY BE OMMITED FOR ONSITE CONSTRUCTION. INVERT SEE UTILITY PLAN SHEET 6 OF 9 ROBINSON MARILYN K/DONALD G BHASKAR ADITI S CASS GAIL D OWENS ANDRE MATTHEW FREDERICK NANCY SALUD HEALTH CENTER LLC (TRANSITION) SALUD HEALTH CENTER LLC (TRANSITION) SALUD HEALTH CENTER LLC (TRANSITION) ZONE -NEIGHBORHOOD CONSERVATION - LOW DENSITY ZONE - TRANSITION ZONE -NEIGHBORHOOD CONSERVATION - LOW DENSITY ZONE - COMMERCIAL LIMITED KOPITZKE ROBERT W BUILDING A (EXISTING) BUILDING B (EXISTING) EXISTING TREE EXISTING TREE 1 UT-1 UTILITY CROSSING 92 LF 4" PVC @ 2.0% EXISTING WATER MAIN CLEANOUT INV OUT 5045.44 5' CLEANOUT INV 5044.54 WW-15 WW-15 UT-2 UT-2 WW-15 UT-2 PROPOSED TRANSFORMER SAWCUT LIMITS 3 PHASE ELEC SS SS SS SS SS SS SS EXISTING SSMH RIM 5051.1 INV 5041.5 (N) INV 5042.0 (S) 2' EXISTING 8" SS MAIN SAWCUT LINE CONCRETE PAN FLOWLINE CLEANOUT INV 5042.70 CONNECT TO EXISTING SS MAIN INV IN 5042.65 CONNECT TO EXISTING SSMH INV IN 5042.80 SAWCUT LINE 3 LF 4" PVC @ 2.0% WW-15 UT-2 WW-9 UT-2 EXISTING SS MAIN STUB (VERIFY LOCATION) STODGY BREWING CO., LLC UTILITY PLAN UT-1 --/--/-- --/--/-- --/--/-- --/--/-- --/--/-- DESC. DESC. DESC. DESC. DESC. N A B C D E F G H A B C D E F G H 1 2 3 4 5 1 2 3 4 5 3050 67th Avenue, Suite 200, Greeley, CO 80634 (970) 535-9318 ▪ fax: (970) 535-9854 SHEET: DATE LAST SAVED: August 20, 2019 DATE: August 20, 2019 DRAWN BY: AGPRO REVISIONS: R1 R2 R3 R4 R5 N O T F O R C O N S T R U C T I O N APPROVAL ONLY! FOR UTILITY PLAN FT COLLINS, CO 0 20 SCALE: 1" =20' SHEET 5 OF 9 SS PROPERTY BOUNDARY RIGHT-OF-WAY PROPOSED SS SERVICE EXISTING EASEMENT LEGEND OVERALL LAYOUT 1 UT-1 SANITARY SERVICE TO MAIN CONNECTION SCALE: 1" = 5' NOTE 1. SEE SHEET UT-2 FOR TYPICAL DETAILS. E E PROPOSED ELECTRIC (TRANSITION) SALUD HEALTH CENTER LLC (TRANSITION) SALUD HEALTH CENTER LLC (TRANSITION) ZONE -NEIGHBORHOOD CONSERVATION - LOW DENSITY ZONE - TRANSITION ZONE -NEIGHBORHOOD CONSERVATION - LOW DENSITY ZONE - COMMERCIAL LIMITED KOPITZKE ROBERT W BUILDING A (EXISTING) BUILDING B (EXISTING) CONCRETE PATH LOW SCREEN WALL LOW SCREEN WALL LOW SCREEN WALL 5055 5052 5053 5054 5056 5050 5051 5052 5053 2.0% 2.0% 2.2% 2.1% RETAINING WALL ( H = 2' - 0.5') 60' R.O.W. 12' ADDITIONAL R.O.W. 15' UTIL ESMT & BLDG SETBACK 6' WALK 24' PROPOSED C&G 25' 50' 24' 7.7% 4.4% 4.2% 3.7% 7.7% 5.6% 25.3% 10.4% 5056 SF SF SF SF SF EXISTING VEGETATION EXISTING VEGETATION TRUE GRID PERMEABLE PAVERS STODGY BREWING CO., LLC GRADING & EROSION CONTROL PLAN GR-1 --/--/-- --/--/-- --/--/-- --/--/-- --/--/-- DESC. DESC. DESC. DESC. DESC. N A B C D E F G H A B C D E F G H 1 2 3 4 5 1 2 3 4 5 3050 67th Avenue, Suite 200, Greeley, CO 80634 (970) 535-9318 ▪ fax: (970) 535-9854 SHEET: DATE LAST SAVED: August 20, 2019 DATE: August 20, 2019 DRAWN BY: AGPRO REVISIONS: R1 R2 R3 R4 R5 N O T F O R C O N S T R U C T I O N APPROVAL ONLY! FOR GRADING & EROSION CONTROL PLAN FT COLLINS, CO 0 20 SCALE: 1" =20' SHEET 3 OF 9 PLAN VIEW 4.0% EXISTING GROUND SURFACE CONTOUR AND ELEVATION, FT PROPOSED GROUND SURFACE CONTOUR AND ELEVATION, FT SILT FENCE ROCK SOCK CONCRETE WASHOUT AREA VEHICLE TRACKING CONTROL FLOW DIRECTION AND SLOPE 5296 LEGEND 5296 SF RS CWA VTC VTC CWA RS GRADING AND EROSION CONTROL NOTES 1. THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS ON THE ACCEPTED PLANS. 2. TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE DEVELOPER, UNTIL THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING. 3. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN TWENTY-FOUR (24) HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE CITY. 4. ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC.). