Loading...
HomeMy WebLinkAbout614 LESSER DRIVE CARRIAGE HOUSE - FDP190013 - SUBMITTAL DOCUMENTS - ROUND 3 - RESPONSE TO STAFF REVIEW COMMENTSCommunity Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview August 23, 2019 Mike Hutsell HighCraft Builders 429 S Howes Street Fort Collins, CO 80521 RE: 614 Lesser Drive Carriage House, FDP190013, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact your Development Review Coordinator, Todd Sullivan, at 970.221.6695 or tsullivan@fcgov.com . Comment Summary: Department: Development Review Coordinator Contact: Todd Sullivan, 970-221-6695, tsullivan@fcgov.com Topic: General Comment Number: 1 Comment Originated: 08/20/2019 08/20/2019: FOR HEARING: Staff has directed to process the next submittal as a shortened 2-week review. Please reach out to me when you are ready to submit. No response needed. Comment Number: 2 Comment Originated: 08/20/2019 08/20/2019: I will schedule a hearing when all departments have given approval. Page 1 of 8 No response needed. Department: Planning Services Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com Topic: General Comment Number: 3 Comment Originated: 08/20/2019 08/20/2019 INFORMATION ONLY: Ready for hearing. No response needed. Department: Stormwater Engineering Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 07/12/2019 08/20/2019: FOR HEARING–UPDATED: Please label sheet U2.0 as “Proposed Grading and Drainage Plan” See Sheet U2.0 for updated title. 07/12/2019: FOR HEARING: Proposed Grading Plan: Because site improvements exceed 1000 SF of new impervious area, a proposed grading plan certified by a Colorado PE will be required. This will need to show existing topography, proposed grading, and be on the NAVD 88 vertical datum. See grading/drainage plan on sheet U2.0. Comment Number: 2 Comment Originated: 07/12/2019 08/20/2019: FOR HEARING-UPDATED: Thank you for providing stormwater runoff and capacity calculations. However, the submitted rational hydrology calculations need to be revised. The time of concentration (Tc) formula used is not appropriate (eqn. 3.3-5 is for maximum Tc). Please see the Fort Collins Stormwater Criteria Manual, ch. 5 (hydrology) sections 3.3.1 to 3.3.3 for the Tc calculation procedure. The Tc for this site will likely be 5-minutes or less. It is acceptable to conservatively assume a 5-min Tc – without additional calculations. Please revise the time of concentrations and recalculate runoff. See the redlined PDF. Page 2 of 8 07/12/2019: FOR HEARING: Drainage Report: Please provide hydrology flow calculations. Because of the significant site improvements (+1000 SF impervious area), the drainage letter will need to confirm that the increased flows can be conveyed to Lesser Drive or an adequate public facility. See Drainage Letter provided by Advanced Engineering. Comment Number: 6 Comment Originated: 08/20/2019 08/20/2019: FOR HEARING: The swale hydraulic capacity calculations need more information presented. This is for the driveway pan and front yard swale. Please present all of the input parameters for the Manning’s normal depth equation – slope and n values are missing. I could not reproduce the results of driveway pan capacity calculation (manning’s normal depth equation). Please recheck and resubmit. See Drainage Letter and Plan provided by Advanced Engineering. Comment Number: 7 Comment Originated: 08/20/2019 08/20/2019: FOR HEARING: The driveway ‘v’-pan does not appear to have enough capacity. This is based on our recheck of the normal depth calculations. Currently this pan has 0.5% slope (So), with 0.03-feet (0.36-inches) flow depth. The City suggests increasing the slope and depth of v-pan driveway to increase capacity. Criteria for swales (less than 100-cfs) require that the driveway v-plan will need to convey 133% of the 100-year flowrate, with no freeboard. Please feel free to contact me for additional clarification if needed. See Drainage Letter and Plan provided by Advanced Engineering Comment Number: 8 Comment Originated: 08/20/2019 08/20/2019: FOR HEARING: Drainage Letter – Please address the letter to “City of Fort Collins Stormwater Staff” and add a statement of compliance with the Fort Collins Stormwater Criteria Manual: “I hereby attest that this [report/ letter] for the [preliminary or final] drainage design for the [project name] was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Page 3 of 8 Criteria Manual. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others.” (From Ch 2., Section 4.2, FCSCM). See Drainage Letter provided by Advanced Engineering Contact: Basil Hamdan, 970-224-6035, bhamdan@fcgov.com Topic: Erosion Control Comment Number: 5 Comment Originated: 07/15/2019 07/15/2019: INFORMATION ONLY: No Comment from Erosion Control. Based upon the submitted Planning Materials it has been determined that this project; will disturb less than 10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes (greater than 3H:1V) within or adjacent to the project, and is not part of a larger common development that will or is under construction. Therefore, no Erosion Control Material submittal is needed. If this project substantially changes in size or design where the above criteria now apply, erosion control materials should be submitted. Though