Loading...
HomeMy WebLinkAboutGROWTH LEASING COLORADO - BDR190008 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTFINAL DRAINAGE AND EROSION CONTROL REPORT April 2, 2019 Growth Leasing Colorado Fort Collins, Colorado Prepared for: Growth Leasing LLC 3019 Duportail Street, #177 Richland, WA 99352 (505) 570-7745 Prepared by: 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 1585-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. 301 N. Howes Street, Suite 100, Fort Collins, CO 80521 970.221.4158 www.northernengineering.com RE: Final Drainage and Erosion Control Report for Growth Leasing Colorado Dear Staff: Northern Engineering is pleased to submit this Final Drainage and Erosion Control Report for your review. This report accompanies Basic Development Review submittal for the proposed Growth Leasing Colorado development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Mason Ruebel, EI Danny Weber, PE Project Engineer Project Engineer Growth Leasing Colorado Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 2 C. Floodplain.......................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description .................................................................................................................... 4 B. Sub-Basin Description ....................................................................................................................... 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations........................................................................................................................................ 5 B. Four Step Process .............................................................................................................................. 5 C. Development Criteria Reference and Constraints ............................................................................ 6 D. Hydrological Criteria ......................................................................................................................... 6 E. Hydraulic Criteria .............................................................................................................................. 6 F. Floodplain Regulations Compliance .................................................................................................. 7 G. Modifications of Criteria ................................................................................................................... 7 IV. DRAINAGE FACILITY DESIGN .................................................................................... 7 A. General Concept ............................................................................................................................... 7 B. Water Quality Treatment/Low Impact Development ....................................................................... 8 C. Specific Details .................................................................................................................................. 8 V. CONCLUSIONS ........................................................................................................ 9 A. Compliance with Standards .............................................................................................................. 9 B. Drainage Concept .............................................................................................................................. 9 References ....................................................................................................................... 10 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Detention Ponds B.2 – Storm Sewers B.3 – Inlets & Weirs APPENDIX C – Erosion Control Report APPENDIX D – LID Exhibit APPENDIX E – References Growth Leasing Colorado Preliminary Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2 – Proposed Site Plan ............................................................................................... 3 Figure 3 – Existing Floodplains ............................................................................................. 4 MAP POCKET: DR1 - Drainage Exhibit Growth Leasing Colorado Final Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. Replat of Lot 17, Block 3, Replat (NO.1) of Evergreen Park. Located in the northwest quarter of Section 1, Township 7 North, Range 69 West of the 6th Prime Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. Bounded to the north by an undeveloped lot and transmission lines, to the west by an existing alley, to the south by an industrial lot, and to the east by public right of way for Red Cedar Circle. 