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 5. AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED TO MINIMIZE WIND-BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. 6. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL TIME. 7. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL BEST MANAGEMENT PRACTICES (BMP) ARE INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS-OF-WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE CITY. 8. TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES SHALL: a. BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED OR RECONSTRUCTED AS NECESSARY TO ENSURE THE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. b. REMAIN IN PLACE UNTIL ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY STABILIZED AS DETERMINED BY THE CITY OR THEIR DESIGNATED REPRESENTATIVE. c. BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE CITY OR THEIR DESIGNATED REPRESENTATIVE. 10. WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEAN-UP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE INFRASTRUCTURE AND OTHER PUBLIC FACILITIES. 11. THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS AND WALKWAYS ARE CLEANED AT THE END OF EACH WORK DAY. 12. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS OF THE UNITED STATES. 13. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL BE SEEDED AND MULCHED. 14. COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT LIMITED TO DISCARDED BUILDING MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY WASTE. THE DEVELOPER SHALL ALWAYS TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 15. A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA SHALL BE CONSTRUCTED TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50) FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR TO THE AREA BEING RESTORED. 16. CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY AS DIRECTED BY THE CITY. 17. ALL DISTURBED AREAS, NOT IN A ROADWAY, SHALL BE SEEDED AND MULCHED AS SOON AS POSSIBLE USING THE APPLICABLE SEED MIXTURE SPECIFIED ON THE PLANS. 1. NO 100 -YR FLOODPLAIN MAPPED IN THIS AREA. NOTE 4 5 3050 67th Avenue, Suite 200, Greeley, CO 80634 (970) 535-9318 ▪ fax: (970) 535-9854 SHEET: DATE LAST SAVED: August 20, 2019 DATE: August 20, 2019 DRAWN BY: AGPRO REVISIONS: R1 R2 R3 R4 R5 N O T F O R C O N S T R U C T I O N APPROVAL ONLY! FOR STODGY BREWING CO., LLC EXISTING CONDITIONS & DEMOLITION PLAN E-1 --/--/-- --/--/-- --/--/-- --/--/-- --/--/-- DESC. DESC. DESC. DESC. DESC. EXISTING CONDITIONS & DEMOLITION PLAN N FT COLLINS, CO 0 20 SCALE: 1" =20' LEGEND REMOVE FENCE REMOVE STRUCTURE REMOVE TREE / SHRUB SHEET 2 OF 9 U C T I O N APPROVAL ONLY! FOR STODGY BREWING CO., LLC COVER SHEET G-1 --/--/-- --/--/-- --/--/-- --/--/-- --/--/-- DESC. DESC. DESC. DESC. DESC. COVER SHEET FT COLLINS, CO SHEET INDEX SHEET NO. SHEET TITLE G-1 COVER SHEET E-1 EXISTING CONDITIONS & DEMOLITION PLAN GR-1 GRADING & EROSION CONTROL PLAN GR-2 GRADING DETAILS UT-1 UTILITY PLAN UT-2 UTILITY DETAILS DR-2 DRAINAGE PLAN RD-1 LAPORTE AVE PLAN & PROFILE RD-2 ROAD DETAILS VICINITY MAP SCALE: 1" = 1000' PROJECT LOCATION: 1800-1804 LAPORTE AVENUE, FORT COLLINS, CO 80521 PROPERTY OWNER: STODGY BREWING CO., LLC 1205 COLUMBINE COURT, FORT COLLINS, CO 80521 PH.