July 31, 2019
Ken Merritt
JR Engineering
2900 S College Ave Suite 3D
Fort Collins, CO 80525
RE: Trail Head Filing Two – Replat & MA, BDR190012 / MA190053, Round Number 1
JR Engineering Response to Comments
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, please contact your Development Review Coordinator Brandy Bethurem Harras at
970.416.2744 or bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
07/23/2019: INFORMATION ONLY:
Please let me know when you are ready to re-submit. I will take all your submittal documents by email.
JR Response: Noted
Comment Number: 2
07/23/2019: INFORMATION ONLY:
For each additional round you will provide responses to your comment letter.
This letter is provided to you in Microsoft Word format. Please use this
document to provide written responses to each comment for submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable.
JR Response: Noted
Comment Number: 3
07/23/2019: INFORMATION ONLY:
2
The proposed development project is subject to a Basic Development Review.
The decision maker for your project will be the Development Review Manager
and/or Director of Community Development and Neighborhood Services. All
documents submitted to the City in association with your Basic Development
Review project are available to the public through our website. Formal public
notice of your project is at the discretion of the Development Review Manager,
including a posted sign, mailing to surrounding neighbors or published notice elsewhere.
JR Response: Noted
Comment Number: 4
07/23/2019: INFORMATION ONLY:
Each additional round of review is 2 weeks. Wednesday is still the cut-off for all submittals/rounds.
JR Response: Noted
Department: Planning Services
Contact: Clark Mapes, 970-221-6225, cmapes@fcgov.com
Topic: General
Comment Number: 1
07/17/2019: No issues, no comments.
Department: Zoning
Contact: Missy Nelson, 970-416-2743, mnelson@fcgov.com
Topic: General
Comment Number: 3
08/01/2019: FOR APPROVAL:
We need to get language on the plat that allows the roof eaves to
overhang/encroach into the easements. Please confirm with the different utility
departments and companies to confirm this is permitted and at what clearance
height is required for said eaves.
JR Response: After speaking with CenturyLink, Comcast, Xcel Energy the following note has been
added to the Plat - Overhanging Eaves into Dry Utility Easements: Overhanging eaves of homes
which encroach into the Dry Utility Easements and which are Ten (10) feet above the finish grade of
said easements do not pose an encumbrance to the dry utility operations and are acceptable with
CenturyLink, Comcast, Xcel Energy and the City of Fort Collins.
Comment Number: 1
08/01/2019: FOR APPROVAL:
Once eaves have been approved by utility companies/departments to encroach into
easements (and at what clearance height), we'll then also need that note on the site plan.
JR Response: Note has been added to General Site Plan Notes on Cover Sheet.
Comment Number: 2
08/01/2019: LANDSCAPE ESCROW CLARIFICATION.
Since this development was not planned in phases, prior to issuance of CO, landscaping
needs to be installed and complete or an escrow/bond/letter of credit for the entire
subdivision in the amount of 125% of landscaper's quote.
JR Response: Noted
3
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1
07/18/2019: NO COMMENTS.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 1
7/24/2019: FOR APPROVAL:
What are the anticipated changes to the landscape plan with this submittal?
Please identify any additional existing tree removal and omitted or added trees
on the plans. Include the City of Fort Collins General Landscaping Notes, Tree
Protection Notes, Street Tree Notes, and Street Tree Permit Note (which should
be shown on each page).
JR Response: There are no Changes to the landscape Plans required only the Property lines are
being moved and each of the individual unit landscape plan shown in the Prototypical Landscape
Plan still applies
Department: Building Services
Contact: Katy Hand, khand@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
07/29/2019: Fire separation distance for sprinkled townhomes: Structure must
be 3ft min to property lines for unlimited openings and no rated walls.
Projections cannot be less than 2ft from property lines. See Table R302.1(2) -2018 IRC
JR Response: Noted
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
Comment Number: 1
07/12/2019: It is the understanding of Light and Power that this minor
amendment will not cause a change to the electric capacity needs or the
location of our facilities. If this an incorrect understanding or if plans change,
please contact me directly at akreager@fcgov.com or (970)224-6152. Thank you.
JR Response: Noted
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
4
Topic: General
Comment Number: 1
07/29/2019:
>PFA has no comments regarding to this Minor Amendment since the required
access is unchanged.
>However, please note that this single family attached residence will still require
an approved residential fire sprinkler system.
>The previously approved addressing is still required.
JR Response: Noted
Comment Number: 2
07/29/2019: INFORMATION ONLY:
PFA does not have comments for this re-plat because the previously approved
access is not changed.
JR Response: Noted
Department: Stormwater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com
Topic: General
Comment Number: 1
07/29/2019: FOR APPROVAL:
The approved drainage design called for a drainage swale on the shared lot
line. With the lot line shift, the swale will no longer be located on the lot line.
Please either update the grading plan to move the proposed drainage swale to
the new lot line location or provide an easement along the lot line so both
properties have right to drain runoff thru the swale.
JR Response: The drainage swales will be shifted to the revised shared lot line and reflected as
such on the plot plans and drainage certifications.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1
07/29/2019: We have no comments on the Minor Amendment, but will need to see
any future submittals.
JR Response: Noted
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 1
07/29/2019: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in response letter.
JR Response: All redlined comments on the attached map have been addressed. There is no lienholder.