4. No significant offsite flows are directed into the site. The majority of off-site flows are prevented from entering the site by existing topography. 5. This lot was originally included in the Master Storm Drainage and Detention Plan for Evergreen Park, prepared by Cornell Consulting Company. The Drainage Plan for the area has been revised per the North East College Corridor Outfall (NECCO) project commissioned by The City of Fort Collins and designed by Ayres Associates. 6. The NECCO project overrides the previous drainage plan for the Evergreen Park Subdivision. 7. This site has also been included in the Final Strom Drainage Report for Evergreen Park Lots17,18 and 19. Growth Leasing Colorado Final Drainage Report 2 B. Description of Property 1. The site is approximately 1.095 acres of Industrial zoning. Figure 1 – Aerial Photograph 2. The existing site is comprised of undeveloped land with natural grasses and vegetation. The northern boundary of the site contains overhead electric lines. 3. The site is generally very flat except along the eastern boundary. The site gently slopes to the south with a high point through the middle of the site. 4. A Web Soil Survey from the Natural Resources Conservation Service lists the soils for the area as Hydrologic Soil Group C, which has a low infiltration rate. 5. The proposed project site plan is composed of one commercial building, asphalt parking/drives, and a concrete equipment area. This site will employ the use of a rain garden as the main source of LID treatment. Growth Leasing Colorado Final Drainage Report 3 Figure 2– Proposed Site Plan 6. There is an abandoned concrete irrigation channel that will be removed with construction. 7. The project site is within the Evergreen Park Subdivision Drainage Plan and the NECCO drainage basin. The proposed project is not requesting a change in the land use. C. Floodplain 1. The subject property is not located in a FEMA or City regulatory floodplain. Growth Leasing Colorado Final Drainage Report 4 Figure 3 – Existing Floodplains II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Growth Leasing project is located within the Dry Creek Master Drainage Basin. B. Sub-Basin Description 1. The existing site is very flat except near the east property line. Flows from the southern half of the site gently slopes towards an existing concrete pan in the property to the south. From there, flows are conveyed to the NECCO Regional Pond through the existing storm infrastructure. Minor flows to the west generally drain to the adjacent alley. These flows are conveyed along the alley to Conifer Street and to existing downstream inlets. Minor Flows to the east generally drain to Red Cedar Circle. From there, the flows are conveyed along the street curb and gutter to Conifer Street and to existing downstream inlets. 2. The proposed plan will generally detain developed flows and release at a historical flow rate to an existing storm drain stub on the southeast corner of the site. The existing storm drain ultimately outfalls into the NECCO Regional Water Quality Pond. Growth Leasing Colorado Final Drainage Report 5 III. DRAINAGE DESIGN CRITERIA A. Regulations There are no additional provisions outside of the FCSCM proposed with the Growth Leasing Colorado Project. B. Four Step Process The overall stormwater management strategy employed with the Growth Leasing Colorado project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Specific techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Routing flows, to the extent feasible, through rain gardens to provide additional infiltration. Providing on-site detention to increase time of concentration, promote infiltration and reduce loads on existing storm infrastructure. Providing vegetated open areas along the south, east, and west portions of the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, this development will still generate stormwater runoff that will require additional BMPs and water quality. The LID strategies listed above will provide the on-site water quality treatment required for this project. Additional water quality for this site is provided by the NECCO drainage project within the downstream extended detention ponds. Step 3 – Stabilize Drainageways There are no major drainageways within the subject property. This property discharges to existing storm sewers. