Loading...
HomeMy WebLinkAboutSUNSHINE HOUSE AT BUCKING HORSE - FDP190016 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE RELATED DOCUMENTProject Number: 687-007 Location: Fort Collins, CO Date: 7/172019 Total Acres: 1.65 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price L.F. 1175 $1.50 $1,762.50 Construction Fence w/Rock Sock L.F. 0 $4.50 $0.00 each 3 $200.00 $600.00 Wattle Dike Inlet Protection each 11 $100.00 $1,100.00 Wattle Dike Swale Protection each 1 $100.00 $100.00 each 1 $2,500.00 $2,500.00 each 1 $1,850.00 $1,850.00 each 1 $150.00 $150.00 L.F. 60 $1.00 $60.00 per hour 30 $60.00 $1,800.00 each 1 $500.00 $500.00 Sub-Total: $10,422.50 1.5 x Sub-Total: $15,633.75 Amount of security: $15,633.75 Total Acres x $1325/acre: $2,186.25 Sub-Total: $2,186.25 1.5 x Sub-Total: $3,279.38 Cost to Re-seed: $3,279.38 Minimum escrow amount: $3,000.00 Erosion Control Escrow: $15,633.75 NOTE: 'Total Acres' represents total disturbed area. Bucking Horse Filing Two - Major Amendment Erosion Control Cost Estimate Silt Fencing Inlet Protection Vehicle Tracking Control Pads Option 2 | Cost to Re-seed Disturbed acreage Option 3 | Miniumum Escrow Amount Final Escrow Amount Concrete Washout Area Rock Sock Sawcutting Pollution Prevention Turf Rinforcement Mat Option 1 | BMP Costs Street Sweeping and Cleaning