the project at this time requires no erosion control material submittal, the project still must be swept and maintained to prevent dirt, saw cuttings, concrete wash, trash & debris, landscape materials and other pollutants from the potential of leaving the site and entering the storm sewer at all times during the project in accordance with City Code 26-498. If complaint driven or site observation of the project seems not to prevent the pollutant discharge the City may require the project to install erosion and sediment control measures. Nearby inlets that may be impacted by the pollutants, in particular dirt, should be protected as a good preventative practice and individual lots should be protected from material escaping onto the sidewalk. If at building permit issuance any issues arise please email erosion@fcgov.com to help facilitate getting these permits signed off. No response needed. Department: Water-Wastewater Engineering Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 07/16/2019 08/20/2019: FOR HEARING–UPDATED: On the Utility Plan, please add dimension between proposed water and sewer Page 4 of 8 services. We will require separate UT plan with coversheet and City signature blocks. The Utility Plan needs to be stamped by a Colorado PE. See the PDF redlines for more information. See Utility Plan on Sheet U3.0 07/16/2019: FOR HEARING: Separation between proposed utility services is too tight. New or modified water and sanitary services require 6-feet of separation from other utilities and 10-feet between water and sanitary. Per Matt Simpson, we will be allowed 4 feet of separation between the sanitary sewer and new gas line. See Utility Plan on Sheet U3.0. Department: Engineering Development Review Contact: Morgan Uhlman, 970-416-4344, muhlman@fcgov.com Topic: General Comment Number: 1 Comment Originated: 07/15/2019 08/15/2019: FOR APPROVAL-Updated: Technical Services has approved the legal exhibits for the right-of-way dedication and utility easement dedication. Please execute the Deed of dedication and have your attorney certify them. Once they are fully executed I will need the original copies as well as recording fees to finalize the dedication process. Your coordinator or I can tell you what the recording fees for this project will be. 07/15/2019: FOR APPROVAL: Please continue to work with me and Technical Services to get the easements dedicated and recorded. No response needed. Comment Number: 3 Comment Originated: 07/17/2019 08/15/2019: FOR HEARING - Updated: Please create a separate plan set for Sheets U1.0 and U2.0. These sheets will need to follow the requirements for a title page as described in Appendix E-4 of LCUASS. This set will need to have the City's signature block in the lower right-hand corner of each sheet. I have provided the City's signature block to the coordinator. Page 5 of 8 See Utility Plan Set (sheets U1.0-U3.0) 07/17/2019: FOR HEARING: If an PE stamped drainage plan is required, please separate the utility and grading plan sheets from the planning set to create a utility plan set. For the utility plan set please use the checklist in LCUASS section E-4 for coversheet requirements and applicable standard comments from section E1 and E-2 for general notes for the utility plan set needed from the Stormwater department. The following link will take you to the sections listed: https://www.larimer.org/sites/default/files/apdxe.pdf Comment Number: 5 Comment Originated: 08/15/2019 08/15/2019: FOR HEARING: Please add a note on the site plan as well as on the utility plan set that indicates that the property owner is responsible for maintaining the swale and chase even in the event that the frontage is brought up to City standards. See Maintenance Note on Site Plan sheet A0.0 and on the Utility Plan on sheet U3.0 Comment Number: 6 Comment Originated: 08/15/2019 08/15/2019: FOR INFORMATION: This project will need to obtain an excavation permit from the City to build the new proposed chase. This permit cannot be issued until the project has been approved and finalized. Here is a link to the permit: https://www.fcgov.com/engineering/pdf/ExcavationPermit2019.pdf?1558542937 No response needed. Department: PFA Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 07/15/2019 08/12/2019: All PFA comments are resolved at this time No response needed. 07/15/2019: ACCESS- no further action required Page 6 of 8 The 150ft access requirement can be achieved by measuring from the street. No response needed. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: General Comment Number: 2 Comment Originated: 07/17/2019 08/19/2019: FOR FINAL APPROVAL: Please provide the following information for the Benchmark Statement in the EXACT format shown below. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 DATUM - X.XX’. 07/17/2019: FOR FINAL APPROVAL: The vertical datum is missing from the plans. See Project Benchmarks on Sheet U1.0 of the Utility Plan Set. Department: Building Inspection Plan Review Contact: Katy Hand, , khand@fcgov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated: 08/19/2019 Informational/For building permit: Page 7 of 8 The roof overhangs (at the 5ft setback) will need to be fire protected per table R302.1(1) No response needed. Page 8 of 8