HomeMy WebLinkAboutSANCTUARY ON THE GREEN - PDP190003 - DOCUMENT MARKUPS - ROUND 3 - SUBDIVISION PLATCity of Fort Collins
Engineering
Development Review
Date: 05/23/2019
Spencer M. Smith, P.E.
City of Fort Collins
Engineering
Development Review
Date: 05/23/2019
Spencer M. Smith, P.E.
City of Fort Collins
Engineering
Development Review
Date: 05/23/2019
Spencer M. Smith, P.E.
SIGHT DISTANCE
EASEMENT
NECESSARY?
IT LOOKS LIKE THE MASTER STREET PLAN UPDATE WILL NOT BE FINALIZED UNTIL
LATER THIS YEAR. I HAVE CONCERNS THAT YOUR SITE WAS LAID OUT ASSUMING
ACCEPTANCE OF THE TAFT HILL RD. DOWNGRADE AND WILL NOT BE ABLE TO
ACCOMMODATE A 4-LANE ARTERIAL IF TAFT HILL RD. DOES NOT GET
DOWNGRADED
15.0 ft
15.1 ft
ULTIMATE UTILITY
EASEMENT LINE IF
TAFT HILL RD. NOT
DOWNGRADED
City of Fort Collins
Engineering
Development Review
Date: 05/23/2019
Spencer M. Smith, P.E.
THE FULL STREET SECTION,
INCLUDING EASEMENT SHOULD BE
CONTAINED ON YOUR SITE, UNLESS
YOU HAVE AN EASEMENT FROM THE
ADJACENT PROPERTY OWNER
City of Fort Collins
Engineering
Development Review
Date: 05/23/2019
Spencer M. Smith, P.E.
City of Fort Collins
Engineering
Development Review
Date: 05/23/2019
Spencer M. Smith, P.E.
City of Fort Collins
Engineering
Development Review
Date: 05/23/2019
Spencer M. Smith, P.E.
City of Fort Collins
Engineering
Development Review
Date: 05/23/2019
Spencer M. Smith, P.E.