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: Localized trash enclosure within the development will allow for the disposal of solid waste. Water Quality measures to protect and prolong the design life of the BMPs delineated in Step 1. Standard Operating Procedures (SOPs) for BMP maintenance of Detention ponds and associated drainage infrastructure to remove sediment accumulation regularly. Growth Leasing Colorado Final Drainage Report 6 C. Development Criteria Reference and Constraints 1. The proposed site is a part of the NECCO Drainage Basin. This project requires the site to discharge runoff from the 100-yr storm event at the historic 2-year release rate, which is 0.2-cfs per acre. Water quality capture volume is provided regionally by the NECCO extended detention ponds downstream. 2. This site is subject to the LID requirements per the City of Fort Collins. Please see the LID Exhibit located in the Appendix for calculations concerning LID treatment. The site must either have the following: 75% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP, or 50% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP and 25% of new pavement shall be pervious. 3. Per the Final Strom Drainage Report for Evergreen Park lots 17,18 and 19, the existing storm is capable of accepting 0.42-cfs as a release from this site. We are discharging at 0.22-cfs. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The FAA Modified method was utilized for detention storage calculations and maximum release from the site during a 100-yr event. 4. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2- year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the site is generally very flat except along the eastern boundary. The site gently slopes to the south with a high point through the middle of the site. 2. All drainage facilities proposed with the Growth Leasing Colorado project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated previously, the subject property is not located within a FEMA regulatory floodplain. 4. The Growth Leasing Colorado project does not propose to modify any natural drainageways. Growth Leasing Colorado Final Drainage Report 7 F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of any FEMA 100-year floodplain, and thus are not subject to any floodplain regulations. G. Modifications of Criteria 1. This project is requesting a slight decrease in the required 75% total new impervious area must be treated through LID. We are treating 73% of the total new impervious area and 100% of the new parking areas. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the Growth Leasing Colorado drainage design are to minimize the developed 100-yr event discharge from the site and meet LID treatment requirements. 2. The site has been designed to store runoff above and release to the existing storm infrastructure located on the southeast corner of the site. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. This project requires the site to discharge runoff from the 100-yr storm event at the historic 2-year release rate. The historic 2-year release rate for the project was calculated at 0.2-cfs per acre. 5. The Growth Leasing Colorado project is divided the site into five (4) major drainage basins, designated as Basins 1A, 1B, 1C, and 1D. Basin 1A Basin A is a total of 0.46 acres. Basin 1A consists of proposed asphalt drive, landscaped area, a concrete pad, and rain garden 1. Runoff from Basin A flows via sheet flow to a concrete pan which outfalls into a proposed rain garden. Basin A is treated entirely for LID within the proposed rain garden 1 and detained in detention pond 1. Basin 1B Basin 1B is a total of 0.05 acres. Basin 1B consists of a section of the proposed building. Runoff from Basin B is captured by downspouts and released into rain garden 1. Basin 1B is also treated entirely for LID within the proposed rain garden 1 and detained in detention pond 1. Basin 1C Basin 1C is a total of 0.15 acres. Basin 1C consists of a section of the proposed building. Runoff from Basin 1C is released from