# 714-348-2007 PLANNER / ENGINEER / PREPARED BY: AGPROFESSIONALS CHAD TeVELDE, PE 3050 67TH AVE GREELEY, CO 80634 PH. # 970-535-9318 Fax. # 970-535-9854 SURVEYOR: AGPROFESSIONALS 3050 67TH AVE, SUITE 200 GREELEY, CO 80634 PH. # 970-535-9318 PROJECT NUMBER: AGPRO PROJECT # 2769-02 PROJECT INFORMATION STODGY BREWING CO., LLC N BEING A PART OF THE SE 1/4 OF THE NW 1/4 SECTION 10, TOWNSHIP 7 NORTH, RANGE 69 WEST, OF THE 6TH P.M., LARIMER COUNTY, COLORADO UTILITY PLANS FOR THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUE FOR ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. IDEMNITY STATEMENT I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY; AND THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS, AND RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS. ____________________________________________________________ ENGINEER STATEMENT PROJECT BENCHMARK Standard Grading and Erosion and Sediment Control Construction Plan Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights- of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the Local Entity. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall clean up any inadvertent deposited material immediately and make sure streets are free of all materials by the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the Local Entity or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. To ensure that sediment does not move off of individual lots one or more of the following sediment/erosion control BMPs shall be installed and maintained until the lots are sufficiently stabilized, as determined by the erosion control inspector, (Within Loveland GMA and City Limits Only). a. Below all gutter downspouts. b. Out to drainage swales. c. Along lot perimeter. d. Other locations, if needed. 16. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City/County. 17. A vehicle tracking control pad shall be installed when needed for construction equipment, including but not limited to personal vehicles exiting existing roadways. No earthen materials, i.e. stone, dirt, etc. shall be placed in the curb & gutter or roadway as a ramp to access temporary stockpiles, staging areas, construction materials, concrete washout areas, and/or building sites. 18. Add notes to reflect the stormwater runoff control plan of the individual development. Street Improvements Notes 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the Local Entity Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the Local Entity Engineer in Loveland. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the Local Entity Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the Local Entity Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the Local Entity Inspector and prior to installation of asphalt. Gutters that hold more than ¼ inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. “Proof roll” vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the Local Entity Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The Local Entity Engineer shall be notified at least 24 hours prior to the “proof roll.” All “proof rolls” shall be preformed in the presence of an Inspector. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per Local Entity Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the Local Entity Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the Local Entity Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period, the Local Entity Engineer reserves the right to require additional signage and/or striping if the Local Entity Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the final drainage and erosion control study (name of the study and date) by (Engineering Firm) shall be followed and implemented. 3. Prior to final inspection and acceptance by The City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. Waterline Note 1. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. TO BE COMPLETED. SHEET 1 OF 9