HomeMy WebLinkAbout128 Racquette Drive Annexation - ANX190001 - TDR Application SUBMITTAL DOCUMENTS - ROUND 1 - 05/20/2019Cfty Of Transportation Development Review Fee Date Received/ Paid
,,,E6rt Coltins Total Amount Paid
P,roj�ect Natne: �'Zs Ac A P1N.1k.'0qCo
�C
Date:
Pro ect Location
J
TypAda cate the type SubPleaseeiof application submitted by checking the box General Information:
preceding the appropriate request(s). Owners Name(s):
Fee structure aniount due o, V
Overall Development Plan (ODFI) $500 each
Final Development Plan (FDP) Street address: Rokz_
This fee includes 2 rounds of review $1 WO each
Additional round of` revs' iew 500 each
Annexation $20 X 0,acres mm i0 + S250
The maximum: fee for each annexation docutiterit/ filing shall be $2,00011
Minor, Amendment
$158 each
Major Amendment
$2,500 each
Re -zone
$200 each
Modification to Land Use Code
$,200 each
Wireless Telcoornmunication Equipment
(WTE) $65 each
- Road Projects
acres (of roadway) X S,3,500 =
- VacationofEasement(s) a # of vacations — X $400
7 Vacation ofRight(s)-of-Way *** # of vacations ®
X $800
Dedication of'FasemLiii(s)aiidYorRiglit(s)-of-Way
City/State/Zip: COAI,iM5 (0
Teleplto= Fax.:
Applicants/ Consultants Firm Namle:
ail
Strect, address; itl RoAq'e'1(L_V
City/State/ Zip':
2
Telephone: q_h./Iil� 74� Fax:
Cert�ifleation:
By signing this permit I acknowledge that I arn acting with
the knowledge, consent, and authority of the owners of the
property . (including all owners having legal or equitable
interest in the real property, as defined in Section 1 -2 of the
City Code; and including common areas legally connected
to or associated with the property which is the subject of
this application) without whose consent and authority the
requested action could not lawfully be accomplished,
Pumuont to said authority,
I hereby permit City officials to
enter upon the property for purposes of inspection,
Naine (please priryy:
Signature-
Telepho= got ill �171
Foot Notes:
When a developmem prqjeo invoNes as change of use for a
building, the charge perscluare fear shall apply to die portion of
the, overall btJldhtg size for wInch the change of use us proposed,
provided that the rie,,v use generales more traffic than the exisinig
use, as determined by the current Institute of Transportation
Engineers Trip Generation. If the new use does not generate more
traffic than the existing i3qc then the charge per square Foot tear
shall apply only to the net additional building size (ifany).
The maximurn fte,fear any residential ONLY project shall be $500 per residential unit,
1-his, check should be used to verily the fee amount (does not apply to mixed -use These fees do rkol, include the cost of filing fees for the recording Of
developments), PDP fee shall be the lesser of this amount or the above calcuWsd the Devekilimcm Agreement, %'hen a Dcvclq)mcnt Agreement or
aniourfl- ft of residenU units X 5500 = Amendment Agreenrent us entered tinter the Dvveloper shill be
responsNe for flue cost ofrecording the document. Said flifing frees
lflhi,s fee amount equals or exceeds $65XX)0 flien the City Manager shall have (lie attflity, shall be calcuhnerl and provided when the signed docuumni is
to reduce the fie; arnount. returneil to the City for signatures and Cling;,.
Reduction for affordable housing — a copy of the City letter certifying/ authorizing the This, fee does not include the cost of filing fees, Filing
affordable housing shall be pmvided V%ruh this appticalion. Amount of reduction to be fees shall be determined at the time of final document
4 of dedications X $250 =
Project Development Plan (PLOP) or Basic Development Reviiew
Project requiring Transportation Services Review andJor utility plan re'view.
This fee includes, 3 rounds of review.
Detached Single: Family $160perunit
# of units X $160
Multifamily or other residential -units $115per unit
# of units X $115
Cornmercial, Industrial, Retail, andlor No�n residential
building square footage $0.25 per square foot
sq 11 X M25 =
Size of the development (ar-ea being platted or if not being
platted size of parcel accompanying all development
improvements) $250 per acre __ acres X $ 250 —
Project fee $2,000 each
Total ofabove arriounts
If this feeannuunt exceeds MPM dien the re: amourfl shall, be adjustedwilh the
fallow ing formula: $30,000 4- 1/z (the amount over 30,000 —) =
appned —Irrrr-l—rlrr' subrnktal and wifl be required prior to filing
Total owed for PDP
cc: ChTistic'Whitc, Engineering1 2012 form Development Review Engineering