downspouts, directly into Basin 1D and detention pond 1. Basin 1D Basin 1D is a total of 0.42 acres. Basin D consists of a concrete pad, landscape area, and detention pond 1. Runoff from Basin D sheet flows and is detained in detention pond 1. Growth Leasing Colorado Final Drainage Report 8 Table 2 – Proposed Rational Basin Summary DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100- yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) 1A 1A 0.46 0.67 0.67 0.84 8.6 8.6 6.7 0.73 1.25 3.51 1B 1B 0.05 0.95 0.95 1.00 5.0 5.0 5.0 0.14 0.23 0.50 1C 1C 0.15 0.95 0.95 1.00 5.0 5.0 5.0 0.41 0.71 1.52 1D 1D 0.42 0.25 0.25 0.31 17.1 17.1 16.1 0.18 0.32 0.83 6. One detention pond is proposed with the Growth Leasing Colorado project. Detention Pond 1 is located within Basin 1D. Detention Pond 1 Detention Pond 1 has a total of 0.22 ac-ft storage available. 0.21 ac-ft of storage is required with this project. Water quality control volume for detention pond 1 is not included in the pond volume since water quality is provided downstream in the NECCO Regional Water Quality Ponds. Emergency Overflow from the pond is directed over the adjacent sidewalk on the east property line and into Red Cedar Circle. Release rate from detention pond 1 is proposed at 0.22 cfs. Table 3 – Detention Pond Summary Detention Pond Summary Pond 100-yr Volume 100-yr WSEL Max Release Pond Spill (ac-ft) (cfs) Elev 1 0.21 4973.4 0.22 4973.5 A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Water Quality Treatment/Low Impact Development 1. Water Quality is provided for the site downstream with the NECCO Regional Water Quality Pond. This site is only required to meet LID requirements for water quality 2. Basins 1A and 1B have water quality provided exclusively via Rain Garden 1. Following UDFCD standards for a 12-hour drain time, a Water Quality Capture Volume of 392 cu. ft. is required. Stormwater volume exceeding the volume provided will overflow into detention pond 1. Growth Leasing Colorado Final Drainage Report 9 2. An emergency overflow weir for Detention Pond 1 was provided to convey the 100-yr storm flowrate from the pond safety to Red Cedar Circle in an emergency event. Weirs were analyzed by Hydraflow Express. 3. Inlets were sized for the 100-yr event utilizing Area Inlet calculations spreadsheets. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the Growth Leasing Colorado project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with the Growth Leasing Colorado complies with the City of Fort Collins’ Master Drainage Plan for the Dry Creek Drainage Basin. 3. There are no regulatory floodplains associated with the development. 4. The drainage plan and stormwater management measures proposed with the development are compliant with all applicable State and Federal regulations governing stormwater discharge. 5. The site is just under the requirements set forth by the City of Fort Collins for Low Impact Development (LID) by providing 73% total impervious areas as being treated through LID treatment. The area that is not being treated is basin 1D which is mainly landscape area and basin 1C which is a section of the proposed building rooftop. This area will have little impact on the water quality. Please see LID Exhibit located in the Appendix. B. Drainage Concept 1. The drainage design proposed with this project will effectively comply with previous studies and will limit any potential damage or erosion associated with its stormwater runoff. All existing downstream drainage facilities are expected to not be impacted negatively by this development 2. The drainage design is anticipated to be very conservative. We have omitted any runoff reduction that will manifest due to infiltration within the Rain Garden. This is currently unable to be calculated with available soils data. Growth Leasing Colorado Final Drainage Report 10 References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Master Storm Drainage and Detention Plan for Evergreen Park, Cornell Consulting Company. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. 6. Final Storm Drainage Report for Evergreen Park Lots 17, 18 and 19, Stewart & Associates, Fort Collins, Colorado, May 1995. APPENDIX A HYDROLOGIC COMPUTATIONS Growth Leasing Colorado CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Growth Leasing Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: D. Weber Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 100% Gravel ……….