Loading...
HomeMy WebLinkAboutSANCTUARY ON THE GREEN - PDP190003 - DOCUMENT MARKUPS - ROUND 3 - SUBDIVISION PLATCity of Fort Collins Engineering Development Review Date: 05/23/2019 Spencer M. Smith, P.E. City of Fort Collins Engineering Development Review Date: 05/23/2019 Spencer M. Smith, P.E. City of Fort Collins Engineering Development Review Date: 05/23/2019 Spencer M. Smith, P.E. SIGHT DISTANCE EASEMENT NECESSARY? IT LOOKS LIKE THE MASTER STREET PLAN UPDATE WILL NOT BE FINALIZED UNTIL LATER THIS YEAR. I HAVE CONCERNS THAT YOUR SITE WAS LAID OUT ASSUMING ACCEPTANCE OF THE TAFT HILL RD. DOWNGRADE AND WILL NOT BE ABLE TO ACCOMMODATE A 4-LANE ARTERIAL IF TAFT HILL RD. DOES NOT GET DOWNGRADED 15.0 ft 15.1 ft ULTIMATE UTILITY EASEMENT LINE IF TAFT HILL RD. NOT DOWNGRADED City of Fort Collins Engineering Development Review Date: 05/23/2019 Spencer M. Smith, P.E. THE FULL STREET SECTION, INCLUDING EASEMENT SHOULD BE CONTAINED ON YOUR SITE, UNLESS YOU HAVE AN EASEMENT FROM THE ADJACENT PROPERTY OWNER City of Fort Collins Engineering Development Review Date: 05/23/2019 Spencer M. Smith, P.E. City of Fort Collins Engineering Development Review Date: 05/23/2019 Spencer M. Smith, P.E. City of Fort Collins Engineering Development Review Date: 05/23/2019 Spencer M. Smith, P.E. City of Fort Collins Engineering Development Review Date: 05/23/2019 Spencer M. Smith, P.E.