Loading...
HomeMy WebLinkAboutGROWTH LEASING COLORADO - BDR190008 - SUBMITTAL DOCUMENTS - ROUND 2 - SUPPLEMENTAL INFORMATION (3)\\UFP\Utilities\WEFS\WEFS-Ops-Mgr\Templates WEFS\WFO Hydrant Flow Test Form Revision Date: July 17, 2018 Water Field Operations Hydrant Flow Test DISCLAIMER The above hydrant flow readings and information (readings) are from a single test performed at an arbitrary point in time and as such are not and should not be assumed to be representative of typical or any specific water system conditions. The City of Fort Collins (City) makes no representation of the readings’ accuracy or representativeness. The City disclaims any and all liability with respect to the readings and any use thereof. The readings are provided for general information purposes only and are not intended to be used for any other or specific purpose, including as the basis for the development of construction plans or any type of engineering. The readings are not guaranteed Flow Test For: 1200 Blk Red Cedar Cir Date: 5/14/19 Time: 6:30 AM Flow Test Hydrant: w12172 Mfg. Mueller Flowed Nozzle Size: 4.5 Flowed at: 48 PSI Hose Monster Conversion Chart: 2294 GPM Side Gauge Reading During Flow Test: 65 PSI Static and Residual Hydrant: w12145 Mfg. Mueller Static Reading: 105 PSI Residual Reading During Flow Test: 97 PSI Notes: Tom Orfanos EVP-Corporate Development Growth Leasing LLC Tel: (505) 570-7745 Email: torfanos@growthleasing.com 720 S Colorado Boulevard Penthouse North Office 1331 Glendale, CO 80246 \\UFP\Utilities\WEFS\WEFS-Ops-Mgr\Templates WEFS\WFO Hydrant Flow Test Form Revision Date: July 17, 2018 to be accurate or suitable for any use. Any use of the readings and any conclusions drawn therefrom shall be strictly the responsibility of the user, and not the City.