…………………….….…………………………..……………………………….0.50 . 40% Roofs …….…….………………..……………….…………………………………………….0.. 95 90% Concrete Pavers…………………………...………………..…………………………………………….0.50 . 40% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 2% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 2% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. 1A 20,023.51 0.46 0.21 0.07 0.00 0.00 0.00 0.18 0.67 0.67 0.84 61% 1B 2,184.00 0.05 0.00 0.00 0.05 0.00 0.00 0.00 0.95 0.95 1.00 90% 1C 6,637.84 0.15 0.00 0.00 0.15 0.00 0.00 0.00 0.95 0.95 1.00 90% 1D 18,369.49 0.42 0.00 0.00 0.00 0.00 0.00 0.42 0.25 0.25 0.31 2% Growth Leasing Colorado Overland Flow, Time of Concentration: Project: Growth Leasing Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Growth Leasing Colorado Rational Method Equation: Project: Growth Leasing Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: 1A 1A 0.46 8.6 8.6 6.7 0.67 0.67 0.84 2.35 4.02 9.06 0.73 1.25 3.51 1B 1B 0.05 5.0 5.0 5.0 0.95 0.95 1.00 2.85 4.87 9.95 0.14 0.23 0.50 1C 1C 0.15 5.0 5.0 5.0 0.95 0.95 1.00 2.85 4.87 9.95 0.41 0.71 1.52 1D 1D 0.42 17.1 17.1 16.1 0.25 0.25 0.31 1.75 2.99 6.30 0.18 0.32 0.83 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) D. Weber March 13, 2019 Q = C f ( C )( i )( A ) \\BRONCOS\Engineers\Projects\1585-001\Drainage\Hydrology\1585-001_Rational.xlsx\Direct-Runoff APPENDIX B HYDRAULIC COMPUTATIONS B.1 DETENTION PONDS B.2 STORM SEWERS B.3 INLET AND WEIR APPENDIX B.1 DETENTION PONDS Pond No : 1 1 100-yr 0.70 6.60 min 9195 ft3 1.08 acres 0.21 ac-ft Max Release Rate = 0.22 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 2257 1.00 0.22 65 2192 10 7.720 3502 0.83 0.18 108 3394 15 6.520 4436 0.72 0.16 140 4296 20 5.600 5080 0.67 0.14 172 4908 25 4.980 5647 0.63 0.14 205 5443 30 4.520 6151 0.61 0.13 237 5914 35 4.080 6477 0.59 0.13 270 6208 40 3.740 6786 0.58 0.13 302 6484 45 3.460 7063 0.57 0.12 334 6728 50 3.230 7326 0.57 0.12 367 6959 55 3.030 7559 0.56 0.12 399 7160 60 2.860 7784 0.56 0.12 432 7352 65 2.720 8020 0.55 0.12 464 7556 70 2.590 8224 0.55 0.12 496 7727 75 2.480 8437 0.54 0.12 529 7908 80 2.380 8637 0.54 0.12 561 8075 85 2.290 8829 0.54 0.12 594 8236 90 2.210 9022 0.54 0.12 626 8396 95 2.130 9179 0.53 0.12 658 8520 100 2.060 9344 0.53 0.12 691 8653 105 2.000 9526 0.53 0.11 723 8802 110 1.940 9680 0.53 0.11 756 8924 115 1.890 9859 0.53 0.11 788 9071 120 1.840 10015 0.53 0.11 820 9195 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, CO 1585-001 Growth Leasing Project Number : Project Name : A = Tc = Project: Date: 4968.79 0.21 ac-ft 4970.5 0.00 ac-ft 4973.5 4973.44 N/A N/A Maximum Elevation Minimum Elevation cu. ft. acre ft cu. ft. acre ft 4970.6 N/A 32.2 0 0.0 0.00 0.0 0.00 4970.8 4970.6 305.3 0.2 33.8 0.00 33.8 0.00 4971.0 4970.8 720.4 0.2 102.6 0.00 136.3 0.00 4971.2 4971.0 1,027.5 0.2 174.8 0.00 311.1 0.01 4971.4 4971.2 1,645.6 0.2 267.3 0.01 578.4 0.01 4971.6 4971.4 2,332.5 0.2 397.8 0.01 976.2 0.02 4971.8 4971.6 2,723.2 0.2 505.6 0.01 1,481.8 0.03 4972.0 4971.8 3,140.2 0.2 586.3 0.01 2,068.1 0.05 4972.2 4972.0 3,585.3 0.2 672.6 0.02 2,740.7 0.06 4972.4 4972.2 4,060.5 0.2 764.6 0.02 3,505.3 0.08 4972.6 4972.4 4,567.5 0.2 862.8 0.02 4,368.1 0.10 4972.8 4972.6 5,107.7 0.2 967.5 0.02 5,335.6 0.12 4973.0 4972.8 5,684.5 0.2 1,079.2 0.02 6,414.8 0.15 4973.2 4973.0 6,301.4 0.2 1,198.6 0.03 7,613.4 0.17 4973.4 4973.2 6,947.0 0.2 1,324.8 0.03 8,938.2 0.21 4973.5 4973.4 7,283.8 0.1 704.4 0.02 9,642.6 0.22 Detention Pond Stage Storage Curve Water Quality Volume: Outlet Elevation: Grate Elevation: Crest of Pond Elev.: Water Quality Elev.: Volume at Grate: Contour Contour Surface Area (ft 2 ) Depth Incremental Volume Cummalitive Volume Pond Stage Storage Curve 1585-001 Fort Collins, Colorado D. Weber 1 Elev at Design Volume: Growth Leasing Colorado 3/14/2019 Pond Outlet and Volume Data Design Volume: Project Number: Project Location: Calculations By: Pond No.: 3/27/2019 1:31 PM \\BRONCOS\Engineers\Projects\1585-001\Drainage\Detention\ 1585-001_Stage-Storage.xlsx\Pond Project Title Date: Project Number Calcs By: Client Pond Designation Q = 0.22 cfs C = 0.65 Q = Release Rate (cfs) Eh = 4973.44 ft C = Discharge Coefficients (unitless) Ei = 4968.79 ft Aa = Area Allowed of Opening (ft2) Ec = 4968.87 ft Circular g = Gravity (32.2 ft/s 2 ) Ec = 4969.02 ft Rectangular Eh = High Water Surface Elevation (ft) Ei = Elevation of Outlet Invert (ft) 0.019566929 ft2 Ec = Elevation of Outlet Centroid (ft) 2.817638 in 2 Orifice Size (in.) 1.9 in Area (in2) 2.82 sq-in Q (cfs) 0.22 cfs Orifice Height (in.) 5.64 in Orifice Width (in.) 0.50 in Above Outlet Stage Dicharge (cfs) Area (in2) 2.82 sq-in +2' 4970.80 0.14 Q 0.21 cfs +3' 4971.80 0.18 +4' 4972.80 0.20 +4.7' 4973.50 0.22 1 Growth Leasing Colorado March 14, 2019 1585-001 D. Weber Growth Leasing Aa = Circular Orifice 100-Year Orifice Rectangular Orifice 100-Year Orifice Stormwater Facility Name: Facility Location & Jurisdiction: User (Input) Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope = 0.017 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs] Watershed Length-to-Width Ratio = 3.70 L:W 0.00 0 0.00 0.00 Watershed Area = 1.08 acres 2.00 305 2.00 0.14 Watershed Imperviousness = 44.0% percent 3.00 2,723 3.00 0.18 Percentage Hydrologic Soil Group A = 0.0% percent 4.00 5,108 4.00 0.20 Percentage Hydrologic Soil Group B = 0.0% percent 4.70 7,284 4.70 0.22 Percentage Hydrologic Soil Groups C/D = 100.0% percent User Input: Detention Basin Characteristics WQCV Design Drain Time = 40.00 hours After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period = WQCV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year Two-Hour Rainfall Depth = 0.53 0.98 1.36 1.71 2.31 2.91 3.67 in Calculated Runoff Volume = 0.017 0.036 0.066 0.094 0.147 0.196 0.264 acre-ft OPTIONAL Override Runoff Volume = acre-ft Inflow Hydrograph Volume = 0.016 0.036 0.065 0.093 0.147 0.196 0.264 acre-ft Time to Drain 97% of Inflow Volume = 2 3 5 7 10 13 16 hours Time to Drain 99% of Inflow Volume = 2 4 5 7 10 13 17 hours Maximum Ponding Depth = 1.91 2.57 3.04 3.37 3.88 4.25 4.67 ft Maximum Ponded Area = 0.007 0.038 0.064 0.083 0.110 0.135 0.165 acres Maximum Volume Stored = 0.006 0.020 0.044 0.068 0.117 0.162 0.226 acre-ft Stormwater Detention and Infiltration Design Data Sheet Growth Leasing Colorado City of Fort Collins, Fort Collins, CO Workbook Protected Worksheet Protected 1585-001_State Drain Time.xlsm, Design Data 3/28/2019, 2:14 PM Doing_Clear_Formatting Yes = CountA= 1 0 1 2 3 #N/A #N/A 0 1 2 3 #N/A #N/A Check Data Set 1 Check Data Set 1 Stormwater Detention and Infiltration Design Data Sheet Area Discharge 0 1 2 3 4 5 6 0.1 1 10 FLOW [cfs] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 0.1 1 10 100 PONDING DEPTH [ft] DRAIN TIME [hr] 100YR 50YR 25YR 10YR 5YR 2YR WQCV 1585-001_State Drain Time.xlsm, Design Data 3/28/2019, 2:14 PM APPENDIX B.2 STORM SEWERS Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Mar 28 2019 Storm 2 Invert Elev Dn (ft) = 4971.50 Pipe Length (ft) = 26.00 Slope (%) = 1.00 Invert Elev Up (ft) = 4971.76 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 4973.50 Top Width (ft) = 5.00 Crest Width (ft) = 25.00 Calculations Qmin (cfs) = 3.50 Qmax (cfs) = 3.50 Tailwater Elev (ft) = Crown Highlighted Qtotal (cfs) = 3.50 Qpipe (cfs) = 3.50 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 1.98 Veloc Up (ft/s) = 4.23 HGL Dn (ft) = 4973.00 HGL Up (ft) = 4972.47 Hw Elev (ft) = 4972.76 Hw/D (ft) = 0.67 Flow Regime = Inlet Control APPENDIX B.3 INLETS AND WEIRS Area Inlet Performance Curve: Growth Leasing Colorado - Inlet Governing Equations: At low flow depths, the inlet will act like a weir governed by the following equation: * where P = 2(L + W) * where H corresponds to the depth of water above the flowline At higher flow depths, the inlet will act like an orifice governed by the following equation: * where A equals the open area of the inlet grate * where H corresponds to the depth of water above the centroid of the cross-sectional area (A) The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown. However, what is known, is that the stage-discharge curves of the weir equation and the orifice equation will cross at a certain flow depth. The two curves can be found below: If H > 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir. Input Parameters: Type of Grate: Dome Grate Diameter (in) 24 Flowline Elevation (ft): 4972.50 Depth Needed Q10 (cfs): 0.00 Q100 (cfs): 4.00 0.63 Depth Interval (ft) 0.1 Open Area of Grate (in 2 ): 270.64 Allowable Capacity: 50% Depth vs. Flow: Depth Above Inlet (ft) Elevation (ft) Shallow Weir Flow (cfs) Orifice Flow (cfs) Actual Flow (cfs) 0.00 4972.50 0.00 0.00 0.00 0.10 4972.60 0.30 1.60 0.30 0.20 4972.70 0.84 2.26 0.84 0.30 4972.80 1.55 2.77 1.55 0.40 4972.90 2.38 3.19 2.38 0.50 4973.00 3.33 3.57 3.33 0.60 4973.10 4.38 3.91 3.91 0.70 4973.20 5.52 4.23 4.23 0.80 4973.30 6.74 4.52 4.52 0.90 4973.40 8.05 4.79 4.79 1.00 4973.50 9.42 5.05 5.05 <-Q100 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Mar 28 2019 Curb Cut Rectangular Weir Crest = Sharp Bottom Length (ft) = 6.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 3.50 Highlighted Depth (ft) = 0.31 Q (cfs) = 3.500 Area (sqft) = 1.88 Velocity (ft/s) = 1.86 Top Width (ft) = 6.00 0 1 2 3 4 5 6 7 8 Depth (ft) Curb Cut Depth (ft) -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft) Weir W.S. Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Mar 28 2019 Emergency Spillway Rectangular Weir Crest = Broad Bottom Length (ft) = 67.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 6.36 Highlighted Depth (ft) = 0.11 Q (cfs) = 6.360 Area (sqft) = 7.37 Velocity (ft/s) = 0.86 Top Width (ft) = 67.00 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 Depth (ft) Emergency Spillway Depth (ft) -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft) Weir W.S. APPENDIX C EROSION CONTROL REPORT Growth Leasing Colorado Preliminary Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) is included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX D LID EXHIBIT UD VAULT ELEC E VAULT F.O. S C S OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU ST ST D S DS LID BASIN 1 TOTAL AREA: 22,208 SF TOTAL IMPERVIOUS AREA: 15,008 SF LID TREATMENT: RAIN GARDEN LID BASIN 2 TOTAL AREA: 25,007 SF TOTAL IMPERVIOUS AREA: 5,607 SF LID TREATMENT: NONE RAIN GARDEN 1 FIGURE 1 LID TREATMENT CALCULATIONS FORT COLLINS, CO GROWTH LEASING COLORADO ENGINEER ING N O R T H E RN 03.14.19 \\BRONCOS\ENGINEERS\PROJECTS\1585-001\DWG\DRNG\1585-001_LID.DWG NORTH ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 LID TREATMENT SUMMARY RAIN GARDEN 1 Total Volume Required (cf) 392 Total Volume Provided (cf) 533 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 68.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.680 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.21 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 22,088 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 392 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 300 sq ft D) Actual Flat Surface Area AActual = 402 sq ft E) Area at Design Depth (Top Surface Area) ATop = 664 sq ft F) Rain Garden Total Volume VT= 533 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) D. Weber Northern Engineering March 14, 2019 Growth Leasing Colorado Rain Garden 1 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 1585-001_Rain Garden.xlsm, RG 3/27/2019, 2:40 PM APPENDIX E REFERENCES Hydrologic Soil Group—Larimer County Area, Colorado (Growth Leasing) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/4/2019 Page 1 of 4 4494780 4494790 4494800 4494810 4494820 4494830 4494840 4494780 4494790 4494800 4494810 4494820 4494830 4494840 493590 493600 493610 493620 493630 493640 493650 493660 493670 493680 493690 493590 493600 493610 493620 493630 493640 493650 493660 493670 493680 493690 40° 36' 15'' N 105° 4' 33'' W 40° 36' 15'' N 105° 4' 28'' W 40° 36' 13'' N 105° 4' 33'' W 40° 36' 13'' N 105° 4' 28'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 25 50 100 150 Feet 0 5 10 20 30 Meters Map Scale: 1:517 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 73 Nunn clay loam, 0 to 1 percent slopes C 1.1 100.0% Totals for Area of Interest 1.1 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Hydrologic Soil Group—Larimer County Area, Colorado Growth Leasing Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/4/2019 Page 3 of 4 Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Growth Leasing Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/4/2019 Page 4 of 4 #* #* #* #* #* #* S COLLEGE AVE E MULBERRY ST E VINE DR MOUNTAIN VISTA DR GIDDINGS RD RICHARDS LAKE RD TERRY LAKE RD ¦¨§25 LEMAY AVE Terry Lake PLoonngd LindLeankmeeier Lari m er a nd Weld C anal L ake Ca n a l Cac h e L a Po u dre R e s . I n l e t Coy D itc h Ca c h e La P o MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT DS DS VAULT ELEC E VAULT F.O. S C S OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU X ST ST ST ST H Y D 0.46 ac 1A 0.05 ac 1B 0.15 ac 1C 0.42 ac 1D UD RED CEDAR CIRCLE ALLEY EVERGREEN PARK REPLAT 1, LOT 6, BLOCK 4 OWNER: DENNIS SMILIE EVERGREEN PARK REPLAT 1, LOT 5, BLOCK 4 OWNER: JERALD RUSSELL REPLAT (NO. 1) OF EVERGREEN PARK TRACT C EVERGREEN PARK REPLAT LOT 18, BLOCK 3 OWNER: GILLETT REVOCABLE LIVING EVERGREEN PARK 5TH FILING LOT 2 OWNER: PWS PROPERTIES, LLC RAIN GARDEN 1 DETENTION POND 1 PARCEL #9701200002 OWNER: GLOBOK LLC EVERGREEN PARK REPLAT 1, LOT 7, BLOCK 4 OWNER: DEBRA & RANDOLPH MILAN Sheet GROWTH LEASING COLORADO These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 16 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 DR1 DRAINAGE EXHIBIT 16 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE "FINAL DRAINAGE AND EROSION CONTROL REPORT FOR GROWTH LEASING COLORADO" DATED APRIL 2, 2019 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION FLOW ARROW BASIN DESIGNATION BASIN AREA (AC) RUNOFF SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) 1A 1A 0.46 0.67 0.67 0.84 8.6 8.6 6.7 0.73 1.25 3.51 1B 1B 0.05 0.95 0.95 1.00 5.0 5.0 5.0 0.14 0.23 0.50 1C 1C 0.15 0.95 0.95 1.00 5.0 5.0 5.0 0.41 0.71 1.52 1D 1D 0.42 0.25 0.25 0.31 17.1 17.1 16.1 0.18 0.32 0.83 u d r e R i ve r Richard's Lake D r y C r e e k C o o p e r S l o u gh Arth u r C a nal JAX No. 8 Outlet SoKoinpgers Greenbriar RBarubsbhit Eastridge Trailhead HIororsne Airport CLaankael MHaipllle RiLcahkaerds CNoomrtmheuansitty Water Quality Dry Master Conceptual Creek Plan Alternatives DC3 Improvements Channel Proposed ● Buyout Property Adriel Hills and Pond place Water Quality Pond Lindenmeier ●Lake Water Quality Treatment provided Lindenmeier in Existing Lake Pheasant ●Pond Retrofit Existing Ridge Pond to accommodate Volume Water Quality Terry ● Retrofit Lake Existing Road Pond Pond to accommodate Volume Water Quality Spalding ●Pond Retrofit Lane Existing Pond to accommodate Volume Water Quality NCDID Quality Regional Pond Water NECCO Quality Pond Regional Water 0 500 1,000 2,000 [ Feet NAIP Image - 2009 Proposed BMP Basin Type Dry Creek Basin Boundary Flood Control Only Water Quality Only Flood Control and Water Quality Proposed Improvements None Proposed Proposed WaterConceptual Quality Alternatives Undeveloped Area Water Stream - Canal #* Proposed Water Quality Pond Natural Area Parks Existing Proposed of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 13, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Sep 20, 2015—Oct 21, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Growth Leasing) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/4/2019 Page 2 of 4 Total Impervious Area Treated (sf) 15,008 Proposed On-site Impervious Area (sf) 20,615 75% Required Minimum Area to be Treated by LID Measures (sf) 15,461 Proposed On-site Treated Area (sf) 15,008 Percent Treated by LID Measures 73% Discharge (cfs) Stage (ft) Stage - Discharge Curves Weir Flow Orifice Flow Q = 3 . 0 P H 1 . 5 Q = 0 . 67 A ( 2 gH ) 0 . 5 Project Location : Design Point C = Design Storm 3/27/2019 1:33 PM 1585-001_FAA Detention.xls POND-1_ModFAAVol Northern Engineering Services Tc (min) 10-yr Tc (min) 100-yr Tc (min) 1A 1A No 0.67 0.67 0.84 60 2.2 4.7 4.7 2.9 290 0.5 1.41 3.4 36 1.0 1.50 0.4 8.6 8.6 6.7 1B 1B No 0.95 0.95 1.00 52 15.0 0.8 0.8 0.5 0 0.0 0.00 N/A 0 0.0 0.00 N/A 5.0 5.0 5.0 1C 1C No 0.95 0.95 1.00 52 5.0 1.2 1.2 0.8 0 0.0 0.00 N/A 0 0.0 0.00 N/A 5.0 5.0 5.0 1D 1D No 0.25 0.25 0.31 125 2.0 14.1 14.1 13.1 0 0.0 0.00 N/A 190 0.5 1.06 3.0 17.1 17.1 16.1 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow D. Weber March 13, 2019 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti = − \\BRONCOS\Engineers\Projects\1585-001\Drainage\Hydrology\1585-001_Rational.xlsx\Tc-2-yr_&_100-yr Total 47,214.83 1.08 0.21 0.07 0.20 0.00 0.00 0.60 0.56 0.56 0.70 44% Rain Garden 22,207.50 0.51 0.21 0.07 0.05 0.00 0.00 1.02 1.12 1.12 1.00 68% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 March 13, 2019 \\BRONCOS\Engineers\Projects\1585-001\Drainage\Hydrology\1585-001_Rational.xlsx\C-Values 3. Rain Garden 1 is used as the Low Impact Development (LID) measure for basins 1A and 1B. This accounts for 73% of the on-site impervious area. Please see the Appendix for detailed calculations. C. Specific Details 1. Storm Sewer were sized for the 100-yr storm utilized the program Hydraflow for AutoCAD extension.